SlideShare una empresa de Scribd logo
1 de 266
Descargar para leer sin conexión
受污染地块可持续性再开发研讨会
Sustainable Redevelopment of
 Contaminated Land Seminar

             上海建国宾馆
        Shanghai, Jianguo Hotel
             2009年6月23日 星期二
                June 23, 2009
Table Of Content
•   Agenda and Venue

•   Summary Survey and Panel Discussion
•   Slides of the presentations

•   White Paper on Sustainable Remediation providing
    the latest insight on Sustainable Remediation
    (published 30 June 2009)

•   For info on event:
    - johnny.browaeys@ch2m.com (+86 1376 1894 720)
    - Lie.Ma@ch2m.com (+86 1370 1742 423)
    - speakers contact details at the first page of respective presentations
Sustainable Redevelopment of Contaminated Site Seminar
 B

            受污染地块可持续性再开发研讨会


                                                             About CH2M HILL
 Jiuzhou Conference Room D
                                                             Headquartered in Denver, Colo., employee-owned
 4 Floor, Jianguo Hotel Shanghai
                                                             CH2M HILL is a global leader in full service consulting,
 439 Cao Xi Bei Road,
                                                             construction and operations for government, civil, industrial
 Shanghai China
                                                             and energy clients.        CH2M HILL has over 25,000
 Tuesday 23rd June, 2009
                                                             employees and USD 5.8 billion in revenue in 2008. The
                                                             firms’s work is concentrated in the areas of environment,
 会议地点:上海市建国宾馆 4 楼九州厅 D
                                                             water, energy, transportation, nuclar and industrial facilties.
            上海市漕溪北路 439 号建国宾馆 4 楼南丹路口
                                                             CH2M HILL has long been recognised as a most admired
 会议时间:二〇〇九年六月二十三日 (星期二)
                                                             company and leading employer, including being named by
 主办单位:西图中国公司
                                                             Fortune as one of the 100 Best Companies to Work For in
                                                             the US and one of America’s Most Admired Companies
 Subjects of the Seminar:
                                                             (2008).
     •   Updating remediation regulations and technologies
                                                             CH2M HILL is recongised as the largest environmental firm
     •   Soil remediation in Shanghai
                                                             in the US for consective three years by Engineering-News
     •   Best practice of property remediation and
                                                             Record (ENR).
         sustainable approach in industry
                                                             As the first international company operating in China,
     •   Case studies of successful revitalization of
                                                             CH2M HILL obtained Environmental Impact Assessment
         contaminated properties
                                                             License from Chinese government in 2001.

 研讨会的主题:
     •   地块修复技术和法规的最新发展
     •   当前上海地区的土壤修复的状况                                      关于西图集团
     •   土壤修复可持续方法在企业中的实践和管理模式                               西图集团总部位于美国科罗拉多州的丹佛是一家
     •   受污染地块重新开发的真实成功案例                                    全球领先的项目咨询、设计、施工和运营公司。
                                                             西图集团在全球拥有约 25,000 名员工, 2008 年营
 Eminent speakers from:                                      业额约为 58 亿美元,是美国财富 500 强企业。西
 • Shanghai Environmental Protection Bureau                  图集团侧重的行业领域包括环境、水、能源、交
 • Shanghai Environmental Science and Research Institute     通、核能和工业设施。
 • CH2M HILL
 • Honeywell                                                 西图集团长期被认为是最受尊敬的公司和雇主。
 • Squire, Sanders & Dempsey L.L.P.                          集团得到的荣誉包括被财富杂志评为 2008 年美国
                                                             最受尊敬的公司和最佳 100 家雇主之一。
 主要发言人将来自于:
 • 上海市环境保护局                                                  西图集团已经连续三年被美国权威的工程新闻杂
 • 上海市环境科学研究院                                                志(Engineering -News-Record)评为美国最大的环
 • 西图公司                                                      境公司。西图中国公司在 2001 年成为第一家获得
 • 霍尼维尔公司                                                    中国政府颁发的环境影响评价资质的外资咨询公
 • 美国翰宇律师事务所                                                 司。
Seminar Agenda 日程安排
                            Tuesday 23rd June, 2009 2009年6月23日(星期二)

13:00 Registration                                     13:00 签到

13:30 Kick Off Speech: Mr. Gene Lupia                        开幕致词:
                                                       13:30 开幕致词
       President, Environmental Services Business            Gene Lupia 先生
       Group, CH2M HILL                                      环境服务集团总裁
                                                                    集团总裁,
                                                             环境服务集团总裁 西图公司

13:45 Words from Shanghai EPB                          13:45 上海市环境保护局领导致词
       Mr. Hailing Luo                                       罗海林先生
                                                             罗海林先生
       Director of Aquatic Environment and Ecology
                                                             水环境与自然生态处处长
       Department, Shanghai EPB
                                                             上海市环境保护局

                                                             第一部分:
                                                       14:00 第一部分 如何运用先进的地块分析手段及修复
14:00 Session One: Streamlined Site Characterization
      and Risk-based Remediation to Facilitate               技术来推动受污染地块的复原和重新开发
      Expedited Revitalization and Redevelopment of          Terry Feng 博士
      Contaminated Properties                                首席技术专家
      Dr. Terry Feng                                         西图公司
      Principal Technologist, CH2M HILL

14:30 Session Two: Remediation and Re-development in   14:30 第二部分: 上海地区的土壤修复和开发
                                                               部分 上海地区的土壤修复和开发
       Shanghai and Case Studies                             罗启仕博士
                                                             罗启仕博士
       Dr. Qishi Luo                                         土壤修复所所长
       Remediation Manager, Shanghai Acadmey of              上海市环境科学研究院
       Environmental Science

15:00 Tea Break                                        15:00 茶歇
15:30 Session Three: The Sustainable Approach to
                                                             第三部分:
                                                       15:30 第三部分 环境修复的可持续方法
      Environmental Remediation
                                                             吴涛先生
      Mr. Tao Wu
      Manager of Global Remediation and Evaluation,          全球场地修复和评价经理
      Honeywell                                              霍尼维尔公司

16:00 Session Four: Review of Contaminated Land              第四部分:
                                                       16:00 第四部分 中国的污染场地的环境责任
      Environmental Liabilities in China                     李康熙先生
                                                             李康熙先生
      Mr. Charles R. McElwee, II                             美国翰宇律师事务所
      Squire, Sanders & Dempsey L.L.P.

16:15 Open Discussion, Challenges and Practices of     16:15 第五部分: 讨论, 跨国公司在场地污染和修复问
                                                               部分 讨论,
      MNCs in China on site contamination and                题上面对的挑战和实践
      remediation                                            庄尼先生
                                                             庄尼先生
      Moderator: Mr. Johnny Browaeys                         环境业务总监,
                                                             环境业务总监,西图公司
      Operations Director of Environmental Services
      CH2M HILL

16:45 Adjourn                                          16:45 休会
Survey and Panel Discussion

                        CH2M HILL
          西图建筑工程(上海)
          西图建筑工程(上海)有限公司
                       Johnny Browaeys
             johnny.browaeys@ch2m.com
Approach
                    •   Survey based on feedback from 55 participants
                        (50MNC, 5 institutes)
                    •   Enquiring for challenges and needs for stakeholders
                        considering remediation in China
                    •   Interactive discussion between attendees and panel:
                           Legal Advisor Squire, Sanders & Dempsey L.L.P.
                           Shanghai Academy of Environmental Sciences (SAES)
                           Industry: Honeywell
                           Remediation Engineer: CH2M HILL
E112004002BDS




                2
Survey: CHALLENGES (scale 1-10)
                    •   Managing environmental liabilities for soil and
                        groundwater pollution during transactions – 4.7
                    •   Unclear regulatory framework – eg. when is
                        remediation required, which clean up objectives? – 4.6
                    •   Lack of consistency between different regions – 4.5
                    •   Quality of consultants – 4.3
                    •   Quality of labs – 4.2
                    •   Consistency between National and Local policies – 4.1
                    •   Lack of companies in China experienced with remedial
                        engineering – 4.0
E112004002BDS




                3
Survey: NEEDS (scale 1-10)
                    •   Find a way to solve the pollution problem without
                        interfering with production – 5.3
                    •   Control of costs, especially now during the financial
                        crisis – 4.8
                    •   Better understanding of what are the real risks related
                        to soil and groundwater – 4.6
                    •   More knowledge of the regulations – 4.4
                    •   More knowledge on understanding the business risks
                        related with soil and groundwater pollution – 4.3
                    •   Better understanding of your corporate strategy on soil
                        and groundwater liabilities – 3.4
E112004002BDS




                4
Panel – strategies for MNC
                    •   Remediation in China: waking sleeping dog or
                        managing future (and actual) liability?
                    •   Communication strategy for dealing with local
                        authorities that have different agenda or lack
                        experience with soil and groundwater pollution
                    •   Managing “2 dreams in one bed” (Joint-Ventures)
                    •   Importance of Asset Management Strategy
                    •   Different drivers behind implementation of grey
                        regulatory framework (eg. closure EIA’s / clean up)
                    •   Rising awareness and managing expectation
                    •   Clean up triggers and “Stay Out” situations
E112004002BDS




                5
Panel – remediation technologies
                    •   Commercially available solutions versus locally design
                        and build ?
                    •   Remediation “Engineering” versus “Solutions from the
                        shelf”
                    •   Reducing Capital Investment and managing O&M costs
                    •   Optimizing remediation budget in the financial crisis
                    •   Leveraging facility upgrades (remediate and build)
                    •   Engineer solutions using excess capacity existing
                        facility utilities (steam etc.)
E112004002BDS




                6
Panel – government and policy
                    •   New soil regulation “next year” (since the last 5 years)
                    •   Unclear reporting level to submit Remedial Action Plan
                    •   Link with EIA regulations
                    •   Independency
                    •   MEP vs Superfund
                    •   MEP vs RBCA
                    •   What changed from SEPA to MEP?
                    •   Local government “developing” brown fields
                    •   Value of brown fields in cities – forced relocations
                    •   Role of project developers and MNC for cleaning up
                        China?
E112004002BDS




                7
Thank you!
Sustainable Redevelopment of Contaminated Land Seminar
June 23, 2009, Shanghai, China



     Streamlined Site Characterization and Risk-
      based Remediation to Facilitate Expedited
        Revitalization and Redevelopment of
              Contaminated Properties

                                     June 23, 2009


                           Terry Feng, Ph.D., P.E.
                              Terry.Feng@ch2m.com
Presentation Outline

                Introduction –
                  Drivers, trends, and tools for revitalization and/or
                  redevelopment of contaminated properties


                Examples
                  Highlight of October 2008 U.S. EPA Document
                  Revitalization of a closed chemical plant in Southern
                  California




June 23, 2009               Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   2
Drivers / Motivations
                Why do we care about contaminated properties? We care
                because it is an intuitively right thing to do. More
                specifically, it is:
                  good for the economy
                  necessary to ensure protection of human health and environment
                  added value for property owners – enhanced property value and
                  reduced liability
                  a part of many deep-pocket corporations’ asset management / property
                  divestiture program
                  a demonstration of great Corporation Citizenship
                  a contractual obligation for sellers or buyers through real estate
                  transactions
                  required by regulation


June 23, 2009                Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   3
It also fits nicely with the three parts
   sustainability model…




                                                                                        al
                                                                         za ciet lob
                                                                                      G
                                                                                   al
                                                                                 l
                                                                               na
                                                                            So
                                                                           tio
                                                                   on ni
                                                                 rs ga
                                                                     al
                                                               Pe Or




June 23, 2009   Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   4
Trends (Observed in U.S.)

                Government leads the way
                More corporations are doing it
                More investors and developers are involved
                More owners interested
                More reputable and experienced contractors
                involved




June 23, 2009             Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   5
Tools and Methodologies
                Brownfield regulations (U.S., Europe, Canada….)
                  Incentives from federal, state and local governments
                  Risk sharing through contractual and legal mechanisms (liability
                  transfer, insurance, price guarantee)
                  Risk management through land use covenant (deed restriction
                  and institutional controls)
                  Flexible and streamlined regulatory processes
                  Support for application of innovative site characterization and
                  remediation technologies
                     Triad, DPT, MIP
                     ERD, ISCO, SVE/MPE, GCW/ART, ERH/ISTD, PRB, Phytoremediation




June 23, 2009                 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   6
Presentation Outline

                Introduction –
                  Drivers, trends, and tools for revitalization and/or
                  redevelopment of contaminated properties


                Examples
                  Highlight of October 2008 U.S. EPA Document
                  Revitalization of a closed chemical plant in Southern
                  California




June 23, 2009               Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   7
October 2008 U.S. EPA Document




June 23, 2009   Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   8
U.S. EPA: 10 Contributors for Successful
  Revitalization of Mothballed Properties

         1.     Reuse First (owners take initiative)
         2.     Recruit Redevelopers
         3.     Local Leadership
         4.     Craft Creative Corporate Strategies
         5.     Take Advantage of State Tools & Resources
         6.     Coordinate Cleanups
         7.     Leverage Federal Funding & Support
         8.     Assist the Mom & Pops
         9.     Reduce Risks
         10.    Create Comfort
June 23, 2009           Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   9
U.S. EPA: 11 Project Profiles of Successful
   Mothballed Property Revitalization
      1.        Car Company Revitalizes Old Manufacturing Sites
      2.        Ohio Development Team Overcomes Barriers to Reuse of Mothballed Waterfront Property
      3.        Manufacturer Takes a Prevention Approach to Mothballed Properties
      4.        Chemical Company Ranks Sites and Reaches out to Regulators for Reuse of
                Underutilized Properties
      5.        Pennsylvania Buyer-Seller Agreement Facilitates Reuse of Old Manufacturing Site
      6.        Vacant Site to Become Rochester Sports Complex
      7.        Milwaukee Master Plan Renews Old Industrial Valley
      8.        Environmental Extension Center Helps Seattle Small Businesses on Contaminated Properties
      9.        West Virginia Small Cities Create A Commerce Corridor
      10.       Colorado Brownfields Foundation Helps Mom & Pops with Environmental Stewardship
                Program
      11.       Innovative Building Reuse Program Spurs Revitalization of North Carolina Small Towns


June 23, 2009                     Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   10
Presentation Outline

                Introduction –
                  Drivers, trends, and tools for revitalization and/or
                  redevelopment of contaminated properties


                Examples
                  Highlight of October 2008 U.S. EPA Document
                  Revitalization of a closed chemical plant in Southern
                  California, U.S.A.




June 23, 2009               Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   11
Site Location and Surroundings

       Prime South Bay
       location – only a few
       miles from the
       Pacific Ocean and
       LAX
       Surrounded by
       industrial /
       commercial
       properties




June 23, 2009          Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   12
Site History
                The 56-acre chemical
                plant was initially
                developed in 1920s and
                ceased operation in 2003
                Main industrial activities
                included:
                  Sulfuric acid production
                  Pesticides
                  packaging/distribution
                  Phthalic anhydride
                  production
                  Solvents packaging and
                  distribution
                  Refrigerants production

June 23, 2009                Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   13
1991 Aerial Photo of the
    Chemical Plant




June 23, 2009   Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   14
Feb. 2003 Aerial Photo – Right before Plant
Closure and Facility Demolition




June 23, 2009    Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   15
2004 - Demolition Completed




June 23, 2009   Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   16
Site Revitalization Strategy
       City re-zoned the parcel from
       Industrial to Commercial and
       approved the plan to develop
       the land into an nice retail
       center
       Prime location helps -
       developer agreed to pay
       $1,000,000 USD per acre for
       redevelopment while the plant
       owner carries all environmental
       liabilities including achieving
       “Regulatory Closure” on
                      Closure
       shallow soil and “Approved
       RAP” for deep soil before the
       RAP
       buyer writes the check

June 23, 2009            Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   17
Phased Redevelopment Plan
       Phase I:
                43 acres including northern
                parcels and southwest corner lot
                parcel
                Retail center including Whole
                Foods, Best Buy, Barnes & Noble,
                etc. as well as restaurants
                Retail center open for business
                by 2006 holiday season
       Phase II:
                13 acres of UND-4&5 parcels
                Industrial/commercial
                development at a later time along
                with the parcels in the east and
                west
       This presentation focuses on
       Phase I project
June 23, 2009                    Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   18
Aggressive Schedule Milestones

                Feb. 2003 - ceased facility operation and began facility demolition
                and site characterization
                Early 2004 - completed demolition and site characterization
                Late 2004 – completed remediation of 23 shallow soil hot spot areas
                Middle 2005 – received regulatory no-further-action (NFA) letter
                (a.k.a., “Regulatory Closure”) for shallow soil on Phase I parcels
                Late 2005 – regulatory approval of sitewide remedial action plan
                (RAP) for deep soil vapor plume (a.k.a., “Approved RAP”)
                Early 2006 – Began redevelopment grading and vertical construction
                Late 2006 – newly constructed retain center opened for business

                Achieving “Regulatory Closure” for shallow soil and “Approved
                RAP” for deep soil vapor plume were two owner’s obligations that
                must be satisfied prior to the real estate closure

June 23, 2009                 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   19
Strategic Planning

                Identify critical success factor – meeting
                schedule milestones
                Focus on critical path work scope:
                  Site characterization
                  Risk assessment
                  Shallow soil remediation

                Find and use innovative solutions
                Strive for dedication, cooperation and teamwork

June 23, 2009              Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   20
Technical Approaches
                The following three technical elements were critical
                contributors to the overall success of the project:
                  Expedited Site Characterization supported by a “dynamic” work
                  plan - the Triad approach
                  Expedited Risk Assessment conducted concurrent with the field
                  investigation; early development of site-specific “risk per unit
                  concentration” values for all site chemicals allowed real time
                  cumulative risk calculations
                  Expedited Shallow Soil Remediation conducted as an interim
                  remedial measure (IRM) led to significant schedule savings




June 23, 2009                Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   21
Expedited Site Characterization
       More than 500 soil borings drilled
       More than 1400 soil samples
       collected
                More than 1400 soil samples
                analyzed for VOCs
                More than 1100 samples analyzed
                for SVOCs, PCBs, pesticides,
                metals & TPH/GROs
       Mobile labs used to expedite field
       screening
       More than 350 soil vapor samples
       collected and analyzed for VOCs
       Water Board RI approval letter
       issued April, 2005




June 23, 2009                    Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   22
RI                                                                            Site-Characterization Report and
   Remedial                                                            Detected                                     Preliminary Screening for Potential
                                  Work Plan and
   Investigation                 Implementation
                                                                       Chemicals                                          Shallow-Soil Hot Spots



                                                                                            Soil Gas;
                                                                                                                                               Johnson & Ettinger
                                                                                            1 mg/m3
                                                                                                                                              Vapor Intrusion Model
                                                                                          (assumption)
   Risk-Assessment Processes
      Risk and Hazard Estimates at
       Unit Concentrations                                            Soil;                              Risk                                 Risk- and Hazard-
                                                                    1 mg/kg                           Assessment                               Estimates
                                                                  (assumption)                        Methodology                         Per Unit Concentration




     Cumulative Risk & Hazard                                                           Estimate of Cumulative                           Risk- and Hazard-                                   Analytical
        (for all chemicals at the area)                                                  Risk and Hazard                                  Estimates                               ×          Results for
                                                                                       At Hot-Spot Locations                         Per Unit Concentration                                  Hot Spots




                                                                                       Is
    Remedial Action Decisions                                                                                                     No        No Further Action
                                                                         Cumulative Risk Estimate >10-5
    IRM Work Plan and Final RAP                                                                                                                  (NFA)
                                                                                       Or
                                                                                  Hazard>1?

                                                                                                    Yes
                                                                                                                                                                              Figure 1
                                                           Develop and Implement IRM and Final RAP ***
                                                        (based on most-stringent, relevant exposure scenario)
                                                                                                                                                                               Risk Management  Honeywell
                                                                                                                                                                                          El Segundo, California
                                                                                                                                                                                      Decision Flow
June 23, 2009                                                                                                                                                                                                      23
                                                   Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.
  *** Potential impact to groundwater from deep soil are addressed in the fate & transport analysis of the final RAP.                                                                       Diagram
                                                                                                                                                                                              PARSONS
Identification of shallow soil hot spots

    46 hot spot areas initially identified                                                      23 hot spot areas retained after site-
       based on available regulatory                                                               specific risk assessment as hot
       screening levels (PRGs, ESLs,                                                               spots for remediation
       CHHSLs, SLs, etc.)




June 23, 2009             Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   24
Expedited Shallow Soil Remediation

                TRIAD approach for IRM using a stepwise
                excavation-confirmation process
                  Step 1 removed impacted soils based on initial
                  estimate
                  Removal action continued until concentrations of all
                  risk drivers were below RBCGs for the hotspot
                More than 20,000 cubic yards of soils were
                removed from the 23 hotspot areas
                Post-IRM risk assessment conducted to ensure
                achieving target risk management goal

June 23, 2009              Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   25
Final Regulatory Approval
                Completion of shallow soil IRM satisfied required shallow soil matrix
                remedial actions
                Agency approval of the IRM Completion Report satisfied the
                requirement for shallow soil closure
                The NFA letter for shallow soil was issued in June 2005 as
                consistent with the redevelopment plan
                A remedial action plan (RAP) was also submitted and approved by
                agency in 2006 which satisfied the remainder requirement for the
                property sale and redevelopment


         *** It may be worthy of noting that deep soil and groundwater cleanup
             is not required prior to site redevelopment



June 23, 2009                  Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   26
Mission Accomplished
                Feb.                                                                                                                        Dec.
                2003                                                                                                                        2007




June 23, 2009          Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   27
Project Progress
                Some aerial photos showing progress of site demolition,
                grading, deep remediation system installation and
                redevelopment construction project

                Some photo shots after redevelopment construction has
                completed and retail center opened for business




June 23, 2009               Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   28
2004 - Post Demolition and Prior to
   Grading Activities




                                                                Piles of crushed
                                                                concrete from
                                                                demolished
                                                                buildings/foundations




June 23, 2009   Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   29
2005 – SVE System Installation Prior to Building
   Construction, SVE Wells and SVE Pipe Laterals




June 23, 2009       Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   30
April 2005 – Retail Store Construction




June 23, 2009     Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   31
Jan. 2007 – Aerial View of Plaza El Segundo




June 23, 2009     Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   32
Nov. 2006 – New Retail Stores Open for
Business




June 23, 2009   Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   33
Nov. 2006 – Retail Stores Open for Business




June 23, 2009     Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   34
Nov. 2006 – Retail Stores Open for Business




June 23, 2009     Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   35
Conclusions

                Strategic planning to identify and focus on
                  critical success factors,
                  critical path scope elements, and
                  innovative solutions
                to address them are critical for the ultimate success of
                the project


                Teamwork from the entire project team including
                the owner, developer and regulatory agencies,
                were crucial factors for the success of the
                project
June 23, 2009               Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   36
Questions?




June 23, 2009   Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited.   37
Site Remediation and
Management in Shanghai

         (罗启仕)
Qishi Luo(罗启仕)
Shanghai Academy of Environmental Sciences
June 23, 2009
Outline
1.   Recent development on site
     management in China
2.   Process management of site
     remediation in Shanghai
3.   Site Remediation by SAES: Case studies
4.   Site Remediation Research in SAES
Recent development on
site management in China
《瞭望》(2009年第9期)
 与土壤污染的较量正在中国广袤的国
 土上拉开大幕。
 土上拉开大幕。
 就世界范围而言,土壤污染尚是一个“
 就世界范围而言,土壤污染尚是一个
 新的问题”,在中国尤其如此。
 新的问题 ,在中国尤其如此。
 如何做到环境保护与经济发展的平衡
 统一,是全世界面临的复杂课题。
 统一,是全世界面临的复杂课题。土
 壤科研人员发现,
 壤科研人员发现,即使是在南极上空
 或喜马拉雅山脉之巅,仍然会有DDT
 或喜马拉雅山脉之巅,仍然会有DDT或
               DDT或
 六六六的残留。
 六六六的残留。
 严酷的现实逼问人类:
 严酷的现实逼问人类:如果失去了清
 洁的空气、水、土壤、安全的食品和
 洁的空气、  土壤、
 平衡的生态空间,
 平衡的生态空间,经济发展还有什么
 意义?
 意义?
 对于人多地少的中国,
 对于人多地少的中国,每一寸安全而
 健康的国土都须加倍爱惜,
 健康的国土都须加倍爱惜,治理土壤
 污染已是刻不容缓,
 污染已是刻不容缓,好在战车已经启
 动。
Current status on soil management in China:
Process management of site
remediation in Shanghai
重视搬迁企业遗留污染场地管理
 场地调查与评估
 场地污染风险评估
 修复方案制定及实施
 修复过程管理
 修复后评估
Site Remediation by SAES: Case
studies
场地调查、风险评估、修复方案制定、工程
监理和工程后评估
RBCA kit、GS+、ArcGIS、BICHLOR、
MODFLOW/MT3D等软件
Royal Haskoning公司:RBCA模型使用
谢菲尔德大学:污染土壤和地下水的风险评
价、修复和管理,模型使用
世博会场地修复和评估
What We did for EXPO Site Remediation

  Developed “Standard of Soil Quality Assessment
  for Exhibition Sites”;
  Recommended demolish guideline;
  Investigated and monitored EXPO sites;
  Developed master plan of soil remediation on
  EXPO site;
  Conducted soil remediation;
  Carried out an after-care program.
在上海世博园区场地土壤修复中创造了四个第一:
在上海世博园区场地土壤修复中创造了四个第一:
 第一次进行了大面积的、以工程为目的的场地污染调查;
 第一次进行了大面积的、以工程为目的的场地污染调查;
 制定了我国第一部用于污染场地质量评价的标准:
 制定了我国第一部用于污染场地质量评价的标准:《展览会
 用地土壤环境质量评价标准(暂行)(HJ350-2007)
 用地土壤环境质量评价标准(暂行)(HJ350-2007)》;
                )(HJ350
 实施了我国最大规模的土壤修复工程;
 实施了我国最大规模的土壤修复工程;
 进行了我国最大规模的一次场地风险评价。
 进行了我国最大规模的一次场地风险评价。
(一)上海世博园区土壤质量的调查
 上海世博园区场地污染调查与监测,
 上海世博园区场地污染调查与监测,贯彻整个世博园区土
 壤修复的全过程:(1 重点企业土壤污染调查,(2
 壤修复的全过程:(1)重点企业土壤污染调查,(2)国
        :(            ,(
 外自建馆的土壤污染调查,
 外自建馆的土壤污染调查,和(3)非重点区域场地污染
 土壤调查。
 土壤调查。
 在现场土壤采样、样品运输保存、样品分析、
 在现场土壤采样、样品运输保存、样品分析、数据整理和
 分析、污染评估等方面积累了丰富经验。
 分析、污染评估等方面积累了丰富经验。
Developed site sampling and monitoring
  methods and demolish guideline
Using GPS
Deep sampling
Geostatistics
Demolish guideline to prevent new
pollution
(二)世博园区土壤质量评价
 制定了我国第一部用于污染场地质量评价的标准:
 制定了我国第一部用于污染场地质量评价的标准:中华人
 民共和国环境保护行业标准--《
 民共和国环境保护行业标准--《展览会用地土壤环境质量
             --
 评价标准(暂行)(HJ350-2007)
 评价标准(暂行)(HJ350-2007)》,并依据该标准对世
        )(HJ350
 博园区土壤质量进行了评价,确定了土壤修复指导限值。
 博园区土壤质量进行了评价,确定了土壤修复指导限值。
Developed Standard of soil quality for exhibition
   sites

                            The State EPA issued
                            “Standard of Soil Quality
                            Assessment for Exhibition
                            Sites” on June 15, 2007,
                            effective on August 1,
                            2007;


                            China has the first criteria
                            of soil quality assessment
                            for SITE.
(三)世博园区土壤土壤修复
 制定了“中国2010年上海世博会园区污染土处置项目管理
     中国2010
 制定了 中国2010年上海世博会园区污染土处置项目管理
 大纲”,分三个阶段对世博园区实施了土壤修复和处置。
 大纲 ,分三个阶段对世博园区实施了土壤修复和处置。
 修复过的场地经第三方监测,土壤各项指标均达到《
 修复过的场地经第三方监测,土壤各项指标均达到《展览
 会用地土壤环境质量评价标准(暂行)(HJ350-2007)
                 )(HJ350
 会用地土壤环境质量评价标准(暂行)(HJ350-2007)》
 的要求,可以作为展览馆用地。
 的要求,可以作为展览馆用地。
 在场地土壤修复、
 在场地土壤修复、工程监理和修复后评估方面积累了丰富
 经验。
 经验。
Dig and dump of high contaiminated soil




  Off site treatment of Cu-Zn con soils
Off site treatment of SVOC con soils
Stabilization and solidification (S/S)
(四)世博园区场地风险评价
对世博会园区ABCDE五个片区面积为4.46
      ABCDE五个片区面积为4.46平方公里
对世博会园区ABCDE五个片区面积为4.46平方公里
区域进行了场地土壤健康风险评估,
区域进行了场地土壤健康风险评估,建立了场地
暴露模型,确定了本土化评估参数。
暴露模型,确定了本土化评估参数。
评估结果表明,
评估结果表明,修复过的世博园区土壤对对参观
人员、管理人员和参展人员没有任何危害风险,
人员、管理人员和参展人员没有任何危害风险,
可以安全使用。
可以安全使用。
本项目地址--
                                                                                                                                本项目地址
                                                                                                                                广兰路地铁站




                                                                                                                        当地
                                                                                                                        当地
                                                                                                                        当地
                                                                                                                         地河
                                                                                                                          河流
                                                                                                                           河流
                                                                                                                           河
                                                                                                                 青桐路
                                                                                         香楠路
                                    当地
                                     地河
                                     地河
                                     地河




                                                        SB-5 MW-16    MW-15              地块8
                                       河流




                                                                                                                           流


                                                                                                           广兰路
                                                                                                           广兰路
                                                                                                           广兰路
                                                                                                           广兰路
                                          MW-13                                                                           河
                                        流
                                        流
                                        流




                                                                                      SB-1
                         SB-6                                                                                           地
  现 有 房                                                         地块5    SB-7
                                                                                               MW-12
                                                                                                                       当
                           SB-9                 DSB-3                             地块6
 MW-1   现         有         路                    面
                                                                      MW-17

                                                                                         MW-9
                                                                                                                 •   场地土壤地下水调查监测
                                                                                                    MW-7
                                MW-14
                                        DSB-2
                                                        SB-10


                                                           路             地块7                                     •   场地污染评估和健康风险评估
                                                                                                                         张江中心
 地块1        地块2            地块3                   地块4    之MW-11
                                                                                                                          小学
                                                       冲
MW-2
                  MW-3
                           DSB-1
                                                     祖 MW-10
                                                  MW-8
                                                                              SB-11
                                                                                                                 •   污染土壤及地下水修复方案
                                SB-4
                                                   SB-3
                                                                                             MW-6
                                                                                                                 •   土壤修复工程(一期)监理
                                                MW-5

                                                                                                                     土壤修复工程(一期)后评估
        MW-4
                                                                                                                 •


                                                                广兰路场地调查、修复和评估
• 场地污染风险评估
                • 场地修复技术方案编制
                • 修复工程监理和后评估




通用南翔灯泡厂场地污染评估
环境突发事件引起的土壤污染应急处置




  浦东槽车硫酸泄露事故

      嘉定化学品倾倒事故
        青泽镇污泥违法倾倒事故
奉贤镇和庄行镇含油污泥违法倾倒事故

        广兰路车站场地污染事故

释放恶臭气体的堆场

       青浦青东农场污染事故处置
Site Remediation Research in
SAES
以稳定固化技术为核心的技术研发和工程应用
 受污染土壤快速阻断与修复技术研究与设备研发(国家863项目)
                       国家863项目
                       国家863项目
 世博园区原工厂旧址受损土壤修复技术与应用(市科委世博科技专项)
                      市科委世博科技专项)

 世博会城市最佳实践区场地土壤维护工程(上海世博局项目)
                   (上海世博局项目)
 青浦区田山庄村建筑垃圾固化利用项目(上海鼓华公司)
                  (上海鼓华公司)
 DOX-底泥固化体固化性能测试及评估(日本贝律泰睦公司)
                   (日本贝律泰睦公司)
 Na3T15对疏浚底泥、尾水和土壤中重金属稳定作用研究(韩国原野化工公司)
                            (韩国原野化工公司)
获得了普适性速凝型固化剂的核心组分
获得了数组高效吸附性固化剂
建立了固化剂研发和性能测试的技术方法
 形态、结构和性能的研究手段
 固化剂性能的测试和表征方法
 稳定固化机理研究也比较深入
TCLP浸出测试
                                                    1800                                                      150
                                                                                                     Cu
                                                                                                     Pb
                                                    1500
                                                                                                     Cd       120
            重金属形态分级测试(BCR提取法)




                                                                                                                    重金属浓度(ug)
                         1200




                                        重金属浓度(ug)
                                                                                                              90
                   碳酸盐结合态   铁锰氧化物结合态          氧化态
                                               900               残渣态
            100%                                                                                              60
                                                     600

            80%                                                                                               30
                                                     300
Zn形态含量百分比




            60%                                         0                                                     0
                                                    5 .2 5        0           2       4      6            8
                                                                              稳定剂添加量 (%)
            40%
                                                    5 .2 0
            20%
                                        浸出液pH值



                                                    5 .1 5
             0%
                   CK   1    2     3    4           5 .1 05           6
                                 底泥样品
                                                    5 .0 5


                                                    5 .0 0
                                                             0            2           4          6                  8
                                                                              稳 定 剂 添 加 量 (% )
扫描电镜分析(SEM)

      傅立叶转换红外光谱(FTIR)分析
                  100
                                                                      50000

X射线衍射(XRD)分析
                                                                                                                           1 高岭石

   80                                                                 40000               2           1%STA                2 石英
                                                                                                                           3 正长石
                                                                                                                           4 钠长石
     50000                                                           30000




                                                                 强度
                    60   2                        1 高岭石
              透射率




                                                      1636
                                                  2 石英 O
     40000                      空白土壤
                                3437
                              v1+v3 H2O
                                                     v2 H2
                                                  3 正长石
                                                             1420 20000
                                                                  2-     776
                    40                            4 钠长石 v3 CO3           石英          2
     30000                                                           10000                    3
                                                                                                             2
强度




                                                                          552                                         2
                                                                                                      2 22                     2
                                                                             1 2-
                                                                        v4 SiO4                   4               2        2        2
     20000          20         空白                           1030         0
                                                                          10      20          30       40 50          60       70           80
                               1%添加量                     v1+v3 SiO4 50000 468
                                                                  2-


                               10%添加量                                      v2 SiO4
                                                                                  2-                  2倍衍射角                1 高岭石
                     2                                                                    2
     10000          0    3
                             3600 2 2 230002   2400 2 1800
                                                2                   40000
                                                                  1200          600               10%STA                   2 石英
                                                                                                                           3 正长石
              1               4              2     2    2
        0                                      波数(cm-1)                                                                    4 钠长石
         10         20       30     40    50    60   70   80          30000
                                                                强度




                                 2倍衍射角
                         不同STA添加量土壤的FTIR光谱
                                      20000

                                                                                      2
                                                                      10000
                                                                                                             2
                                                                                                      2 22            2        2
                                                                                1         3 4                     2        2            2
                                                                          0
                                                                           10       20        30       40    50       60       70           80
                                                                                                      2倍衍射角
配备了稳定固化技术研发的专业设备
土   单
                           壤   轴
                           粉   搅
                           碎   拌
                           机   机



     球磨机
    翻转振荡机
TCLP翻转振荡机
低湿电子干燥柜                标
                       准
                       振
                振      筛
            恒   动      机
            温   台
            干
           燥
   压力试验机 箱
       压滤机          万能液压试验机
启动了土壤稳定固化模块化设备的研发工作
土壤筛分破碎搅拌斗




                            固化剂添加系统
     履带式拖拉机
                                            振
                                            动
                                            压




                            混
              动力源




                             合
                                            实




                              搅
                                                      重力碾压轮




                               拌
土壤筛分破碎过程   螺旋取土构件                           装




                                装
                                 置
                                            置
                                     回填装置

                             边缘切刀
                      开沟机

                               土壤铣刀
    原土                                          回填压实固化土



污染土壤快速固化一体化集成设备设计简图            挖掘沟槽
所开发的稳定固化剂已在世博会城市最佳实践区
场地修复工程中得到成功应用
S/S based Projects conducted by SAES


                             池塘生态重建
            河岸护坡

       尾矿


村镇建筑垃圾                      城市建筑垃圾




                               路面固化
固化水渠
                    海岸护堤
Pavement made by Ore
tailing (2007),Nanjing
Meishan Iron Ore Mine
Construction garbage reused by
Stabilization and solidification (S/S)
Sediments reused by (S/S) in
Haining, Zhejiang Province
S/S based ecological engineering
END

 Just Started,
 Not Perfect,
 Need to Improve a Lot,
 Will be Better.
Thank you for
your attention !
Shanghai Forum for Revitalization of Contaminated Properties
                 Shanghai Forum for Revitalization of Contaminated Properties




                  June 23, 2009



The Sustainable Approach to
Environmental Remediation
Tao Wu
tao.wu@honeywell.com
Honeywell.com




    Sustainability
    • What does this really mean?
    • Idea of “Sustainability” or “Sustainable
      Development” from the UN’s 1987 Brundtland
      Report:
      – Environmental protection will not be sustained unless it is
        coordinated with economic development
      – Our natural resource base is finite, and we must re-think and
        re-engineer development to preserve that resource base for
        ourselves and future generations
      – Communities/stakeholders should be deeply engaged in
        environmental decisions to make the results sustainable




2                                                                Honeywell Proprietary
Honeywell.com




    Honeywell’s Sustainable Opportunities Policy:
     By integrating health, safety and environmental
     considerations into all aspects of our business ...
      – We actively promote and develop opportunities for
        expanding sustainable capacity by increasing fuel efficiency,
        improving security and safety, and reducing emissions of
        harmful pollutants.
      – We identify, control and endeavor to reduce emissions,
        waste and inefficient use of resources and energy.
      – We are open with stakeholders and work within our
        communities to advance laws, regulation and practices that
        safeguard the public …
     These are our commitments to health, safety, and the
     environment, and to creating Sustainable Opportunity
     everywhere we operate.
3                                                               Honeywell Proprietary
Honeywell.com




    Sustainable Development
    • Redevelopment and/or reuse of contaminated
      properties is the optimal way to make an
      environmental remediation (remedy) sustainable.
    • A sustainable remedy has the best opportunity for
      satisfying stakeholders and communities.
    • Sustainable remedies have highest likelihood of
      success.




4                                                     Honeywell Proprietary
Honeywell.com




    Redevelopment and Reuse
    • Why does redevelopment and reuse work?
      – Links environmental protection and economic
        development
      – Preserves finite natural resources
      – Involves affected stakeholders


    • The new frontiers for the sustainability
      – It’s the climate,
      – Brown to green
      – The urban planning approach



5                                                     Honeywell Proprietary
Honeywell.com




    Redevelopment and Reuse
    • Case studies
     – Syracuse, NY
     – Baltimore Inner Harbor, MD
     – Jersey City, NJ




6                                   Honeywell Proprietary
Honeywell.com



     Syracuse, NY
     Renewable Fuels
    Town of
    Town of
      Van
      Van                                                                           Liverpoo
     Buren                                                                          Liverpoo
     Buren                                                                              ll
                              Honeywell Willow




                                                          T
                                                          To
              To edd n of s
              To edd n of s




                                                            ow To ed
               G w lllu


                               Demonstration
               G w u




                                                             wn ow d
                wn es
                 wn es
                 Toami




                                                              n
                  To mil
                  Ca
                   C




                                                                of n o es
                                                                of n o s
                                                                 T ed
                     of
                     of




                                                                  S
                                                                  G


                                                                  Sa ff
                                                                   G
                                                                   w de

                                                                    all
                                                                      iin
                                                                        naa
                                                                          Onondag
                                                                          Onondag
                                                                           a Lake
                                                                           a Lake
                                        Ninemile
                                        Ninemile
                                        Creek
                                        Creek




                                                                                                                            k
                                                                                                                        ree
                                                                                                                      yC
                                                                                                                    Le
                                                                                                e cu s
                                                                                                     s
                                                                                                 e cu
                                                                                                   a
                                                                                                 rra
                                                                                               Sy
                                                                                               Sy
                                                      NYS
                 Shrub                             Fairground
              Willow Farm                               s       West Flume
                                                                                                          Carouse
                                                                                                           l Mall
                                                     LCP
                               Geddes
                               Geddes          Mathews
                               Brook
                               Brook                                  Former                      Metro
                                                 Ave                   Main
                                                                       Plant


7                                                                                                 Honeywell Proprietary
Honeywell.com




    Syracuse, NY
    Renewable Fuels Project Approach




8                                      Honeywell Proprietary
Honeywell.com




    Syracuse, NY
    Renewable Fuels Project Approach




9                                      Honeywell Proprietary
Honeywell.com




     Syracuse, NY
     Renewable Fuels Project Approach




10                                      Honeywell Proprietary
Honeywell.com




     Syracuse, NY
     Renewable Fuels Project Approach




      Walking Trails            Wildlife Viewing Areas     Saltwater Marsh




                       Shrub Willow Stands               Varied Berm Planting


11                                                                    Honeywell Proprietary
Honeywell.com



     Syracuse, NY
     Renewable Fuels Project Approach

     • So, Linking
       – Environmental & economic improvements
       – Preserving & enhancing resources
       – Deep engagement with affected community
       – Climate
       – Brown to Green




12                                                 Honeywell Proprietary
Honeywell.com




     Baltimore Inner Harbor, MD
     Project Location




                                  Site




13                                       Honeywell Proprietary
Honeywell.com




     Baltimore Inner Harbor, MD




14                                Honeywell Proprietary
Honeywell.com




     Baltimore Inner Harbor, MD




15                                Honeywell Proprietary
Honeywell.com




     Baltimore Inner Harbor, MD




16                                Honeywell Proprietary
Honeywell.com




     Baltimore Inner Harbor, MD




17                                Honeywell Proprietary
Honeywell.com




     Baltimore Inner Harbor, MD
     • So, Linking
       – Environmental & economic improvements
       – Preserving & enhancing resources
       – Deep engagement with affected community
       – Brown to Green




18                                                 Honeywell Proprietary
Honeywell.com




     Jersey City, NJ
     Project Location




19                      Honeywell Proprietary
Honeywell.com




     Jersey City, NJ
     100 Acres Along The Hackensack River




20                                          Honeywell Proprietary
Honeywell.com




     Jersey City, NJ




                                      Connected to the rest of City through an
Proposed Layout Showing Green Space   extension of the existing Light Rail




                                        Walkway Along the Hackensack River
21                                                                      Honeywell Proprietary
Honeywell.com




     Jersey City, NJ
     • So, Linking
       – Environmental & economic improvements
       – Preserving & enhancing resources
       – Deep engagement with affected community
       – Brown to Green
       – The urban planning approach




22                                                 Honeywell Proprietary
Honeywell.com




     Sustainability = Success
     • Redevelopment and reuse is what will truly make an
       environmental cleanup sustainable
       – Resource conservation
       – Coordinate Economic/Environmental development
       – Working with impacted communities on clean up and end use
     • Redevelopment and reuse encourage the kind of growth we
       want and need for a sustainable future:
       – Smart growth development that concentrates spaces to live, work, play and
         commute, optimizes energy efficiency, and preserves open space
     • Redevelopment and/or reuse should make the
       sustainability link more explicit by encouraging renewable
       energy, green buildings and brownfield area planning
     • Sustainable remedies key to best lifecycle remedy: if it’s
       sustainable, everyone will have a stake in making it work
       for the long run


23                                                                           Honeywell Proprietary
Review of Contaminated Land
              Environmental Liabilities in China
                中国的污染场地的环境责任

                               Charles R. McElwee, II
                                 cmcelwee@ssd.com
                          Squire, Sanders & Dempsey, LLP
                               美国翰宇律师事务所
                                   Shanghai, China
SQUIRE, SANDERS & DEMPSEY L.L.P.
General Proposition: Polluter pays

      Environmental Protection Law (Article 41):
        A unit that has caused an environmental
        pollution hazard shall have the obligation to
        eliminate it and make compensation to the unit
        or individual that suffered direct losses.




SQUIRE, SANDERS & DEMPSEY L.L.P.
一般提议:由污染者买单
      中华人民共和国环境保护法 (第四十一条):
          造成环境污染危害的,有责任排除危害,并对直接
          受到损害的单位或者个人赔偿损失。

          赔偿责任和赔偿金额的纠纷,可以根据当事人的请
          求,由环境保护行政主管部门或者其他依照法律规
          定行使环境监督管理权的部门处理;当事人对处理
          决定不服的,可以向人民法院起诉。当事人也可以
          直接向人民法院起诉。


SQUIRE, SANDERS & DEMPSEY L.L.P.
On-Site Contamination
  • Very few provisions of Chinese law address
    responsibility for investigation or
    remediation of on-site contamination.
  • Those that do generally only impose
    obligations when the ownership/control or
    use of property changes.


SQUIRE, SANDERS & DEMPSEY L.L.P.
现场污染

  • 中国法律很少有规定涉及现场污染的调
    查或补救责任。
  • 有此规定的法律一般仅在财产所有权/控
    制权或使用权变更时才附加义务。



SQUIRE, SANDERS & DEMPSEY L.L.P.
Regulation on Discarded Hazardous
            Chemicals (effective 2005/10/01)

      Article 14: "In case any entity that undertakes the
      production, storage or use of hazardous chemicals
      changes its line of production, stops production,
      stop business operation or dissolves, it shall . . . in
      light of the relevant state standards and criterions
      on environmental protection, test the soil and
      underground water around the factory, compile
      environmental risk assessment report, and report
      its findings to the relevant EPB."
SQUIRE, SANDERS & DEMPSEY L.L.P.
废弃危险化学品污染环境防治办法
             (实施日期 2005/10/01)

    第十四条: 危险化学品的生产、储存、使用单位转产、
     停产、停业或者解散的,应当按照《危险化学品安全
     管理条例》有关规定对危险化学品的生产或者储存设
     备、库存产品及生产原料进行妥善处置,并按照国家
     有关环境保护标准和规范,对厂区的土壤和地下水进
     行检测,编制环境风险评估报告,报县级以上环境保
     护部门备案。
    对场地造成污染的,应当将环境恢复方案报经县级以
     上环境保护部门同意后,在环境保护部门规定的期限
     内对污染场地进行环境恢复。对污染场地完成环境恢
     复后,应当委托环境保护检测机构对恢复后的场地进
     行检测,并将检测报告报县级以上环境保护部门备案。
SQUIRE, SANDERS & DEMPSEY L.L.P.
Notice on Duly Carrying Out the Work Associated With the
  Prevention and Treatment of Environmental Pollution During
              Enterprise Relocation (2004/06/01)


  • Enterprises & Laboratories that produce
    hazardous waste cease production or nature
    of operations changes:
       – Arrange for soil sampling
       – Responsible for controlling & rehabilitating the
         usage and function of soil


SQUIRE, SANDERS & DEMPSEY L.L.P.
关于切实做好企业搬迁过程中环
    境污染防治工作的通知(2004/06/01)

  • 生产有害废物的企业和实验室停止生产
    或者经营性质变更:
       – 安排土壤采样
       – 负责控制和恢复土壤的使用及功能




SQUIRE, SANDERS & DEMPSEY L.L.P.
Solid Waste Law (Article 35)
  •   If a unit where industrial solid waste is generated need to be terminated, it
      shall, in advance, take measures to prevent and control pollution from the
      facilities and grounds for storage or treatment of industrial solid waste and
      make proper arrangements in respect of the untreated industrial solid waste to
      prevent environmental pollution.
  •   Where the parties before the change is made have agreed otherwise in respect
      of their responsibilities for prevention and control of pollution by industrial
      solid waste and by the facilities and grounds for its storage and treatment, their
      agreement shall prevail; but they shall not thus be relieved of their duty to
      prevent and control pollution.
  •   The expenses for safe treatment of the industrial solid waste that has been left
      untreated by the unit terminated before implementation of this Law and for
      safe treatment of the facilities and grounds for storage or treatment of such
      waste shall be borne by the people's government concerned; but if the land use
      right enjoyed by such unit has been transferred according to law, the said
      expenses shall be borne by the transferee of the said right. If the parties have
      agreed otherwise, their agreement shall prevail; but they shall not thus be
      relieved of their duty to prevent and control pollution.
SQUIRE, SANDERS & DEMPSEY L.L.P.
固体废物污染环境防治法(第三十五条)

  • 产生工业固体废物的单位需要终止的,应当事先对工业固体废物
    的贮存、处置的设施、场所采取污染防治措施,并对未处置的工
    业固体废物作出妥善处置,防止污染环境。
  • 产生工业固体废物的单位发生变更的,变更后的单位应当按照国
    家有关环境保护的规定对未处置的工业固体废物及其贮存、处置
    的设施、场所进行安全处置或者采取措施保证该设施、场所安全
    运行。变更前当事人对工业固体废物及其贮存、处置的设施、场
    所的污染防治责任另有约定的,从其约定;但是,不得免除当事
    人的污染防治义务。
  • 对本法施行前已经终止的单位未处置的工业固体废物及其贮存、
    处置的设施、场所进行安全处置的费用,由有关人民政府承担;
    但是,该单位享有的土地使用权依法转让的,应当由土地使用权
    受让人承担处置费用。当事人另有约定的,从其约定;但是,不
    得免除当事人的污染防治义务。


SQUIRE, SANDERS & DEMPSEY L.L.P.
Potential Liabilities of Purchaser
  • Criminal
  • Administrative
  • Civil (third-party)




SQUIRE, SANDERS & DEMPSEY L.L.P.
买方的潜在责任
  • 刑事责任
  • 行政责任
  • 民事责任(第三方)




SQUIRE, SANDERS & DEMPSEY L.L.P.
Criminal
  • Unlikely unless significant off-site property
    damage or personal injury occurs in a
    sudden manner




SQUIRE, SANDERS & DEMPSEY L.L.P.
刑事责任
  • 除非突发重大非现场财产损害或人身伤
    害,否则不会承担刑事责任




SQUIRE, SANDERS & DEMPSEY L.L.P.
Administrative
  • Probably won’t be asked to clean up until
    one of regulations above triggered or off-
    site migration is beginning to present
    problems for adjacent property owners.




SQUIRE, SANDERS & DEMPSEY L.L.P.
行政责任
  • 除非上述法规有此规定或者场外迁移对
    相邻财产所有人造成干扰,否则可能不
    会被要求进行清理。




SQUIRE, SANDERS & DEMPSEY L.L.P.
Civil (third-party)
  • Most likely of three
       – Nuisance action
       – Property Damage/Personal Injury Claims




SQUIRE, SANDERS & DEMPSEY L.L.P.
民事责任(第三方)
  • 最有可能的三种诉讼
       – 排除妨碍之诉
       – 财产损害/人身伤害之诉




SQUIRE, SANDERS & DEMPSEY L.L.P.
Buyer’s Options at Transfer
  Option                         Benefits                             Disadvantages

      Establish fund paid           Assures a certain sum will be        Difficult to agree upon the
      for by seller to pay for      available for any future clean-      size of fund and scope of
      future liabilities            up obligations                       coverage


      Negotiate reduction in        Assures that a quantifiable          May be difficult to
      purchase price to             benefit has been obtained to         negotiate a meaningful
      cover future liabilities      offset any future clean-up           reduction
                                    obligations



      Negotiation with              Defines risk more accurately         May be difficult to
      government to define                                               negotiate, and enforce
      liability going forward                                            understanding with
                                                                         government
      Ask seller to clean up Eliminates liability; may be                May be difficult to
      sites as condition of  suitable for small scale                    manage, and will delay
      sale                   problems solvable with                      close of deal
                             “excavation”
SQUIRE, SANDERS & DEMPSEY L.L.P.
在出售时的买房的选择
              方式                     优势           劣势
        建立由卖方出资的基                  确保有一定资金可用   难以商定基金的规模
        金,以备将来承担责                  来在将来履行清理义   以及适用范围
        任                          务

        协商减少购买价格,                  确保取得具体数量的   可能难以就可行的降
        以虑及将来的责任风                  优惠,以抵消将来的   价进行协商
        险                          任何清理责任

        与政府部门进行协                   更准确地界定风险    可能难以与政府部门
        商,以界定将来的责                              进行协商并达成谅解
        任
        要求卖方清理现场,                  消除责任;适用于可   可能难以管理,并将
        作为销售条件                     通过“挖掘”解决的   导致成交迟延
                                   小问题。


SQUIRE, SANDERS & DEMPSEY L.L.P.
cmcelwee@ssd.com




SQUIRE, SANDERS & DEMPSEY L.L.P.
REMEDIATION Summer 2009




                                          Sustainable Remediation White
                                          Paper—Integrating Sustainable Principles,
                                          Practices, and Metrics Into Remediation
                                          Projects

           David E. Ellis

         Paul W. Hadley



                                          1.0 INTRODUCTION

                                          The remediation industry was born in the late 1970s, following a steady stream of highly
                                          publicized discoveries of toxic chemicals in landfills, drinking water, and even
                                          neighborhoods. The government responded to these discoveries of environmental
                                          contamination. Environmental laws were passed at the state and national level, and
                                          programs were created within environmental regulatory agencies to oversee and
                                          sometimes fund the cleanups. Industry and consultants kept pace by hiring staff, building
                                          programs, and initiating cleanups. The remediation industry was off at a sprint before it
                                          had learned to crawl.
                                               With the public demand for swift and sometimes immediate cleanups, responsible
                                          parties and the remediation industry invested heavily in energy-intensive engineered
                                          projects, such as groundwater pump-and-treat systems, soil excavation and off-site
                                          disposal, incineration, and thermal treatment. The public’s attitude was that no cleanup
                                          could be initiated soon enough or implemented fast enough.
                                               While such energy-intensive remediation systems are well intended, they generally
                                          have not achieved acceptable cleanup levels (National Research Council [NRC], 2005).
                                          These energy-intensive engineered remedies frequently cannot overcome the basic
                                          technical limitations encountered when recovering contaminants from the environment
                                          once the contaminants are widespread and dilute. As a result, most engineered
                                          groundwater remediation systems reach a certain concentration and go no further
                                          regardless of the energy expended. The concentration that can be reached is often far
                                          higher than the cleanup level.
                                               Within the last ten years, a growing body of information suggests that global climate
                                          change can be correlated with fossil fuel use and carbon dioxide releases into the
                                          atmosphere. As members of the broader environmental industry, remediation experts are
                                          well aware of this concern and have firsthand knowledge of the potential contribution of
                                          energy-intensive remediation systems to global climate change. For example, at one
                                          remediation project in New Jersey, it was estimated that the difference between two
                                          proposed remedies could be as high as 2 percent of the annual greenhouse gas emissions


c 2009 U.S. Sustainable Remediation Forum
Published online in Wiley Interscience (www.interscience.wiley.com). DOI: 10.1002/rem.20210                                        5
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China
Sustainable Brownfield Redevelopment in China

Más contenido relacionado

La actualidad más candente

Islamabad city planning
Islamabad city planningIslamabad city planning
Islamabad city planningCoEP
 
Garden city
Garden cityGarden city
Garden cityCoEP
 
AL BAHR - an intelligent building of ABU DHABI.
AL BAHR - an intelligent building of ABU DHABI.AL BAHR - an intelligent building of ABU DHABI.
AL BAHR - an intelligent building of ABU DHABI.Sajida Shah
 
CLARENCE STEIN
CLARENCE STEINCLARENCE STEIN
CLARENCE STEINYamini K
 
case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.Milan Jain
 
pruitt–igoe social Housing
pruitt–igoe social Housingpruitt–igoe social Housing
pruitt–igoe social Housingbanaldarwish
 
Case study- Mixed Use Building
Case study- Mixed Use BuildingCase study- Mixed Use Building
Case study- Mixed Use BuildingFathimaTabassum2
 
Case Study (Stockholm City)
Case Study (Stockholm City)Case Study (Stockholm City)
Case Study (Stockholm City)suzilawatie
 
Case Study of Changi Airport,Singapore
Case Study of Changi Airport,SingaporeCase Study of Changi Airport,Singapore
Case Study of Changi Airport,Singaporeeileen_0692
 
IT/ITeS Growth Corridor Series_Whitefield & Electronics City, Bangalore
IT/ITeS Growth Corridor Series_Whitefield & Electronics City, BangaloreIT/ITeS Growth Corridor Series_Whitefield & Electronics City, Bangalore
IT/ITeS Growth Corridor Series_Whitefield & Electronics City, BangaloreShailendra Chandrasekar
 
Design of spaces by william whyte
Design of spaces by william whyte  Design of spaces by william whyte
Design of spaces by william whyte SomaiaElsherif
 
Nature and Psychological Comfort: Biophilic Architecture
Nature and Psychological Comfort: Biophilic ArchitectureNature and Psychological Comfort: Biophilic Architecture
Nature and Psychological Comfort: Biophilic ArchitecturePrabal Dahal
 

La actualidad más candente (20)

Islamabad city planning
Islamabad city planningIslamabad city planning
Islamabad city planning
 
LOW RISE MEDIUM SCALE COMMERCIAL COMPLEX
LOW RISE MEDIUM SCALE COMMERCIAL COMPLEXLOW RISE MEDIUM SCALE COMMERCIAL COMPLEX
LOW RISE MEDIUM SCALE COMMERCIAL COMPLEX
 
Garden city
Garden cityGarden city
Garden city
 
AL BAHR - an intelligent building of ABU DHABI.
AL BAHR - an intelligent building of ABU DHABI.AL BAHR - an intelligent building of ABU DHABI.
AL BAHR - an intelligent building of ABU DHABI.
 
CLARENCE STEIN
CLARENCE STEINCLARENCE STEIN
CLARENCE STEIN
 
case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.
 
pruitt–igoe social Housing
pruitt–igoe social Housingpruitt–igoe social Housing
pruitt–igoe social Housing
 
Case study- Mixed Use Building
Case study- Mixed Use BuildingCase study- Mixed Use Building
Case study- Mixed Use Building
 
Iim ahemdabad
Iim ahemdabadIim ahemdabad
Iim ahemdabad
 
Case Study (Stockholm City)
Case Study (Stockholm City)Case Study (Stockholm City)
Case Study (Stockholm City)
 
Case Study of Changi Airport,Singapore
Case Study of Changi Airport,SingaporeCase Study of Changi Airport,Singapore
Case Study of Changi Airport,Singapore
 
Copenhagen City, Denmark
Copenhagen City, DenmarkCopenhagen City, Denmark
Copenhagen City, Denmark
 
IT/ITeS Growth Corridor Series_Whitefield & Electronics City, Bangalore
IT/ITeS Growth Corridor Series_Whitefield & Electronics City, BangaloreIT/ITeS Growth Corridor Series_Whitefield & Electronics City, Bangalore
IT/ITeS Growth Corridor Series_Whitefield & Electronics City, Bangalore
 
Green buildings case study
Green buildings case studyGreen buildings case study
Green buildings case study
 
Design of spaces by william whyte
Design of spaces by william whyte  Design of spaces by william whyte
Design of spaces by william whyte
 
Jan Gehl-An Urbanist
Jan Gehl-An UrbanistJan Gehl-An Urbanist
Jan Gehl-An Urbanist
 
Norman foster
Norman fosterNorman foster
Norman foster
 
Nature and Psychological Comfort: Biophilic Architecture
Nature and Psychological Comfort: Biophilic ArchitectureNature and Psychological Comfort: Biophilic Architecture
Nature and Psychological Comfort: Biophilic Architecture
 
Broadacre city
Broadacre cityBroadacre city
Broadacre city
 
CASBEE
CASBEECASBEE
CASBEE
 

Destacado

Cost effective cleaning up of contaminated groundwater
Cost effective cleaning up of contaminated groundwaterCost effective cleaning up of contaminated groundwater
Cost effective cleaning up of contaminated groundwaterTurlough Guerin GAICD FGIA
 
Guidelines for planning_and_implementing_gw_characterization_of-contam_sites
Guidelines for planning_and_implementing_gw_characterization_of-contam_sitesGuidelines for planning_and_implementing_gw_characterization_of-contam_sites
Guidelines for planning_and_implementing_gw_characterization_of-contam_sitesCristobal Frausto Cruz
 
Innovative groundwater remediation technology
Innovative groundwater remediation technologyInnovative groundwater remediation technology
Innovative groundwater remediation technologySoumyadeep Mukherjee
 
Green Remediation - 2012 Maine Water Conference
Green Remediation - 2012 Maine Water ConferenceGreen Remediation - 2012 Maine Water Conference
Green Remediation - 2012 Maine Water ConferenceSt.Germain Collins
 
Nordic experiences of soil and groundwater in situ remediation
Nordic experiences of soil and groundwater in situ remediationNordic experiences of soil and groundwater in situ remediation
Nordic experiences of soil and groundwater in situ remediationJarno Laitinen
 
Phytoremediation..A cost effective and ecofriendly technique for removal of h...
Phytoremediation..A cost effective and ecofriendly technique for removal of h...Phytoremediation..A cost effective and ecofriendly technique for removal of h...
Phytoremediation..A cost effective and ecofriendly technique for removal of h...Soumyashree Panigrahi
 
Bioremediation Of Heavy Metals (Copper)
Bioremediation Of Heavy Metals (Copper)Bioremediation Of Heavy Metals (Copper)
Bioremediation Of Heavy Metals (Copper)kaiser AS
 
15) groundwater contamination, prevention and remedial techniques as on 27-05...
15) groundwater contamination, prevention and remedial techniques as on 27-05...15) groundwater contamination, prevention and remedial techniques as on 27-05...
15) groundwater contamination, prevention and remedial techniques as on 27-05...Najam Ul Syed Hassan
 
Hazardous Waste Management
Hazardous Waste ManagementHazardous Waste Management
Hazardous Waste ManagementTareq Zarouni
 
Biorestoration of contaminated land
Biorestoration of contaminated landBiorestoration of contaminated land
Biorestoration of contaminated landJasleen Rajpal
 
PHYTOREMEDIATION OF CONTAMINATED SOILS (WAQAS AZEEM)
PHYTOREMEDIATION OF CONTAMINATED SOILS (WAQAS AZEEM)PHYTOREMEDIATION OF CONTAMINATED SOILS (WAQAS AZEEM)
PHYTOREMEDIATION OF CONTAMINATED SOILS (WAQAS AZEEM)Waqas Azeem
 

Destacado (12)

Cost effective cleaning up of contaminated groundwater
Cost effective cleaning up of contaminated groundwaterCost effective cleaning up of contaminated groundwater
Cost effective cleaning up of contaminated groundwater
 
Guidelines for planning_and_implementing_gw_characterization_of-contam_sites
Guidelines for planning_and_implementing_gw_characterization_of-contam_sitesGuidelines for planning_and_implementing_gw_characterization_of-contam_sites
Guidelines for planning_and_implementing_gw_characterization_of-contam_sites
 
Innovative groundwater remediation technology
Innovative groundwater remediation technologyInnovative groundwater remediation technology
Innovative groundwater remediation technology
 
Green Remediation - 2012 Maine Water Conference
Green Remediation - 2012 Maine Water ConferenceGreen Remediation - 2012 Maine Water Conference
Green Remediation - 2012 Maine Water Conference
 
Ground water contamination
Ground water contaminationGround water contamination
Ground water contamination
 
Nordic experiences of soil and groundwater in situ remediation
Nordic experiences of soil and groundwater in situ remediationNordic experiences of soil and groundwater in situ remediation
Nordic experiences of soil and groundwater in situ remediation
 
Phytoremediation..A cost effective and ecofriendly technique for removal of h...
Phytoremediation..A cost effective and ecofriendly technique for removal of h...Phytoremediation..A cost effective and ecofriendly technique for removal of h...
Phytoremediation..A cost effective and ecofriendly technique for removal of h...
 
Bioremediation Of Heavy Metals (Copper)
Bioremediation Of Heavy Metals (Copper)Bioremediation Of Heavy Metals (Copper)
Bioremediation Of Heavy Metals (Copper)
 
15) groundwater contamination, prevention and remedial techniques as on 27-05...
15) groundwater contamination, prevention and remedial techniques as on 27-05...15) groundwater contamination, prevention and remedial techniques as on 27-05...
15) groundwater contamination, prevention and remedial techniques as on 27-05...
 
Hazardous Waste Management
Hazardous Waste ManagementHazardous Waste Management
Hazardous Waste Management
 
Biorestoration of contaminated land
Biorestoration of contaminated landBiorestoration of contaminated land
Biorestoration of contaminated land
 
PHYTOREMEDIATION OF CONTAMINATED SOILS (WAQAS AZEEM)
PHYTOREMEDIATION OF CONTAMINATED SOILS (WAQAS AZEEM)PHYTOREMEDIATION OF CONTAMINATED SOILS (WAQAS AZEEM)
PHYTOREMEDIATION OF CONTAMINATED SOILS (WAQAS AZEEM)
 

Similar a Sustainable Brownfield Redevelopment in China

Randy Higgison Resume
Randy Higgison ResumeRandy Higgison Resume
Randy Higgison ResumeHiggison
 
How To Grow Your Business Green, Woodbridge Bizmania October 2009
How To Grow Your Business Green, Woodbridge Bizmania October 2009How To Grow Your Business Green, Woodbridge Bizmania October 2009
How To Grow Your Business Green, Woodbridge Bizmania October 2009Victoria Zelin
 
2010 sustainability forum
2010 sustainability forum2010 sustainability forum
2010 sustainability forumGied Hermsen
 
EHS 2017 Summit Shanghai - what's in the Tool Kit of an EHS Manager in China ...
EHS 2017 Summit Shanghai - what's in the Tool Kit of an EHS Manager in China ...EHS 2017 Summit Shanghai - what's in the Tool Kit of an EHS Manager in China ...
EHS 2017 Summit Shanghai - what's in the Tool Kit of an EHS Manager in China ...Johnny Browaeys - 庄博闻
 
12th Annual Discussions of The Round Table - Reviewed
12th Annual Discussions of The Round Table - Reviewed12th Annual Discussions of The Round Table - Reviewed
12th Annual Discussions of The Round Table - ReviewedLOESCHE
 
ICCC2009 - Conference Program as of 21 Sept 2009
ICCC2009 - Conference Program as of 21 Sept 2009ICCC2009 - Conference Program as of 21 Sept 2009
ICCC2009 - Conference Program as of 21 Sept 2009Rita Hausmann
 
Orchard-Garden-Hotel-Case Study
Orchard-Garden-Hotel-Case StudyOrchard-Garden-Hotel-Case Study
Orchard-Garden-Hotel-Case StudyStefan Mühle
 
Sustainability and green engineering
Sustainability and green engineeringSustainability and green engineering
Sustainability and green engineeringkeroma07
 
Rating Green Buildings - 4th March 2010
Rating Green Buildings - 4th March 2010Rating Green Buildings - 4th March 2010
Rating Green Buildings - 4th March 2010smilerneil
 
Ricoh (RPL) Sustainability Oct 2016
Ricoh (RPL) Sustainability Oct 2016Ricoh (RPL) Sustainability Oct 2016
Ricoh (RPL) Sustainability Oct 2016Andy Whyle
 
Korea business forum july4 0930-1400
Korea business forum july4 0930-1400Korea business forum july4 0930-1400
Korea business forum july4 0930-1400nautes7881
 
How to create a green and productive workplace
How to create a green and productive workplaceHow to create a green and productive workplace
How to create a green and productive workplaceJLL
 
Project Report Shivram Mukherjee (Energy Management), 2009 11
Project Report Shivram Mukherjee (Energy Management), 2009 11Project Report Shivram Mukherjee (Energy Management), 2009 11
Project Report Shivram Mukherjee (Energy Management), 2009 11shivram21957
 
DAHL JEFFREY - CV - Resume 20161026
DAHL JEFFREY - CV - Resume 20161026DAHL JEFFREY - CV - Resume 20161026
DAHL JEFFREY - CV - Resume 20161026Jeff Dahl
 

Similar a Sustainable Brownfield Redevelopment in China (20)

Randy Higgison Resume
Randy Higgison ResumeRandy Higgison Resume
Randy Higgison Resume
 
How To Grow Your Business Green, Woodbridge Bizmania October 2009
How To Grow Your Business Green, Woodbridge Bizmania October 2009How To Grow Your Business Green, Woodbridge Bizmania October 2009
How To Grow Your Business Green, Woodbridge Bizmania October 2009
 
How To Grow Your Business Green
How To Grow Your Business GreenHow To Grow Your Business Green
How To Grow Your Business Green
 
2010 sustainability forum
2010 sustainability forum2010 sustainability forum
2010 sustainability forum
 
EHS 2017 Summit Shanghai - what's in the Tool Kit of an EHS Manager in China ...
EHS 2017 Summit Shanghai - what's in the Tool Kit of an EHS Manager in China ...EHS 2017 Summit Shanghai - what's in the Tool Kit of an EHS Manager in China ...
EHS 2017 Summit Shanghai - what's in the Tool Kit of an EHS Manager in China ...
 
Track 2
Track 2Track 2
Track 2
 
12th Annual Discussions of The Round Table - Reviewed
12th Annual Discussions of The Round Table - Reviewed12th Annual Discussions of The Round Table - Reviewed
12th Annual Discussions of The Round Table - Reviewed
 
ICCC2009 - Conference Program as of 21 Sept 2009
ICCC2009 - Conference Program as of 21 Sept 2009ICCC2009 - Conference Program as of 21 Sept 2009
ICCC2009 - Conference Program as of 21 Sept 2009
 
Orchard-Garden-Hotel-Case Study
Orchard-Garden-Hotel-Case StudyOrchard-Garden-Hotel-Case Study
Orchard-Garden-Hotel-Case Study
 
Sustainability and Green Engineering
Sustainability and Green EngineeringSustainability and Green Engineering
Sustainability and Green Engineering
 
Sustainability and green engineering
Sustainability and green engineeringSustainability and green engineering
Sustainability and green engineering
 
Matt Turner
Matt TurnerMatt Turner
Matt Turner
 
Rating Green Buildings - 4th March 2010
Rating Green Buildings - 4th March 2010Rating Green Buildings - 4th March 2010
Rating Green Buildings - 4th March 2010
 
Ricoh (RPL) Sustainability Oct 2016
Ricoh (RPL) Sustainability Oct 2016Ricoh (RPL) Sustainability Oct 2016
Ricoh (RPL) Sustainability Oct 2016
 
Korea business forum july4 0930-1400
Korea business forum july4 0930-1400Korea business forum july4 0930-1400
Korea business forum july4 0930-1400
 
How to create a green and productive workplace
How to create a green and productive workplaceHow to create a green and productive workplace
How to create a green and productive workplace
 
Project Report Shivram Mukherjee (Energy Management), 2009 11
Project Report Shivram Mukherjee (Energy Management), 2009 11Project Report Shivram Mukherjee (Energy Management), 2009 11
Project Report Shivram Mukherjee (Energy Management), 2009 11
 
Rev Bio Times
Rev Bio TimesRev Bio Times
Rev Bio Times
 
DAHL JEFFREY - CV - Resume 20161026
DAHL JEFFREY - CV - Resume 20161026DAHL JEFFREY - CV - Resume 20161026
DAHL JEFFREY - CV - Resume 20161026
 
Resume_Chirag
Resume_ChiragResume_Chirag
Resume_Chirag
 

Más de Johnny Browaeys - 庄博闻

Part 2 digitization in operational and supply chain risk management
Part 2 digitization in operational and supply chain risk managementPart 2 digitization in operational and supply chain risk management
Part 2 digitization in operational and supply chain risk managementJohnny Browaeys - 庄博闻
 
Boletinomap 210 - CircularEconomy and Transformation GDP leading to growth an...
Boletinomap 210 - CircularEconomy and Transformation GDP leading to growth an...Boletinomap 210 - CircularEconomy and Transformation GDP leading to growth an...
Boletinomap 210 - CircularEconomy and Transformation GDP leading to growth an...Johnny Browaeys - 庄博闻
 
Impact from the Jiangsu explosion on Chemical Business in China
Impact from the Jiangsu explosion on Chemical Business in ChinaImpact from the Jiangsu explosion on Chemical Business in China
Impact from the Jiangsu explosion on Chemical Business in ChinaJohnny Browaeys - 庄博闻
 
Digitisation of environmental risk management in China
Digitisation of environmental risk management in ChinaDigitisation of environmental risk management in China
Digitisation of environmental risk management in ChinaJohnny Browaeys - 庄博闻
 
White Paper on 3-dimensional environmental protection in China's New Environm...
White Paper on 3-dimensional environmental protection in China's New Environm...White Paper on 3-dimensional environmental protection in China's New Environm...
White Paper on 3-dimensional environmental protection in China's New Environm...Johnny Browaeys - 庄博闻
 
Weathering the Environmental Storm in China's - Beyond Compliance
Weathering the Environmental Storm in China's - Beyond ComplianceWeathering the Environmental Storm in China's - Beyond Compliance
Weathering the Environmental Storm in China's - Beyond ComplianceJohnny Browaeys - 庄博闻
 
Beijng remediation seminar 20170614 final for distribution
Beijng remediation seminar 20170614 final for distributionBeijng remediation seminar 20170614 final for distribution
Beijng remediation seminar 20170614 final for distributionJohnny Browaeys - 庄博闻
 
EUCHAM remediation seminar 20170921 final short version
EUCHAM remediation seminar 20170921 final short versionEUCHAM remediation seminar 20170921 final short version
EUCHAM remediation seminar 20170921 final short versionJohnny Browaeys - 庄博闻
 
Building a-world-class-emergency-response-center
Building a-world-class-emergency-response-centerBuilding a-world-class-emergency-response-center
Building a-world-class-emergency-response-centerJohnny Browaeys - 庄博闻
 
14.35 Integrated Water Management Johnny Browaeys Ch2 M Hill
14.35 Integrated Water Management Johnny Browaeys Ch2 M Hill14.35 Integrated Water Management Johnny Browaeys Ch2 M Hill
14.35 Integrated Water Management Johnny Browaeys Ch2 M HillJohnny Browaeys - 庄博闻
 
Urban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case DescriptionsUrban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case DescriptionsJohnny Browaeys - 庄博闻
 

Más de Johnny Browaeys - 庄博闻 (18)

Guidance for cleantech companies in china 2020
Guidance for cleantech companies in china 2020Guidance for cleantech companies in china 2020
Guidance for cleantech companies in china 2020
 
Part 2 digitization in operational and supply chain risk management
Part 2 digitization in operational and supply chain risk managementPart 2 digitization in operational and supply chain risk management
Part 2 digitization in operational and supply chain risk management
 
Environmental Governance in China Part 1
Environmental Governance in China Part 1Environmental Governance in China Part 1
Environmental Governance in China Part 1
 
Boletinomap 210 - CircularEconomy and Transformation GDP leading to growth an...
Boletinomap 210 - CircularEconomy and Transformation GDP leading to growth an...Boletinomap 210 - CircularEconomy and Transformation GDP leading to growth an...
Boletinomap 210 - CircularEconomy and Transformation GDP leading to growth an...
 
Impact from the Jiangsu explosion on Chemical Business in China
Impact from the Jiangsu explosion on Chemical Business in ChinaImpact from the Jiangsu explosion on Chemical Business in China
Impact from the Jiangsu explosion on Chemical Business in China
 
Digitisation of environmental risk management in China
Digitisation of environmental risk management in ChinaDigitisation of environmental risk management in China
Digitisation of environmental risk management in China
 
2018 supply chain forum info
2018 supply chain forum info2018 supply chain forum info
2018 supply chain forum info
 
White Paper on 3-dimensional environmental protection in China's New Environm...
White Paper on 3-dimensional environmental protection in China's New Environm...White Paper on 3-dimensional environmental protection in China's New Environm...
White Paper on 3-dimensional environmental protection in China's New Environm...
 
Weathering the Environmental Storm in China's - Beyond Compliance
Weathering the Environmental Storm in China's - Beyond ComplianceWeathering the Environmental Storm in China's - Beyond Compliance
Weathering the Environmental Storm in China's - Beyond Compliance
 
Beijng remediation seminar 20170614 final for distribution
Beijng remediation seminar 20170614 final for distributionBeijng remediation seminar 20170614 final for distribution
Beijng remediation seminar 20170614 final for distribution
 
EUCHAM remediation seminar 20170921 final short version
EUCHAM remediation seminar 20170921 final short versionEUCHAM remediation seminar 20170921 final short version
EUCHAM remediation seminar 20170921 final short version
 
David's story
David's storyDavid's story
David's story
 
Achieving environmental compliance cn
Achieving environmental compliance   cnAchieving environmental compliance   cn
Achieving environmental compliance cn
 
Building a-world-class-emergency-response-center
Building a-world-class-emergency-response-centerBuilding a-world-class-emergency-response-center
Building a-world-class-emergency-response-center
 
14.35 Integrated Water Management Johnny Browaeys Ch2 M Hill
14.35 Integrated Water Management Johnny Browaeys Ch2 M Hill14.35 Integrated Water Management Johnny Browaeys Ch2 M Hill
14.35 Integrated Water Management Johnny Browaeys Ch2 M Hill
 
Global Intro CH2M HILL
Global Intro CH2M HILLGlobal Intro CH2M HILL
Global Intro CH2M HILL
 
Urban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case DescriptionsUrban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case Descriptions
 
Final China08 Johnny Browaeys Csr In Business
Final China08 Johnny Browaeys Csr In BusinessFinal China08 Johnny Browaeys Csr In Business
Final China08 Johnny Browaeys Csr In Business
 

Sustainable Brownfield Redevelopment in China

  • 1. 受污染地块可持续性再开发研讨会 Sustainable Redevelopment of Contaminated Land Seminar 上海建国宾馆 Shanghai, Jianguo Hotel 2009年6月23日 星期二 June 23, 2009
  • 2. Table Of Content • Agenda and Venue • Summary Survey and Panel Discussion • Slides of the presentations • White Paper on Sustainable Remediation providing the latest insight on Sustainable Remediation (published 30 June 2009) • For info on event: - johnny.browaeys@ch2m.com (+86 1376 1894 720) - Lie.Ma@ch2m.com (+86 1370 1742 423) - speakers contact details at the first page of respective presentations
  • 3. Sustainable Redevelopment of Contaminated Site Seminar B 受污染地块可持续性再开发研讨会 About CH2M HILL Jiuzhou Conference Room D Headquartered in Denver, Colo., employee-owned 4 Floor, Jianguo Hotel Shanghai CH2M HILL is a global leader in full service consulting, 439 Cao Xi Bei Road, construction and operations for government, civil, industrial Shanghai China and energy clients. CH2M HILL has over 25,000 Tuesday 23rd June, 2009 employees and USD 5.8 billion in revenue in 2008. The firms’s work is concentrated in the areas of environment, 会议地点:上海市建国宾馆 4 楼九州厅 D water, energy, transportation, nuclar and industrial facilties. 上海市漕溪北路 439 号建国宾馆 4 楼南丹路口 CH2M HILL has long been recognised as a most admired 会议时间:二〇〇九年六月二十三日 (星期二) company and leading employer, including being named by 主办单位:西图中国公司 Fortune as one of the 100 Best Companies to Work For in the US and one of America’s Most Admired Companies Subjects of the Seminar: (2008). • Updating remediation regulations and technologies CH2M HILL is recongised as the largest environmental firm • Soil remediation in Shanghai in the US for consective three years by Engineering-News • Best practice of property remediation and Record (ENR). sustainable approach in industry As the first international company operating in China, • Case studies of successful revitalization of CH2M HILL obtained Environmental Impact Assessment contaminated properties License from Chinese government in 2001. 研讨会的主题: • 地块修复技术和法规的最新发展 • 当前上海地区的土壤修复的状况 关于西图集团 • 土壤修复可持续方法在企业中的实践和管理模式 西图集团总部位于美国科罗拉多州的丹佛是一家 • 受污染地块重新开发的真实成功案例 全球领先的项目咨询、设计、施工和运营公司。 西图集团在全球拥有约 25,000 名员工, 2008 年营 Eminent speakers from: 业额约为 58 亿美元,是美国财富 500 强企业。西 • Shanghai Environmental Protection Bureau 图集团侧重的行业领域包括环境、水、能源、交 • Shanghai Environmental Science and Research Institute 通、核能和工业设施。 • CH2M HILL • Honeywell 西图集团长期被认为是最受尊敬的公司和雇主。 • Squire, Sanders & Dempsey L.L.P. 集团得到的荣誉包括被财富杂志评为 2008 年美国 最受尊敬的公司和最佳 100 家雇主之一。 主要发言人将来自于: • 上海市环境保护局 西图集团已经连续三年被美国权威的工程新闻杂 • 上海市环境科学研究院 志(Engineering -News-Record)评为美国最大的环 • 西图公司 境公司。西图中国公司在 2001 年成为第一家获得 • 霍尼维尔公司 中国政府颁发的环境影响评价资质的外资咨询公 • 美国翰宇律师事务所 司。
  • 4. Seminar Agenda 日程安排 Tuesday 23rd June, 2009 2009年6月23日(星期二) 13:00 Registration 13:00 签到 13:30 Kick Off Speech: Mr. Gene Lupia 开幕致词: 13:30 开幕致词 President, Environmental Services Business Gene Lupia 先生 Group, CH2M HILL 环境服务集团总裁 集团总裁, 环境服务集团总裁 西图公司 13:45 Words from Shanghai EPB 13:45 上海市环境保护局领导致词 Mr. Hailing Luo 罗海林先生 罗海林先生 Director of Aquatic Environment and Ecology 水环境与自然生态处处长 Department, Shanghai EPB 上海市环境保护局 第一部分: 14:00 第一部分 如何运用先进的地块分析手段及修复 14:00 Session One: Streamlined Site Characterization and Risk-based Remediation to Facilitate 技术来推动受污染地块的复原和重新开发 Expedited Revitalization and Redevelopment of Terry Feng 博士 Contaminated Properties 首席技术专家 Dr. Terry Feng 西图公司 Principal Technologist, CH2M HILL 14:30 Session Two: Remediation and Re-development in 14:30 第二部分: 上海地区的土壤修复和开发 部分 上海地区的土壤修复和开发 Shanghai and Case Studies 罗启仕博士 罗启仕博士 Dr. Qishi Luo 土壤修复所所长 Remediation Manager, Shanghai Acadmey of 上海市环境科学研究院 Environmental Science 15:00 Tea Break 15:00 茶歇 15:30 Session Three: The Sustainable Approach to 第三部分: 15:30 第三部分 环境修复的可持续方法 Environmental Remediation 吴涛先生 Mr. Tao Wu Manager of Global Remediation and Evaluation, 全球场地修复和评价经理 Honeywell 霍尼维尔公司 16:00 Session Four: Review of Contaminated Land 第四部分: 16:00 第四部分 中国的污染场地的环境责任 Environmental Liabilities in China 李康熙先生 李康熙先生 Mr. Charles R. McElwee, II 美国翰宇律师事务所 Squire, Sanders & Dempsey L.L.P. 16:15 Open Discussion, Challenges and Practices of 16:15 第五部分: 讨论, 跨国公司在场地污染和修复问 部分 讨论, MNCs in China on site contamination and 题上面对的挑战和实践 remediation 庄尼先生 庄尼先生 Moderator: Mr. Johnny Browaeys 环境业务总监, 环境业务总监,西图公司 Operations Director of Environmental Services CH2M HILL 16:45 Adjourn 16:45 休会
  • 5. Survey and Panel Discussion CH2M HILL 西图建筑工程(上海) 西图建筑工程(上海)有限公司 Johnny Browaeys johnny.browaeys@ch2m.com
  • 6. Approach • Survey based on feedback from 55 participants (50MNC, 5 institutes) • Enquiring for challenges and needs for stakeholders considering remediation in China • Interactive discussion between attendees and panel: Legal Advisor Squire, Sanders & Dempsey L.L.P. Shanghai Academy of Environmental Sciences (SAES) Industry: Honeywell Remediation Engineer: CH2M HILL E112004002BDS 2
  • 7. Survey: CHALLENGES (scale 1-10) • Managing environmental liabilities for soil and groundwater pollution during transactions – 4.7 • Unclear regulatory framework – eg. when is remediation required, which clean up objectives? – 4.6 • Lack of consistency between different regions – 4.5 • Quality of consultants – 4.3 • Quality of labs – 4.2 • Consistency between National and Local policies – 4.1 • Lack of companies in China experienced with remedial engineering – 4.0 E112004002BDS 3
  • 8. Survey: NEEDS (scale 1-10) • Find a way to solve the pollution problem without interfering with production – 5.3 • Control of costs, especially now during the financial crisis – 4.8 • Better understanding of what are the real risks related to soil and groundwater – 4.6 • More knowledge of the regulations – 4.4 • More knowledge on understanding the business risks related with soil and groundwater pollution – 4.3 • Better understanding of your corporate strategy on soil and groundwater liabilities – 3.4 E112004002BDS 4
  • 9. Panel – strategies for MNC • Remediation in China: waking sleeping dog or managing future (and actual) liability? • Communication strategy for dealing with local authorities that have different agenda or lack experience with soil and groundwater pollution • Managing “2 dreams in one bed” (Joint-Ventures) • Importance of Asset Management Strategy • Different drivers behind implementation of grey regulatory framework (eg. closure EIA’s / clean up) • Rising awareness and managing expectation • Clean up triggers and “Stay Out” situations E112004002BDS 5
  • 10. Panel – remediation technologies • Commercially available solutions versus locally design and build ? • Remediation “Engineering” versus “Solutions from the shelf” • Reducing Capital Investment and managing O&M costs • Optimizing remediation budget in the financial crisis • Leveraging facility upgrades (remediate and build) • Engineer solutions using excess capacity existing facility utilities (steam etc.) E112004002BDS 6
  • 11. Panel – government and policy • New soil regulation “next year” (since the last 5 years) • Unclear reporting level to submit Remedial Action Plan • Link with EIA regulations • Independency • MEP vs Superfund • MEP vs RBCA • What changed from SEPA to MEP? • Local government “developing” brown fields • Value of brown fields in cities – forced relocations • Role of project developers and MNC for cleaning up China? E112004002BDS 7
  • 13. Sustainable Redevelopment of Contaminated Land Seminar June 23, 2009, Shanghai, China Streamlined Site Characterization and Risk- based Remediation to Facilitate Expedited Revitalization and Redevelopment of Contaminated Properties June 23, 2009 Terry Feng, Ph.D., P.E. Terry.Feng@ch2m.com
  • 14. Presentation Outline Introduction – Drivers, trends, and tools for revitalization and/or redevelopment of contaminated properties Examples Highlight of October 2008 U.S. EPA Document Revitalization of a closed chemical plant in Southern California June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 2
  • 15. Drivers / Motivations Why do we care about contaminated properties? We care because it is an intuitively right thing to do. More specifically, it is: good for the economy necessary to ensure protection of human health and environment added value for property owners – enhanced property value and reduced liability a part of many deep-pocket corporations’ asset management / property divestiture program a demonstration of great Corporation Citizenship a contractual obligation for sellers or buyers through real estate transactions required by regulation June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 3
  • 16. It also fits nicely with the three parts sustainability model… al za ciet lob G al l na So tio on ni rs ga al Pe Or June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 4
  • 17. Trends (Observed in U.S.) Government leads the way More corporations are doing it More investors and developers are involved More owners interested More reputable and experienced contractors involved June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 5
  • 18. Tools and Methodologies Brownfield regulations (U.S., Europe, Canada….) Incentives from federal, state and local governments Risk sharing through contractual and legal mechanisms (liability transfer, insurance, price guarantee) Risk management through land use covenant (deed restriction and institutional controls) Flexible and streamlined regulatory processes Support for application of innovative site characterization and remediation technologies Triad, DPT, MIP ERD, ISCO, SVE/MPE, GCW/ART, ERH/ISTD, PRB, Phytoremediation June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 6
  • 19. Presentation Outline Introduction – Drivers, trends, and tools for revitalization and/or redevelopment of contaminated properties Examples Highlight of October 2008 U.S. EPA Document Revitalization of a closed chemical plant in Southern California June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 7
  • 20. October 2008 U.S. EPA Document June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 8
  • 21. U.S. EPA: 10 Contributors for Successful Revitalization of Mothballed Properties 1. Reuse First (owners take initiative) 2. Recruit Redevelopers 3. Local Leadership 4. Craft Creative Corporate Strategies 5. Take Advantage of State Tools & Resources 6. Coordinate Cleanups 7. Leverage Federal Funding & Support 8. Assist the Mom & Pops 9. Reduce Risks 10. Create Comfort June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 9
  • 22. U.S. EPA: 11 Project Profiles of Successful Mothballed Property Revitalization 1. Car Company Revitalizes Old Manufacturing Sites 2. Ohio Development Team Overcomes Barriers to Reuse of Mothballed Waterfront Property 3. Manufacturer Takes a Prevention Approach to Mothballed Properties 4. Chemical Company Ranks Sites and Reaches out to Regulators for Reuse of Underutilized Properties 5. Pennsylvania Buyer-Seller Agreement Facilitates Reuse of Old Manufacturing Site 6. Vacant Site to Become Rochester Sports Complex 7. Milwaukee Master Plan Renews Old Industrial Valley 8. Environmental Extension Center Helps Seattle Small Businesses on Contaminated Properties 9. West Virginia Small Cities Create A Commerce Corridor 10. Colorado Brownfields Foundation Helps Mom & Pops with Environmental Stewardship Program 11. Innovative Building Reuse Program Spurs Revitalization of North Carolina Small Towns June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 10
  • 23. Presentation Outline Introduction – Drivers, trends, and tools for revitalization and/or redevelopment of contaminated properties Examples Highlight of October 2008 U.S. EPA Document Revitalization of a closed chemical plant in Southern California, U.S.A. June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 11
  • 24. Site Location and Surroundings Prime South Bay location – only a few miles from the Pacific Ocean and LAX Surrounded by industrial / commercial properties June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 12
  • 25. Site History The 56-acre chemical plant was initially developed in 1920s and ceased operation in 2003 Main industrial activities included: Sulfuric acid production Pesticides packaging/distribution Phthalic anhydride production Solvents packaging and distribution Refrigerants production June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 13
  • 26. 1991 Aerial Photo of the Chemical Plant June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 14
  • 27. Feb. 2003 Aerial Photo – Right before Plant Closure and Facility Demolition June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 15
  • 28. 2004 - Demolition Completed June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 16
  • 29. Site Revitalization Strategy City re-zoned the parcel from Industrial to Commercial and approved the plan to develop the land into an nice retail center Prime location helps - developer agreed to pay $1,000,000 USD per acre for redevelopment while the plant owner carries all environmental liabilities including achieving “Regulatory Closure” on Closure shallow soil and “Approved RAP” for deep soil before the RAP buyer writes the check June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 17
  • 30. Phased Redevelopment Plan Phase I: 43 acres including northern parcels and southwest corner lot parcel Retail center including Whole Foods, Best Buy, Barnes & Noble, etc. as well as restaurants Retail center open for business by 2006 holiday season Phase II: 13 acres of UND-4&5 parcels Industrial/commercial development at a later time along with the parcels in the east and west This presentation focuses on Phase I project June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 18
  • 31. Aggressive Schedule Milestones Feb. 2003 - ceased facility operation and began facility demolition and site characterization Early 2004 - completed demolition and site characterization Late 2004 – completed remediation of 23 shallow soil hot spot areas Middle 2005 – received regulatory no-further-action (NFA) letter (a.k.a., “Regulatory Closure”) for shallow soil on Phase I parcels Late 2005 – regulatory approval of sitewide remedial action plan (RAP) for deep soil vapor plume (a.k.a., “Approved RAP”) Early 2006 – Began redevelopment grading and vertical construction Late 2006 – newly constructed retain center opened for business Achieving “Regulatory Closure” for shallow soil and “Approved RAP” for deep soil vapor plume were two owner’s obligations that must be satisfied prior to the real estate closure June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 19
  • 32. Strategic Planning Identify critical success factor – meeting schedule milestones Focus on critical path work scope: Site characterization Risk assessment Shallow soil remediation Find and use innovative solutions Strive for dedication, cooperation and teamwork June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 20
  • 33. Technical Approaches The following three technical elements were critical contributors to the overall success of the project: Expedited Site Characterization supported by a “dynamic” work plan - the Triad approach Expedited Risk Assessment conducted concurrent with the field investigation; early development of site-specific “risk per unit concentration” values for all site chemicals allowed real time cumulative risk calculations Expedited Shallow Soil Remediation conducted as an interim remedial measure (IRM) led to significant schedule savings June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 21
  • 34. Expedited Site Characterization More than 500 soil borings drilled More than 1400 soil samples collected More than 1400 soil samples analyzed for VOCs More than 1100 samples analyzed for SVOCs, PCBs, pesticides, metals & TPH/GROs Mobile labs used to expedite field screening More than 350 soil vapor samples collected and analyzed for VOCs Water Board RI approval letter issued April, 2005 June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 22
  • 35. RI Site-Characterization Report and Remedial Detected Preliminary Screening for Potential Work Plan and Investigation Implementation Chemicals Shallow-Soil Hot Spots Soil Gas; Johnson & Ettinger 1 mg/m3 Vapor Intrusion Model (assumption) Risk-Assessment Processes Risk and Hazard Estimates at Unit Concentrations Soil; Risk Risk- and Hazard- 1 mg/kg Assessment Estimates (assumption) Methodology Per Unit Concentration Cumulative Risk & Hazard Estimate of Cumulative Risk- and Hazard- Analytical (for all chemicals at the area) Risk and Hazard Estimates × Results for At Hot-Spot Locations Per Unit Concentration Hot Spots Is Remedial Action Decisions No No Further Action Cumulative Risk Estimate >10-5 IRM Work Plan and Final RAP (NFA) Or Hazard>1? Yes Figure 1 Develop and Implement IRM and Final RAP *** (based on most-stringent, relevant exposure scenario) Risk Management Honeywell El Segundo, California Decision Flow June 23, 2009 23 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. *** Potential impact to groundwater from deep soil are addressed in the fate & transport analysis of the final RAP. Diagram PARSONS
  • 36. Identification of shallow soil hot spots 46 hot spot areas initially identified 23 hot spot areas retained after site- based on available regulatory specific risk assessment as hot screening levels (PRGs, ESLs, spots for remediation CHHSLs, SLs, etc.) June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 24
  • 37. Expedited Shallow Soil Remediation TRIAD approach for IRM using a stepwise excavation-confirmation process Step 1 removed impacted soils based on initial estimate Removal action continued until concentrations of all risk drivers were below RBCGs for the hotspot More than 20,000 cubic yards of soils were removed from the 23 hotspot areas Post-IRM risk assessment conducted to ensure achieving target risk management goal June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 25
  • 38. Final Regulatory Approval Completion of shallow soil IRM satisfied required shallow soil matrix remedial actions Agency approval of the IRM Completion Report satisfied the requirement for shallow soil closure The NFA letter for shallow soil was issued in June 2005 as consistent with the redevelopment plan A remedial action plan (RAP) was also submitted and approved by agency in 2006 which satisfied the remainder requirement for the property sale and redevelopment *** It may be worthy of noting that deep soil and groundwater cleanup is not required prior to site redevelopment June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 26
  • 39. Mission Accomplished Feb. Dec. 2003 2007 June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 27
  • 40. Project Progress Some aerial photos showing progress of site demolition, grading, deep remediation system installation and redevelopment construction project Some photo shots after redevelopment construction has completed and retail center opened for business June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 28
  • 41. 2004 - Post Demolition and Prior to Grading Activities Piles of crushed concrete from demolished buildings/foundations June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 29
  • 42. 2005 – SVE System Installation Prior to Building Construction, SVE Wells and SVE Pipe Laterals June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 30
  • 43. April 2005 – Retail Store Construction June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 31
  • 44. Jan. 2007 – Aerial View of Plaza El Segundo June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 32
  • 45. Nov. 2006 – New Retail Stores Open for Business June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 33
  • 46. Nov. 2006 – Retail Stores Open for Business June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 34
  • 47. Nov. 2006 – Retail Stores Open for Business June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 35
  • 48. Conclusions Strategic planning to identify and focus on critical success factors, critical path scope elements, and innovative solutions to address them are critical for the ultimate success of the project Teamwork from the entire project team including the owner, developer and regulatory agencies, were crucial factors for the success of the project June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 36
  • 49. Questions? June 23, 2009 Copyright 2009 by CH2M HILL. Reproduction and distribution in whole or in part without the written consent of CH2M HILL is prohibited. 37
  • 50. Site Remediation and Management in Shanghai (罗启仕) Qishi Luo(罗启仕) Shanghai Academy of Environmental Sciences June 23, 2009
  • 51. Outline 1. Recent development on site management in China 2. Process management of site remediation in Shanghai 3. Site Remediation by SAES: Case studies 4. Site Remediation Research in SAES
  • 52. Recent development on site management in China
  • 53. 《瞭望》(2009年第9期) 与土壤污染的较量正在中国广袤的国 土上拉开大幕。 土上拉开大幕。 就世界范围而言,土壤污染尚是一个“ 就世界范围而言,土壤污染尚是一个 新的问题”,在中国尤其如此。 新的问题 ,在中国尤其如此。 如何做到环境保护与经济发展的平衡 统一,是全世界面临的复杂课题。 统一,是全世界面临的复杂课题。土 壤科研人员发现, 壤科研人员发现,即使是在南极上空 或喜马拉雅山脉之巅,仍然会有DDT 或喜马拉雅山脉之巅,仍然会有DDT或 DDT或 六六六的残留。 六六六的残留。 严酷的现实逼问人类: 严酷的现实逼问人类:如果失去了清 洁的空气、水、土壤、安全的食品和 洁的空气、 土壤、 平衡的生态空间, 平衡的生态空间,经济发展还有什么 意义? 意义? 对于人多地少的中国, 对于人多地少的中国,每一寸安全而 健康的国土都须加倍爱惜, 健康的国土都须加倍爱惜,治理土壤 污染已是刻不容缓, 污染已是刻不容缓,好在战车已经启 动。
  • 54. Current status on soil management in China:
  • 55.
  • 56.
  • 57.
  • 58.
  • 59.
  • 60.
  • 61.
  • 62. Process management of site remediation in Shanghai
  • 63. 重视搬迁企业遗留污染场地管理 场地调查与评估 场地污染风险评估 修复方案制定及实施 修复过程管理 修复后评估
  • 64. Site Remediation by SAES: Case studies
  • 67. What We did for EXPO Site Remediation Developed “Standard of Soil Quality Assessment for Exhibition Sites”; Recommended demolish guideline; Investigated and monitored EXPO sites; Developed master plan of soil remediation on EXPO site; Conducted soil remediation; Carried out an after-care program.
  • 68. 在上海世博园区场地土壤修复中创造了四个第一: 在上海世博园区场地土壤修复中创造了四个第一: 第一次进行了大面积的、以工程为目的的场地污染调查; 第一次进行了大面积的、以工程为目的的场地污染调查; 制定了我国第一部用于污染场地质量评价的标准: 制定了我国第一部用于污染场地质量评价的标准:《展览会 用地土壤环境质量评价标准(暂行)(HJ350-2007) 用地土壤环境质量评价标准(暂行)(HJ350-2007)》; )(HJ350 实施了我国最大规模的土壤修复工程; 实施了我国最大规模的土壤修复工程; 进行了我国最大规模的一次场地风险评价。 进行了我国最大规模的一次场地风险评价。
  • 69. (一)上海世博园区土壤质量的调查 上海世博园区场地污染调查与监测, 上海世博园区场地污染调查与监测,贯彻整个世博园区土 壤修复的全过程:(1 重点企业土壤污染调查,(2 壤修复的全过程:(1)重点企业土壤污染调查,(2)国 :( ,( 外自建馆的土壤污染调查, 外自建馆的土壤污染调查,和(3)非重点区域场地污染 土壤调查。 土壤调查。 在现场土壤采样、样品运输保存、样品分析、 在现场土壤采样、样品运输保存、样品分析、数据整理和 分析、污染评估等方面积累了丰富经验。 分析、污染评估等方面积累了丰富经验。
  • 70. Developed site sampling and monitoring methods and demolish guideline Using GPS Deep sampling Geostatistics Demolish guideline to prevent new pollution
  • 71. (二)世博园区土壤质量评价 制定了我国第一部用于污染场地质量评价的标准: 制定了我国第一部用于污染场地质量评价的标准:中华人 民共和国环境保护行业标准--《 民共和国环境保护行业标准--《展览会用地土壤环境质量 -- 评价标准(暂行)(HJ350-2007) 评价标准(暂行)(HJ350-2007)》,并依据该标准对世 )(HJ350 博园区土壤质量进行了评价,确定了土壤修复指导限值。 博园区土壤质量进行了评价,确定了土壤修复指导限值。
  • 72. Developed Standard of soil quality for exhibition sites The State EPA issued “Standard of Soil Quality Assessment for Exhibition Sites” on June 15, 2007, effective on August 1, 2007; China has the first criteria of soil quality assessment for SITE.
  • 73. (三)世博园区土壤土壤修复 制定了“中国2010年上海世博会园区污染土处置项目管理 中国2010 制定了 中国2010年上海世博会园区污染土处置项目管理 大纲”,分三个阶段对世博园区实施了土壤修复和处置。 大纲 ,分三个阶段对世博园区实施了土壤修复和处置。 修复过的场地经第三方监测,土壤各项指标均达到《 修复过的场地经第三方监测,土壤各项指标均达到《展览 会用地土壤环境质量评价标准(暂行)(HJ350-2007) )(HJ350 会用地土壤环境质量评价标准(暂行)(HJ350-2007)》 的要求,可以作为展览馆用地。 的要求,可以作为展览馆用地。 在场地土壤修复、 在场地土壤修复、工程监理和修复后评估方面积累了丰富 经验。 经验。
  • 74. Dig and dump of high contaiminated soil Off site treatment of Cu-Zn con soils
  • 75. Off site treatment of SVOC con soils
  • 77. (四)世博园区场地风险评价 对世博会园区ABCDE五个片区面积为4.46 ABCDE五个片区面积为4.46平方公里 对世博会园区ABCDE五个片区面积为4.46平方公里 区域进行了场地土壤健康风险评估, 区域进行了场地土壤健康风险评估,建立了场地 暴露模型,确定了本土化评估参数。 暴露模型,确定了本土化评估参数。 评估结果表明, 评估结果表明,修复过的世博园区土壤对对参观 人员、管理人员和参展人员没有任何危害风险, 人员、管理人员和参展人员没有任何危害风险, 可以安全使用。 可以安全使用。
  • 78.
  • 79. 本项目地址-- 本项目地址 广兰路地铁站 当地 当地 当地 地河 河流 河流 河 青桐路 香楠路 当地 地河 地河 地河 SB-5 MW-16 MW-15 地块8 河流 流 广兰路 广兰路 广兰路 广兰路 MW-13 河 流 流 流 SB-1 SB-6 地 现 有 房 地块5 SB-7 MW-12 当 SB-9 DSB-3 地块6 MW-1 现 有 路 面 MW-17 MW-9 • 场地土壤地下水调查监测 MW-7 MW-14 DSB-2 SB-10 路 地块7 • 场地污染评估和健康风险评估 张江中心 地块1 地块2 地块3 地块4 之MW-11 小学 冲 MW-2 MW-3 DSB-1 祖 MW-10 MW-8 SB-11 • 污染土壤及地下水修复方案 SB-4 SB-3 MW-6 • 土壤修复工程(一期)监理 MW-5 土壤修复工程(一期)后评估 MW-4 • 广兰路场地调查、修复和评估
  • 80.
  • 81. • 场地污染风险评估 • 场地修复技术方案编制 • 修复工程监理和后评估 通用南翔灯泡厂场地污染评估
  • 82.
  • 83.
  • 84. 环境突发事件引起的土壤污染应急处置 浦东槽车硫酸泄露事故 嘉定化学品倾倒事故 青泽镇污泥违法倾倒事故
  • 85. 奉贤镇和庄行镇含油污泥违法倾倒事故 广兰路车站场地污染事故 释放恶臭气体的堆场 青浦青东农场污染事故处置
  • 87. 以稳定固化技术为核心的技术研发和工程应用 受污染土壤快速阻断与修复技术研究与设备研发(国家863项目) 国家863项目 国家863项目 世博园区原工厂旧址受损土壤修复技术与应用(市科委世博科技专项) 市科委世博科技专项) 世博会城市最佳实践区场地土壤维护工程(上海世博局项目) (上海世博局项目) 青浦区田山庄村建筑垃圾固化利用项目(上海鼓华公司) (上海鼓华公司) DOX-底泥固化体固化性能测试及评估(日本贝律泰睦公司) (日本贝律泰睦公司) Na3T15对疏浚底泥、尾水和土壤中重金属稳定作用研究(韩国原野化工公司) (韩国原野化工公司)
  • 90. TCLP浸出测试 1800 150 Cu Pb 1500 Cd 120 重金属形态分级测试(BCR提取法) 重金属浓度(ug) 1200 重金属浓度(ug) 90 碳酸盐结合态 铁锰氧化物结合态 氧化态 900 残渣态 100% 60 600 80% 30 300 Zn形态含量百分比 60% 0 0 5 .2 5 0 2 4 6 8 稳定剂添加量 (%) 40% 5 .2 0 20% 浸出液pH值 5 .1 5 0% CK 1 2 3 4 5 .1 05 6 底泥样品 5 .0 5 5 .0 0 0 2 4 6 8 稳 定 剂 添 加 量 (% )
  • 91. 扫描电镜分析(SEM) 傅立叶转换红外光谱(FTIR)分析 100 50000 X射线衍射(XRD)分析 1 高岭石 80 40000 2 1%STA 2 石英 3 正长石 4 钠长石 50000 30000 强度 60 2 1 高岭石 透射率 1636 2 石英 O 40000 空白土壤 3437 v1+v3 H2O v2 H2 3 正长石 1420 20000 2- 776 40 4 钠长石 v3 CO3 石英 2 30000 10000 3 2 强度 552 2 2 22 2 1 2- v4 SiO4 4 2 2 2 20000 20 空白 1030 0 10 20 30 40 50 60 70 80 1%添加量 v1+v3 SiO4 50000 468 2- 10%添加量 v2 SiO4 2- 2倍衍射角 1 高岭石 2 2 10000 0 3 3600 2 2 230002 2400 2 1800 2 40000 1200 600 10%STA 2 石英 3 正长石 1 4 2 2 2 0 波数(cm-1) 4 钠长石 10 20 30 40 50 60 70 80 30000 强度 2倍衍射角 不同STA添加量土壤的FTIR光谱 20000 2 10000 2 2 22 2 2 1 3 4 2 2 2 0 10 20 30 40 50 60 70 80 2倍衍射角
  • 93. 单 壤 轴 粉 搅 碎 拌 机 机 球磨机 翻转振荡机 TCLP翻转振荡机 低湿电子干燥柜 标 准 振 振 筛 恒 动 机 温 台 干 燥 压力试验机 箱 压滤机 万能液压试验机
  • 95. 土壤筛分破碎搅拌斗 固化剂添加系统 履带式拖拉机 振 动 压 混 动力源 合 实 搅 重力碾压轮 拌 土壤筛分破碎过程 螺旋取土构件 装 装 置 置 回填装置 边缘切刀 开沟机 土壤铣刀 原土 回填压实固化土 污染土壤快速固化一体化集成设备设计简图 挖掘沟槽
  • 97. S/S based Projects conducted by SAES 池塘生态重建 河岸护坡 尾矿 村镇建筑垃圾 城市建筑垃圾 路面固化 固化水渠 海岸护堤
  • 98. Pavement made by Ore tailing (2007),Nanjing Meishan Iron Ore Mine
  • 99. Construction garbage reused by Stabilization and solidification (S/S)
  • 100. Sediments reused by (S/S) in Haining, Zhejiang Province
  • 101. S/S based ecological engineering
  • 102. END Just Started, Not Perfect, Need to Improve a Lot, Will be Better.
  • 103. Thank you for your attention !
  • 104. Shanghai Forum for Revitalization of Contaminated Properties Shanghai Forum for Revitalization of Contaminated Properties June 23, 2009 The Sustainable Approach to Environmental Remediation Tao Wu tao.wu@honeywell.com
  • 105. Honeywell.com Sustainability • What does this really mean? • Idea of “Sustainability” or “Sustainable Development” from the UN’s 1987 Brundtland Report: – Environmental protection will not be sustained unless it is coordinated with economic development – Our natural resource base is finite, and we must re-think and re-engineer development to preserve that resource base for ourselves and future generations – Communities/stakeholders should be deeply engaged in environmental decisions to make the results sustainable 2 Honeywell Proprietary
  • 106. Honeywell.com Honeywell’s Sustainable Opportunities Policy: By integrating health, safety and environmental considerations into all aspects of our business ... – We actively promote and develop opportunities for expanding sustainable capacity by increasing fuel efficiency, improving security and safety, and reducing emissions of harmful pollutants. – We identify, control and endeavor to reduce emissions, waste and inefficient use of resources and energy. – We are open with stakeholders and work within our communities to advance laws, regulation and practices that safeguard the public … These are our commitments to health, safety, and the environment, and to creating Sustainable Opportunity everywhere we operate. 3 Honeywell Proprietary
  • 107. Honeywell.com Sustainable Development • Redevelopment and/or reuse of contaminated properties is the optimal way to make an environmental remediation (remedy) sustainable. • A sustainable remedy has the best opportunity for satisfying stakeholders and communities. • Sustainable remedies have highest likelihood of success. 4 Honeywell Proprietary
  • 108. Honeywell.com Redevelopment and Reuse • Why does redevelopment and reuse work? – Links environmental protection and economic development – Preserves finite natural resources – Involves affected stakeholders • The new frontiers for the sustainability – It’s the climate, – Brown to green – The urban planning approach 5 Honeywell Proprietary
  • 109. Honeywell.com Redevelopment and Reuse • Case studies – Syracuse, NY – Baltimore Inner Harbor, MD – Jersey City, NJ 6 Honeywell Proprietary
  • 110. Honeywell.com Syracuse, NY Renewable Fuels Town of Town of Van Van Liverpoo Buren Liverpoo Buren ll Honeywell Willow T To To edd n of s To edd n of s ow To ed G w lllu Demonstration G w u wn ow d wn es wn es Toami n To mil Ca C of n o es of n o s T ed of of S G Sa ff G w de all iin naa Onondag Onondag a Lake a Lake Ninemile Ninemile Creek Creek k ree yC Le e cu s s e cu a rra Sy Sy NYS Shrub Fairground Willow Farm s West Flume Carouse l Mall LCP Geddes Geddes Mathews Brook Brook Former Metro Ave Main Plant 7 Honeywell Proprietary
  • 111. Honeywell.com Syracuse, NY Renewable Fuels Project Approach 8 Honeywell Proprietary
  • 112. Honeywell.com Syracuse, NY Renewable Fuels Project Approach 9 Honeywell Proprietary
  • 113. Honeywell.com Syracuse, NY Renewable Fuels Project Approach 10 Honeywell Proprietary
  • 114. Honeywell.com Syracuse, NY Renewable Fuels Project Approach Walking Trails Wildlife Viewing Areas Saltwater Marsh Shrub Willow Stands Varied Berm Planting 11 Honeywell Proprietary
  • 115. Honeywell.com Syracuse, NY Renewable Fuels Project Approach • So, Linking – Environmental & economic improvements – Preserving & enhancing resources – Deep engagement with affected community – Climate – Brown to Green 12 Honeywell Proprietary
  • 116. Honeywell.com Baltimore Inner Harbor, MD Project Location Site 13 Honeywell Proprietary
  • 117. Honeywell.com Baltimore Inner Harbor, MD 14 Honeywell Proprietary
  • 118. Honeywell.com Baltimore Inner Harbor, MD 15 Honeywell Proprietary
  • 119. Honeywell.com Baltimore Inner Harbor, MD 16 Honeywell Proprietary
  • 120. Honeywell.com Baltimore Inner Harbor, MD 17 Honeywell Proprietary
  • 121. Honeywell.com Baltimore Inner Harbor, MD • So, Linking – Environmental & economic improvements – Preserving & enhancing resources – Deep engagement with affected community – Brown to Green 18 Honeywell Proprietary
  • 122. Honeywell.com Jersey City, NJ Project Location 19 Honeywell Proprietary
  • 123. Honeywell.com Jersey City, NJ 100 Acres Along The Hackensack River 20 Honeywell Proprietary
  • 124. Honeywell.com Jersey City, NJ Connected to the rest of City through an Proposed Layout Showing Green Space extension of the existing Light Rail Walkway Along the Hackensack River 21 Honeywell Proprietary
  • 125. Honeywell.com Jersey City, NJ • So, Linking – Environmental & economic improvements – Preserving & enhancing resources – Deep engagement with affected community – Brown to Green – The urban planning approach 22 Honeywell Proprietary
  • 126. Honeywell.com Sustainability = Success • Redevelopment and reuse is what will truly make an environmental cleanup sustainable – Resource conservation – Coordinate Economic/Environmental development – Working with impacted communities on clean up and end use • Redevelopment and reuse encourage the kind of growth we want and need for a sustainable future: – Smart growth development that concentrates spaces to live, work, play and commute, optimizes energy efficiency, and preserves open space • Redevelopment and/or reuse should make the sustainability link more explicit by encouraging renewable energy, green buildings and brownfield area planning • Sustainable remedies key to best lifecycle remedy: if it’s sustainable, everyone will have a stake in making it work for the long run 23 Honeywell Proprietary
  • 127. Review of Contaminated Land Environmental Liabilities in China 中国的污染场地的环境责任 Charles R. McElwee, II cmcelwee@ssd.com Squire, Sanders & Dempsey, LLP 美国翰宇律师事务所 Shanghai, China SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 128. General Proposition: Polluter pays Environmental Protection Law (Article 41): A unit that has caused an environmental pollution hazard shall have the obligation to eliminate it and make compensation to the unit or individual that suffered direct losses. SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 129. 一般提议:由污染者买单 中华人民共和国环境保护法 (第四十一条): 造成环境污染危害的,有责任排除危害,并对直接 受到损害的单位或者个人赔偿损失。 赔偿责任和赔偿金额的纠纷,可以根据当事人的请 求,由环境保护行政主管部门或者其他依照法律规 定行使环境监督管理权的部门处理;当事人对处理 决定不服的,可以向人民法院起诉。当事人也可以 直接向人民法院起诉。 SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 130. On-Site Contamination • Very few provisions of Chinese law address responsibility for investigation or remediation of on-site contamination. • Those that do generally only impose obligations when the ownership/control or use of property changes. SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 131. 现场污染 • 中国法律很少有规定涉及现场污染的调 查或补救责任。 • 有此规定的法律一般仅在财产所有权/控 制权或使用权变更时才附加义务。 SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 132. Regulation on Discarded Hazardous Chemicals (effective 2005/10/01) Article 14: "In case any entity that undertakes the production, storage or use of hazardous chemicals changes its line of production, stops production, stop business operation or dissolves, it shall . . . in light of the relevant state standards and criterions on environmental protection, test the soil and underground water around the factory, compile environmental risk assessment report, and report its findings to the relevant EPB." SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 133. 废弃危险化学品污染环境防治办法 (实施日期 2005/10/01) 第十四条: 危险化学品的生产、储存、使用单位转产、 停产、停业或者解散的,应当按照《危险化学品安全 管理条例》有关规定对危险化学品的生产或者储存设 备、库存产品及生产原料进行妥善处置,并按照国家 有关环境保护标准和规范,对厂区的土壤和地下水进 行检测,编制环境风险评估报告,报县级以上环境保 护部门备案。 对场地造成污染的,应当将环境恢复方案报经县级以 上环境保护部门同意后,在环境保护部门规定的期限 内对污染场地进行环境恢复。对污染场地完成环境恢 复后,应当委托环境保护检测机构对恢复后的场地进 行检测,并将检测报告报县级以上环境保护部门备案。 SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 134. Notice on Duly Carrying Out the Work Associated With the Prevention and Treatment of Environmental Pollution During Enterprise Relocation (2004/06/01) • Enterprises & Laboratories that produce hazardous waste cease production or nature of operations changes: – Arrange for soil sampling – Responsible for controlling & rehabilitating the usage and function of soil SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 135. 关于切实做好企业搬迁过程中环 境污染防治工作的通知(2004/06/01) • 生产有害废物的企业和实验室停止生产 或者经营性质变更: – 安排土壤采样 – 负责控制和恢复土壤的使用及功能 SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 136. Solid Waste Law (Article 35) • If a unit where industrial solid waste is generated need to be terminated, it shall, in advance, take measures to prevent and control pollution from the facilities and grounds for storage or treatment of industrial solid waste and make proper arrangements in respect of the untreated industrial solid waste to prevent environmental pollution. • Where the parties before the change is made have agreed otherwise in respect of their responsibilities for prevention and control of pollution by industrial solid waste and by the facilities and grounds for its storage and treatment, their agreement shall prevail; but they shall not thus be relieved of their duty to prevent and control pollution. • The expenses for safe treatment of the industrial solid waste that has been left untreated by the unit terminated before implementation of this Law and for safe treatment of the facilities and grounds for storage or treatment of such waste shall be borne by the people's government concerned; but if the land use right enjoyed by such unit has been transferred according to law, the said expenses shall be borne by the transferee of the said right. If the parties have agreed otherwise, their agreement shall prevail; but they shall not thus be relieved of their duty to prevent and control pollution. SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 137. 固体废物污染环境防治法(第三十五条) • 产生工业固体废物的单位需要终止的,应当事先对工业固体废物 的贮存、处置的设施、场所采取污染防治措施,并对未处置的工 业固体废物作出妥善处置,防止污染环境。 • 产生工业固体废物的单位发生变更的,变更后的单位应当按照国 家有关环境保护的规定对未处置的工业固体废物及其贮存、处置 的设施、场所进行安全处置或者采取措施保证该设施、场所安全 运行。变更前当事人对工业固体废物及其贮存、处置的设施、场 所的污染防治责任另有约定的,从其约定;但是,不得免除当事 人的污染防治义务。 • 对本法施行前已经终止的单位未处置的工业固体废物及其贮存、 处置的设施、场所进行安全处置的费用,由有关人民政府承担; 但是,该单位享有的土地使用权依法转让的,应当由土地使用权 受让人承担处置费用。当事人另有约定的,从其约定;但是,不 得免除当事人的污染防治义务。 SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 138. Potential Liabilities of Purchaser • Criminal • Administrative • Civil (third-party) SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 139. 买方的潜在责任 • 刑事责任 • 行政责任 • 民事责任(第三方) SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 140. Criminal • Unlikely unless significant off-site property damage or personal injury occurs in a sudden manner SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 141. 刑事责任 • 除非突发重大非现场财产损害或人身伤 害,否则不会承担刑事责任 SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 142. Administrative • Probably won’t be asked to clean up until one of regulations above triggered or off- site migration is beginning to present problems for adjacent property owners. SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 143. 行政责任 • 除非上述法规有此规定或者场外迁移对 相邻财产所有人造成干扰,否则可能不 会被要求进行清理。 SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 144. Civil (third-party) • Most likely of three – Nuisance action – Property Damage/Personal Injury Claims SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 145. 民事责任(第三方) • 最有可能的三种诉讼 – 排除妨碍之诉 – 财产损害/人身伤害之诉 SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 146. Buyer’s Options at Transfer Option Benefits Disadvantages Establish fund paid Assures a certain sum will be Difficult to agree upon the for by seller to pay for available for any future clean- size of fund and scope of future liabilities up obligations coverage Negotiate reduction in Assures that a quantifiable May be difficult to purchase price to benefit has been obtained to negotiate a meaningful cover future liabilities offset any future clean-up reduction obligations Negotiation with Defines risk more accurately May be difficult to government to define negotiate, and enforce liability going forward understanding with government Ask seller to clean up Eliminates liability; may be May be difficult to sites as condition of suitable for small scale manage, and will delay sale problems solvable with close of deal “excavation” SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 147. 在出售时的买房的选择 方式 优势 劣势 建立由卖方出资的基 确保有一定资金可用 难以商定基金的规模 金,以备将来承担责 来在将来履行清理义 以及适用范围 任 务 协商减少购买价格, 确保取得具体数量的 可能难以就可行的降 以虑及将来的责任风 优惠,以抵消将来的 价进行协商 险 任何清理责任 与政府部门进行协 更准确地界定风险 可能难以与政府部门 商,以界定将来的责 进行协商并达成谅解 任 要求卖方清理现场, 消除责任;适用于可 可能难以管理,并将 作为销售条件 通过“挖掘”解决的 导致成交迟延 小问题。 SQUIRE, SANDERS & DEMPSEY L.L.P.
  • 149. REMEDIATION Summer 2009 Sustainable Remediation White Paper—Integrating Sustainable Principles, Practices, and Metrics Into Remediation Projects David E. Ellis Paul W. Hadley 1.0 INTRODUCTION The remediation industry was born in the late 1970s, following a steady stream of highly publicized discoveries of toxic chemicals in landfills, drinking water, and even neighborhoods. The government responded to these discoveries of environmental contamination. Environmental laws were passed at the state and national level, and programs were created within environmental regulatory agencies to oversee and sometimes fund the cleanups. Industry and consultants kept pace by hiring staff, building programs, and initiating cleanups. The remediation industry was off at a sprint before it had learned to crawl. With the public demand for swift and sometimes immediate cleanups, responsible parties and the remediation industry invested heavily in energy-intensive engineered projects, such as groundwater pump-and-treat systems, soil excavation and off-site disposal, incineration, and thermal treatment. The public’s attitude was that no cleanup could be initiated soon enough or implemented fast enough. While such energy-intensive remediation systems are well intended, they generally have not achieved acceptable cleanup levels (National Research Council [NRC], 2005). These energy-intensive engineered remedies frequently cannot overcome the basic technical limitations encountered when recovering contaminants from the environment once the contaminants are widespread and dilute. As a result, most engineered groundwater remediation systems reach a certain concentration and go no further regardless of the energy expended. The concentration that can be reached is often far higher than the cleanup level. Within the last ten years, a growing body of information suggests that global climate change can be correlated with fossil fuel use and carbon dioxide releases into the atmosphere. As members of the broader environmental industry, remediation experts are well aware of this concern and have firsthand knowledge of the potential contribution of energy-intensive remediation systems to global climate change. For example, at one remediation project in New Jersey, it was estimated that the difference between two proposed remedies could be as high as 2 percent of the annual greenhouse gas emissions c 2009 U.S. Sustainable Remediation Forum Published online in Wiley Interscience (www.interscience.wiley.com). DOI: 10.1002/rem.20210 5