1. FACADE
HPR INTEGRATED DESIGN Presentation #4:
Jeremy Heilman
CONSTRUCTION
Nico Pugliese
LIGHTING/ELECTRICAL
Proposal
Josh Progar
STRUCTURAL
James Rodgers
MECHANICAL
Penn State Ice Hockey Arena
The Pennsylvania State University
Mission Statement:
HPR Integrated Design combines innovative, cutting edge concepts with a
collaborative multi-disciplinary approach through the utilization of state-of-the-art
BIM technologies to exceed owner expectations both in system efficiencies and the
enrichment of the human experience within its aesthetic.
2. Agenda BIM Uses
HPR Integrated Design’s Project Touchstones for the
Penn State Ice Arena
Improve the Game Day experience for both the fans and players
Create an environment that fosters hockey excellence
Minimize the amount of energy the facility consumes
Create an architecturally recognizable facility
Maximize value with minimizing cost
Earn a LEED Gold rating
MILESTONES Required by Contract
Used for this Stage of design
6. Approach
Air Handler Relocation Club Level
and Event Level Redesign
REASON: -Reduce duct size and length
-Reduce fan energy and use smaller air handling units
-Limit the number of shafts and there sizes. Concourse Level
Mt. Nittany Room—Rm. 230
AHU-6: Energy Recovery Unit
Carrier 39MW050
Serves Event Level– Weight Room
20,000 Peak CFM
8’-0” W x 13’-2” L x 7’-1” H
AHU-5: Air Handler
Carrier 39MW061
8’-0” Commissary—Rm. 163
Design Constraints Event Level
Serves Event Level Lobby &
Administration
25,000 CFM Supply
9’-9” W x 30’-3” L x 8’-6” H
7. Approach
Air Handler Relocation
Mt. Nittany Room—Rm. 230
Mt. Nittany Room—Rm. 230
20” THICK. TWO WAY
and Event Level Redesign AHU–6
SLAB—CONSERVATIVE
1’-8”
MAIN CONCOURSE
LEVEL
AHU–5 0’-7” CLR.
2’-0” CLR.
9’-6”
AHU–5
AHU–6
8’-0” Commissary—Rm. 163
20’-9”
AHU-6 1’-8”
20” THICK. TWO WAY 4” THICK VIBRATION
SLAB—CONSERVATIVE ISOLATORS
AHU-5 8’-0” Commissary—Rm. 163
EVENT LEVEL
8. Access Layout
Approach
Air Handler Relocation AHU-6
PROPOSED ACCESS POINT
AHU-6
RA—PLENUM
EA FROM AHU-6
and Event Level Redesign 44’-0”
SA FROM AHU 5
44’-0”
AHU-5
OA TO AHU-6 AHU-5
AHU-6
OA TO AHU 5&6 OA TO AHU-5
29’-6”
29’-6”
AHU-5
EA FROM AHU-5
Multisport Complex
9. Approach
Roof Profile Redesign
REASON: -Maximize the efficiency of the structural system to reduce cost
-Integrate the mechanical, lighting, and catwalk systems to optimize the
performance of each
-Create a clean and attractive ceiling area
N-S Section – New Roof Profile N-S Section – Lighting
Incident Angle Reflection
Bryce Jordan Center
Beaver Stadium
60’ Clear (To Bottom Of Steel)
Design Constraints Multisport Complex Holuba Hall
10. Approach
Roof Profile Redesign
REASON: -Maximize the efficiency of the structural system to reduce cost
-Integrate the mechanical, lighting, and catwalk systems to optimize the
performance of each
-Create a clean and attractive ceiling area
N-S Section – New Roof Profile N-S Section – Lighting
Incident Angle Reflection
Bryce Jordan Center
Beaver Stadium
60’ Clear (To Bottom Of Steel)
Design Constraints Multisport Complex Holuba Hall
11. Enhance student entrance
Create a prominent entrance (Globe) Approach
Façade Redesign
REASON: We believe we can maintain the original intent of the east façade
(to create an impressive view from University Drive as well as a view out to Mt.
Nittany and the Bryce Jordan Center) while enhancing the prominence of the
entrances as well as reducing thermal loads and cost.
View to Mt. Nittany
Off glass at 15o
Translate the pattern of
Design Constraints Louvers added for AHU 5 & 6 repeating glass and brick
13. KEY MILESTONES:
January 27th, 2012: March 26th, 2012:
All Redesign Focuses Completed.
Initial Architectural Modeling Completed
February 13th, 2012: April 4th, 2012:
Air Handler Relocation & Event Level Design Completed Final Report Submission
March 2nd, 2012: April 9th, 2012:
Initial Clash Detection & Value Engineering Final Presentation
Team Schedule
16. MILESTONE: Architectural Modeling Completed
Progress
Air Handler Relocation
Arena Roof Systems Design Authoring, Structural
Two Way Flooring Redesign & Arena Roof Modeling
MAJOR BIM USE(S)
Analysis
SOFTWARE
Design Authoring, Lighting
Event Level Daylighting & Electrical Load Calculations
Analysis
Façade Redesign Design Authoring, Mechanical
Event Level Load Calcs, AHU & Ductwork Sizing Analysis
Friday, January 27th, 2012
Existing Conditions Estimate & Scheduling Analysis Cost Estimation, 4D Modeling
17. MILESTONE: Air Handler Relocation Completed
Progress
Air Handler Relocation
Arena Roof Systems Structural Analysis
Gravity Column Redesign & Long Span Truss Design
MAJOR BIM USE(S)
SOFTWARE
Design Authoring, Lighting
Façade Daylighting Controls & Finalize Event Lvl. Design
Analysis
Façade Redesign Design Authoring, Mechanical
Finalize Event Level Designs & AHU Relocations Analysis
Tuesday, February 13th, 2012
LEED Analysis & Crane Placement Study Site Utilization, LEED Analysis
18. MILESTONE: Initial Clash Detection & Value Eng.
Progress
Air Handler Relocation
Arena Roof Systems Design Authoring, Structural
Long Span Truss Design & Façade Glazing Analysis
MAJOR BIM USE(S)
Analysis, 3D Coordination
SOFTWARE
Design Authoring, Lighting
Arena Lighting Layout & Finalize Electrical Redesign
Analysis
Façade Redesign Design Authoring, Mechanical
Main Arena Mechanical Design & Coordination Analysis, 3D Coordination
Friday, March 2nd, 2012
Update Cost, Schedule & Perform Clash Detection 3D Coordination, Cost
Estimation, 4D Modeling
19. MILESTONE: Redesign Focuses Completed
Progress
Air Handler Relocation
Arena Roof Systems Structural Analysis, 3D
Column Analysis & Façade Analysis/Redesign
MAJOR BIM USE(S)
Coordination
SOFTWARE
Design Authoring, Lighting
Finalize Arena Lighting Design & Façade Redesign
Analysis
Façade Redesign Design Authoring, Mechanical
Main Arena Mechanical & Life Safety Designs Analysis, 3D Coordination
Monday, March 26th, 2012
Finalize Cost Estimates, Schedule & LEED Analysis 3D Coordination, Cost
Estimation, 4D Modeling
20. MILESTONE: Final Report Submission
Progress
Air Handler Relocation
Arena Roof Systems None.
Finalize Final Report
MAJOR BIM USE(S)
SOFTWARE
None.
Finalize Final Report
Façade Redesign None.
Finalize Final Report
Wednesday, April 4th, 2012
Finalize Final Report None.
21. MILESTONE: Final Presentation
Progress
Air Handler Relocation
Arena Roof Systems None.
Finalize & Practice Final Presentation
MAJOR BIM USE(S)
SOFTWARE
None.
Finalize & Practice Final Presentation
Façade Redesign None.
Finalize & Practice Final Presentation
Monday, April 9th, 2012
Finalize & Practice Final Presentation None.
22. FACADE
Presentation #4:
Thank You
Questions & Comments
Mt. Nittany Room—
Rm. 230
Penn State Ice Hockey Arena
The Pennsylvania State University
AHU AHU
–6 –5
8’- Commissary—
0” Rm. 163
Notas del editor
Add money shot. We need a third category to base decisions on, cost, sustainability and
Add money shot. We need a third category to base decisions on, cost, sustainability and