SlideShare una empresa de Scribd logo
1 de 22
Traffic and Parking Generation
The impact on development
AITPM National Conference 2014
Paul Morris
Development Assessment
• Parking Demands
• Off-street supply
• On-Street impacts
• Shared/Compatible Uses
• Multiple-use discounts
• Development Plan
• Specific rates
• Generic definitions
• Empirical Data
• SA Guides
• RTA Guide
• SA Surveys
• GTA Database
Development Assessment
• Traffic generation
• Internal operation
• Access
• External impacts
• Development Plans
• Objectives
• Principles
• Empirical Data
• RTA Guide
• SA Surveys
• GTA Database
Access – a matter of degrees
• Linked to traffic generation
• Appropriate Access?
• Unsignalised or signalised
• Restricted turning movements
• Use of existing local streets
• Left turn auxiliary lanes
• Warrants
• Left turn lanes
Access – a matter of degrees
• Austroads Guides
Determining the Need for Auxiliary Lanes
The need for deceleration turn lanes cannot be stated definitively in all instances
because of the many factors to be considered, such as speeds, traffic volumes,
capacity, type of road, service provided, traffic control and crash history.
Guide to Road Design – Part 4A: Unsignalised and Signalised Intersections
Access – a matter of degrees
Figure 4.9: Warrants for turn treatments on the major road at unsignalised intersections
Access – a matter of degrees
• External Infrastructure Costs
• Short Taper - $30K
• Standard Deceleration Lane - $150K
• Extra costs for land acquisition, services, design, etc
• Developments are marginal
• Use appropriate analysis
• Justify needs not just broad warrant
Parking – The BIG Issue
• Parking Demands
• Off-street supply
• On-Street impacts
• Shared/Compatible Uses
• Multiple-use discounts
• Development Plan
Parking – Development Plan Rates
3
3.5
4
4.5
5
5.5
6
6.5
7
Shop
5.5
7.0
Parking Demands
• Impacts on Parking Rates
• Extended Shopping Hours
• Changes in Shopping Trends (On-line, Entertainment)
• Increased Retail Floor Space
• Multiple Use Discounts
Parking
5.2
4.8
5.1
5.2
4.6
5.1
Spaces per 100 square metres
Gross Leasable Floor Space
Parking
3.8
3.0
3.8
3.6
3.6
3.1
5.2
4.8
5.1
5.2
4.6
5.1
Spaces per 100 square metres
Gross Leasable Floor Space
They should
build more
parking......

Only 3.9 per
100sqm...WOW
Hmmm...
130 spaces
OMG...$650K
to build
RUK....
$3.7m..!!
WOW....
85 spaces
available
$2.5m
Conclusions
• Development Plans
• Review parking rates
• Lower shopping centre rates
• Traffic Warrants
• Review the use of warrants
• Consider the actual need from analysis
• Consider the cost
• Impact on feasibility
Thank You

Más contenido relacionado

Similar a Paul Morris - parking

Steering committee presentation
Steering committee presentationSteering committee presentation
Steering committee presentation
BVallecillos
 
Final town of windsor parking planning study presentation 040109
Final town of windsor parking planning study presentation 040109Final town of windsor parking planning study presentation 040109
Final town of windsor parking planning study presentation 040109
David Kelley, MBA
 
Capitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open HouseCapitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open House
jseattle
 

Similar a Paul Morris - parking (20)

RV 2014: Space Exploration: Innovative Parking Tools + Strategies
RV 2014: Space Exploration: Innovative Parking Tools + StrategiesRV 2014: Space Exploration: Innovative Parking Tools + Strategies
RV 2014: Space Exploration: Innovative Parking Tools + Strategies
 
parking problems in metro cities
parking problems in metro citiesparking problems in metro cities
parking problems in metro cities
 
Steering committee presentation
Steering committee presentationSteering committee presentation
Steering committee presentation
 
Steering committee
Steering committeeSteering committee
Steering committee
 
Analysis of Parking Facilities
Analysis of Parking Facilities Analysis of Parking Facilities
Analysis of Parking Facilities
 
SB 743 & VMT – CEQA Implementation and Issues for Agencies and Developers
SB 743 & VMT – CEQA Implementation and Issues for Agencies and DevelopersSB 743 & VMT – CEQA Implementation and Issues for Agencies and Developers
SB 743 & VMT – CEQA Implementation and Issues for Agencies and Developers
 
2520-20measure20presentation (1).ppt
2520-20measure20presentation (1).ppt2520-20measure20presentation (1).ppt
2520-20measure20presentation (1).ppt
 
Eville pkg wkshp_111617
Eville pkg wkshp_111617Eville pkg wkshp_111617
Eville pkg wkshp_111617
 
Parking, Technology and Curb Management Creating Value out of Emerging Techno...
Parking, Technology and Curb Management Creating Value out of Emerging Techno...Parking, Technology and Curb Management Creating Value out of Emerging Techno...
Parking, Technology and Curb Management Creating Value out of Emerging Techno...
 
Una introducción a HDM-4
Una introducción a HDM-4Una introducción a HDM-4
Una introducción a HDM-4
 
Final town of windsor parking planning study presentation 040109
Final town of windsor parking planning study presentation 040109Final town of windsor parking planning study presentation 040109
Final town of windsor parking planning study presentation 040109
 
dr. cal
dr. caldr. cal
dr. cal
 
TransForm - Growth Without Gridlock - Sunnyvale
TransForm - Growth Without Gridlock - SunnyvaleTransForm - Growth Without Gridlock - Sunnyvale
TransForm - Growth Without Gridlock - Sunnyvale
 
Microtransit Overview: A Research Perspective
Microtransit Overview: A Research PerspectiveMicrotransit Overview: A Research Perspective
Microtransit Overview: A Research Perspective
 
Strategic to Simulation - A Pedestrian Perspective
Strategic to Simulation - A Pedestrian PerspectiveStrategic to Simulation - A Pedestrian Perspective
Strategic to Simulation - A Pedestrian Perspective
 
619 tdm presentation 4 18 12
619 tdm presentation 4 18 12619 tdm presentation 4 18 12
619 tdm presentation 4 18 12
 
The Synergistic Traffic Intersection
The Synergistic Traffic Intersection The Synergistic Traffic Intersection
The Synergistic Traffic Intersection
 
Using Publicly Available Datasets to Evaluate the Intersection between Bicycl...
Using Publicly Available Datasets to Evaluate the Intersection between Bicycl...Using Publicly Available Datasets to Evaluate the Intersection between Bicycl...
Using Publicly Available Datasets to Evaluate the Intersection between Bicycl...
 
Capitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open HouseCapitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open House
 
TOD and Parking: Matching the Requirements to the Neighborhood by Jason Witte...
TOD and Parking: Matching the Requirements to the Neighborhood by Jason Witte...TOD and Parking: Matching the Requirements to the Neighborhood by Jason Witte...
TOD and Parking: Matching the Requirements to the Neighborhood by Jason Witte...
 

Más de JumpingJaq

Más de JumpingJaq (20)

Richard Tang - Mitcham Princes Road Crossing
Richard Tang - Mitcham Princes Road CrossingRichard Tang - Mitcham Princes Road Crossing
Richard Tang - Mitcham Princes Road Crossing
 
Darren Blasdale - Seaford roundabout
Darren Blasdale - Seaford roundaboutDarren Blasdale - Seaford roundabout
Darren Blasdale - Seaford roundabout
 
Zak Valiff - Causeway Road and Semaphore Road Shared Use Paths
Zak Valiff - Causeway Road and Semaphore Road Shared Use PathsZak Valiff - Causeway Road and Semaphore Road Shared Use Paths
Zak Valiff - Causeway Road and Semaphore Road Shared Use Paths
 
Lydia Kairl - King William pedestrian crossings
Lydia Kairl - King William pedestrian crossingsLydia Kairl - King William pedestrian crossings
Lydia Kairl - King William pedestrian crossings
 
Shaun Smith - Resident street parties
Shaun Smith - Resident street partiesShaun Smith - Resident street parties
Shaun Smith - Resident street parties
 
Shaun Smith - Narrow road parking
Shaun Smith - Narrow road parkingShaun Smith - Narrow road parking
Shaun Smith - Narrow road parking
 
Edward Chan - Local Area Traffic Management Novar Gardens and Camden Park
Edward Chan - Local Area Traffic Management Novar Gardens and Camden ParkEdward Chan - Local Area Traffic Management Novar Gardens and Camden Park
Edward Chan - Local Area Traffic Management Novar Gardens and Camden Park
 
Li Meng - Shared mobility
Li Meng - Shared mobilityLi Meng - Shared mobility
Li Meng - Shared mobility
 
Gabby O'Neil - Safe System Approach
Gabby O'Neil - Safe System ApproachGabby O'Neil - Safe System Approach
Gabby O'Neil - Safe System Approach
 
Ingrid Hunt - Traffic control device approval
Ingrid Hunt - Traffic control device approval  Ingrid Hunt - Traffic control device approval
Ingrid Hunt - Traffic control device approval
 
David Hayes - Robust decision making
David Hayes - Robust decision makingDavid Hayes - Robust decision making
David Hayes - Robust decision making
 
Paul Steely White Plenary
Paul Steely White PlenaryPaul Steely White Plenary
Paul Steely White Plenary
 
Aecom - Streets for people workshop
Aecom - Streets for people workshop Aecom - Streets for people workshop
Aecom - Streets for people workshop
 
AITPM Conference Presentation - Bob Davis
AITPM Conference Presentation - Bob DavisAITPM Conference Presentation - Bob Davis
AITPM Conference Presentation - Bob Davis
 
AITPM Conference Presentation - Casper Baum
AITPM Conference Presentation - Casper BaumAITPM Conference Presentation - Casper Baum
AITPM Conference Presentation - Casper Baum
 
AITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie PiggottAITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie Piggott
 
AITPM Conference Presentation - David Sanders
AITPM Conference Presentation - David SandersAITPM Conference Presentation - David Sanders
AITPM Conference Presentation - David Sanders
 
AITPM Conference Presentation - Willem Deddam
AITPM Conference Presentation - Willem DeddamAITPM Conference Presentation - Willem Deddam
AITPM Conference Presentation - Willem Deddam
 
AITPM Conference Presentation - Nicole Lockwood
AITPM Conference Presentation - Nicole LockwoodAITPM Conference Presentation - Nicole Lockwood
AITPM Conference Presentation - Nicole Lockwood
 
AITPM Conference Presentation - David Brown
AITPM Conference Presentation - David BrownAITPM Conference Presentation - David Brown
AITPM Conference Presentation - David Brown
 

Último

The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Último (20)

Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...
Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...
Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableCuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
KOTA 💋 Call Girl 9827461493 Call Girls in Escort service book now
KOTA 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKOTA 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KOTA 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 

Paul Morris - parking

  • 1. Traffic and Parking Generation The impact on development AITPM National Conference 2014 Paul Morris
  • 2.
  • 3. Development Assessment • Parking Demands • Off-street supply • On-Street impacts • Shared/Compatible Uses • Multiple-use discounts • Development Plan • Specific rates • Generic definitions • Empirical Data • SA Guides • RTA Guide • SA Surveys • GTA Database
  • 4. Development Assessment • Traffic generation • Internal operation • Access • External impacts • Development Plans • Objectives • Principles • Empirical Data • RTA Guide • SA Surveys • GTA Database
  • 5. Access – a matter of degrees • Linked to traffic generation • Appropriate Access? • Unsignalised or signalised • Restricted turning movements • Use of existing local streets • Left turn auxiliary lanes • Warrants • Left turn lanes
  • 6. Access – a matter of degrees • Austroads Guides Determining the Need for Auxiliary Lanes The need for deceleration turn lanes cannot be stated definitively in all instances because of the many factors to be considered, such as speeds, traffic volumes, capacity, type of road, service provided, traffic control and crash history. Guide to Road Design – Part 4A: Unsignalised and Signalised Intersections
  • 7. Access – a matter of degrees Figure 4.9: Warrants for turn treatments on the major road at unsignalised intersections
  • 8. Access – a matter of degrees • External Infrastructure Costs • Short Taper - $30K • Standard Deceleration Lane - $150K • Extra costs for land acquisition, services, design, etc • Developments are marginal • Use appropriate analysis • Justify needs not just broad warrant
  • 9. Parking – The BIG Issue • Parking Demands • Off-street supply • On-Street impacts • Shared/Compatible Uses • Multiple-use discounts • Development Plan
  • 10. Parking – Development Plan Rates 3 3.5 4 4.5 5 5.5 6 6.5 7 Shop 5.5 7.0
  • 11. Parking Demands • Impacts on Parking Rates • Extended Shopping Hours • Changes in Shopping Trends (On-line, Entertainment) • Increased Retail Floor Space • Multiple Use Discounts
  • 12. Parking 5.2 4.8 5.1 5.2 4.6 5.1 Spaces per 100 square metres Gross Leasable Floor Space
  • 14.
  • 16.
  • 17.
  • 18. Only 3.9 per 100sqm...WOW Hmmm... 130 spaces OMG...$650K to build RUK.... $3.7m..!!
  • 19.
  • 21. Conclusions • Development Plans • Review parking rates • Lower shopping centre rates • Traffic Warrants • Review the use of warrants • Consider the actual need from analysis • Consider the cost • Impact on feasibility

Notas del editor

  1. Consider this street Describe it
  2. Can we reallocate space away from the car? Describe it