*-KADASIDDA SAVALGI Laxminarasimya Nilaya,
Email: kadasidda_savalgi@rediffmail.com No 20/7, 11th cross,
Mobile: +91 9620272033 5th main,
+91 9036598639 Pragatinagar layout,
Hongasandra,
Bangalore-560076
To achieve a challenging and rewarding career in the field of Civil Engineering. Particularly keen on serving for
organization, which offers a dynamic environment, where performance is demanded and rewarded.
Total Working Experience: 9.5 years
 Working as a DEPUTY PROJECT MANAGER in DIVYASREE DEVELOPERS at
BANGALORE From JAN-2013 to till date.
 Worked as a PROJECT ENGINEER in MJR BUILDERS PVT LTD BANGALORE. From
JULY- 2011 to JAN-2013
 Worked as SITE ENGINEER in TOTAL ENVIRONMENTL BUILDING SYSTEMS PVT LTD
in BANGALORE, from JUNE- 2008 to JULY-2011.
 Worked as a TRAINEE/JR SITE ENGINEER in PURAVANKARA PROJECTS LTD., Bangalore from
MAY 2006 to FEBRUARY 2008.
 Worked as LABORATORYASSISTANT in PATIL GROUP OF INDUSTRIES. From SEPT- 2005
to MARCH 2006.
Responsibility ofHandling:
 Monitor the total project execution in line with specification and procedures in terms of
time, cost and quality
 Preparing the project schedule in co-ordination with the all departments.
 Planning of resources like manpower, material, machinery, estimates, approvals from
consultants and drawings as per the schedule.
 Preparation of WORK BREAK DOWN structure, and sub dividing the work
responsibilities to engineers, supervisors& foreman’s.
 Co-ordination with clients, architects and consultants to get the prior clearance.
 Co-ordination with our internal departments like purchase, accounts, admin, and
auditing.
 Co-coordinating with the billing engineer to ensure the same that all PO items & NT
items are claimed in the Running Bills.
 Analyzing the daily productivity report of all major Equipments available at site and
daily labor report.
 Preparing weekly bills of subcontractors and analyzing extra claims and deviations
 Conducting weekly review meeting with all related department and ensure the project
runs as per the schedule.
 Weekly training given to supervisors and engineers to achieve our quality.
 Attending the Weekly progress review meeting with the client/other Departments to
ensure the issues to be sorted out ASAP.
 Anchoring on-site construction activities to ensure completion of projects within the
time and cost parameters with effective resources utilization to maximize the out put
 Ensure safety and housekeeping during and after work.
Projects Details:
 PATIL GROUP OF INDUSTRIES: worked as Lab Assistant from Sept 2005
to March 2006. Work Description: Worked as a laboratory Assistant in
Rayalseema Concrete sleepers (P) Ltd,Kargi Road, Bilaspur. (C.G)
Responsibility:
1. Civil materials like fine aggregates,coarse aggregates,
2. cement lab testing in site to check quality deviation,
3. Preparing Reports of testing.
 PURAVANKARA PROJECTS LTD.,Bangalore:Project Description: Purva
Atria at Sanjay Nagar, Bangalore. Super built up area:1, 10,000 sq.ft. From
May 2006 to march 2008 As Trainee/Jr. site Engineer.
Responsibility: Execution in charge of 2 Towers,A Tower- G+11 floors, 43
flats finishing works, B-Tower- G+6 structure work, (23 flats).
1. Responsible of supervision of All civil activity as per drawings,
Specifications with quality checking,
2. Documentation of checklists, ISO reports,
3. Store stock reports maintaining,
4. Bill checking of contractors
5. Daily Labor report, Progress report preparing,
6. Weekly all Flats Work status report Preparation,
 TOTAL ENVIRONMENTAL BUILDING SYSTEMS PVT LTD,
Bangalore: Project description: Windmills of your mind- White field: Project
consists of 73 duplex villas which are categorized in 6 blocks, each villa has
SBA 3800 sq. ft., Individual swimming pool, home automation system and
vacuum system, A/C works etc. From 2008 to July 2011.
Responsibility: Execution of2 blocks (16 villas)- Structural works,
Finishing works, and Interior works.
1. Execution of 16 villa Marking, footing, Structural slab works,
2. Brick work, plastering, Flooring along with Plumbing and Electrical works.
3. Flooring and cladding works with materials like Italian marble, Jaisalmer,
Kota, Engineered Wood, Hard Wood, Laminate floor, Vitrified tiles,
ceramic tiles, Terracota tiles, Travertino, Granites, stones, Artificial
Marbles.
4. Brickworks, blockworks, Wirecut brick works, Butchwork etc.
5. Electrical, plumbing, HVAC,Vacuum, Home automation Work,
Mechanical Ventilator works etc.
6. Execution of Finishing activity as per Customised Drawings.
7. Villas Checklists, Test report maintaining, Weekly Status report prepation,
 MJR BUILDERS PVT LTD. BANGALORE.
MJR Platina, Kudlu Gate, Bangalore. From July 2011 to January 2013.
Project Description: Project Consists of 8 blocks of each G+9-2 basements,
With dwelling 281 apartments,
This covered in total 2.7 acres of Land. Worked area 75000 sq.ft
Responsibility: Execution ofStructural work of block consisting of
3BHK- 4 flats in Floor, G+9-2.
1. Execution of Earthwork of Overall 8 blocks,
2. Retaining wall of 8 blocks upto podium slab,
3. Footing works of overall 8 blocks,
4. Structural work of a block G+9-2,
5. Masonry work of a block upto 5th
floor.
6. Ramp work.
 77’EAST VILLAS- OF DIVYASREE INFRASTRUCTURE PROJECTS
PVT LTD- Since from January 2013 to till date
A Project at HAL airport, Yemalur, Bangalore. Construction of high end
Villas of 85 plots of value each about 10cr.of 5800 SFT each villa
Responsibility:
1. . Handling 2 Cluster (Blocks) with 20 villas, which are of G+2 Floor.
With Built up Area of around 80000 Sft.
2. Execution of Villas works as per specification, Drawings, Approval,
Modifications,
3. Villas Block masonry work, Marbles, vitrified, wooden, ceramic, Elbana,
Clay tiles Flooring works.
4. Individual Villas spiral st’case, Glass railing, Swimming pool, works.
5. External Hardscape work such as Pavers,Cobbul, Stamp, grass Pavers,etc
6. External Landscape works,
7. Material arrangements for all villas works,
8. Work order preparation, PO follow up with QS, Purchase department,
9. Manpower arrangements,
10. Scheduling of villas, constraints, with Planning Department to complete the
activities as per schedule.
11. Work Break schedule preparation every week and sharing with
Subordinates to get work Complete as per schedule.
12. Attending meeting with management and sharing requirements like
Drawings, RFI, material, Instructions, etc.
13. Getting work done and clearances from Plumbing and Electrical
Departments.
AREA OF SPECIALAIZATION
 Handling of High rise apartment up to 9 floors high
 Good experience in finishing of individual High End villas
 Good knowledge in all kind of structural finishing activities
 Ensuring the quality standards in each and every activity
 Good interacting capacity with our customers/clients
 Individual Resource arranging capacity
 Trouble shooting capacity
 Decision making role
 Timely completion of project
Educational Qualifications
 Bachelors of Engineering – Civil (2005)
 PDA College of Gulbarga, VT University Belgaum, Karnataka,First Class
Skill Set
 Operating Systems : Windows 2007
 Auto Cad
 MS PROJECT
Passport Details:
 Passport No: G1701860
 Place of Issue : Bangalore
 Date of Issue : 07/02/2007
 Date of Expiry : 06/02/2017
Pe rsonal Details
Father’s Name : D.G.Savalgi
Nationality : Indian.
Marital Status : Married
Date ofBirth : 29/11/1983
Permanent Address : Veerabhadreshwar Nilaya,
Plot No 46,
Santosh colony,
Aland Rod,
Gulbarga
Karnataka-585101
Linguistic Ability
 English, Kannada, Hindi (To Speak, Read & Write)
De claration
I hereby declare that the above furnished details are true and up to the best of my knowledge.
Place: Bangalore Yours Truly
Date: KADASIDDA SAVALGI

More Related Content

What's hot (19)

paramasivam resume
paramasivam resume paramasivam resume
paramasivam resume
 
shimul_c.v_2_NEW_1
shimul_c.v_2_NEW_1shimul_c.v_2_NEW_1
shimul_c.v_2_NEW_1
 
Jeff Jvancich Resume 2016
Jeff Jvancich Resume 2016Jeff Jvancich Resume 2016
Jeff Jvancich Resume 2016
 
AC SOQ
AC SOQAC SOQ
AC SOQ
 
russell resume
russell resumerussell resume
russell resume
 
CV_Anup
CV_AnupCV_Anup
CV_Anup
 
Scott M Tidwell Resume word document 030415
Scott M Tidwell Resume word document 030415Scott M Tidwell Resume word document 030415
Scott M Tidwell Resume word document 030415
 
Scott M Tidwell Resume 030415
Scott M Tidwell Resume 030415Scott M Tidwell Resume 030415
Scott M Tidwell Resume 030415
 
Myresume
MyresumeMyresume
Myresume
 
Prakash cv update
Prakash cv updatePrakash cv update
Prakash cv update
 
My work at KWSP project
My work at KWSP project My work at KWSP project
My work at KWSP project
 
sunil.kumar resume
sunil.kumar resumesunil.kumar resume
sunil.kumar resume
 
Robert Le Mieux
Robert Le MieuxRobert Le Mieux
Robert Le Mieux
 
GL resume-carpenter
GL resume-carpenterGL resume-carpenter
GL resume-carpenter
 
Project list
Project listProject list
Project list
 
A. Nasir CV(1)
A. Nasir CV(1)A. Nasir CV(1)
A. Nasir CV(1)
 
Charles W resume
Charles W resumeCharles W resume
Charles W resume
 
CV-Bhat 2016
CV-Bhat 2016CV-Bhat 2016
CV-Bhat 2016
 
ESV CV-764 (new)
ESV CV-764 (new)ESV CV-764 (new)
ESV CV-764 (new)
 

Similar to kadasidda savalgi-Resume (20)

My Resume.1
My Resume.1My Resume.1
My Resume.1
 
Resume
ResumeResume
Resume
 
Rajbir Singh-2
Rajbir Singh-2Rajbir Singh-2
Rajbir Singh-2
 
Cris' Updated resume
Cris' Updated resumeCris' Updated resume
Cris' Updated resume
 
Ravi resume
Ravi resumeRavi resume
Ravi resume
 
Ravi Resume
Ravi ResumeRavi Resume
Ravi Resume
 
PROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF bennyPROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF benny
 
Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)
 
Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
anoop-CV 2016
anoop-CV 2016anoop-CV 2016
anoop-CV 2016
 
V.BASKAR CV
V.BASKAR CVV.BASKAR CV
V.BASKAR CV
 
Resume
ResumeResume
Resume
 
Resume vinoth kumar
Resume   vinoth kumarResume   vinoth kumar
Resume vinoth kumar
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
JAGMOC RESUME
JAGMOC RESUMEJAGMOC RESUME
JAGMOC RESUME
 
Resume - RAVI PRAKASH
Resume - RAVI PRAKASHResume - RAVI PRAKASH
Resume - RAVI PRAKASH
 
Resume - Celieto Rey Suarez
Resume - Celieto Rey SuarezResume - Celieto Rey Suarez
Resume - Celieto Rey Suarez
 
PROFESSIONAL EXPERIENCE
PROFESSIONAL EXPERIENCEPROFESSIONAL EXPERIENCE
PROFESSIONAL EXPERIENCE
 
cv for Project Engineer
cv for Project Engineercv for Project Engineer
cv for Project Engineer
 
updated CV 2016
updated CV 2016updated CV 2016
updated CV 2016
 

kadasidda savalgi-Resume

  • 1. *-KADASIDDA SAVALGI Laxminarasimya Nilaya, Email: kadasidda_savalgi@rediffmail.com No 20/7, 11th cross, Mobile: +91 9620272033 5th main, +91 9036598639 Pragatinagar layout, Hongasandra, Bangalore-560076 To achieve a challenging and rewarding career in the field of Civil Engineering. Particularly keen on serving for organization, which offers a dynamic environment, where performance is demanded and rewarded. Total Working Experience: 9.5 years  Working as a DEPUTY PROJECT MANAGER in DIVYASREE DEVELOPERS at BANGALORE From JAN-2013 to till date.  Worked as a PROJECT ENGINEER in MJR BUILDERS PVT LTD BANGALORE. From JULY- 2011 to JAN-2013  Worked as SITE ENGINEER in TOTAL ENVIRONMENTL BUILDING SYSTEMS PVT LTD in BANGALORE, from JUNE- 2008 to JULY-2011.  Worked as a TRAINEE/JR SITE ENGINEER in PURAVANKARA PROJECTS LTD., Bangalore from MAY 2006 to FEBRUARY 2008.  Worked as LABORATORYASSISTANT in PATIL GROUP OF INDUSTRIES. From SEPT- 2005 to MARCH 2006. Responsibility ofHandling:  Monitor the total project execution in line with specification and procedures in terms of time, cost and quality  Preparing the project schedule in co-ordination with the all departments.  Planning of resources like manpower, material, machinery, estimates, approvals from consultants and drawings as per the schedule.  Preparation of WORK BREAK DOWN structure, and sub dividing the work responsibilities to engineers, supervisors& foreman’s.  Co-ordination with clients, architects and consultants to get the prior clearance.  Co-ordination with our internal departments like purchase, accounts, admin, and auditing.  Co-coordinating with the billing engineer to ensure the same that all PO items & NT items are claimed in the Running Bills.  Analyzing the daily productivity report of all major Equipments available at site and daily labor report.  Preparing weekly bills of subcontractors and analyzing extra claims and deviations
  • 2.  Conducting weekly review meeting with all related department and ensure the project runs as per the schedule.  Weekly training given to supervisors and engineers to achieve our quality.  Attending the Weekly progress review meeting with the client/other Departments to ensure the issues to be sorted out ASAP.  Anchoring on-site construction activities to ensure completion of projects within the time and cost parameters with effective resources utilization to maximize the out put  Ensure safety and housekeeping during and after work. Projects Details:  PATIL GROUP OF INDUSTRIES: worked as Lab Assistant from Sept 2005 to March 2006. Work Description: Worked as a laboratory Assistant in Rayalseema Concrete sleepers (P) Ltd,Kargi Road, Bilaspur. (C.G) Responsibility: 1. Civil materials like fine aggregates,coarse aggregates, 2. cement lab testing in site to check quality deviation, 3. Preparing Reports of testing.  PURAVANKARA PROJECTS LTD.,Bangalore:Project Description: Purva Atria at Sanjay Nagar, Bangalore. Super built up area:1, 10,000 sq.ft. From May 2006 to march 2008 As Trainee/Jr. site Engineer. Responsibility: Execution in charge of 2 Towers,A Tower- G+11 floors, 43 flats finishing works, B-Tower- G+6 structure work, (23 flats). 1. Responsible of supervision of All civil activity as per drawings, Specifications with quality checking, 2. Documentation of checklists, ISO reports, 3. Store stock reports maintaining, 4. Bill checking of contractors 5. Daily Labor report, Progress report preparing, 6. Weekly all Flats Work status report Preparation,  TOTAL ENVIRONMENTAL BUILDING SYSTEMS PVT LTD, Bangalore: Project description: Windmills of your mind- White field: Project consists of 73 duplex villas which are categorized in 6 blocks, each villa has SBA 3800 sq. ft., Individual swimming pool, home automation system and vacuum system, A/C works etc. From 2008 to July 2011.
  • 3. Responsibility: Execution of2 blocks (16 villas)- Structural works, Finishing works, and Interior works. 1. Execution of 16 villa Marking, footing, Structural slab works, 2. Brick work, plastering, Flooring along with Plumbing and Electrical works. 3. Flooring and cladding works with materials like Italian marble, Jaisalmer, Kota, Engineered Wood, Hard Wood, Laminate floor, Vitrified tiles, ceramic tiles, Terracota tiles, Travertino, Granites, stones, Artificial Marbles. 4. Brickworks, blockworks, Wirecut brick works, Butchwork etc. 5. Electrical, plumbing, HVAC,Vacuum, Home automation Work, Mechanical Ventilator works etc. 6. Execution of Finishing activity as per Customised Drawings. 7. Villas Checklists, Test report maintaining, Weekly Status report prepation,  MJR BUILDERS PVT LTD. BANGALORE. MJR Platina, Kudlu Gate, Bangalore. From July 2011 to January 2013. Project Description: Project Consists of 8 blocks of each G+9-2 basements, With dwelling 281 apartments, This covered in total 2.7 acres of Land. Worked area 75000 sq.ft Responsibility: Execution ofStructural work of block consisting of 3BHK- 4 flats in Floor, G+9-2. 1. Execution of Earthwork of Overall 8 blocks, 2. Retaining wall of 8 blocks upto podium slab, 3. Footing works of overall 8 blocks, 4. Structural work of a block G+9-2, 5. Masonry work of a block upto 5th floor. 6. Ramp work.  77’EAST VILLAS- OF DIVYASREE INFRASTRUCTURE PROJECTS PVT LTD- Since from January 2013 to till date A Project at HAL airport, Yemalur, Bangalore. Construction of high end Villas of 85 plots of value each about 10cr.of 5800 SFT each villa Responsibility: 1. . Handling 2 Cluster (Blocks) with 20 villas, which are of G+2 Floor. With Built up Area of around 80000 Sft. 2. Execution of Villas works as per specification, Drawings, Approval, Modifications,
  • 4. 3. Villas Block masonry work, Marbles, vitrified, wooden, ceramic, Elbana, Clay tiles Flooring works. 4. Individual Villas spiral st’case, Glass railing, Swimming pool, works. 5. External Hardscape work such as Pavers,Cobbul, Stamp, grass Pavers,etc 6. External Landscape works, 7. Material arrangements for all villas works, 8. Work order preparation, PO follow up with QS, Purchase department, 9. Manpower arrangements, 10. Scheduling of villas, constraints, with Planning Department to complete the activities as per schedule. 11. Work Break schedule preparation every week and sharing with Subordinates to get work Complete as per schedule. 12. Attending meeting with management and sharing requirements like Drawings, RFI, material, Instructions, etc. 13. Getting work done and clearances from Plumbing and Electrical Departments. AREA OF SPECIALAIZATION  Handling of High rise apartment up to 9 floors high  Good experience in finishing of individual High End villas  Good knowledge in all kind of structural finishing activities  Ensuring the quality standards in each and every activity  Good interacting capacity with our customers/clients  Individual Resource arranging capacity  Trouble shooting capacity  Decision making role  Timely completion of project Educational Qualifications  Bachelors of Engineering – Civil (2005)  PDA College of Gulbarga, VT University Belgaum, Karnataka,First Class Skill Set  Operating Systems : Windows 2007  Auto Cad  MS PROJECT
  • 5. Passport Details:  Passport No: G1701860  Place of Issue : Bangalore  Date of Issue : 07/02/2007  Date of Expiry : 06/02/2017 Pe rsonal Details Father’s Name : D.G.Savalgi Nationality : Indian. Marital Status : Married Date ofBirth : 29/11/1983 Permanent Address : Veerabhadreshwar Nilaya, Plot No 46, Santosh colony, Aland Rod, Gulbarga Karnataka-585101 Linguistic Ability  English, Kannada, Hindi (To Speak, Read & Write) De claration I hereby declare that the above furnished details are true and up to the best of my knowledge. Place: Bangalore Yours Truly Date: KADASIDDA SAVALGI