Enviar búsqueda
Cargar
Electrical load report
•
Descargar como XLS, PDF
•
0 recomendaciones
•
1,509 vistas
Kamran Arshad
Seguir
Denunciar
Compartir
Denunciar
Compartir
1 de 2
Descargar ahora
Recomendados
Disc Clutch (Single Plate Clutch) EME
Disc Clutch (Single Plate Clutch) EME
Bhavesh Rathod
POWER TRANSMISSION IN ENGINES
POWER TRANSMISSION IN ENGINES
Chinedu Isiadinso
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
Shankar Ramasamy
Tata motors workshop
Tata motors workshop
Daniel Sujit
wagon tippler with side arm charger - LMM GROUP
wagon tippler with side arm charger - LMM GROUP
LMM GROUP CO., LTD.
Basics of bridge construction
Basics of bridge construction
symphonyjo
central Railway project report
central Railway project report
akshay ghanwat
indicated and brake mean effective pressure
indicated and brake mean effective pressure
mp poonia
Recomendados
Disc Clutch (Single Plate Clutch) EME
Disc Clutch (Single Plate Clutch) EME
Bhavesh Rathod
POWER TRANSMISSION IN ENGINES
POWER TRANSMISSION IN ENGINES
Chinedu Isiadinso
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
Shankar Ramasamy
Tata motors workshop
Tata motors workshop
Daniel Sujit
wagon tippler with side arm charger - LMM GROUP
wagon tippler with side arm charger - LMM GROUP
LMM GROUP CO., LTD.
Basics of bridge construction
Basics of bridge construction
symphonyjo
central Railway project report
central Railway project report
akshay ghanwat
indicated and brake mean effective pressure
indicated and brake mean effective pressure
mp poonia
2SC1740Sのデータシート
2SC1740Sのデータシート
Tsuyoshi Horigome
021[1]
021[1]
宗逸 沈
Nano Fusion Technologies Overview)
Nano Fusion Technologies Overview)
ogawam
SPICE MODEL of TC75S51FU in SPICE PARK
SPICE MODEL of TC75S51FU in SPICE PARK
Tsuyoshi Horigome
SPICE MODEL of TC75S51F in SPICE PARK
SPICE MODEL of TC75S51F in SPICE PARK
Tsuyoshi Horigome
La7836
La7836
karlangaz
SPICE MODEL of TC75S51FE in SPICE PARK
SPICE MODEL of TC75S51FE in SPICE PARK
Tsuyoshi Horigome
Fvg fvpg-fd (r22) 008-8
Fvg fvpg-fd (r22) 008-8
tiger1202
Fvg fvpg-fd (r22) 008-6
Fvg fvpg-fd (r22) 008-6
tiger1202
Testo - Stationary Measurement - Humidity and Temperature
Testo - Stationary Measurement - Humidity and Temperature
Testo Limited
Impact of political stability on the reserves of pakistan
Impact of political stability on the reserves of pakistan
Kamran Arshad
Short listing techniques used by online recruitment sites
Short listing techniques used by online recruitment sites
Kamran Arshad
Public research and innovation in Germany
Public research and innovation in Germany
Kamran Arshad
Research on it products
Research on it products
Kamran Arshad
Employee personal information form
Employee personal information form
Kamran Arshad
Workshop feeback-form
Workshop feeback-form
Kamran Arshad
Rack documentation template
Rack documentation template
Kamran Arshad
Employee performance evaluation form
Employee performance evaluation form
Kamran Arshad
Sample inventory report
Sample inventory report
Kamran Arshad
Financial Analysis Of Annual Report Of Pil
Financial Analysis Of Annual Report Of Pil
Kamran Arshad
Banyan tree case study
Banyan tree case study
Kamran Arshad
Cross cultural business communication in un
Cross cultural business communication in un
Kamran Arshad
Más contenido relacionado
Similar a Electrical load report
2SC1740Sのデータシート
2SC1740Sのデータシート
Tsuyoshi Horigome
021[1]
021[1]
宗逸 沈
Nano Fusion Technologies Overview)
Nano Fusion Technologies Overview)
ogawam
SPICE MODEL of TC75S51FU in SPICE PARK
SPICE MODEL of TC75S51FU in SPICE PARK
Tsuyoshi Horigome
SPICE MODEL of TC75S51F in SPICE PARK
SPICE MODEL of TC75S51F in SPICE PARK
Tsuyoshi Horigome
La7836
La7836
karlangaz
SPICE MODEL of TC75S51FE in SPICE PARK
SPICE MODEL of TC75S51FE in SPICE PARK
Tsuyoshi Horigome
Fvg fvpg-fd (r22) 008-8
Fvg fvpg-fd (r22) 008-8
tiger1202
Fvg fvpg-fd (r22) 008-6
Fvg fvpg-fd (r22) 008-6
tiger1202
Testo - Stationary Measurement - Humidity and Temperature
Testo - Stationary Measurement - Humidity and Temperature
Testo Limited
Similar a Electrical load report
(10)
2SC1740Sのデータシート
2SC1740Sのデータシート
021[1]
021[1]
Nano Fusion Technologies Overview)
Nano Fusion Technologies Overview)
SPICE MODEL of TC75S51FU in SPICE PARK
SPICE MODEL of TC75S51FU in SPICE PARK
SPICE MODEL of TC75S51F in SPICE PARK
SPICE MODEL of TC75S51F in SPICE PARK
La7836
La7836
SPICE MODEL of TC75S51FE in SPICE PARK
SPICE MODEL of TC75S51FE in SPICE PARK
Fvg fvpg-fd (r22) 008-8
Fvg fvpg-fd (r22) 008-8
Fvg fvpg-fd (r22) 008-6
Fvg fvpg-fd (r22) 008-6
Testo - Stationary Measurement - Humidity and Temperature
Testo - Stationary Measurement - Humidity and Temperature
Más de Kamran Arshad
Impact of political stability on the reserves of pakistan
Impact of political stability on the reserves of pakistan
Kamran Arshad
Short listing techniques used by online recruitment sites
Short listing techniques used by online recruitment sites
Kamran Arshad
Public research and innovation in Germany
Public research and innovation in Germany
Kamran Arshad
Research on it products
Research on it products
Kamran Arshad
Employee personal information form
Employee personal information form
Kamran Arshad
Workshop feeback-form
Workshop feeback-form
Kamran Arshad
Rack documentation template
Rack documentation template
Kamran Arshad
Employee performance evaluation form
Employee performance evaluation form
Kamran Arshad
Sample inventory report
Sample inventory report
Kamran Arshad
Financial Analysis Of Annual Report Of Pil
Financial Analysis Of Annual Report Of Pil
Kamran Arshad
Banyan tree case study
Banyan tree case study
Kamran Arshad
Cross cultural business communication in un
Cross cultural business communication in un
Kamran Arshad
Hrm practices at telenor
Hrm practices at telenor
Kamran Arshad
Hrm practices at telenor
Hrm practices at telenor
Kamran Arshad
Impact of stress on productivity
Impact of stress on productivity
Kamran Arshad
Cross cultural business communication in UN
Cross cultural business communication in UN
Kamran Arshad
My Resume
My Resume
Kamran Arshad
Más de Kamran Arshad
(17)
Impact of political stability on the reserves of pakistan
Impact of political stability on the reserves of pakistan
Short listing techniques used by online recruitment sites
Short listing techniques used by online recruitment sites
Public research and innovation in Germany
Public research and innovation in Germany
Research on it products
Research on it products
Employee personal information form
Employee personal information form
Workshop feeback-form
Workshop feeback-form
Rack documentation template
Rack documentation template
Employee performance evaluation form
Employee performance evaluation form
Sample inventory report
Sample inventory report
Financial Analysis Of Annual Report Of Pil
Financial Analysis Of Annual Report Of Pil
Banyan tree case study
Banyan tree case study
Cross cultural business communication in un
Cross cultural business communication in un
Hrm practices at telenor
Hrm practices at telenor
Hrm practices at telenor
Hrm practices at telenor
Impact of stress on productivity
Impact of stress on productivity
Cross cultural business communication in UN
Cross cultural business communication in UN
My Resume
My Resume
Electrical load report
1.
Electrical Load at
OMC Date:5/4/2005 1 Ton (Amps) 1.5 Ton (Amps) 2 Ton (Amps) 2.5 Ton (Amps) Amps Qty Total Amps Items Tube Lights 0.5 37 18.5 Bulbs 0.3 70 21 Fans 1 9 9 Computers 2 50 100 W 8 12 16 20 0 11(1.5 tons), 4 (2 Tons) & Air Conditioners S 7 11 15 19 16 1(1 Ton) 188 Heaters (2000W) 8 2 16 Other Equipment Server Room 5 357.5 Amps 230 Volts 82,225 VA 82.23 KVA 3 Phase max. 90Amps 1 Amp 230Volt 230Watts 8.7 Room wise Electricity Load Lobby Kitchen Lobby Kitchen Marketing (Upper (Upper Finance Finance Asst (Ground (Ground Guest Tech Dept Dept Server Room Call Center M.S&O Floor) Floor) Reception Dept manager C.E.O Board Room Admin Floor) floor) Room Items Tube Lights(0.5 AMP) 2 2 1 11 3 2 4 18 Bulbs 2 2 24 bulbs 16(Bulbs) 12 Bulbs 2 2 2 Fans (1 AMP) 1 1 1 1 1 1 1 1 1 Computers (2 AMP) 6 2 4 20 2 8 1 3 2 1 1 Heaters (8 AMPS) 1 1 1(1.5 Ton) 1(1.5 Air Conditioner 1(2 Ton)Split 1(1.5 Ton) Split 1(1 Ton) Split Other Equipment 2 (2 Tons) Split 1(1.5 Ton) Split 2(1.5 Ton)Split 1(1.5 Ton) Split 1(1.5 Ton) Split 1(1.5 Ton) Split 2(1.5 Ton) Split 1(2 Ton) Split Split Ton) Split (5 AMPS) AMPS 29 17 20.5 75.5 25.5 3 41 18.4 19 25 31.2 20.8 16.6 1 1 13 357.5
2.
Date: 18.04.2005
Room wise Electricity Load Tube Lights(0.5 AMP) Bulbs(0.3) Fans (1 AMP) Computers (2 AMP) Heaters (8 AMPS) Air Conditioner AMPS Tech Dept 2 1 6 1(1.5 Ton)Split 25 Marketing Dept 2 1 2 1(1.5 Ton) Split 17 Other Equipments (5 Server Room 1 4 1(1 Ton) Split AMPS) 20.5 Call Center 11 20 2 (1.5 Tons) Split 67.5 M.S&O 3 1 2 1 1(1.5 Ton) Split 25.5 Kitchen (Upper Floor) 2 1 3 2(1.5 Ton)Split Lobby (Upper Floor) 4 1 8 41 Reception 18 1 1(1.5 Ton) Split 18.4 Finance Dept 2 1 3 1(1.5 Ton) Split 19 Finance manager 2 1 2 1 1(1.5 Ton) Split 25 C.E.O 24 1 2(1.5 Ton) Split 31.2 Board Room 16 1 1(1.5 Ton) Split 16.8 Asst Admin 12 1 1(.75 Ton) Split 11.6 Kitchen(Ground Floor) 2 1 Lobby(Ground floor) 2 1 Guest Room 2 1 1(1.5 Ton) Split 13 Total 336.5 Approx. Electrical Load at OMC .75 Ton (Amps) 1.5 Ton (Amps) 2 Ton (Amps) 2.5 Ton (Amps) Amps Quantity Total Amps Items Tube Lights 0.5 37 18.5 Bulbs 0.3 70 21 Fans 1 9 9 Computers 2 50 100 Air Conditioners Split 6 11 15 19 16 167 14 (1.5 Tons), 1 (1 Ton) & 1 (.75 Ton ) Heaters (2000W) 8 2 16 Other Equipment of Server Room 5 Approx 336.5 Amps Approx. 230 Volts 77,395 VA 77.40 KVA Approx.
Descargar ahora