From:    Mike McKeen                     To: David Ficklin - OnGoal
                                                                          Rory O’Connor – OnGoal
                             Office: Kansas City                          Lee Turner – OnGoal
                             Date:    10.13.2010                          Andy Heitmann – Turner
                                                                          Dave Dudzik – Turner
                             Re:      Wizards Stadium Project
                                      Update – Week of
                                      10.11.2010


                                                             Area 3 – Loading dock SOG.
 Current Activities this Week:

 Foundations:
 Area 4 Field Level – Foundations for “infill” area
 between Column Lines 39-1 are complete.

 Concrete Flatwork:
 Field Level - Cauldron club should pour Thursday 10/14
 Bowl – Intermediate stairs should be complete this week.

 Masonry:
 Area 1 – Field level masonry installation is ongoing in
                                                             Field 3 – Masonry – Concrete slab-on grade
                                                             Area Level Area 3 walls on east side.
 Area F, E, D and C.
                                                             prep is ongoing to column line 4.
 Area 2/3 – Concourse building masonry installation
 is ongoing. Masonry pilasters will begin 10/13
 on the east side.

 Steel Erection:
 Area 4 – decking and stud install for “infill” area is
 ongoing (Sequence 3-3). Truss installation is complete,
 and now installing purlins.
 Area 2/3 – Steel joist and metal decking installation for
 concourse buildings is ongoing. Canopy decking
 installation is ongoing. Canopy gutter enclosure framing
 installation is ongoing.                                    Field Level Area 3 – Masonry in Section D is
                                                             ongoing.
 Roofing and Sheetmetal:
 Area 1 – Permanent roofing installation at West
 Building should be complete by end of wk.
 Area 2/3 – Canopy gutter installation will be complete
 by the end of wk.



Building the Future                                          Area 4 – All the large trusses are set.
Metal Stud Framing:
 Area 1 – Metal stud framing and sheetrock install
 for Field, Concourse, Suite and Press Levels are ongoing.
 Exterior metal stud framing and sheathing installation
 is ongoing at Field, Suite, and Press Levels.
 Area 2 –Metal studs at south corridor ongoing.
 Metal studs at concessions will begin 10/14 – 10/15.

 Glass:
 Area 1 - Curtainwall framing and glass installation is
 ongoing at West Building on west, south, east and north
 elevations. South “wing” framing is complete. Curtainwall      Area 1 – RTU’s and roofing on west building.
 framing on Suite and Press Level balconies is complete.
 Curtainwall framing at Field Side of Main Concourse
 is also complete.

 MEP Rough-in:
 Area 1 -Ductwork installation on Field, Main, Suite
 and Press Levels are ongoing. Plumbing rough-in is
 ongoing on Field, Mezz, Main, Suite and Press Levels.
 Fire Protection rough-in is ongoing at Field Level.
 Electrical rough-in is ongoing on Field, Mezz, Concourse,
 Suite and Press Levels. The main electrical gear is onsite,
 and the RTU units will be will set this week.
 Area 3 – Underground MEP rough-in is ongoing. Rough-in
 at Main Concourse CMU walls is ongoing.
                                                                Area 3 – Canopy decking on east side.
 Elevators:
 S1 elevator is onsite and install is ongoing.
 F1 elevator to arrive onsite 10/13.

 Projected Activities occurring next Week:

 Concrete Flatwork:
 Area 3 – Mezzanine concrete will be poured from grid
 33 – 40. Area 3 and 4 Field Level – Installation of on-grade
 seating risers and intermediate stairs will continue.




Building the Future                                             Area 1 – Install of playing field storm loop.
Masonry:
 Area 1 – Field level masonry installation will continue inArea F, E, D and C.
 Area 2/3 – Concourse building masonry, Field Level walls
                                                                 Area 2 – South Corridor Framing
 and east exterior pilasters will continue.

 Structural Steel Erection:
 Area 4 – Decking of “infill” area should be complete and
 ready for MEP rough-in.
 Area 2 – Steel joist and metal decking
 installation for concourse buildings will continue.
 Canopy decking and canopy gutter enclosure framing
 installation will continue.

 Roofing and Sheetmetal:
 Prepping and field measuring for metal panels at suites.

 Metal Stud Framing:
 Area 1 – Metal stud framing and sheetrock install
 for Field, Concourse, Suite and Press Levels will continue.
 Exterior Framing and sheathing installation will continue.
 Area 2 – Field Level and Concession framing will continue.

 Glass:
 Area 1 – Curtain Framing and Glass installation around West
 Building will continue. Glass install will begin at Press Level
 balcony, Suite Level balcony, and Main Concourse west side
 elevation. North wing wall framing will begin next week as Area 1 – Metal stud framing in the home
 well.                                                           locker room.

 MEP Rough-in:
 MEP rough-in at Concourse, Suite and Press Levels will
 continue. Ductwork installation on Concourse, Suite, and
 Press Levels will continue. Fire Sprinkler installation will
 continue on the Field Level. Storm system plumbing
 install will continue at all levels.

 Elevators:
 Install of F1 and S1 will continue.




Building the Future
Additional Photos:




Area 3– On-grade seating installation is
ongoing at north elevation.




Building the Future

Más contenido relacionado

Destacado

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

Destacado (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Construction Update 10-13-2010

  • 1. From: Mike McKeen To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 10.13.2010 Andy Heitmann – Turner Dave Dudzik – Turner Re: Wizards Stadium Project Update – Week of 10.11.2010 Area 3 – Loading dock SOG. Current Activities this Week: Foundations: Area 4 Field Level – Foundations for “infill” area between Column Lines 39-1 are complete. Concrete Flatwork: Field Level - Cauldron club should pour Thursday 10/14 Bowl – Intermediate stairs should be complete this week. Masonry: Area 1 – Field level masonry installation is ongoing in Field 3 – Masonry – Concrete slab-on grade Area Level Area 3 walls on east side. Area F, E, D and C. prep is ongoing to column line 4. Area 2/3 – Concourse building masonry installation is ongoing. Masonry pilasters will begin 10/13 on the east side. Steel Erection: Area 4 – decking and stud install for “infill” area is ongoing (Sequence 3-3). Truss installation is complete, and now installing purlins. Area 2/3 – Steel joist and metal decking installation for concourse buildings is ongoing. Canopy decking installation is ongoing. Canopy gutter enclosure framing installation is ongoing. Field Level Area 3 – Masonry in Section D is ongoing. Roofing and Sheetmetal: Area 1 – Permanent roofing installation at West Building should be complete by end of wk. Area 2/3 – Canopy gutter installation will be complete by the end of wk. Building the Future Area 4 – All the large trusses are set.
  • 2. Metal Stud Framing: Area 1 – Metal stud framing and sheetrock install for Field, Concourse, Suite and Press Levels are ongoing. Exterior metal stud framing and sheathing installation is ongoing at Field, Suite, and Press Levels. Area 2 –Metal studs at south corridor ongoing. Metal studs at concessions will begin 10/14 – 10/15. Glass: Area 1 - Curtainwall framing and glass installation is ongoing at West Building on west, south, east and north elevations. South “wing” framing is complete. Curtainwall Area 1 – RTU’s and roofing on west building. framing on Suite and Press Level balconies is complete. Curtainwall framing at Field Side of Main Concourse is also complete. MEP Rough-in: Area 1 -Ductwork installation on Field, Main, Suite and Press Levels are ongoing. Plumbing rough-in is ongoing on Field, Mezz, Main, Suite and Press Levels. Fire Protection rough-in is ongoing at Field Level. Electrical rough-in is ongoing on Field, Mezz, Concourse, Suite and Press Levels. The main electrical gear is onsite, and the RTU units will be will set this week. Area 3 – Underground MEP rough-in is ongoing. Rough-in at Main Concourse CMU walls is ongoing. Area 3 – Canopy decking on east side. Elevators: S1 elevator is onsite and install is ongoing. F1 elevator to arrive onsite 10/13. Projected Activities occurring next Week: Concrete Flatwork: Area 3 – Mezzanine concrete will be poured from grid 33 – 40. Area 3 and 4 Field Level – Installation of on-grade seating risers and intermediate stairs will continue. Building the Future Area 1 – Install of playing field storm loop.
  • 3. Masonry: Area 1 – Field level masonry installation will continue inArea F, E, D and C. Area 2/3 – Concourse building masonry, Field Level walls Area 2 – South Corridor Framing and east exterior pilasters will continue. Structural Steel Erection: Area 4 – Decking of “infill” area should be complete and ready for MEP rough-in. Area 2 – Steel joist and metal decking installation for concourse buildings will continue. Canopy decking and canopy gutter enclosure framing installation will continue. Roofing and Sheetmetal: Prepping and field measuring for metal panels at suites. Metal Stud Framing: Area 1 – Metal stud framing and sheetrock install for Field, Concourse, Suite and Press Levels will continue. Exterior Framing and sheathing installation will continue. Area 2 – Field Level and Concession framing will continue. Glass: Area 1 – Curtain Framing and Glass installation around West Building will continue. Glass install will begin at Press Level balcony, Suite Level balcony, and Main Concourse west side elevation. North wing wall framing will begin next week as Area 1 – Metal stud framing in the home well. locker room. MEP Rough-in: MEP rough-in at Concourse, Suite and Press Levels will continue. Ductwork installation on Concourse, Suite, and Press Levels will continue. Fire Sprinkler installation will continue on the Field Level. Storm system plumbing install will continue at all levels. Elevators: Install of F1 and S1 will continue. Building the Future
  • 4. Additional Photos: Area 3– On-grade seating installation is ongoing at north elevation. Building the Future