Value Stream Mapping:
From Tool to Management Practice
Omaha Lean User Group
May 6, 2014
 Consultant / Facilitator / Coach: Lean
transformation & business performance
improvement in all industries.
 Teacher: University of California, San Diego
 Author & Speaker:
Karen Martin, President
2
www.ksmartin.com/subscribe
2013 Shingo
Prize winner!
© 2014 The Karen Martin Group, Inc.
Wherever there is a request
and a deliverable,
there is a value stream.
Value Stream Defined
Value Stream: All of the activities required to transform
a customer request into a good or service.
4
First defined in The Machine That Changed the World,
James Womack, Daniel Jones, & Daniel Roos, 1990.
Process ProcessProcess
Customer
Request
Customer
Receipt
Value Stream Mapping’s Roots
• Value
• Value Stream
• Flow
• Pull
• Perfection
1996
Work: Degrees of Granularity
Value
Stream
Process Process Process
Step StepStep
6
Macro
Perspective
• Define strategic
direction (“what”)
• Heavy leadership
involvement
• Value Stream
Mapping
Micro
Perspective
• Identify the
tactical “how”
• Heavy frontline
involvement
• Metrics-Based
Process Mapping
Value Stream Mapping Progression
Mike Rother &
John Shook, 1999
Beau Keyte &
Drew Locher, 2004
Karen Martin &
Mike Osterling, 2014
8
1
Information
Flow
2
Work Flow
3
Timeline
Basic Current State Value Stream Map: 3 Sections
© 2014 The Karen Martin Group, Inc. 9
Customer
1
Process 3
Function E
LT = 0.5 days
PT = 30 mins.
%C&A = 95%
4
4
10 mins.
1 days
120 mins.
2 days
30 mins.
0.5 days Total LT = 3.5 days
Total PT = 160 mins.
Activity Ratio = 9.5%
Rolled %C&A = 89.3%
Process 2
Function C
LT = 2 days
PT = 120 mins.
%C&A = 95%
3
3
ABC Technology, Inc.
Future State Value Stream Map
Name of Value Stream Being Mapped
Demand Rate = XX / Year
Name of Value Stream Champion
Mapping Date
IT-1 IT-2
5 items
Process 1
Function A
LT = 1 days
PT = 10 mins.
%C&A = 99%
5
2
1 items 10 items
Standard
work
Modified
approvals
IT interface
Cross-
train
Cross-
train
Standard
work
Error
proof
Basic Value Stream Map: Future State
Which do you prefer?
OR
Example of Value Stream Improvement:
You Can Achieve HUGE Gains
Metric Current State
Projected
Future State
Projected %
Improvement
Lead Time
(PO to shipping)
17 months 7.5 months 56%
Process Time 600 hours 450 hours 25% (22 FTEs)
Rolled % Complete &
Accurate
0% 21% > 2,000%
On-time delivery 13% 90% 592%
# Internally-produced
Change Orders
25/project 12/project 52%
Freed cash flow $25M per year
Proper Value Stream Mapping
Builds Organizational Muscles
© 2014 The Karen Martin Group, Inc. 13
Common Failing:
Approaching VSM Mechanistically
Value Stream Maps:
Strategy Before Tactics
Where am I?
Where do I want
to go?
I-80 option I-40 option I-70 option
Which route
should I take?
? ?
?
Value Stream
Mapping is a Strategic,
Leadership-Heavy
Activity
Who? Accountability Practice / Tool
Sr. Leaders “What has to happen” Hoshin Planning,
Value Stream
Mapping
Frontlines “How it will happen” Kaizen Events,
Just-do-its,
and Projects
Improvement RolesStrategicTactical
Middle
Management
© 2014 The Karen Martin Group, Inc. 17
Value Stream Mapping Benefit:
Seeing the Whole
17
Value Stream Mapping enables a
mapping team to get ABOVE the work
18
Work is More Similar Than Not…
…When
Viewed
from a
Macro
Perspective
VSM Aids in Developing Systems Thinking
19
System Efficiency = Optimal Value Stream Performance
Individual Efficiency = Sub-optimization
© 2014 The Karen Martin Group, Inc.
VSM Helps Break Down Functional Silos
20
Function FunctionFunctionFunction
Core Value Streams
Support Value Streams
Support Value Streams
Customer
Customer
Customer
21
22
Value Stream
Maps help
visualize
problems
Value Stream Maps Help Visualize Problems
23
24
Visualize the entire cycle of value delivery
on a single sheet of paper
© 2014 The Karen Martin Group, Inc. 24
Prepare
Understand
Current State
Design
Future State
Develop
Transformation
Plan
Execute
Transformation
Plan
Three Consecutive Days
4-6 Weeks
Prior to Mapping
Following
Mapping
And Repeat
Value Stream Mapping Activity
Phases and Timing
25
Prepare
Understand
Current State
Design
Future State
Develop
Transformation
Plan
Execute
Transformation
Plan
Three Consecutive Days
4-6 Weeks
Prior to Mapping
Following
Mapping
And Repeat
Value Stream Mapping Activity
Phases and Timing
26
1
2 1
3 2
4 3
5 4
5
1 6
2 7
3 8
4 9
5 10
1
2 1
3 2
4 3
5 4
1
2
3
4 Date: Date:engagement, financials, lead time, safety records, etc.
effectiveness, market trends, customer satisfaction, employee Signature:
Date:
Relevant Data Agreement
Examples: work volume & volume variation, process quality &
Executive SponsorWhat data is required to understand relevant current state isues.
Signature: Signature:
How will the business, internal and external customers, and Function
internal and external suppliers benefit from value stream improvement? SMEs that may not be needed full time
Always a nice touch; keeps
the team from wandering
On-site, ample wall space,
quiet/private location
Benefits to Customers & Business On-Call Support
Increase <defined metric> from X to Y (Z% improvement).
Reduce <defined metric> from X to Y (Z% improvement).
Measurable Target Condition
What's driving the need for improvement? Function
Leadership-heavy
Current State Problems & Business Needs Mapping Team
Boundaries &
Limitations
Improvement Time
Frame
What is the team NOT authorized to change?
Typically 3-6 months
Last Step Task on last process block
Logistics
Coordinator
Not always needed
Aids in consensus building
and organizational learning.
Typically the last hour of the
day.
First Step Task on first process block
Briefing
Dates &
Times
Meals
Provided
Briefing
Attendees
** required
*optional
List the the people that are
required to attend the briefings (**)
and those whose attendance is
optional (*).
Demand Rate
Trigger
How many times is this done per wk, qtr, mo, or yr?
What initiates the process?
Value Stream Mapping Charter
Scope Accountable Parties Logistics
Required: typically VP or C-level
If needed—often director or
manager level
Specific
Conditions
What circumstances are included and excluded?
(e.g., type of customer, geographic location, etc.)
Value Stream
Champion
Value stream being improved
Executive
Sponsor
Value Stream
Event Dates
& Times
3 days typically; consecutive
is best; 6 hrs per day
minimum; 7 or 8 hrs is best
Required: skilled, objective person
leading the activity
Base-camp
Location
Facilitator
Name
Name
FacilitatorValue Stream Champion
Contact Information
Contact Information
Critical planning, communication, and consensus-building tool
Available at www.ksmartin.com/charter
Where should the “fenceposts” be?
Function Activity
Marketing Generates sales leads
Sales Calls on and qualifies customers
Customer Submits RFQ to sales
Sales Reviews RFQ
Estimating Generates quote
Sales Approve quote
Customer Accepts quote; submits a PO
Sales Approves PO
Customer service Creates SO; compiles spec package
EE/ME design Designs product; generates BOM
Customer Approves design
EE/ME design Forwards design to SW dev
Software Dev Writes code
Purchasing/Planning Releases WO; schedules production
Supplier (external) Delivers materials
Production Manufactures & ships product
Customer Installs equipment
Field service Conducts 90-day follow-up
Value Stream Scoping Diagram
Defining Specific Conditions
Golden State
Equipment, Inc.
Capital Equipment
Catalog
Configure to
order
Engineer to
order
Custom hardware
Custom software
Both
New Product
Development
Spares &
subassemblies
Catalog
Engineer to order
29
Prepare
Understand
Current State
Design
Future State
Develop
Transformation
Plan
Execute
Transformation
Plan
Three Consecutive Days
4-6 Weeks
Prior to Mapping
Following
Mapping
And Repeat
Value Stream Mapping Activity
Phases and Timing
30
Briefing #1
31
Purpose: Reduce resistance to future state design
Briefing #2
32
Purpose: Build consensus around future state design
Briefing #3
33
Purpose: Gain commitment re: improvement priorities,
ownership, resources needed, and timeline.
Always
Paper &
Post-its
First!
© 2014 The Karen Martin Group, Inc. 35
Customer
1
Process 3
Function E
LT = 0.5 days
PT = 30 mins.
%C&A = 95%
4
4
10 mins.
1 days
120 mins.
2 days
30 mins.
0.5 days Total LT = 3.5 days
Total PT = 160 mins.
Activity Ratio = 9.5%
Rolled %C&A = 89.3%
Process 2
Function C
LT = 2 days
PT = 120 mins.
%C&A = 95%
3
3
ABC Technology, Inc.
Future State Value Stream Map
Name of Value Stream Being Mapped
Demand Rate = XX / Year
Name of Value Stream Champion
Mapping Date
IT-1 IT-2
5 items
Process 1
Function A
LT = 1 days
PT = 10 mins.
%C&A = 99%
5
2
1 items 10 items
Standard
work
Modified
approvals
IT interface
Cross-
train
Cross-
train
Standard
work
Error
proof
Basic Value Stream Map: Future State
J F M A M J J A S O N D
1 PROJ Steve 0%
2 PROJ Steve 100%
3 KE Bruce 50%
4 KE Bruce 50%
5 PROJ Jessie 100%
6 PROJ Sally 100%
7 KE Jessie 0%
8 PROJ Mike 100%
9 JDI Jessie 50%
10 PROJ Steve 80%
11 PROJ Steve 10%
12 PROJ Bob 0%
13 JDI Jessie 100%
14 PROJ Marcia 25%
15 PROJ Tom 30%
16 KE Marcia 50%
17 PROJ Sally 50%
Value Stream Champion Sally Brooks
Value Stream Mapping Facilitator Karen Martin
Value Stream Transformation Plan
Value Stream Product Y Scheduled Review Dates
Executive Sponsor Jim McMahon 2/10 + bi-weekly Thu 10 am
Socialize new criteria for engineering,
quality, & purchasing involvement.
Date Created 1/5/2014
Kaizen
Burst #
Improvement Objective / Hypothesis Proposed Countermeasure
Exec.
Method *
Owner
Planned Timeline for Execution
Status
Create procedure/train GS service engineers to
properly feedback suggestions to engineering.
Create bulletin re: standardized headplate
design to eliminate flange orientation.
Create visual "milestone" timeline to
educate customers.
Define technical info needed from
customer and when.
Signature: Signature: Signature:
Revise standard Ts & Cs to incorporate time limit
for customer approval for final payment.
Error proof P.O. info (correct specs, ship to,
etc.); notify customer re missing info and
drop dead date.
Create criteria for LOI acceptance.
Add initial project release in SF.
Resocialize existing customer-requested
CO procedure.
One piece engineering flow
Agreement
Executive Sponsor Value Stream Champion Value Stream Mapping Facilitator
* Execution Method = JDI (Just-do-it), KE (Kaizen Event), or Proj (Project)
Move to one release (pump & systems)
Date: Date: Date:
Create commodity management team &
supplier SLAs.
Standardize WPS/PQR from suppliers.
Revise proposal template to limit time to 4
revisions.
Create pull signal for invoicing.
Create trigger to release (BOMs) for
purchase.
ConfidentialContentRemoved
Available at www.ksmartin.com/vsm-transformation-plan
Prepare
Understand
Current State
Design
Future State
Develop
Transformation
Plan
Execute
Transformation
Plan
Three Consecutive Days
4-6 Weeks
Prior to Mapping
Following
Mapping
And Repeat
Value Stream Mapping Activity
Phases and Timing
37
Outpatient CT Scans: Current State Value Stream Map
Outpatient CT Scans: Future State Value Stream Map
Outpatient Imaging Value Stream Improvement
Metric Current State
Projected
Future State
Projected
% Improvement
Timeline Lead Time 4.0 days 1.3 days 67.5%
Timeline Process Time 59 minutes 48 minutes 18.6%
Activity Ratio 3.1% 7.6% 145.2%
Rolled % Complete &
Accurate
30.5% 65.0% 113.1%
And Repeat…
But wait!
Who Owns the
Value Stream???
42
43
Karen Martin, President
858.677.6799
@karenmartinopex
Blog & newsletter:
www.ksmartin.com/subscribe

Más contenido relacionado

La actualidad más candente

value stream mapping
value stream mappingvalue stream mapping
value stream mappingvvmech
 
Lean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleLean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleFrank-G. Adler
 
UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingLean6Sigma4all
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mappingmahawar1987
 
VSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturingVSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturingJessica Mitchell
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream MappingTKMG, Inc.
 
Advanced Lean Strategies for Office & Service Environments
Advanced Lean Strategies for Office & Service Environments Advanced Lean Strategies for Office & Service Environments
Advanced Lean Strategies for Office & Service Environments TKMG, Inc.
 
WEBINAR: Introduction to Value Stream Mapping
WEBINAR: Introduction to Value Stream MappingWEBINAR: Introduction to Value Stream Mapping
WEBINAR: Introduction to Value Stream MappingGoLeanSixSigma.com
 
Value Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesValue Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesTKMG, Inc.
 
Six Sigma DMADV DMAIC - Project Charter
Six Sigma DMADV DMAIC - Project CharterSix Sigma DMADV DMAIC - Project Charter
Six Sigma DMADV DMAIC - Project CharterDavid Nichols
 
Froehling Value Stream Mapping G2 2008 Final Version
Froehling Value Stream Mapping G2 2008 Final VersionFroehling Value Stream Mapping G2 2008 Final Version
Froehling Value Stream Mapping G2 2008 Final Versionhfroehling1
 
Value stream mapping (current state)
Value stream mapping (current state)Value stream mapping (current state)
Value stream mapping (current state)nestor martinez
 
Lean Six Sigma - Introduction
Lean Six Sigma - IntroductionLean Six Sigma - Introduction
Lean Six Sigma - Introductionvivek pandey
 
Simple Process Mapping Techniques
Simple Process Mapping TechniquesSimple Process Mapping Techniques
Simple Process Mapping TechniquesStephen Deas
 

La actualidad más candente (20)

value stream mapping
value stream mappingvalue stream mapping
value stream mapping
 
Lean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleLean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training Module
 
UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream Mapping
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Value Stream Mapping in the Office
Value Stream Mapping in the Office Value Stream Mapping in the Office
Value Stream Mapping in the Office
 
VSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturingVSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturing
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Advanced Lean Strategies for Office & Service Environments
Advanced Lean Strategies for Office & Service Environments Advanced Lean Strategies for Office & Service Environments
Advanced Lean Strategies for Office & Service Environments
 
The Lean Game
The Lean GameThe Lean Game
The Lean Game
 
13. value stream mapping
13. value stream mapping13. value stream mapping
13. value stream mapping
 
WEBINAR: Introduction to Value Stream Mapping
WEBINAR: Introduction to Value Stream MappingWEBINAR: Introduction to Value Stream Mapping
WEBINAR: Introduction to Value Stream Mapping
 
Value Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesValue Stream Mapping: Case Studies
Value Stream Mapping: Case Studies
 
Six Sigma DMADV DMAIC - Project Charter
Six Sigma DMADV DMAIC - Project CharterSix Sigma DMADV DMAIC - Project Charter
Six Sigma DMADV DMAIC - Project Charter
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 
Froehling Value Stream Mapping G2 2008 Final Version
Froehling Value Stream Mapping G2 2008 Final VersionFroehling Value Stream Mapping G2 2008 Final Version
Froehling Value Stream Mapping G2 2008 Final Version
 
Value stream mapping (current state)
Value stream mapping (current state)Value stream mapping (current state)
Value stream mapping (current state)
 
7 waste in the production
7 waste in the production7 waste in the production
7 waste in the production
 
Lean Six Sigma - Introduction
Lean Six Sigma - IntroductionLean Six Sigma - Introduction
Lean Six Sigma - Introduction
 
Simple Process Mapping Techniques
Simple Process Mapping TechniquesSimple Process Mapping Techniques
Simple Process Mapping Techniques
 

Destacado

Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)
Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)
Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)TKMG, Inc.
 
Metrics-Based Process Mapping: Part 2 of 3
Metrics-Based Process Mapping: Part 2 of 3Metrics-Based Process Mapping: Part 2 of 3
Metrics-Based Process Mapping: Part 2 of 3TKMG, Inc.
 
Metrics-Based Process Mapping: Part 1 of 3
Metrics-Based Process Mapping: Part 1 of 3Metrics-Based Process Mapping: Part 1 of 3
Metrics-Based Process Mapping: Part 1 of 3TKMG, Inc.
 
Metrics-Based Process Mapping
Metrics-Based Process Mapping Metrics-Based Process Mapping
Metrics-Based Process Mapping TKMG, Inc.
 
Value Stream Mapping in Office and Service
Value Stream Mapping in Office and ServiceValue Stream Mapping in Office and Service
Value Stream Mapping in Office and ServiceTKMG, Inc.
 
Value Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service SetttingsValue Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service SetttingsTKMG, Inc.
 
Mapping the Value (Agilia Budapest 2016)
Mapping the Value (Agilia Budapest 2016)Mapping the Value (Agilia Budapest 2016)
Mapping the Value (Agilia Budapest 2016)Fabio Armani
 
Value Stream Mapping Workshop
Value Stream Mapping WorkshopValue Stream Mapping Workshop
Value Stream Mapping WorkshopMichael Sahota
 
Mapping supply chains
Mapping supply chainsMapping supply chains
Mapping supply chainsArkkkky
 
101 lecture 1 Introduction
101 lecture 1 Introduction101 lecture 1 Introduction
101 lecture 1 IntroductionGale Pooley
 
BrandZ Top 50 Latin American Brands
BrandZ Top 50 Latin American BrandsBrandZ Top 50 Latin American Brands
BrandZ Top 50 Latin American BrandsKantar
 
Involving patients in their own treatment & research Aspergillosis Patients M...
Involving patients in their own treatment & research Aspergillosis Patients M...Involving patients in their own treatment & research Aspergillosis Patients M...
Involving patients in their own treatment & research Aspergillosis Patients M...Graham Atherton
 
Google - How social technologies drive business success
Google - How social technologies drive business successGoogle - How social technologies drive business success
Google - How social technologies drive business successKantar
 

Destacado (16)

Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)
Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)
Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)
 
Metrics-Based Process Mapping: Part 2 of 3
Metrics-Based Process Mapping: Part 2 of 3Metrics-Based Process Mapping: Part 2 of 3
Metrics-Based Process Mapping: Part 2 of 3
 
Metrics-Based Process Mapping: Part 1 of 3
Metrics-Based Process Mapping: Part 1 of 3Metrics-Based Process Mapping: Part 1 of 3
Metrics-Based Process Mapping: Part 1 of 3
 
Metrics-Based Process Mapping
Metrics-Based Process Mapping Metrics-Based Process Mapping
Metrics-Based Process Mapping
 
Value Stream Mapping in Office and Service
Value Stream Mapping in Office and ServiceValue Stream Mapping in Office and Service
Value Stream Mapping in Office and Service
 
Value Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service SetttingsValue Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service Setttings
 
Mapping the Value (Agilia Budapest 2016)
Mapping the Value (Agilia Budapest 2016)Mapping the Value (Agilia Budapest 2016)
Mapping the Value (Agilia Budapest 2016)
 
Value Stream Mapping Workshop
Value Stream Mapping WorkshopValue Stream Mapping Workshop
Value Stream Mapping Workshop
 
Mapping supply chains
Mapping supply chainsMapping supply chains
Mapping supply chains
 
101 lecture 1 Introduction
101 lecture 1 Introduction101 lecture 1 Introduction
101 lecture 1 Introduction
 
BrandZ Top 50 Latin American Brands
BrandZ Top 50 Latin American BrandsBrandZ Top 50 Latin American Brands
BrandZ Top 50 Latin American Brands
 
Involving patients in their own treatment & research Aspergillosis Patients M...
Involving patients in their own treatment & research Aspergillosis Patients M...Involving patients in their own treatment & research Aspergillosis Patients M...
Involving patients in their own treatment & research Aspergillosis Patients M...
 
Lisboa
LisboaLisboa
Lisboa
 
Google - How social technologies drive business success
Google - How social technologies drive business successGoogle - How social technologies drive business success
Google - How social technologies drive business success
 
101 lecture 12
101 lecture 12101 lecture 12
101 lecture 12
 
101 lecture 3
101 lecture 3101 lecture 3
101 lecture 3
 

Similar a Value Stream Mapping: From Tool to Management Practice

Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...TKMG, Inc.
 
Value Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management PracticeValue Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management PracticeTKMG, Inc.
 
Kash Masuria Whats Six Simga Presentation
Kash Masuria Whats Six Simga PresentationKash Masuria Whats Six Simga Presentation
Kash Masuria Whats Six Simga Presentationguestd0440a
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Six Sigma Leaders For Today Presentation Slides (Six Sigma)
Six Sigma Leaders For Today Presentation Slides (Six Sigma)Six Sigma Leaders For Today Presentation Slides (Six Sigma)
Six Sigma Leaders For Today Presentation Slides (Six Sigma)JoanMullins
 
Six Sigma Leaders For Today Presentation Slides (Six Sigma)
Six Sigma Leaders For Today Presentation Slides (Six Sigma)Six Sigma Leaders For Today Presentation Slides (Six Sigma)
Six Sigma Leaders For Today Presentation Slides (Six Sigma)JoanMullins
 
Driving Growth and Profitability through Customer Experience & Process Trans...
Driving Growth and Profitability through Customer Experience & Process Trans...Driving Growth and Profitability through Customer Experience & Process Trans...
Driving Growth and Profitability through Customer Experience & Process Trans...Brad Power
 
Six sigma awareness
Six sigma awarenessSix sigma awareness
Six sigma awarenesssawate
 
The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...
The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...
The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...Workday, Inc.
 
El Llc Six Sigma June 2011
El Llc Six Sigma June 2011El Llc Six Sigma June 2011
El Llc Six Sigma June 2011ExerciseLeanLLC
 
Realizing Successful Transformation Within Politically Charged Environments
Realizing Successful Transformation Within Politically Charged EnvironmentsRealizing Successful Transformation Within Politically Charged Environments
Realizing Successful Transformation Within Politically Charged EnvironmentsNathaniel Palmer
 
Realizing Successful Transformation Within Politically Charged Environments
Realizing Successful Transformation Within Politically Charged EnvironmentsRealizing Successful Transformation Within Politically Charged Environments
Realizing Successful Transformation Within Politically Charged EnvironmentsNathaniel Palmer
 
Business Performance Management - Process Approach
Business Performance Management - Process ApproachBusiness Performance Management - Process Approach
Business Performance Management - Process ApproachAjay Koul
 
Value Stream Management: Is Your Organization Ready?
Value Stream Management: Is Your Organization Ready?Value Stream Management: Is Your Organization Ready?
Value Stream Management: Is Your Organization Ready?DevOps.com
 

Similar a Value Stream Mapping: From Tool to Management Practice (20)

Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
 
Value Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management PracticeValue Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management Practice
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Kash Masuria Whats Six Simga Presentation
Kash Masuria Whats Six Simga PresentationKash Masuria Whats Six Simga Presentation
Kash Masuria Whats Six Simga Presentation
 
6 Sigma
6 Sigma6 Sigma
6 Sigma
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Six sigma[2]
Six sigma[2]Six sigma[2]
Six sigma[2]
 
Six Sigma Leaders For Today Presentation Slides (Six Sigma)
Six Sigma Leaders For Today Presentation Slides (Six Sigma)Six Sigma Leaders For Today Presentation Slides (Six Sigma)
Six Sigma Leaders For Today Presentation Slides (Six Sigma)
 
Six Sigma Leaders For Today Presentation Slides (Six Sigma)
Six Sigma Leaders For Today Presentation Slides (Six Sigma)Six Sigma Leaders For Today Presentation Slides (Six Sigma)
Six Sigma Leaders For Today Presentation Slides (Six Sigma)
 
Driving Growth and Profitability through Customer Experience & Process Trans...
Driving Growth and Profitability through Customer Experience & Process Trans...Driving Growth and Profitability through Customer Experience & Process Trans...
Driving Growth and Profitability through Customer Experience & Process Trans...
 
Six sigma awareness
Six sigma awarenessSix sigma awareness
Six sigma awareness
 
Asq int lss
Asq int lssAsq int lss
Asq int lss
 
The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...
The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...
The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...
 
El Llc Six Sigma June 2011
El Llc Six Sigma June 2011El Llc Six Sigma June 2011
El Llc Six Sigma June 2011
 
Realizing Successful Transformation Within Politically Charged Environments
Realizing Successful Transformation Within Politically Charged EnvironmentsRealizing Successful Transformation Within Politically Charged Environments
Realizing Successful Transformation Within Politically Charged Environments
 
Realizing Successful Transformation Within Politically Charged Environments
Realizing Successful Transformation Within Politically Charged EnvironmentsRealizing Successful Transformation Within Politically Charged Environments
Realizing Successful Transformation Within Politically Charged Environments
 
Business Performance Management - Process Approach
Business Performance Management - Process ApproachBusiness Performance Management - Process Approach
Business Performance Management - Process Approach
 
Modul 2.3: Define Phase
Modul 2.3: Define PhaseModul 2.3: Define Phase
Modul 2.3: Define Phase
 
Value Stream Management: Is Your Organization Ready?
Value Stream Management: Is Your Organization Ready?Value Stream Management: Is Your Organization Ready?
Value Stream Management: Is Your Organization Ready?
 

Más de TKMG, Inc.

Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process MappingTKMG, Inc.
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean ManagementTKMG, Inc.
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean ManagementTKMG, Inc.
 
CLEAR Problem-Solving Questions
CLEAR Problem-Solving QuestionsCLEAR Problem-Solving Questions
CLEAR Problem-Solving QuestionsTKMG, Inc.
 
Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.TKMG, Inc.
 
Clarity First - You
Clarity First - YouClarity First - You
Clarity First - YouTKMG, Inc.
 
Clarity First - Problem Solving
Clarity First - Problem Solving Clarity First - Problem Solving
Clarity First - Problem Solving TKMG, Inc.
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & PerformanceTKMG, Inc.
 
Clarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesClarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesTKMG, Inc.
 
Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)TKMG, Inc.
 
Know How Data is Calculated - OEE example
Know How Data is Calculated - OEE exampleKnow How Data is Calculated - OEE example
Know How Data is Calculated - OEE exampleTKMG, Inc.
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management SystemsTKMG, Inc.
 
The Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable SystemThe Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable SystemTKMG, Inc.
 
Metrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount CodeMetrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount CodeTKMG, Inc.
 
Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3TKMG, Inc.
 
Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3TKMG, Inc.
 
Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3TKMG, Inc.
 
Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)TKMG, Inc.
 
Process Change: Communication & Training Tips
Process Change:  Communication & Training TipsProcess Change:  Communication & Training Tips
Process Change: Communication & Training TipsTKMG, Inc.
 
Lean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob StollerLean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob StollerTKMG, Inc.
 

Más de TKMG, Inc. (20)

Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process Mapping
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean Management
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean Management
 
CLEAR Problem-Solving Questions
CLEAR Problem-Solving QuestionsCLEAR Problem-Solving Questions
CLEAR Problem-Solving Questions
 
Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.
 
Clarity First - You
Clarity First - YouClarity First - You
Clarity First - You
 
Clarity First - Problem Solving
Clarity First - Problem Solving Clarity First - Problem Solving
Clarity First - Problem Solving
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & Performance
 
Clarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesClarity First: Purpose and Priorities
Clarity First: Purpose and Priorities
 
Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)
 
Know How Data is Calculated - OEE example
Know How Data is Calculated - OEE exampleKnow How Data is Calculated - OEE example
Know How Data is Calculated - OEE example
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management Systems
 
The Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable SystemThe Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable System
 
Metrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount CodeMetrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount Code
 
Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3
 
Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3
 
Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3
 
Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)
 
Process Change: Communication & Training Tips
Process Change:  Communication & Training TipsProcess Change:  Communication & Training Tips
Process Change: Communication & Training Tips
 
Lean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob StollerLean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob Stoller
 

Último

MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandSharisaBethune
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 

Último (20)

MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal Brand
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 

Value Stream Mapping: From Tool to Management Practice

  • 1. Value Stream Mapping: From Tool to Management Practice Omaha Lean User Group May 6, 2014
  • 2.  Consultant / Facilitator / Coach: Lean transformation & business performance improvement in all industries.  Teacher: University of California, San Diego  Author & Speaker: Karen Martin, President 2 www.ksmartin.com/subscribe 2013 Shingo Prize winner!
  • 3. © 2014 The Karen Martin Group, Inc. Wherever there is a request and a deliverable, there is a value stream.
  • 4. Value Stream Defined Value Stream: All of the activities required to transform a customer request into a good or service. 4 First defined in The Machine That Changed the World, James Womack, Daniel Jones, & Daniel Roos, 1990. Process ProcessProcess Customer Request Customer Receipt
  • 5. Value Stream Mapping’s Roots • Value • Value Stream • Flow • Pull • Perfection 1996
  • 6. Work: Degrees of Granularity Value Stream Process Process Process Step StepStep 6 Macro Perspective • Define strategic direction (“what”) • Heavy leadership involvement • Value Stream Mapping Micro Perspective • Identify the tactical “how” • Heavy frontline involvement • Metrics-Based Process Mapping
  • 7. Value Stream Mapping Progression Mike Rother & John Shook, 1999 Beau Keyte & Drew Locher, 2004 Karen Martin & Mike Osterling, 2014
  • 9. © 2014 The Karen Martin Group, Inc. 9 Customer 1 Process 3 Function E LT = 0.5 days PT = 30 mins. %C&A = 95% 4 4 10 mins. 1 days 120 mins. 2 days 30 mins. 0.5 days Total LT = 3.5 days Total PT = 160 mins. Activity Ratio = 9.5% Rolled %C&A = 89.3% Process 2 Function C LT = 2 days PT = 120 mins. %C&A = 95% 3 3 ABC Technology, Inc. Future State Value Stream Map Name of Value Stream Being Mapped Demand Rate = XX / Year Name of Value Stream Champion Mapping Date IT-1 IT-2 5 items Process 1 Function A LT = 1 days PT = 10 mins. %C&A = 99% 5 2 1 items 10 items Standard work Modified approvals IT interface Cross- train Cross- train Standard work Error proof Basic Value Stream Map: Future State
  • 10. Which do you prefer? OR
  • 11. Example of Value Stream Improvement: You Can Achieve HUGE Gains Metric Current State Projected Future State Projected % Improvement Lead Time (PO to shipping) 17 months 7.5 months 56% Process Time 600 hours 450 hours 25% (22 FTEs) Rolled % Complete & Accurate 0% 21% > 2,000% On-time delivery 13% 90% 592% # Internally-produced Change Orders 25/project 12/project 52% Freed cash flow $25M per year
  • 12. Proper Value Stream Mapping Builds Organizational Muscles
  • 13. © 2014 The Karen Martin Group, Inc. 13 Common Failing: Approaching VSM Mechanistically
  • 14. Value Stream Maps: Strategy Before Tactics Where am I? Where do I want to go? I-80 option I-40 option I-70 option Which route should I take? ? ? ?
  • 15. Value Stream Mapping is a Strategic, Leadership-Heavy Activity
  • 16. Who? Accountability Practice / Tool Sr. Leaders “What has to happen” Hoshin Planning, Value Stream Mapping Frontlines “How it will happen” Kaizen Events, Just-do-its, and Projects Improvement RolesStrategicTactical Middle Management
  • 17. © 2014 The Karen Martin Group, Inc. 17 Value Stream Mapping Benefit: Seeing the Whole 17 Value Stream Mapping enables a mapping team to get ABOVE the work
  • 18. 18 Work is More Similar Than Not… …When Viewed from a Macro Perspective
  • 19. VSM Aids in Developing Systems Thinking 19 System Efficiency = Optimal Value Stream Performance Individual Efficiency = Sub-optimization
  • 20. © 2014 The Karen Martin Group, Inc. VSM Helps Break Down Functional Silos 20 Function FunctionFunctionFunction Core Value Streams Support Value Streams Support Value Streams Customer Customer Customer
  • 21. 21
  • 23. Value Stream Maps Help Visualize Problems 23
  • 24. 24 Visualize the entire cycle of value delivery on a single sheet of paper © 2014 The Karen Martin Group, Inc. 24
  • 25. Prepare Understand Current State Design Future State Develop Transformation Plan Execute Transformation Plan Three Consecutive Days 4-6 Weeks Prior to Mapping Following Mapping And Repeat Value Stream Mapping Activity Phases and Timing 25
  • 26. Prepare Understand Current State Design Future State Develop Transformation Plan Execute Transformation Plan Three Consecutive Days 4-6 Weeks Prior to Mapping Following Mapping And Repeat Value Stream Mapping Activity Phases and Timing 26
  • 27. 1 2 1 3 2 4 3 5 4 5 1 6 2 7 3 8 4 9 5 10 1 2 1 3 2 4 3 5 4 1 2 3 4 Date: Date:engagement, financials, lead time, safety records, etc. effectiveness, market trends, customer satisfaction, employee Signature: Date: Relevant Data Agreement Examples: work volume & volume variation, process quality & Executive SponsorWhat data is required to understand relevant current state isues. Signature: Signature: How will the business, internal and external customers, and Function internal and external suppliers benefit from value stream improvement? SMEs that may not be needed full time Always a nice touch; keeps the team from wandering On-site, ample wall space, quiet/private location Benefits to Customers & Business On-Call Support Increase <defined metric> from X to Y (Z% improvement). Reduce <defined metric> from X to Y (Z% improvement). Measurable Target Condition What's driving the need for improvement? Function Leadership-heavy Current State Problems & Business Needs Mapping Team Boundaries & Limitations Improvement Time Frame What is the team NOT authorized to change? Typically 3-6 months Last Step Task on last process block Logistics Coordinator Not always needed Aids in consensus building and organizational learning. Typically the last hour of the day. First Step Task on first process block Briefing Dates & Times Meals Provided Briefing Attendees ** required *optional List the the people that are required to attend the briefings (**) and those whose attendance is optional (*). Demand Rate Trigger How many times is this done per wk, qtr, mo, or yr? What initiates the process? Value Stream Mapping Charter Scope Accountable Parties Logistics Required: typically VP or C-level If needed—often director or manager level Specific Conditions What circumstances are included and excluded? (e.g., type of customer, geographic location, etc.) Value Stream Champion Value stream being improved Executive Sponsor Value Stream Event Dates & Times 3 days typically; consecutive is best; 6 hrs per day minimum; 7 or 8 hrs is best Required: skilled, objective person leading the activity Base-camp Location Facilitator Name Name FacilitatorValue Stream Champion Contact Information Contact Information Critical planning, communication, and consensus-building tool Available at www.ksmartin.com/charter
  • 28. Where should the “fenceposts” be? Function Activity Marketing Generates sales leads Sales Calls on and qualifies customers Customer Submits RFQ to sales Sales Reviews RFQ Estimating Generates quote Sales Approve quote Customer Accepts quote; submits a PO Sales Approves PO Customer service Creates SO; compiles spec package EE/ME design Designs product; generates BOM Customer Approves design EE/ME design Forwards design to SW dev Software Dev Writes code Purchasing/Planning Releases WO; schedules production Supplier (external) Delivers materials Production Manufactures & ships product Customer Installs equipment Field service Conducts 90-day follow-up
  • 29. Value Stream Scoping Diagram Defining Specific Conditions Golden State Equipment, Inc. Capital Equipment Catalog Configure to order Engineer to order Custom hardware Custom software Both New Product Development Spares & subassemblies Catalog Engineer to order 29
  • 30. Prepare Understand Current State Design Future State Develop Transformation Plan Execute Transformation Plan Three Consecutive Days 4-6 Weeks Prior to Mapping Following Mapping And Repeat Value Stream Mapping Activity Phases and Timing 30
  • 31. Briefing #1 31 Purpose: Reduce resistance to future state design
  • 32. Briefing #2 32 Purpose: Build consensus around future state design
  • 33. Briefing #3 33 Purpose: Gain commitment re: improvement priorities, ownership, resources needed, and timeline.
  • 35. © 2014 The Karen Martin Group, Inc. 35 Customer 1 Process 3 Function E LT = 0.5 days PT = 30 mins. %C&A = 95% 4 4 10 mins. 1 days 120 mins. 2 days 30 mins. 0.5 days Total LT = 3.5 days Total PT = 160 mins. Activity Ratio = 9.5% Rolled %C&A = 89.3% Process 2 Function C LT = 2 days PT = 120 mins. %C&A = 95% 3 3 ABC Technology, Inc. Future State Value Stream Map Name of Value Stream Being Mapped Demand Rate = XX / Year Name of Value Stream Champion Mapping Date IT-1 IT-2 5 items Process 1 Function A LT = 1 days PT = 10 mins. %C&A = 99% 5 2 1 items 10 items Standard work Modified approvals IT interface Cross- train Cross- train Standard work Error proof Basic Value Stream Map: Future State
  • 36. J F M A M J J A S O N D 1 PROJ Steve 0% 2 PROJ Steve 100% 3 KE Bruce 50% 4 KE Bruce 50% 5 PROJ Jessie 100% 6 PROJ Sally 100% 7 KE Jessie 0% 8 PROJ Mike 100% 9 JDI Jessie 50% 10 PROJ Steve 80% 11 PROJ Steve 10% 12 PROJ Bob 0% 13 JDI Jessie 100% 14 PROJ Marcia 25% 15 PROJ Tom 30% 16 KE Marcia 50% 17 PROJ Sally 50% Value Stream Champion Sally Brooks Value Stream Mapping Facilitator Karen Martin Value Stream Transformation Plan Value Stream Product Y Scheduled Review Dates Executive Sponsor Jim McMahon 2/10 + bi-weekly Thu 10 am Socialize new criteria for engineering, quality, & purchasing involvement. Date Created 1/5/2014 Kaizen Burst # Improvement Objective / Hypothesis Proposed Countermeasure Exec. Method * Owner Planned Timeline for Execution Status Create procedure/train GS service engineers to properly feedback suggestions to engineering. Create bulletin re: standardized headplate design to eliminate flange orientation. Create visual "milestone" timeline to educate customers. Define technical info needed from customer and when. Signature: Signature: Signature: Revise standard Ts & Cs to incorporate time limit for customer approval for final payment. Error proof P.O. info (correct specs, ship to, etc.); notify customer re missing info and drop dead date. Create criteria for LOI acceptance. Add initial project release in SF. Resocialize existing customer-requested CO procedure. One piece engineering flow Agreement Executive Sponsor Value Stream Champion Value Stream Mapping Facilitator * Execution Method = JDI (Just-do-it), KE (Kaizen Event), or Proj (Project) Move to one release (pump & systems) Date: Date: Date: Create commodity management team & supplier SLAs. Standardize WPS/PQR from suppliers. Revise proposal template to limit time to 4 revisions. Create pull signal for invoicing. Create trigger to release (BOMs) for purchase. ConfidentialContentRemoved Available at www.ksmartin.com/vsm-transformation-plan
  • 37. Prepare Understand Current State Design Future State Develop Transformation Plan Execute Transformation Plan Three Consecutive Days 4-6 Weeks Prior to Mapping Following Mapping And Repeat Value Stream Mapping Activity Phases and Timing 37
  • 38. Outpatient CT Scans: Current State Value Stream Map
  • 39. Outpatient CT Scans: Future State Value Stream Map
  • 40. Outpatient Imaging Value Stream Improvement Metric Current State Projected Future State Projected % Improvement Timeline Lead Time 4.0 days 1.3 days 67.5% Timeline Process Time 59 minutes 48 minutes 18.6% Activity Ratio 3.1% 7.6% 145.2% Rolled % Complete & Accurate 30.5% 65.0% 113.1%