 Accomplished MEP Engineer with 10+ years’ experience in engineering, technical,
planning, supervisory and leading positions. Capability of handling technical and market
analysis with respect to MEP works. Recognized for ability to manage up to High rise
towers, electrical substations project with control of all, Front End Engineering Design
(FEED), Pre Engineering, Detail engineering, site works and responsibility of supervisory
staff for coordination in design, execution and testing commissioning. Well versed in
Design, Technical Bid Evaluation, and vendor management, handling material and service
procurement. Recognized for ability to build relationships with key personnel and skills to
drive individual performance from team members as a team leader.
Global experience: India, and U.A.E.
Approval/Certification
 Abu Dhabi Transmission & Despatch Company (TRANSCO) certified “Competent
person” for Installation Testing , commissioning & Maintenance of HVAC & Fire-fighting
systems
 Abu Dhabi Distribution Company certified (ADDC) “Competent person” for Installation
Testing , commissioning & Maintenance of HVAC & Fire-fighting systems
 Federal Electricity and water Authority (FEWA ) Approved MEP Design Coordinator for
HVAC & Fire Fighting System
PROJECTS MANAGED:
1) GASCO 5273 Contract -Power supply for AL MAHA Camp & HABSHAN 5
Power interconnection between Habshan5 & Transco
 Client GASCO
 Mott Macdonald
2) 220/33KV GRID STATION IN AIN AI FAYDHA AND ALL RELATED 220 KV CABLE/OHL
WORKS- CONTRACT 6977
 Client: TRANSCO
 Consultant: Energo
3) SUPPLY AND INSTALLATION OF NEW 220/33kV GRID STATION IN ZAKHER AREA –
CONTRACT 7733
 Client: TRANSCO
 Consultant :SNC LAVALIN
KARIAPPA M.P.
P.O Box 30803
Abu Dhabi
+971-508477231
kkariappa@gmail.com
Resume of kariappa m p
4) Supply, Installation, Testing & commissioning of Investment Residences & Jebel Ali
Horse Race course 132/11kV substation and associated works Contract No.
CE/448B/2007
 Client: Dubai Electricity & Water Authority
5) Supply and Installation of Three New 33/11kV Primary Substation and associated cables-
ICAD-11 Lot A G.42241.1
 Consultant: Parsons Brinkerhoff (PB Power)
6) KHALIFA Port & Industrial Zone MV Power System 3no’s GIS Building (2 Offshore & 1
onshore substation) Contract No. 1000-207
 Project Management Consultant: International Bechtel Corporation .LTD
 Consultant: Parsons Brinkerhoff (PB Power)
7) KHALIFA Port & Industrial Zone Industrial Area-A 33/11kV Electrical 5 Substation
Contract No.1001-272
 Project Management Consultant: International Bechtel Corporation .LTD
 Consultant: AECOM
8) Jumeirah Lake Towers Cluster F-Tower F2 HDS Tower & T2 Lake plaza Tower, 3
Basement +Ground Floor+39 Floor Commercial Building Jumeirah Lake Towers, Cluster
M-Tower M1 HDS Business Centre
9) Basement +Ground Floor+41 Floor Commercial, 31 luxury villas at Jumeirah island,
Khalifa Port & Industrial Zone MV Power System 8 no’s GIS Building (2 offshore & 6
onshore substation),
RELEVANT WORK EXPERIENCE
LARSEN & TOUBRO, U.A.E May 2008 – till date
Asst. Manager-Mechanical (MEP Design Engineer)
 Fire Protection System (FPS) – Full Lifecycle experience covering Design, Quantity
Estimation, Optimisation & Execution/ Installation
 Heating, Ventilation, Air-Conditioning (HVAC) – Full Lifecycle experience covering Design,
Quantity Estimation, Optimisation & Execution/ Installation
Roles &Responsibilities
 Review & preparation of Front End Engineering Design (FEED) drawings, overall
equipment Layout w.r.t HVAC, Fire Fighting & EOT. , w.r.t Project SOW, specification,
Codes & standards and UAE Fire & safety Code.
 Pre Engineering & Detail engineering of the projects including Design Basis report,
Technical Specification
Resume of kariappa m p
 Reviewing the Technical offers from Vendors during Tender/order stage, w.r.t Project
SOW specification, Codes & standards and UAE Fire & safety Code.
 Preparation / review Conceptual and Detailed design of HVAC system with cooling load
estimations, ducting/piping/accessories design and equipment selection in accordance
with Carrier HAP 4.3.5 design software.
 Preparing / review Operational Philosophy and Conceptual Design of Fire Fighting System
as follows in accordance with NFPA/LPCB/BS standards.
 Review of Deluge water spray system/ Water Mist System for Transformer Protection with
pump/piping designs
 Review of Automatic Sprinkler system for cable basement areas and fire pump room
 Review of Fire Alarm / detection system / VESDA system for control building and
switchgear building NFPA
 Tender bidding process, proposal preparations, Technical bid evaluation, evaluation
reports, tender documents preparation, FEED design for firefighting systems, HVAC and
plumbing and drainage system.
 Review of Mechanical/Piping design drawings (all stages – from preliminary to detailed
design)
 Review of equipment and materials submittals by HVAC ,FF & EOT Vendors
 Review of method statements for site installation works
 Review of QA/QC and safety procedures for MEP Works
 Coordination with Civil, Mechanical and Electrical design drawings and construction
activities
 Carrying out co-ordination procedures with Client’s specialists , consultant and local civil
defence authorities
 Testing and commissioning of the Fire Fighting system, Double Girder EOT crane, Electrical
hoist and HVAC systems
 Evaluations of Vendor claims and punch list preparation for completed MEP works.
 Conducting project review meetings for evaluating project progress
PROJECT ENGINEER MEP- SOBHA DEVELOPERS; INDIA January 2007 to April 2008
 In charge of Design, Installation and Commissioning of MEP (HVAC, Fire Fighting
&Plumbing) Services for high raised building (2B+G+11,9 Blocks), STP, Swimming pool and
Rain water Harvesting System.
Resume of kariappa m p
MEP DESIGN Engineer- KAVERI CONSULTANTS INDIA January 2005 to October 2006
 Co-ordinate in Design and preparation of MEP Drawings Ensure work as in accordance
with working Design drawing and Specifications.; Prepare Construction method
statements, Material Approvals, Work Methods and obtain approval for Mechanical works
EDUCATIONAL BACKGROUND
BACHELOR OF ENGINEERING -VISVESHWARAIAH UNIVERSITY, INDIA (Adichunchanagiri Institute
of Technology)
July 2000 - August 2004
 Relevant Modules: The Innovation Process and Project Management, Engineering Design
Methods, ,
 Project: A study on Alcohol non-conventional Eco friendly fuels for I.C engines
 Performance study and efficiency of Tertiary treatment plant
 Grade - -First Class -68%
INSTITUTE OF PIPING ENGINEERING & BUILDING SERVICES- DIPLOMA IN DESIGN &DRAFTING OF
HVAC SYSTEM (AS PER ASHRAE) AND FIRE FIGHTING SYSTEM (AS PER NFPA)
2004 -
 Relevant Modules: HVAC – central plant design & drafting as per ASHRAE & SMACNA./
concept theory, problem solving, system design, Heating systems, ventilation, air
conditioning, psychometrics, cooling and heating load estimations (peak and Partial
Loads), hydraunic systems–chilled water systems/piping design, air distribution systems
 CAD drafting and exposure to HVAC Software’s like Elite Package & Comfort Air HAP etc.
Fire Fighting per NFPA ( NFPA - National Fire Protection Association Piping, Pipeline ,
Industrial Plant Design & Engineering )
 Grade - - First Class
SKILLS
 Software:, AutoCAD, MS Office ,HAP
 Other Languages: Hindi & English,
 Interpersonal:
o Time Management- Developed through successful task completion
o Organisation- Developed through maintenance of records and documents during
employment and also as a personal quality
o Team Player- Part of the high rise building & Electrical Substation Engineering Team
o Performing under pressure- Highly necessary quality developed with experience as an
employee in a construction company with intense time-scale projects
o Analytical & Logical Thinking- Developed through quick decision making with foresight of
results
o Negotiation- Developed through vendor management
Resume of kariappa m p
ACHIEVEMENTS
 Captain of the University Football team
 Countries Experience: India, United Arab Emirates,
 Hobbies: , Football, Cricket ,hockey listening to music
PERSONAL DETAILS
 Passport Details: Passport No. G7127633
 Date of Birth 16th
February 1981
 Sex :Male
 Marital Status: Married.
 Date of Issue: 21/01/2008, Date of Expiry: 20/01/2018
 Driving license Holder –United Arab emirates

More Related Content

What's hot

Electrical Design Engineer
Electrical Design EngineerElectrical Design Engineer
Electrical Design Engineermohamed ateeq
 
Hassan Bakry CV. Aug, 2015
Hassan Bakry CV. Aug,  2015Hassan Bakry CV. Aug,  2015
Hassan Bakry CV. Aug, 2015Hassan Bakry
 
Samuel WORDResume Test Tech
Samuel WORDResume Test TechSamuel WORDResume Test Tech
Samuel WORDResume Test Techsamuel sahlie
 
Ahmed Ibrahim Refaey Ahmed
Ahmed Ibrahim Refaey AhmedAhmed Ibrahim Refaey Ahmed
Ahmed Ibrahim Refaey AhmedAhmed Refaey
 
Resume Rafael Balboa
Resume  Rafael BalboaResume  Rafael Balboa
Resume Rafael BalboaRafael Balboa
 
THEODORE H Soper - resume
THEODORE H Soper - resumeTHEODORE H Soper - resume
THEODORE H Soper - resumeTheodore Soper
 
سيرة ذاتية عبد النبي انجليزي[1]
سيرة  ذاتية عبد النبي انجليزي[1]سيرة  ذاتية عبد النبي انجليزي[1]
سيرة ذاتية عبد النبي انجليزي[1]عبدالنبي شحات
 
Rev2 Indetails LC EhabSaad
Rev2 Indetails  LC EhabSaad Rev2 Indetails  LC EhabSaad
Rev2 Indetails LC EhabSaad Ehab Saad
 

What's hot (18)

Electrical Design Engineer
Electrical Design EngineerElectrical Design Engineer
Electrical Design Engineer
 
Minder's Resume
Minder's ResumeMinder's Resume
Minder's Resume
 
Hassan Bakry CV. Aug, 2015
Hassan Bakry CV. Aug,  2015Hassan Bakry CV. Aug,  2015
Hassan Bakry CV. Aug, 2015
 
Abdelrhman CV
Abdelrhman CVAbdelrhman CV
Abdelrhman CV
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
Samuel WORDResume Test Tech
Samuel WORDResume Test TechSamuel WORDResume Test Tech
Samuel WORDResume Test Tech
 
Description
DescriptionDescription
Description
 
Ogbonnaya Okoro CV
Ogbonnaya Okoro  CVOgbonnaya Okoro  CV
Ogbonnaya Okoro CV
 
Ahmed Ibrahim Refaey Ahmed
Ahmed Ibrahim Refaey AhmedAhmed Ibrahim Refaey Ahmed
Ahmed Ibrahim Refaey Ahmed
 
Resume Rafael Balboa
Resume  Rafael BalboaResume  Rafael Balboa
Resume Rafael Balboa
 
FPL RESUME1115
FPL RESUME1115FPL RESUME1115
FPL RESUME1115
 
The W4 Group Presentation 1
The W4 Group Presentation 1The W4 Group Presentation 1
The W4 Group Presentation 1
 
m.rizk cv 1
m.rizk cv 1m.rizk cv 1
m.rizk cv 1
 
THEODORE H Soper - resume
THEODORE H Soper - resumeTHEODORE H Soper - resume
THEODORE H Soper - resume
 
سيرة ذاتية عبد النبي انجليزي[1]
سيرة  ذاتية عبد النبي انجليزي[1]سيرة  ذاتية عبد النبي انجليزي[1]
سيرة ذاتية عبد النبي انجليزي[1]
 
Shafeeque CV (1)
Shafeeque CV (1)Shafeeque CV (1)
Shafeeque CV (1)
 
Resume of ECHeausler
Resume of ECHeausler Resume of ECHeausler
Resume of ECHeausler
 
Rev2 Indetails LC EhabSaad
Rev2 Indetails  LC EhabSaad Rev2 Indetails  LC EhabSaad
Rev2 Indetails LC EhabSaad
 

Viewers also liked

mep based resume 2
mep based resume 2mep based resume 2
mep based resume 2mohd waseem
 
MEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr ResumeMEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr ResumeAmr Sakr
 
Top 8 mep engineer resume samples
Top 8 mep engineer resume samplesTop 8 mep engineer resume samples
Top 8 mep engineer resume samplesgedihutes
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007sajid hasan
 
Mechanical engineer cv
Mechanical engineer cvMechanical engineer cv
Mechanical engineer cvmustafaghazy
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 

Viewers also liked (8)

mep based resume 2
mep based resume 2mep based resume 2
mep based resume 2
 
MEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr ResumeMEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr Resume
 
Resume (cv) Naeem Ahmad ELV Engineer
Resume (cv) Naeem Ahmad ELV EngineerResume (cv) Naeem Ahmad ELV Engineer
Resume (cv) Naeem Ahmad ELV Engineer
 
Top 8 mep engineer resume samples
Top 8 mep engineer resume samplesTop 8 mep engineer resume samples
Top 8 mep engineer resume samples
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
 
Bala electl engineer-cv
Bala electl engineer-cvBala electl engineer-cv
Bala electl engineer-cv
 
Mechanical engineer cv
Mechanical engineer cvMechanical engineer cv
Mechanical engineer cv
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 

Similar to MPK - Resume

Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkatesh Rajendran
 
Bruce Jurgens-CV 20152
Bruce Jurgens-CV 20152Bruce Jurgens-CV 20152
Bruce Jurgens-CV 20152Bruce Jurgens
 
Syed javed hazari resume
Syed javed hazari resumeSyed javed hazari resume
Syed javed hazari resumejaved hazari
 
Syed javed hazari resume
Syed javed hazari resumeSyed javed hazari resume
Syed javed hazari resumejaved hazari
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
Sutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSuthar Vinu
 
Instrumentation and telecom engineer
Instrumentation and telecom  engineerInstrumentation and telecom  engineer
Instrumentation and telecom engineerAlfred Joe
 
Nallusamy Gandhi
Nallusamy GandhiNallusamy Gandhi
Nallusamy GandhiNallu Samy
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed
 

Similar to MPK - Resume (20)

Sanoop CV 2016
Sanoop CV 2016Sanoop CV 2016
Sanoop CV 2016
 
Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16
 
CV R46
CV R46CV R46
CV R46
 
Bruce Jurgens-CV 20152
Bruce Jurgens-CV 20152Bruce Jurgens-CV 20152
Bruce Jurgens-CV 20152
 
RENJITH CVpdf
RENJITH CVpdfRENJITH CVpdf
RENJITH CVpdf
 
Ukeje cv updated
Ukeje cv updatedUkeje cv updated
Ukeje cv updated
 
Syed javed hazari resume
Syed javed hazari resumeSyed javed hazari resume
Syed javed hazari resume
 
Syed javed hazari resume
Syed javed hazari resumeSyed javed hazari resume
Syed javed hazari resume
 
Cv ihsan ul haq
Cv ihsan ul haqCv ihsan ul haq
Cv ihsan ul haq
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
EPLopez RESUME
EPLopez RESUMEEPLopez RESUME
EPLopez RESUME
 
Ramanuja Sharma_CV
Ramanuja Sharma_CVRamanuja Sharma_CV
Ramanuja Sharma_CV
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Sutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineer
 
Resume
Resume Resume
Resume
 
Instrumentation and telecom engineer
Instrumentation and telecom  engineerInstrumentation and telecom  engineer
Instrumentation and telecom engineer
 
Nallusamy Gandhi
Nallusamy GandhiNallusamy Gandhi
Nallusamy Gandhi
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Ukeje CV
Ukeje CVUkeje CV
Ukeje CV
 

MPK - Resume

  • 1. Resume of kariappa m p PROFILE  Accomplished MEP Engineer with 10+ years’ experience in engineering, technical, planning, supervisory and leading positions. Capability of handling technical and market analysis with respect to MEP works. Recognized for ability to manage up to High rise towers, electrical substations project with control of all, Front End Engineering Design (FEED), Pre Engineering, Detail engineering, site works and responsibility of supervisory staff for coordination in design, execution and testing commissioning. Well versed in Design, Technical Bid Evaluation, and vendor management, handling material and service procurement. Recognized for ability to build relationships with key personnel and skills to drive individual performance from team members as a team leader. Global experience: India, and U.A.E. Approval/Certification  Abu Dhabi Transmission & Despatch Company (TRANSCO) certified “Competent person” for Installation Testing , commissioning & Maintenance of HVAC & Fire-fighting systems  Abu Dhabi Distribution Company certified (ADDC) “Competent person” for Installation Testing , commissioning & Maintenance of HVAC & Fire-fighting systems  Federal Electricity and water Authority (FEWA ) Approved MEP Design Coordinator for HVAC & Fire Fighting System PROJECTS MANAGED: 1) GASCO 5273 Contract -Power supply for AL MAHA Camp & HABSHAN 5 Power interconnection between Habshan5 & Transco  Client GASCO  Mott Macdonald 2) 220/33KV GRID STATION IN AIN AI FAYDHA AND ALL RELATED 220 KV CABLE/OHL WORKS- CONTRACT 6977  Client: TRANSCO  Consultant: Energo 3) SUPPLY AND INSTALLATION OF NEW 220/33kV GRID STATION IN ZAKHER AREA – CONTRACT 7733  Client: TRANSCO  Consultant :SNC LAVALIN KARIAPPA M.P. P.O Box 30803 Abu Dhabi +971-508477231 kkariappa@gmail.com
  • 2. Resume of kariappa m p 4) Supply, Installation, Testing & commissioning of Investment Residences & Jebel Ali Horse Race course 132/11kV substation and associated works Contract No. CE/448B/2007  Client: Dubai Electricity & Water Authority 5) Supply and Installation of Three New 33/11kV Primary Substation and associated cables- ICAD-11 Lot A G.42241.1  Consultant: Parsons Brinkerhoff (PB Power) 6) KHALIFA Port & Industrial Zone MV Power System 3no’s GIS Building (2 Offshore & 1 onshore substation) Contract No. 1000-207  Project Management Consultant: International Bechtel Corporation .LTD  Consultant: Parsons Brinkerhoff (PB Power) 7) KHALIFA Port & Industrial Zone Industrial Area-A 33/11kV Electrical 5 Substation Contract No.1001-272  Project Management Consultant: International Bechtel Corporation .LTD  Consultant: AECOM 8) Jumeirah Lake Towers Cluster F-Tower F2 HDS Tower & T2 Lake plaza Tower, 3 Basement +Ground Floor+39 Floor Commercial Building Jumeirah Lake Towers, Cluster M-Tower M1 HDS Business Centre 9) Basement +Ground Floor+41 Floor Commercial, 31 luxury villas at Jumeirah island, Khalifa Port & Industrial Zone MV Power System 8 no’s GIS Building (2 offshore & 6 onshore substation), RELEVANT WORK EXPERIENCE LARSEN & TOUBRO, U.A.E May 2008 – till date Asst. Manager-Mechanical (MEP Design Engineer)  Fire Protection System (FPS) – Full Lifecycle experience covering Design, Quantity Estimation, Optimisation & Execution/ Installation  Heating, Ventilation, Air-Conditioning (HVAC) – Full Lifecycle experience covering Design, Quantity Estimation, Optimisation & Execution/ Installation Roles &Responsibilities  Review & preparation of Front End Engineering Design (FEED) drawings, overall equipment Layout w.r.t HVAC, Fire Fighting & EOT. , w.r.t Project SOW, specification, Codes & standards and UAE Fire & safety Code.  Pre Engineering & Detail engineering of the projects including Design Basis report, Technical Specification
  • 3. Resume of kariappa m p  Reviewing the Technical offers from Vendors during Tender/order stage, w.r.t Project SOW specification, Codes & standards and UAE Fire & safety Code.  Preparation / review Conceptual and Detailed design of HVAC system with cooling load estimations, ducting/piping/accessories design and equipment selection in accordance with Carrier HAP 4.3.5 design software.  Preparing / review Operational Philosophy and Conceptual Design of Fire Fighting System as follows in accordance with NFPA/LPCB/BS standards.  Review of Deluge water spray system/ Water Mist System for Transformer Protection with pump/piping designs  Review of Automatic Sprinkler system for cable basement areas and fire pump room  Review of Fire Alarm / detection system / VESDA system for control building and switchgear building NFPA  Tender bidding process, proposal preparations, Technical bid evaluation, evaluation reports, tender documents preparation, FEED design for firefighting systems, HVAC and plumbing and drainage system.  Review of Mechanical/Piping design drawings (all stages – from preliminary to detailed design)  Review of equipment and materials submittals by HVAC ,FF & EOT Vendors  Review of method statements for site installation works  Review of QA/QC and safety procedures for MEP Works  Coordination with Civil, Mechanical and Electrical design drawings and construction activities  Carrying out co-ordination procedures with Client’s specialists , consultant and local civil defence authorities  Testing and commissioning of the Fire Fighting system, Double Girder EOT crane, Electrical hoist and HVAC systems  Evaluations of Vendor claims and punch list preparation for completed MEP works.  Conducting project review meetings for evaluating project progress PROJECT ENGINEER MEP- SOBHA DEVELOPERS; INDIA January 2007 to April 2008  In charge of Design, Installation and Commissioning of MEP (HVAC, Fire Fighting &Plumbing) Services for high raised building (2B+G+11,9 Blocks), STP, Swimming pool and Rain water Harvesting System.
  • 4. Resume of kariappa m p MEP DESIGN Engineer- KAVERI CONSULTANTS INDIA January 2005 to October 2006  Co-ordinate in Design and preparation of MEP Drawings Ensure work as in accordance with working Design drawing and Specifications.; Prepare Construction method statements, Material Approvals, Work Methods and obtain approval for Mechanical works EDUCATIONAL BACKGROUND BACHELOR OF ENGINEERING -VISVESHWARAIAH UNIVERSITY, INDIA (Adichunchanagiri Institute of Technology) July 2000 - August 2004  Relevant Modules: The Innovation Process and Project Management, Engineering Design Methods, ,  Project: A study on Alcohol non-conventional Eco friendly fuels for I.C engines  Performance study and efficiency of Tertiary treatment plant  Grade - -First Class -68% INSTITUTE OF PIPING ENGINEERING & BUILDING SERVICES- DIPLOMA IN DESIGN &DRAFTING OF HVAC SYSTEM (AS PER ASHRAE) AND FIRE FIGHTING SYSTEM (AS PER NFPA) 2004 -  Relevant Modules: HVAC – central plant design & drafting as per ASHRAE & SMACNA./ concept theory, problem solving, system design, Heating systems, ventilation, air conditioning, psychometrics, cooling and heating load estimations (peak and Partial Loads), hydraunic systems–chilled water systems/piping design, air distribution systems  CAD drafting and exposure to HVAC Software’s like Elite Package & Comfort Air HAP etc. Fire Fighting per NFPA ( NFPA - National Fire Protection Association Piping, Pipeline , Industrial Plant Design & Engineering )  Grade - - First Class SKILLS  Software:, AutoCAD, MS Office ,HAP  Other Languages: Hindi & English,  Interpersonal: o Time Management- Developed through successful task completion o Organisation- Developed through maintenance of records and documents during employment and also as a personal quality o Team Player- Part of the high rise building & Electrical Substation Engineering Team o Performing under pressure- Highly necessary quality developed with experience as an employee in a construction company with intense time-scale projects o Analytical & Logical Thinking- Developed through quick decision making with foresight of results o Negotiation- Developed through vendor management
  • 5. Resume of kariappa m p ACHIEVEMENTS  Captain of the University Football team  Countries Experience: India, United Arab Emirates,  Hobbies: , Football, Cricket ,hockey listening to music PERSONAL DETAILS  Passport Details: Passport No. G7127633  Date of Birth 16th February 1981  Sex :Male  Marital Status: Married.  Date of Issue: 21/01/2008, Date of Expiry: 20/01/2018  Driving license Holder –United Arab emirates