Camfil Farr Training Academy Webinar Programme 2011 Attend a Free Camfil Farr Webinar from the comfort of your own office Every Friday at 11am GMT  Register at www.lowenergyairfilter.co.uk This webinar programme is aimed at assisting you with your business processes demonstrating how substantial energy saving opportunities can be made. Each Webinar lasts no more than 30-45 minutes and is free of charge.
Who is EECO2? EECO2 – Energy Efficiency HVAC Consultants ltd  - based in Macclesfield Cheshire Pharma HVAC Energy Consultancy services Legislative energy solutions – AC Inspections, Part L compliance, EPC’s. Global Pharmaceutical HVAC Energy solutions Identify opportunities & supporting implementation Combined 60+ years experience of Design & Building Pharma Facilities 9+ years delivering innovative Energy focused Pharma HVAC solutions Sharing Industry best practice solutions
Current  EECO2 Activity Sustainable Energy Improvement Programmes: Global Pharmaceutical manufacture: Delivering HVAC energy solutions across 79 sites in 33 Countries  Supporting Global SEIP events Client selected Energy Alliance Partners : Camfil: Schneider Electric: Munters: QA supported risk based approach, pilots & implementation  Integrating viable solutions & savings into a single implementation strategy Best practice & knowledge sharing
A History lesson: To our knowledge there has never been any scientifically based work to identify Pharma Manufacturing ACPH requirements Current  ACPH “Guidelines” are based upon experiments to identify the high failure rates of rocket gyroscopes in the 1950’s for the USAF Similarly for Aseptic manufacturing laminar air velocities have not been fully challenged. Compliance requirements are based upon air quality Collaborative scientifically based review of ACPH & Laminarity has just been completed  The initial indications are – prepare for change!
An Inconvenient Truth! Compliance driven, business risk aversion, has resulted in over designed systems for many years HVAC systems commonly found to be 50% + oversized This has now come back to haunt us,  as we are now  paying higher energy costs and increased emissions Key Challenge; maintaining compliance and product quality, at the same time as reducing energy costs Otherwise how do you retain your competitive edge, in a global market, if your “fixed” overhead is constantly increasing? The recession may temporarily slow Energy cost increases, providing a breathing space to mitigate your baseline Energy costs Corporate Responsibility – Sustainability. ISO16001
The Other Inconvenient Truth!
Sustainable Energy Improvement Process (SEIP) Using OE Principles
Define OE Principles (Define, Measure, Analyse, Improve) Understand where your energy is being used Prioritise – CO2, kWh, £ Identify the Opportunities (size of the prize!) Prioritise focus – low risk quick win to Capital intensive Identify cost to implement ROI with savings Identify potential impact Programme implementation Verify savings
HVAC Opportunity Secondary Manufacturing  – Typically 50-70% of site energy usage is associated with HVAC
Measure
Energy Consumption– Identify Usage!
Energy Map – Identify Usage! HVAC demand 61% of site total – typically 60 > 70% of facility load can be HVAC
HVAC By kWh
Heating & Cooling Degree Day Graphs
Existing Energy Calculation Model
Analyse
Production (units) v Energy  14% Variable Load 86% Fixed Load
Gas vs Heating Degree Days Variable load External condition Driven Scatter could represent poor control or inaccurate meter reading. BaseLoad Independent of Degree Days ie 24/7 fan operation. Humidification / Dehum, Re-Heat Hot Water, Process Water, WFI
Moisture Content vs Electrical Energy Monthly Energy kWh Moisture Content g/Kg
CSUM Heating Improvement Projects? BMS Set point work Improving Performance      Reducing Performance Steady State Improvement Projects? Block 1 HVAC
HVAC - The “Usual suspects” Top 10 most commonly found opportunities: High air change rates.  High fresh air volumes. Challenge  area classifications & manufacturing demand. Operational changes made in areas served.  High energy, low capacity filtration. BMS not Optimised. Dehumidifiers not Optimised. Few VSD’s & where fitted left on “manual” Switch off/reduce HVAC during none operational hours Laboratory fume cupboards -  upgrades
Identify “size of the prize”
Sample – Energy Audit Summary
Improve
 Energy Design Flow Path Production Area:  Product & Compliance  need driven Design HVAC to  Meet - not exceed  production  requirements Chillers & Support Utilities 1.  Identify current product need 2. Review; Classification & Pressure Regimes etc. 3. Energy Audit space 4. Calculate required ACPH  5. Design HVAC Plant to meet 1>4 6. Ensure all elements of design are Energy Efficient 7. System should be fit for purpose 8. Designed to support 1>7 9. Using Energy Efficiency;   Best Engineering Practice  10. Integrate relevant innovation  Minimising Air Change Rates is the key issue
Quick Win Opportunities?: Design review of HVAC systems – ACPH & Fresh air volumes Review potential to switch off or set back air volumes in non cGMP areas at nights & week ends  Secondary Packaging Offices Warehouse Modify fresh air HVAC systems to recirculation system with “free cooling “ where viable – mitigate potential cross contamination issues - filtration BMS Optimisation, strategy review,  system maintenance  VSD’s with volume control reduces Energy demand & improves flexibility Review current AHU & terminal filtration, replace with low energy types Challenge requirement for dehumidification & energy upgrade when required
Big Win Opportunities! Minimise fresh air volumes to achieve pressure cascades, overcome loss & personnel requirements ,[object Object]
 Season dependant it requires: cooling, heating, filtering, dehumidifying etc
 If it requires dehumidification: reactivation heating, cooling & filtration
 The Dehumidification  process uses significant energy     Minimise air change rates (ACPH) to meet air quality requirements & Production equipment heat loads ,[object Object]
 Most areas have excessive ACPH
 Review potential to set back ACPH during none operation hoursIdentify actual HVAC operational hours vs Manufacturing schedules
Key Project Issues; Energy Efficiency need not compromise :  Compliance, product quality, quantity or safety Structured approach to identifying and safely delivering Energy Efficiency Functional Requirement Specification (FRS): area classifications, product & production requirements, identifies cGMP & change control requirements Identify viable solutions to reduce HVAC energy Review the Production Area’s current and projected HVAC demand Balance that demand with the most Energy Efficient HVAC operation Plan production impact minimisation  Energy upgrading can qualify for Enhanced Capital Allowances (EHA)
Project Development  Process: Following completion of HVAC Energy Audit: Step 1: Prioritise upgrades based on: best cost savings @ least business risk Step 2: Commence with “quick win” opportunities Step 3: Complete FRS risk assessment with: Eng/QA/Users/EHS Step 4: Devise low impact implementation strategy  Step 5: Programme to minimise and manage shutdowns & business impact Step 6: Verify savings projected have been delivered
Energy Focused Strategic Planning: Development of Business Risk Strategic Planning: Virgin Refrigerant R22 ceased in January 2010, usage banned in 2015 – affects older chillers Phased Chiller replacement  with energy efficient replacements based in LCCA Chiller replacement design load based on reduced cooling demand not historical Recommission HVAC air systems to ensure they meet cGMP Guides Install EEF1 motors on failure or VSD installation Phased upgrade to low energy filtration Dust extract units: air pulse on ΔP & review carrier air velocity

Más contenido relacionado

La actualidad más candente

Life cycle cost analysis for chilled water plant
Life cycle cost analysis for chilled water plantLife cycle cost analysis for chilled water plant
Life cycle cost analysis for chilled water plantIr. Kok Jing Shun
 
Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)ravindradatar
 
Energy Management Audit
Energy Management AuditEnergy Management Audit
Energy Management Auditalnaidu305
 
Enhancing Sustainability in Automobile & Ancillaries; Boost productivity; red...
Enhancing Sustainability in Automobile & Ancillaries; Boost productivity; red...Enhancing Sustainability in Automobile & Ancillaries; Boost productivity; red...
Enhancing Sustainability in Automobile & Ancillaries; Boost productivity; red...A.T.E. Private Limited
 
Introduction to energy audit part 2
Introduction to energy audit part 2Introduction to energy audit part 2
Introduction to energy audit part 2ZAINI ABDUL WAHAB
 
Energy Auditing in College Campus
Energy Auditing in College CampusEnergy Auditing in College Campus
Energy Auditing in College CampusSanjush Suresh
 
Ambicales Energy Audit
Ambicales Energy AuditAmbicales Energy Audit
Ambicales Energy AuditAmbicales
 
Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)Anish Maman
 
Same Jetc May 6 2010
Same Jetc May 6 2010Same Jetc May 6 2010
Same Jetc May 6 2010GPlattenburg
 
Energy Audit Basics and Principles
Energy Audit Basics and Principles Energy Audit Basics and Principles
Energy Audit Basics and Principles RCREEE
 
Energy Audit Recommendations
Energy Audit RecommendationsEnergy Audit Recommendations
Energy Audit Recommendationskwikcilva
 

La actualidad más candente (20)

Life cycle cost analysis for chilled water plant
Life cycle cost analysis for chilled water plantLife cycle cost analysis for chilled water plant
Life cycle cost analysis for chilled water plant
 
Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)
 
Energy audit
Energy auditEnergy audit
Energy audit
 
Energy Management Audit
Energy Management AuditEnergy Management Audit
Energy Management Audit
 
Air Conditioning Inspections For Buildings Cibse Belfast
Air Conditioning Inspections For Buildings  Cibse BelfastAir Conditioning Inspections For Buildings  Cibse Belfast
Air Conditioning Inspections For Buildings Cibse Belfast
 
Enhancing Sustainability in Automobile & Ancillaries; Boost productivity; red...
Enhancing Sustainability in Automobile & Ancillaries; Boost productivity; red...Enhancing Sustainability in Automobile & Ancillaries; Boost productivity; red...
Enhancing Sustainability in Automobile & Ancillaries; Boost productivity; red...
 
Introduction to energy audit part 2
Introduction to energy audit part 2Introduction to energy audit part 2
Introduction to energy audit part 2
 
Air Conditioning Inspections For Buildings Talk
Air Conditioning Inspections For Buildings  TalkAir Conditioning Inspections For Buildings  Talk
Air Conditioning Inspections For Buildings Talk
 
Energy Auditing in College Campus
Energy Auditing in College CampusEnergy Auditing in College Campus
Energy Auditing in College Campus
 
Ambicales Energy Audit
Ambicales Energy AuditAmbicales Energy Audit
Ambicales Energy Audit
 
Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)
 
Energy audit
Energy auditEnergy audit
Energy audit
 
Same Jetc May 6 2010
Same Jetc May 6 2010Same Jetc May 6 2010
Same Jetc May 6 2010
 
Luke Marshall - One Number to Prioritise Work?
Luke Marshall - One Number to Prioritise Work?Luke Marshall - One Number to Prioritise Work?
Luke Marshall - One Number to Prioritise Work?
 
Energy Audit Basics and Principles
Energy Audit Basics and Principles Energy Audit Basics and Principles
Energy Audit Basics and Principles
 
ENERGY STAR Portfolio Manager and LEED: Bill Willis, West Virginia Division O...
ENERGY STAR Portfolio Manager and LEED: Bill Willis, West Virginia Division O...ENERGY STAR Portfolio Manager and LEED: Bill Willis, West Virginia Division O...
ENERGY STAR Portfolio Manager and LEED: Bill Willis, West Virginia Division O...
 
Refrigeration Maintenance - ACR Today_ Croydon
Refrigeration Maintenance - ACR Today_ CroydonRefrigeration Maintenance - ACR Today_ Croydon
Refrigeration Maintenance - ACR Today_ Croydon
 
3b 2 Energy Audit
3b  2   Energy Audit3b  2   Energy Audit
3b 2 Energy Audit
 
energy audit
energy auditenergy audit
energy audit
 
Energy Audit Recommendations
Energy Audit RecommendationsEnergy Audit Recommendations
Energy Audit Recommendations
 

Similar a Enhancing competitiveness and achieving sustainability

An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedEECO2
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionKeith Beattie
 
Power Conservation Technology Integration Webinar
Power Conservation Technology Integration WebinarPower Conservation Technology Integration Webinar
Power Conservation Technology Integration WebinarLegend Power
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...guest3e1229f
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Alliance To Save Energy
 
Utility Master Planning- National Engineers
Utility Master Planning- National EngineersUtility Master Planning- National Engineers
Utility Master Planning- National EngineersNasser Karimzadeh, P.E.
 
Chilled Water Plant Optimization
Chilled Water Plant OptimizationChilled Water Plant Optimization
Chilled Water Plant OptimizationJoePessa
 
Funding Infrastructure Investments with Guaranteed Performance
Funding Infrastructure  Investments with  Guaranteed PerformanceFunding Infrastructure  Investments with  Guaranteed Performance
Funding Infrastructure Investments with Guaranteed PerformanceSchneider Electric
 
High Performance Buidlings for Brazil
High Performance Buidlings for BrazilHigh Performance Buidlings for Brazil
High Performance Buidlings for Brazilsekkelww
 
Deep Dive Training Energy Efficiency in Industrial Processes
Deep Dive TrainingEnergy Efficiency in Industrial ProcessesDeep Dive TrainingEnergy Efficiency in Industrial Processes
Deep Dive Training Energy Efficiency in Industrial ProcessesChristoph Emde
 
Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010Hayley Pallister
 
Top 10 Products That Save Money - David McDougall, EnerNOC
Top 10 Products That Save Money - David McDougall, EnerNOCTop 10 Products That Save Money - David McDougall, EnerNOC
Top 10 Products That Save Money - David McDougall, EnerNOCMassRecycle
 
Energy audit and career opportunities -EnSave
Energy audit  and career opportunities -EnSaveEnergy audit  and career opportunities -EnSave
Energy audit and career opportunities -EnSaveDharmalingam P
 
How to develop an effective energy management plan according to business type
How to develop an effective energy management plan according to business typeHow to develop an effective energy management plan according to business type
How to develop an effective energy management plan according to business typeCecilia Hall
 
The Role of Incentives in Advancing Energy Efficiency Initiatives
The Role of Incentives in Advancing Energy Efficiency InitiativesThe Role of Incentives in Advancing Energy Efficiency Initiatives
The Role of Incentives in Advancing Energy Efficiency InitiativesAnne Patenaude
 

Similar a Enhancing competitiveness and achieving sustainability (20)

An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy Limited
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reduction
 
Power Conservation Technology Integration Webinar
Power Conservation Technology Integration WebinarPower Conservation Technology Integration Webinar
Power Conservation Technology Integration Webinar
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Utility Master Planning- National Engineers
Utility Master Planning- National EngineersUtility Master Planning- National Engineers
Utility Master Planning- National Engineers
 
Chilled Water Plant Optimization
Chilled Water Plant OptimizationChilled Water Plant Optimization
Chilled Water Plant Optimization
 
Cold-Climate Research Round-Up
Cold-Climate Research Round-UpCold-Climate Research Round-Up
Cold-Climate Research Round-Up
 
Funding Infrastructure Investments with Guaranteed Performance
Funding Infrastructure  Investments with  Guaranteed PerformanceFunding Infrastructure  Investments with  Guaranteed Performance
Funding Infrastructure Investments with Guaranteed Performance
 
High Performance Buidlings for Brazil
High Performance Buidlings for BrazilHigh Performance Buidlings for Brazil
High Performance Buidlings for Brazil
 
Deep Dive Training Energy Efficiency in Industrial Processes
Deep Dive TrainingEnergy Efficiency in Industrial ProcessesDeep Dive TrainingEnergy Efficiency in Industrial Processes
Deep Dive Training Energy Efficiency in Industrial Processes
 
Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010
 
Proa presentation
Proa presentationProa presentation
Proa presentation
 
Top 10 Products That Save Money - David McDougall, EnerNOC
Top 10 Products That Save Money - David McDougall, EnerNOCTop 10 Products That Save Money - David McDougall, EnerNOC
Top 10 Products That Save Money - David McDougall, EnerNOC
 
CK2017: Energy Efficiency Retrofits in Commercial Buildings
CK2017: Energy Efficiency Retrofits in Commercial Buildings CK2017: Energy Efficiency Retrofits in Commercial Buildings
CK2017: Energy Efficiency Retrofits in Commercial Buildings
 
Energy audit and career opportunities -EnSave
Energy audit  and career opportunities -EnSaveEnergy audit  and career opportunities -EnSave
Energy audit and career opportunities -EnSave
 
How to develop an effective energy management plan according to business type
How to develop an effective energy management plan according to business typeHow to develop an effective energy management plan according to business type
How to develop an effective energy management plan according to business type
 
Cooling Efficiencies
Cooling EfficienciesCooling Efficiencies
Cooling Efficiencies
 
1.1
1.11.1
1.1
 
The Role of Incentives in Advancing Energy Efficiency Initiatives
The Role of Incentives in Advancing Energy Efficiency InitiativesThe Role of Incentives in Advancing Energy Efficiency Initiatives
The Role of Incentives in Advancing Energy Efficiency Initiatives
 

Más de Simply Marcomms

Site Insurance & Warranties - Standard contracts on self-build, renovation an...
Site Insurance & Warranties - Standard contracts on self-build, renovation an...Site Insurance & Warranties - Standard contracts on self-build, renovation an...
Site Insurance & Warranties - Standard contracts on self-build, renovation an...Simply Marcomms
 
Self-Build Zone host site insurance masterclass at national home improvement ...
Self-Build Zone host site insurance masterclass at national home improvement ...Self-Build Zone host site insurance masterclass at national home improvement ...
Self-Build Zone host site insurance masterclass at national home improvement ...Simply Marcomms
 
Self Build Zone Home Improvement show 2012
Self Build Zone Home Improvement show 2012 Self Build Zone Home Improvement show 2012
Self Build Zone Home Improvement show 2012 Simply Marcomms
 
Energy and Construction PR and Marketing Case Study - William Dyer Electrical...
Energy and Construction PR and Marketing Case Study - William Dyer Electrical...Energy and Construction PR and Marketing Case Study - William Dyer Electrical...
Energy and Construction PR and Marketing Case Study - William Dyer Electrical...Simply Marcomms
 
Promoting more Custom Build Housing
Promoting more Custom Build HousingPromoting more Custom Build Housing
Promoting more Custom Build HousingSimply Marcomms
 
Solihull School - David Turnbull Music School - Case Study
Solihull School - David Turnbull Music School - Case StudySolihull School - David Turnbull Music School - Case Study
Solihull School - David Turnbull Music School - Case StudySimply Marcomms
 
Scottish Ballet - Case Study
Scottish Ballet - Case StudyScottish Ballet - Case Study
Scottish Ballet - Case StudySimply Marcomms
 
Pimlico Academy Auditorium
Pimlico Academy  AuditoriumPimlico Academy  Auditorium
Pimlico Academy AuditoriumSimply Marcomms
 
Noodle Street Restaurant - Case Study
Noodle Street Restaurant - Case StudyNoodle Street Restaurant - Case Study
Noodle Street Restaurant - Case StudySimply Marcomms
 
Buildstore developers conference structural warranty
Buildstore developers conference structural warrantyBuildstore developers conference structural warranty
Buildstore developers conference structural warrantySimply Marcomms
 
Saving Energy in Halls of Residence
Saving Energy in Halls of ResidenceSaving Energy in Halls of Residence
Saving Energy in Halls of ResidenceSimply Marcomms
 
Asbestos Surveying London Case Study – Retail Projects
Asbestos Surveying London Case Study – Retail ProjectsAsbestos Surveying London Case Study – Retail Projects
Asbestos Surveying London Case Study – Retail ProjectsSimply Marcomms
 
Asbestos Removal Case Study -Construction
Asbestos Removal Case Study -ConstructionAsbestos Removal Case Study -Construction
Asbestos Removal Case Study -ConstructionSimply Marcomms
 
Asbestos Removal and Surveying London Case Study - Hotels
Asbestos Removal and Surveying London Case Study - HotelsAsbestos Removal and Surveying London Case Study - Hotels
Asbestos Removal and Surveying London Case Study - HotelsSimply Marcomms
 
Asbestos Removal London Case Study – Financial
Asbestos Removal London Case Study – FinancialAsbestos Removal London Case Study – Financial
Asbestos Removal London Case Study – FinancialSimply Marcomms
 
Asbestos Removal Case Study – Healthcare
Asbestos Removal  Case Study – HealthcareAsbestos Removal  Case Study – Healthcare
Asbestos Removal Case Study – HealthcareSimply Marcomms
 
Asbestos Removal London Case Study – Healthcare
Asbestos Removal London Case Study – HealthcareAsbestos Removal London Case Study – Healthcare
Asbestos Removal London Case Study – HealthcareSimply Marcomms
 
Asbestos Removal London Case Study – Education
Asbestos Removal London Case Study – EducationAsbestos Removal London Case Study – Education
Asbestos Removal London Case Study – EducationSimply Marcomms
 
Asbestos Removal London Case Study – Residential
Asbestos Removal London Case Study – ResidentialAsbestos Removal London Case Study – Residential
Asbestos Removal London Case Study – ResidentialSimply Marcomms
 
Asbestos Removal London Case Study – Community Centre Projects
Asbestos Removal London Case Study – Community Centre ProjectsAsbestos Removal London Case Study – Community Centre Projects
Asbestos Removal London Case Study – Community Centre ProjectsSimply Marcomms
 

Más de Simply Marcomms (20)

Site Insurance & Warranties - Standard contracts on self-build, renovation an...
Site Insurance & Warranties - Standard contracts on self-build, renovation an...Site Insurance & Warranties - Standard contracts on self-build, renovation an...
Site Insurance & Warranties - Standard contracts on self-build, renovation an...
 
Self-Build Zone host site insurance masterclass at national home improvement ...
Self-Build Zone host site insurance masterclass at national home improvement ...Self-Build Zone host site insurance masterclass at national home improvement ...
Self-Build Zone host site insurance masterclass at national home improvement ...
 
Self Build Zone Home Improvement show 2012
Self Build Zone Home Improvement show 2012 Self Build Zone Home Improvement show 2012
Self Build Zone Home Improvement show 2012
 
Energy and Construction PR and Marketing Case Study - William Dyer Electrical...
Energy and Construction PR and Marketing Case Study - William Dyer Electrical...Energy and Construction PR and Marketing Case Study - William Dyer Electrical...
Energy and Construction PR and Marketing Case Study - William Dyer Electrical...
 
Promoting more Custom Build Housing
Promoting more Custom Build HousingPromoting more Custom Build Housing
Promoting more Custom Build Housing
 
Solihull School - David Turnbull Music School - Case Study
Solihull School - David Turnbull Music School - Case StudySolihull School - David Turnbull Music School - Case Study
Solihull School - David Turnbull Music School - Case Study
 
Scottish Ballet - Case Study
Scottish Ballet - Case StudyScottish Ballet - Case Study
Scottish Ballet - Case Study
 
Pimlico Academy Auditorium
Pimlico Academy  AuditoriumPimlico Academy  Auditorium
Pimlico Academy Auditorium
 
Noodle Street Restaurant - Case Study
Noodle Street Restaurant - Case StudyNoodle Street Restaurant - Case Study
Noodle Street Restaurant - Case Study
 
Buildstore developers conference structural warranty
Buildstore developers conference structural warrantyBuildstore developers conference structural warranty
Buildstore developers conference structural warranty
 
Saving Energy in Halls of Residence
Saving Energy in Halls of ResidenceSaving Energy in Halls of Residence
Saving Energy in Halls of Residence
 
Asbestos Surveying London Case Study – Retail Projects
Asbestos Surveying London Case Study – Retail ProjectsAsbestos Surveying London Case Study – Retail Projects
Asbestos Surveying London Case Study – Retail Projects
 
Asbestos Removal Case Study -Construction
Asbestos Removal Case Study -ConstructionAsbestos Removal Case Study -Construction
Asbestos Removal Case Study -Construction
 
Asbestos Removal and Surveying London Case Study - Hotels
Asbestos Removal and Surveying London Case Study - HotelsAsbestos Removal and Surveying London Case Study - Hotels
Asbestos Removal and Surveying London Case Study - Hotels
 
Asbestos Removal London Case Study – Financial
Asbestos Removal London Case Study – FinancialAsbestos Removal London Case Study – Financial
Asbestos Removal London Case Study – Financial
 
Asbestos Removal Case Study – Healthcare
Asbestos Removal  Case Study – HealthcareAsbestos Removal  Case Study – Healthcare
Asbestos Removal Case Study – Healthcare
 
Asbestos Removal London Case Study – Healthcare
Asbestos Removal London Case Study – HealthcareAsbestos Removal London Case Study – Healthcare
Asbestos Removal London Case Study – Healthcare
 
Asbestos Removal London Case Study – Education
Asbestos Removal London Case Study – EducationAsbestos Removal London Case Study – Education
Asbestos Removal London Case Study – Education
 
Asbestos Removal London Case Study – Residential
Asbestos Removal London Case Study – ResidentialAsbestos Removal London Case Study – Residential
Asbestos Removal London Case Study – Residential
 
Asbestos Removal London Case Study – Community Centre Projects
Asbestos Removal London Case Study – Community Centre ProjectsAsbestos Removal London Case Study – Community Centre Projects
Asbestos Removal London Case Study – Community Centre Projects
 

Último

INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
EMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxEMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxElton John Embodo
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 

Último (20)

INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
EMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxEMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docx
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 

Enhancing competitiveness and achieving sustainability

  • 1. Enhancing Competitiveness and Achieving Sustainability Identifying and implementing Energy Efficiency in Pharmaceutical Critical HVAC Systems
  • 2. Camfil Farr Training Academy Webinar Programme 2011 Attend a Free Camfil Farr Webinar from the comfort of your own office Every Friday at 11am GMT Register at www.lowenergyairfilter.co.uk This webinar programme is aimed at assisting you with your business processes demonstrating how substantial energy saving opportunities can be made. Each Webinar lasts no more than 30-45 minutes and is free of charge.
  • 3. Who is EECO2? EECO2 – Energy Efficiency HVAC Consultants ltd - based in Macclesfield Cheshire Pharma HVAC Energy Consultancy services Legislative energy solutions – AC Inspections, Part L compliance, EPC’s. Global Pharmaceutical HVAC Energy solutions Identify opportunities & supporting implementation Combined 60+ years experience of Design & Building Pharma Facilities 9+ years delivering innovative Energy focused Pharma HVAC solutions Sharing Industry best practice solutions
  • 4. Current EECO2 Activity Sustainable Energy Improvement Programmes: Global Pharmaceutical manufacture: Delivering HVAC energy solutions across 79 sites in 33 Countries Supporting Global SEIP events Client selected Energy Alliance Partners : Camfil: Schneider Electric: Munters: QA supported risk based approach, pilots & implementation Integrating viable solutions & savings into a single implementation strategy Best practice & knowledge sharing
  • 5. A History lesson: To our knowledge there has never been any scientifically based work to identify Pharma Manufacturing ACPH requirements Current ACPH “Guidelines” are based upon experiments to identify the high failure rates of rocket gyroscopes in the 1950’s for the USAF Similarly for Aseptic manufacturing laminar air velocities have not been fully challenged. Compliance requirements are based upon air quality Collaborative scientifically based review of ACPH & Laminarity has just been completed The initial indications are – prepare for change!
  • 6. An Inconvenient Truth! Compliance driven, business risk aversion, has resulted in over designed systems for many years HVAC systems commonly found to be 50% + oversized This has now come back to haunt us, as we are now paying higher energy costs and increased emissions Key Challenge; maintaining compliance and product quality, at the same time as reducing energy costs Otherwise how do you retain your competitive edge, in a global market, if your “fixed” overhead is constantly increasing? The recession may temporarily slow Energy cost increases, providing a breathing space to mitigate your baseline Energy costs Corporate Responsibility – Sustainability. ISO16001
  • 8. Sustainable Energy Improvement Process (SEIP) Using OE Principles
  • 9. Define OE Principles (Define, Measure, Analyse, Improve) Understand where your energy is being used Prioritise – CO2, kWh, £ Identify the Opportunities (size of the prize!) Prioritise focus – low risk quick win to Capital intensive Identify cost to implement ROI with savings Identify potential impact Programme implementation Verify savings
  • 10. HVAC Opportunity Secondary Manufacturing – Typically 50-70% of site energy usage is associated with HVAC
  • 13. Energy Map – Identify Usage! HVAC demand 61% of site total – typically 60 > 70% of facility load can be HVAC
  • 15. Heating & Cooling Degree Day Graphs
  • 18. Production (units) v Energy 14% Variable Load 86% Fixed Load
  • 19. Gas vs Heating Degree Days Variable load External condition Driven Scatter could represent poor control or inaccurate meter reading. BaseLoad Independent of Degree Days ie 24/7 fan operation. Humidification / Dehum, Re-Heat Hot Water, Process Water, WFI
  • 20. Moisture Content vs Electrical Energy Monthly Energy kWh Moisture Content g/Kg
  • 21. CSUM Heating Improvement Projects? BMS Set point work Improving Performance Reducing Performance Steady State Improvement Projects? Block 1 HVAC
  • 22. HVAC - The “Usual suspects” Top 10 most commonly found opportunities: High air change rates. High fresh air volumes. Challenge area classifications & manufacturing demand. Operational changes made in areas served. High energy, low capacity filtration. BMS not Optimised. Dehumidifiers not Optimised. Few VSD’s & where fitted left on “manual” Switch off/reduce HVAC during none operational hours Laboratory fume cupboards - upgrades
  • 23. Identify “size of the prize”
  • 24. Sample – Energy Audit Summary
  • 26. Energy Design Flow Path Production Area: Product & Compliance need driven Design HVAC to Meet - not exceed production requirements Chillers & Support Utilities 1. Identify current product need 2. Review; Classification & Pressure Regimes etc. 3. Energy Audit space 4. Calculate required ACPH 5. Design HVAC Plant to meet 1>4 6. Ensure all elements of design are Energy Efficient 7. System should be fit for purpose 8. Designed to support 1>7 9. Using Energy Efficiency; Best Engineering Practice 10. Integrate relevant innovation Minimising Air Change Rates is the key issue
  • 27. Quick Win Opportunities?: Design review of HVAC systems – ACPH & Fresh air volumes Review potential to switch off or set back air volumes in non cGMP areas at nights & week ends Secondary Packaging Offices Warehouse Modify fresh air HVAC systems to recirculation system with “free cooling “ where viable – mitigate potential cross contamination issues - filtration BMS Optimisation, strategy review, system maintenance VSD’s with volume control reduces Energy demand & improves flexibility Review current AHU & terminal filtration, replace with low energy types Challenge requirement for dehumidification & energy upgrade when required
  • 28.
  • 29. Season dependant it requires: cooling, heating, filtering, dehumidifying etc
  • 30. If it requires dehumidification: reactivation heating, cooling & filtration
  • 31.
  • 32. Most areas have excessive ACPH
  • 33. Review potential to set back ACPH during none operation hoursIdentify actual HVAC operational hours vs Manufacturing schedules
  • 34. Key Project Issues; Energy Efficiency need not compromise : Compliance, product quality, quantity or safety Structured approach to identifying and safely delivering Energy Efficiency Functional Requirement Specification (FRS): area classifications, product & production requirements, identifies cGMP & change control requirements Identify viable solutions to reduce HVAC energy Review the Production Area’s current and projected HVAC demand Balance that demand with the most Energy Efficient HVAC operation Plan production impact minimisation Energy upgrading can qualify for Enhanced Capital Allowances (EHA)
  • 35. Project Development Process: Following completion of HVAC Energy Audit: Step 1: Prioritise upgrades based on: best cost savings @ least business risk Step 2: Commence with “quick win” opportunities Step 3: Complete FRS risk assessment with: Eng/QA/Users/EHS Step 4: Devise low impact implementation strategy Step 5: Programme to minimise and manage shutdowns & business impact Step 6: Verify savings projected have been delivered
  • 36. Energy Focused Strategic Planning: Development of Business Risk Strategic Planning: Virgin Refrigerant R22 ceased in January 2010, usage banned in 2015 – affects older chillers Phased Chiller replacement with energy efficient replacements based in LCCA Chiller replacement design load based on reduced cooling demand not historical Recommission HVAC air systems to ensure they meet cGMP Guides Install EEF1 motors on failure or VSD installation Phased upgrade to low energy filtration Dust extract units: air pulse on ΔP & review carrier air velocity
  • 38. Low Cost MM&T Ability to measure, monitor & trend energy usage is critical EECO2 has developed a range of Mobile Energy Monitoring Units “ MEMU’s”
  • 39. Renewable Energy Solutions Combined Heating & Power ( Absorption Cooling) Wind Turbines Solar Hot Water Solar PV Biofuels Tidal Schemes Anaerobic Digestions Green Energy Rainwater Recovery
  • 40. Way Forward Think that you have already picked your “low hanging fruit” – think again! Take ownership of energy management Identify where your energy is used If you cannot measure it – you cannot manage it! Team work solutions – Engineering/QA/Production/EHS Do not be afraid to challenge/challenge/challenge – perceived “standards” The bottom line is! If you do not make it cheaper – someone else will!
  • 41. QUESTIONS? Peter Harrison Thanks for attending from Camfil & EECO2 Please send any questions by email & we will respond shortly

Notas del editor

  1. It is estimated that Pharma Manufacturing globally emits 100,000,000 Tonnes of Co2 Annually.
  2. Typical modelling of HVAC system to provide energy consumption data for targeting energy savings.
  3. Need a structured & managed approach to delivery of energy savingsWas at a site in the Philippines. Engineering started switching plant off at weekend without Quality input. Caused quality issues and now difficulties to implement change.