A performance planning system designed by SSM for a medium company By Li Qi and Prof. Wenbin Liu
Background & Introduction We undertook a performance management project for Beijing Tonsan Ltd. in 2008. Tonsan is a Chinese high-tech enterprise, specializing in the R&D, production, sales and service of engineering adhesives, which is a full-blossomed company with all-around functions and business activities. In the end of 2009, the company's profit was doubled despite the economical crisis. It turns out that it is the performance planning system, which was designed via SSM, played the key role in boosting the company's performance, according to its CEO. In this talk we report how to develop KP (Key Processes) and KPI (Key Performance Indicator) via SSM, and focus on performance planning for this company. 
Improvements in Tonsan’s performance management Phase I: Collect much information and data for a clear picture of Tonsan. Phase II: Decompose the strategy by utilizing BSC and the strategy map combined with the SSM. Phase III: Form a set of targets and tasks of the middle-level departments, which stemmed from the strategy decomposition from top to the middle level management. To choose to measure the performance for the tasks by using 3E dimensions so as to form the performance indicator system.  Phase IV: This phase is for design of performance planning. Phase V: For Tonsan, we put forward some suggestions regarding to appropriate performance feedback or organizational response.
Phase IV Design of performance planning The performance planning system we developed enables the supervisors and the subordinates in the hierarchical structure to communicate and negotiate formally and informally.  The performance planning system is to build effective bi-directional communication among the higher and the lower levels of the management to analyze what specific tasks must be carried out for the KPs that support the KPIs so that the KPIs can be fulfilled. The performance planning system will be employed to monitor the key performance processes (KPs) and the key performance indicators (KPIs). Our performance planning system is based on the KPs and KPIs which had been developed in the last phase, and thus the contents for the communication and discussion are more specific and systematic. We developed the specific contents for their performance plan for each department and unit at various levels in accordance with the KPs derived in the third phase, and called upon the managers at various levels to implement performance plan agreed upon by both managers themselves and their subordinates, track their subordinates’ progresses, provide proper guidance, and keep records of their tracking and guidance.
Phase II Tonsan’s Strategy Map
SSM and 3Es 7.Take into actions  to improve 1.Complex situation  inspect 6.Debate with  systematically desirable  and culture feasible 5.Compare CM with 2 2.Express  messy system Real world 4.Formulate CM 3.Build RD of  relevant purposeful  activity system system things RD1 RD2 RD3 The spirit of SSM is that any system can be analysed by answering three questions as:  What to do (P) - Efficacy relate, measures the outputs of the system How to do (Q) - Efficiency relate, evaluates whether minimum resources are used.  Why to do (R) -  Effectiveness relate, assesses whether the system outputs are meaningful or useful to higher level (wider) system.
Table 7.4: The entire supporting processes analysis An example of supporting processes analysis
Phase III KPs & KPIs
An example of KPIs & KPs form
Phase IV KP adjustment and tracking record

Más contenido relacionado

Destacado

Paper 1: Shanghai Ranking (Liu, Nian Cai)
Paper 1: Shanghai Ranking (Liu, Nian Cai)Paper 1: Shanghai Ranking (Liu, Nian Cai)
Paper 1: Shanghai Ranking (Liu, Nian Cai)Kent Business School
 
Paper 3: DEA Weights (Mar Molinero & Portillo)
Paper 3: DEA Weights (Mar Molinero & Portillo)Paper 3: DEA Weights (Mar Molinero & Portillo)
Paper 3: DEA Weights (Mar Molinero & Portillo)Kent Business School
 
Le marché du logement neuf en Ile de France - 3ème trimestre 2015
Le marché du logement neuf en Ile de France - 3ème trimestre 2015Le marché du logement neuf en Ile de France - 3ème trimestre 2015
Le marché du logement neuf en Ile de France - 3ème trimestre 2015Monimmeuble.com
 
Paper 5: Sustainable Organisation (Metawie)
Paper 5: Sustainable Organisation (Metawie)Paper 5: Sustainable Organisation (Metawie)
Paper 5: Sustainable Organisation (Metawie)Kent Business School
 
Paper 8: The Government as Venture Capitalist (Li)
Paper 8: The Government as Venture Capitalist (Li)Paper 8: The Government as Venture Capitalist (Li)
Paper 8: The Government as Venture Capitalist (Li)Kent Business School
 
Paper 1: Changing Policy for Innovation Capacity-building (Mu)
Paper 1: Changing Policy for Innovation Capacity-building (Mu)Paper 1: Changing Policy for Innovation Capacity-building (Mu)
Paper 1: Changing Policy for Innovation Capacity-building (Mu)Kent Business School
 
Paper 5: Study of the Model and Methodology for Institute Evaluation (Yang)
Paper 5: Study of the Model and Methodology for Institute Evaluation (Yang)Paper 5: Study of the Model and Methodology for Institute Evaluation (Yang)
Paper 5: Study of the Model and Methodology for Institute Evaluation (Yang)Kent Business School
 

Destacado (7)

Paper 1: Shanghai Ranking (Liu, Nian Cai)
Paper 1: Shanghai Ranking (Liu, Nian Cai)Paper 1: Shanghai Ranking (Liu, Nian Cai)
Paper 1: Shanghai Ranking (Liu, Nian Cai)
 
Paper 3: DEA Weights (Mar Molinero & Portillo)
Paper 3: DEA Weights (Mar Molinero & Portillo)Paper 3: DEA Weights (Mar Molinero & Portillo)
Paper 3: DEA Weights (Mar Molinero & Portillo)
 
Le marché du logement neuf en Ile de France - 3ème trimestre 2015
Le marché du logement neuf en Ile de France - 3ème trimestre 2015Le marché du logement neuf en Ile de France - 3ème trimestre 2015
Le marché du logement neuf en Ile de France - 3ème trimestre 2015
 
Paper 5: Sustainable Organisation (Metawie)
Paper 5: Sustainable Organisation (Metawie)Paper 5: Sustainable Organisation (Metawie)
Paper 5: Sustainable Organisation (Metawie)
 
Paper 8: The Government as Venture Capitalist (Li)
Paper 8: The Government as Venture Capitalist (Li)Paper 8: The Government as Venture Capitalist (Li)
Paper 8: The Government as Venture Capitalist (Li)
 
Paper 1: Changing Policy for Innovation Capacity-building (Mu)
Paper 1: Changing Policy for Innovation Capacity-building (Mu)Paper 1: Changing Policy for Innovation Capacity-building (Mu)
Paper 1: Changing Policy for Innovation Capacity-building (Mu)
 
Paper 5: Study of the Model and Methodology for Institute Evaluation (Yang)
Paper 5: Study of the Model and Methodology for Institute Evaluation (Yang)Paper 5: Study of the Model and Methodology for Institute Evaluation (Yang)
Paper 5: Study of the Model and Methodology for Institute Evaluation (Yang)
 

Similar a Paper 4: Performance Management in SMEs (Qi)

chapter 7 Rolling Out the Performance Management Sys.docx
chapter 7 Rolling Out the Performance Management Sys.docxchapter 7 Rolling Out the Performance Management Sys.docx
chapter 7 Rolling Out the Performance Management Sys.docxspoonerneddy
 
chapter 7 Rolling Out the Performance Management Sys.docx
chapter 7 Rolling Out the Performance Management Sys.docxchapter 7 Rolling Out the Performance Management Sys.docx
chapter 7 Rolling Out the Performance Management Sys.docxmccormicknadine86
 
WP Management Reporting Excellence_3
WP Management Reporting Excellence_3WP Management Reporting Excellence_3
WP Management Reporting Excellence_3Fabien Lennertz
 
The Role of Balanced Scorecard for Measuring Competitive Advantage of Contain...
The Role of Balanced Scorecard for Measuring Competitive Advantage of Contain...The Role of Balanced Scorecard for Measuring Competitive Advantage of Contain...
The Role of Balanced Scorecard for Measuring Competitive Advantage of Contain...inventionjournals
 
Performance Management- Guest Lecture
Performance Management- Guest LecturePerformance Management- Guest Lecture
Performance Management- Guest Lecturekaushiknandi79
 
Integrated Analytical Hierarchy Process and Objective Matrix in Balanced Scor...
Integrated Analytical Hierarchy Process and Objective Matrix in Balanced Scor...Integrated Analytical Hierarchy Process and Objective Matrix in Balanced Scor...
Integrated Analytical Hierarchy Process and Objective Matrix in Balanced Scor...TELKOMNIKA JOURNAL
 
Developing IT Strategy
Developing IT StrategyDeveloping IT Strategy
Developing IT StrategyMario Navarro
 
Operational Performance Management in the digital era
Operational Performance Management in the digital eraOperational Performance Management in the digital era
Operational Performance Management in the digital eraRolf Sleddens
 
Closed-loop operational performance management - Enabling the performance dia...
Closed-loop operational performance management - Enabling the performance dia...Closed-loop operational performance management - Enabling the performance dia...
Closed-loop operational performance management - Enabling the performance dia...Hans Toebak
 
Manpower planning project
Manpower planning projectManpower planning project
Manpower planning projecthema_nt
 
Jurnal an example of using key performance indicators for software development
Jurnal   an example of using key performance indicators for software developmentJurnal   an example of using key performance indicators for software development
Jurnal an example of using key performance indicators for software developmentRatzman III
 
The interdependance between planning, performance and measurement v print
The interdependance between planning, performance and measurement v printThe interdependance between planning, performance and measurement v print
The interdependance between planning, performance and measurement v printmarkhocknell
 
Steps to blueprint successful erp projects immortal
Steps to blueprint successful erp projects immortalSteps to blueprint successful erp projects immortal
Steps to blueprint successful erp projects immortalImmortal Technologies
 
Performance management an introduction
Performance management an introductionPerformance management an introduction
Performance management an introductionGopal Verma
 
Project management
Project managementProject management
Project managementRohit Mishra
 
Project management
Project managementProject management
Project managementRohit Mishra
 
Quality improvement paradigm (QIP)
Quality improvement paradigm (QIP)Quality improvement paradigm (QIP)
Quality improvement paradigm (QIP)Chandan Thakur
 
Manager's manual rpms
Manager's manual rpmsManager's manual rpms
Manager's manual rpmsJulie Alvero
 
Ejkm volume1-issue1-article8
Ejkm volume1-issue1-article8Ejkm volume1-issue1-article8
Ejkm volume1-issue1-article8Dipannita Roy
 

Similar a Paper 4: Performance Management in SMEs (Qi) (20)

chapter 7 Rolling Out the Performance Management Sys.docx
chapter 7 Rolling Out the Performance Management Sys.docxchapter 7 Rolling Out the Performance Management Sys.docx
chapter 7 Rolling Out the Performance Management Sys.docx
 
chapter 7 Rolling Out the Performance Management Sys.docx
chapter 7 Rolling Out the Performance Management Sys.docxchapter 7 Rolling Out the Performance Management Sys.docx
chapter 7 Rolling Out the Performance Management Sys.docx
 
WP Management Reporting Excellence_3
WP Management Reporting Excellence_3WP Management Reporting Excellence_3
WP Management Reporting Excellence_3
 
The Role of Balanced Scorecard for Measuring Competitive Advantage of Contain...
The Role of Balanced Scorecard for Measuring Competitive Advantage of Contain...The Role of Balanced Scorecard for Measuring Competitive Advantage of Contain...
The Role of Balanced Scorecard for Measuring Competitive Advantage of Contain...
 
Performance Management- Guest Lecture
Performance Management- Guest LecturePerformance Management- Guest Lecture
Performance Management- Guest Lecture
 
Integrated Analytical Hierarchy Process and Objective Matrix in Balanced Scor...
Integrated Analytical Hierarchy Process and Objective Matrix in Balanced Scor...Integrated Analytical Hierarchy Process and Objective Matrix in Balanced Scor...
Integrated Analytical Hierarchy Process and Objective Matrix in Balanced Scor...
 
Developing IT Strategy
Developing IT StrategyDeveloping IT Strategy
Developing IT Strategy
 
Matthew Week 3 Feedback & Project
Matthew Week 3 Feedback & Project Matthew Week 3 Feedback & Project
Matthew Week 3 Feedback & Project
 
Operational Performance Management in the digital era
Operational Performance Management in the digital eraOperational Performance Management in the digital era
Operational Performance Management in the digital era
 
Closed-loop operational performance management - Enabling the performance dia...
Closed-loop operational performance management - Enabling the performance dia...Closed-loop operational performance management - Enabling the performance dia...
Closed-loop operational performance management - Enabling the performance dia...
 
Manpower planning project
Manpower planning projectManpower planning project
Manpower planning project
 
Jurnal an example of using key performance indicators for software development
Jurnal   an example of using key performance indicators for software developmentJurnal   an example of using key performance indicators for software development
Jurnal an example of using key performance indicators for software development
 
The interdependance between planning, performance and measurement v print
The interdependance between planning, performance and measurement v printThe interdependance between planning, performance and measurement v print
The interdependance between planning, performance and measurement v print
 
Steps to blueprint successful erp projects immortal
Steps to blueprint successful erp projects immortalSteps to blueprint successful erp projects immortal
Steps to blueprint successful erp projects immortal
 
Performance management an introduction
Performance management an introductionPerformance management an introduction
Performance management an introduction
 
Project management
Project managementProject management
Project management
 
Project management
Project managementProject management
Project management
 
Quality improvement paradigm (QIP)
Quality improvement paradigm (QIP)Quality improvement paradigm (QIP)
Quality improvement paradigm (QIP)
 
Manager's manual rpms
Manager's manual rpmsManager's manual rpms
Manager's manual rpms
 
Ejkm volume1-issue1-article8
Ejkm volume1-issue1-article8Ejkm volume1-issue1-article8
Ejkm volume1-issue1-article8
 

Más de Kent Business School

Kent Business School Open innovation Network (Presentation: 23 January 2014) ...
Kent Business School Open innovation Network (Presentation: 23 January 2014) ...Kent Business School Open innovation Network (Presentation: 23 January 2014) ...
Kent Business School Open innovation Network (Presentation: 23 January 2014) ...Kent Business School
 
Kent Business School Open innovation Network (Presentation: 23 January 2014):...
Kent Business School Open innovation Network (Presentation: 23 January 2014):...Kent Business School Open innovation Network (Presentation: 23 January 2014):...
Kent Business School Open innovation Network (Presentation: 23 January 2014):...Kent Business School
 
Kent Business School Open innovation network (Presentation: 5th June 2013): H...
Kent Business School Open innovation network (Presentation: 5th June 2013): H...Kent Business School Open innovation network (Presentation: 5th June 2013): H...
Kent Business School Open innovation network (Presentation: 5th June 2013): H...Kent Business School
 
Paper 1: Integrated Bank Performance Assessment (Yang)
Paper 1:  Integrated Bank Performance Assessment (Yang)Paper 1:  Integrated Bank Performance Assessment (Yang)
Paper 1: Integrated Bank Performance Assessment (Yang)Kent Business School
 
Paper 7: Promoting Sustainable Performance (Turpin)
Paper 7: Promoting Sustainable Performance (Turpin)Paper 7: Promoting Sustainable Performance (Turpin)
Paper 7: Promoting Sustainable Performance (Turpin)Kent Business School
 
Paper 2: Voice (Bull, Gilman & Pyman)
Paper 2: Voice (Bull, Gilman & Pyman) Paper 2: Voice (Bull, Gilman & Pyman)
Paper 2: Voice (Bull, Gilman & Pyman) Kent Business School
 
Paper 6: A Structure for Performance (Dudley)
Paper 6: A Structure for Performance (Dudley)Paper 6: A Structure for Performance (Dudley)
Paper 6: A Structure for Performance (Dudley)Kent Business School
 
Paper 1: Comparative Growth (Gilman & Raby)
Paper 1: Comparative Growth (Gilman & Raby)Paper 1: Comparative Growth (Gilman & Raby)
Paper 1: Comparative Growth (Gilman & Raby)Kent Business School
 
Paper 3: Regional Innovation Policy (Gill)
Paper 3: Regional Innovation Policy (Gill)Paper 3: Regional Innovation Policy (Gill)
Paper 3: Regional Innovation Policy (Gill)Kent Business School
 
Paper 7: Innovation Capacity of Chinese Manufacturing (Chen)
Paper 7: Innovation Capacity of Chinese Manufacturing (Chen)Paper 7: Innovation Capacity of Chinese Manufacturing (Chen)
Paper 7: Innovation Capacity of Chinese Manufacturing (Chen)Kent Business School
 
Paper 9: Innovation Assessment and Improvement (D. Xu)
Paper 9: Innovation Assessment and Improvement (D. Xu)Paper 9: Innovation Assessment and Improvement (D. Xu)
Paper 9: Innovation Assessment and Improvement (D. Xu)Kent Business School
 
Paper 6: Sustainable Organisation (Butler)
Paper 6: Sustainable Organisation (Butler)Paper 6: Sustainable Organisation (Butler)
Paper 6: Sustainable Organisation (Butler)Kent Business School
 
Paper 4: Ethical Environment of Nano-Science (Chunliang)
Paper 4: Ethical Environment of Nano-Science (Chunliang)Paper 4: Ethical Environment of Nano-Science (Chunliang)
Paper 4: Ethical Environment of Nano-Science (Chunliang)Kent Business School
 
Paper 2: Correlation of China’s Government Procurement (Song)
Paper 2: Correlation of China’s Government Procurement (Song)Paper 2: Correlation of China’s Government Procurement (Song)
Paper 2: Correlation of China’s Government Procurement (Song)Kent Business School
 
Paper 8: Business and Management Journal Quality (Mingers)
Paper 8: Business and Management Journal Quality (Mingers)Paper 8: Business and Management Journal Quality (Mingers)
Paper 8: Business and Management Journal Quality (Mingers)Kent Business School
 
Paper 7: Ranking Methodology of Times Higher Education (Baty)
Paper 7: Ranking Methodology of Times Higher Education (Baty)Paper 7: Ranking Methodology of Times Higher Education (Baty)
Paper 7: Ranking Methodology of Times Higher Education (Baty)Kent Business School
 
Paper 6: World University's Evaluation (Qiu & Zhao)
Paper 6: World University's Evaluation (Qiu & Zhao)Paper 6: World University's Evaluation (Qiu & Zhao)
Paper 6: World University's Evaluation (Qiu & Zhao)Kent Business School
 
Paper 5: Rankings of International Research Institutes (Liu, Wenbin)
Paper 5: Rankings of International Research Institutes (Liu, Wenbin)Paper 5: Rankings of International Research Institutes (Liu, Wenbin)
Paper 5: Rankings of International Research Institutes (Liu, Wenbin)Kent Business School
 
Paper 4: Ranking Universities (Ince)
Paper 4: Ranking Universities (Ince)Paper 4: Ranking Universities (Ince)
Paper 4: Ranking Universities (Ince)Kent Business School
 
Paper 3: Chinese University's Evaluation (Qiu & Wang)
Paper 3: Chinese University's Evaluation (Qiu & Wang)Paper 3: Chinese University's Evaluation (Qiu & Wang)
Paper 3: Chinese University's Evaluation (Qiu & Wang)Kent Business School
 

Más de Kent Business School (20)

Kent Business School Open innovation Network (Presentation: 23 January 2014) ...
Kent Business School Open innovation Network (Presentation: 23 January 2014) ...Kent Business School Open innovation Network (Presentation: 23 January 2014) ...
Kent Business School Open innovation Network (Presentation: 23 January 2014) ...
 
Kent Business School Open innovation Network (Presentation: 23 January 2014):...
Kent Business School Open innovation Network (Presentation: 23 January 2014):...Kent Business School Open innovation Network (Presentation: 23 January 2014):...
Kent Business School Open innovation Network (Presentation: 23 January 2014):...
 
Kent Business School Open innovation network (Presentation: 5th June 2013): H...
Kent Business School Open innovation network (Presentation: 5th June 2013): H...Kent Business School Open innovation network (Presentation: 5th June 2013): H...
Kent Business School Open innovation network (Presentation: 5th June 2013): H...
 
Paper 1: Integrated Bank Performance Assessment (Yang)
Paper 1:  Integrated Bank Performance Assessment (Yang)Paper 1:  Integrated Bank Performance Assessment (Yang)
Paper 1: Integrated Bank Performance Assessment (Yang)
 
Paper 7: Promoting Sustainable Performance (Turpin)
Paper 7: Promoting Sustainable Performance (Turpin)Paper 7: Promoting Sustainable Performance (Turpin)
Paper 7: Promoting Sustainable Performance (Turpin)
 
Paper 2: Voice (Bull, Gilman & Pyman)
Paper 2: Voice (Bull, Gilman & Pyman) Paper 2: Voice (Bull, Gilman & Pyman)
Paper 2: Voice (Bull, Gilman & Pyman)
 
Paper 6: A Structure for Performance (Dudley)
Paper 6: A Structure for Performance (Dudley)Paper 6: A Structure for Performance (Dudley)
Paper 6: A Structure for Performance (Dudley)
 
Paper 1: Comparative Growth (Gilman & Raby)
Paper 1: Comparative Growth (Gilman & Raby)Paper 1: Comparative Growth (Gilman & Raby)
Paper 1: Comparative Growth (Gilman & Raby)
 
Paper 3: Regional Innovation Policy (Gill)
Paper 3: Regional Innovation Policy (Gill)Paper 3: Regional Innovation Policy (Gill)
Paper 3: Regional Innovation Policy (Gill)
 
Paper 7: Innovation Capacity of Chinese Manufacturing (Chen)
Paper 7: Innovation Capacity of Chinese Manufacturing (Chen)Paper 7: Innovation Capacity of Chinese Manufacturing (Chen)
Paper 7: Innovation Capacity of Chinese Manufacturing (Chen)
 
Paper 9: Innovation Assessment and Improvement (D. Xu)
Paper 9: Innovation Assessment and Improvement (D. Xu)Paper 9: Innovation Assessment and Improvement (D. Xu)
Paper 9: Innovation Assessment and Improvement (D. Xu)
 
Paper 6: Sustainable Organisation (Butler)
Paper 6: Sustainable Organisation (Butler)Paper 6: Sustainable Organisation (Butler)
Paper 6: Sustainable Organisation (Butler)
 
Paper 4: Ethical Environment of Nano-Science (Chunliang)
Paper 4: Ethical Environment of Nano-Science (Chunliang)Paper 4: Ethical Environment of Nano-Science (Chunliang)
Paper 4: Ethical Environment of Nano-Science (Chunliang)
 
Paper 2: Correlation of China’s Government Procurement (Song)
Paper 2: Correlation of China’s Government Procurement (Song)Paper 2: Correlation of China’s Government Procurement (Song)
Paper 2: Correlation of China’s Government Procurement (Song)
 
Paper 8: Business and Management Journal Quality (Mingers)
Paper 8: Business and Management Journal Quality (Mingers)Paper 8: Business and Management Journal Quality (Mingers)
Paper 8: Business and Management Journal Quality (Mingers)
 
Paper 7: Ranking Methodology of Times Higher Education (Baty)
Paper 7: Ranking Methodology of Times Higher Education (Baty)Paper 7: Ranking Methodology of Times Higher Education (Baty)
Paper 7: Ranking Methodology of Times Higher Education (Baty)
 
Paper 6: World University's Evaluation (Qiu & Zhao)
Paper 6: World University's Evaluation (Qiu & Zhao)Paper 6: World University's Evaluation (Qiu & Zhao)
Paper 6: World University's Evaluation (Qiu & Zhao)
 
Paper 5: Rankings of International Research Institutes (Liu, Wenbin)
Paper 5: Rankings of International Research Institutes (Liu, Wenbin)Paper 5: Rankings of International Research Institutes (Liu, Wenbin)
Paper 5: Rankings of International Research Institutes (Liu, Wenbin)
 
Paper 4: Ranking Universities (Ince)
Paper 4: Ranking Universities (Ince)Paper 4: Ranking Universities (Ince)
Paper 4: Ranking Universities (Ince)
 
Paper 3: Chinese University's Evaluation (Qiu & Wang)
Paper 3: Chinese University's Evaluation (Qiu & Wang)Paper 3: Chinese University's Evaluation (Qiu & Wang)
Paper 3: Chinese University's Evaluation (Qiu & Wang)
 

Último

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 

Último (20)

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 

Paper 4: Performance Management in SMEs (Qi)

  • 1. A performance planning system designed by SSM for a medium company By Li Qi and Prof. Wenbin Liu
  • 2. Background & Introduction We undertook a performance management project for Beijing Tonsan Ltd. in 2008. Tonsan is a Chinese high-tech enterprise, specializing in the R&D, production, sales and service of engineering adhesives, which is a full-blossomed company with all-around functions and business activities. In the end of 2009, the company's profit was doubled despite the economical crisis. It turns out that it is the performance planning system, which was designed via SSM, played the key role in boosting the company's performance, according to its CEO. In this talk we report how to develop KP (Key Processes) and KPI (Key Performance Indicator) via SSM, and focus on performance planning for this company. 
  • 3. Improvements in Tonsan’s performance management Phase I: Collect much information and data for a clear picture of Tonsan. Phase II: Decompose the strategy by utilizing BSC and the strategy map combined with the SSM. Phase III: Form a set of targets and tasks of the middle-level departments, which stemmed from the strategy decomposition from top to the middle level management. To choose to measure the performance for the tasks by using 3E dimensions so as to form the performance indicator system. Phase IV: This phase is for design of performance planning. Phase V: For Tonsan, we put forward some suggestions regarding to appropriate performance feedback or organizational response.
  • 4. Phase IV Design of performance planning The performance planning system we developed enables the supervisors and the subordinates in the hierarchical structure to communicate and negotiate formally and informally. The performance planning system is to build effective bi-directional communication among the higher and the lower levels of the management to analyze what specific tasks must be carried out for the KPs that support the KPIs so that the KPIs can be fulfilled. The performance planning system will be employed to monitor the key performance processes (KPs) and the key performance indicators (KPIs). Our performance planning system is based on the KPs and KPIs which had been developed in the last phase, and thus the contents for the communication and discussion are more specific and systematic. We developed the specific contents for their performance plan for each department and unit at various levels in accordance with the KPs derived in the third phase, and called upon the managers at various levels to implement performance plan agreed upon by both managers themselves and their subordinates, track their subordinates’ progresses, provide proper guidance, and keep records of their tracking and guidance.
  • 5. Phase II Tonsan’s Strategy Map
  • 6. SSM and 3Es 7.Take into actions to improve 1.Complex situation inspect 6.Debate with systematically desirable and culture feasible 5.Compare CM with 2 2.Express messy system Real world 4.Formulate CM 3.Build RD of relevant purposeful activity system system things RD1 RD2 RD3 The spirit of SSM is that any system can be analysed by answering three questions as: What to do (P) - Efficacy relate, measures the outputs of the system How to do (Q) - Efficiency relate, evaluates whether minimum resources are used. Why to do (R) - Effectiveness relate, assesses whether the system outputs are meaningful or useful to higher level (wider) system.
  • 7. Table 7.4: The entire supporting processes analysis An example of supporting processes analysis
  • 8. Phase III KPs & KPIs
  • 9. An example of KPIs & KPs form
  • 10. Phase IV KP adjustment and tracking record