1. Kevin Gunter
Career
Summary
35 years of both local and international experience working
in the oil and gas industry. The last 10 years as a consultant
Last worked as supervisory role on a Core project for
Devon Canada concentrating on Safety, training,
organization and strong leadership. Experienced in a variety
of environments and on a variety of rigs Triples, double’s ,
super singles (slant drilling), coil tubing, core rigs and
jackups.
Skills Commitment to Safety and adhering to environmental
policies.
Ability to work individually or as part of a team
Have all required supervisory tickets up to date
Strong proficiency with Well View and work orders
Code rite
Well core.
Summary of
Supervisor
qualifications
2004 – March 19th 2015
Day supervisor for Devon Canada in heavy oil, thermal /
strata coring.
SAGD projects.
Day supervisor at Athabasca Oil Corporation
Day supervisor Suncor Mackay River
Day supervisor Husky Sunrise
Statoil: Leismer Demonstration
Southern Pacific Senlac
Oilsands Quest in northern Saskatchewan
Petro Canada: MacKay River
Japan Canada Oil Sands Ltd: Hangingstone
Drilling supervisor on Coil tubing, core rigs and Triples.
Imperial Oil: Brookes/Medicine Hat
o Shallow gas wells
Shiningbank Energy Ltd: Ferrier
Phone: 780-221-2830
E-mail: kevinwgunter@hotmail.com
2. o 2600m – 3600m wells
Precision Drilling Int. 2000 – 2003
Rig Manager / Relief Field Superintendent
Daily operations as field superintendent in the Mexico office
Day to day running of a 3600m triple diesel electric can-rig top
drive rig and 2500m telescopic double in the Burgos Filed,
Mexico
Day to day running of a 3600m triple diesel electric can-rig top
drive rig doing multi lateral pad work in the Petrozuata field,
Venezuela
Nabors Drilling 1997 - 2000
Driller / Relief Rig Manager
Drilling and supervising of crew on a 6200m diesel electric
can-rig top drive rig throughout western Alberta and British
Columbia
Relief Tool Push duties on a 6200m rig
Noble Drilling Int. 1992 – 1997
Driller
Drilling and supervising crews on a jackup rig in Lake
Maricbo, Venezuela
Drilling and supervising crews on a land rig in Port au Port,
Newfoundland
Working in the St. John, N.B. shipyard on the Hiberina
derricks in the installation and commissioning of the
Draworks top drive pipe handling system
Drilling and supervising crews on a Telescoping Rig in
Senegal Africa
Drilling and supervising crews on Diesel Electric Triple Rigs
in Alberta, B.C. From The Crownest pass to Tumbler Ridge
Brinkerhoff Drilling 1984 – 1992
Driller
Drilling and supervising crews on jackknife doubles and
telescopic doubles in northern Alberta and northern British
Columbia
Arrowhead Drilling 1980 – 1984
References Available upon request