SlideShare una empresa de Scribd logo
1 de 25
Descargar para leer sin conexión
End-Assignment                                           Enschede (29-01-2013)

“Winning the Race for Talent in the Construction Industry. How to keep the correct players
to the correct positions? Anticipating or Designing Tomorrow?”

Abstract
The construction market constantly struggles to find the ideal balance between the
exploration and exploitation forces which affect directly the innovation capabilities of the
industry. The aforementioned issue is like trying to solve the so called Competition Policy
dilemma in a dynamic environment where construction firms collaborate and
simultaneously compete to charter, acquire and retain their brilliant minds. In particular,
graduate programs, several cycles of pre-hiring training and interviews hamper the initial
enthusiasm of candidates. If construction firms do not articulate clearly the spirit of pre-
occupation with what is the match wanted from both sides; the employer and the
employee, this demand and supply gap in all levels; industry (macro), organization (meso),
and individual (micro), will not be bridged. The purpose of this article is to provide a practical
framework linking the work abilities (Human Resources) with the insight of the construction
work environment and make interconnections with all the talent-analytics around the
pipeline. The framework selects specific change drivers and will aid to develop a
comprehensive end-to-end process illustrating the transition from poor practices to best,
and latter on to implementation challenges. Hopefully, this framework will induce academic
research on exploring applications of Complex Production Systems and High Reliability
Organizations in the work of HR professionals.

Key-words: Talent management, Construction industry, Talent analytics
Managing Human Resource Flows (194120090)                                                                                UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)


Contents
  “Winning the Race for Talent in the Construction Industry. How to keep the correct
  players to the correct positions? Anticipating or Designing Tomorrow?” ............................ 1
  1.      Introduction .................................................................................................................. 4
  2.      Background ................................................................................................................... 5
 2.1 Denmark-case ................................................................................................................... 5
  2.2 France-case ...................................................................................................................... 5
  2.3 Netherlands-case ............................................................................................................. 6
  2.4 Germany-case .................................................................................................................. 6
  2.4 Portugal-case ................................................................................................................... 6
  3.      Situation analysis .......................................................................................................... 7
  4.      Scenario planning ......................................................................................................... 8
  5.      Naming the pain ......................................................................................................... 11
  6.      Problem statement ..................................................................................................... 12
  7.      The relevance triangle ................................................................................................ 12
  7.1 Strategy to create competitive advantages................................................................ 14
  7.2 Strategic implications for talent ................................................................................. 15
  7.3 Talent pool strategy .................................................................................................... 15
  7.4 Talent Management systems ..................................................................................... 16
  7.5 Talent practices .......................................................................................................... 17
  8.      A tool for thinking (TM Framework) ........................................................................... 19
  9.      Managerial implications ............................................................................................. 20
  10. Further discussion ...................................................................................................... 22




                                                                  [2]
Managing Human Resource Flows (194120090)                                               UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)


Executive Summary
Many critics have been written the last decade for the limited productivity and the low
adoption rate of innovation in the construction industry. Several conceptual models are
already developed to explain the ‘inside’ and ‘outside’ character of the construction sector
and to visualize the need for looking in and looking out in order to gain a common shared
vision amongst stakeholders (Barrett, 2005). National and European reports are structured
to evaluate the present productivity capacities and innovation capabilities of large
construction firms in order to design guidelines for the future transformation of the
industry. Today’s construction recipe must be urgently modernized to deliver the highest
customer-value by improving the construction performance, improving client and supplier
performance and procuring and managing Construction. Modernizing construction (NAO,
2001) however entails not only technical and engineering approaches to the central themes
of the industry; it leads to the need for re-designing the Human Resource departments’
working philosophy. Nowadays more than ever construction industry increases its pace to
keep up with other industries and become more competitive moving towards the targets for
improvements illustrated in the following picture.




             Figure 1: Drivers for Change in Rethinking Construction (Egan, 2002)

For many years now the construction industry has lost out to other sectors in attracting the
very best people. This has been partly because of economic circumstances - boom and bust
cycles have denied the industry the opportunity to train and provide long term careers for its
workforce. The consequence is that we now have an aging workforce and too few people
entering the industry (Egan, 2002, p. 29).
This reality calls for sketching an holistic framework concerning all the Talent Management
components; as they are identified by (Lewis & Heckman, 2006), which are; strategy to
create sustainable competitive advantages, strategy implications for talent, talent pool
strategy, talent management systems, and talent practices.
The restructuring of the talent hierarchy creates new views on the need for specialist skills,
for multi-skilling, or for de-skilling. In practice the term de-skilling is probably more
accurately re-skilling. In some scenarios there may be a narrowing of the existing skill base of
some trades, but all trades are likely to need training and re-training to cope with the new
methods and materials that may emerge in the innovative scenarios, even if their use is
apparently simpler. On balance the most probable outcome appears likely to be a blend of
specialist skill, multi-skilling and re-skilling, but in any given scenario there will be a different
blend (Consulting, 2008).




                                                [3]
Managing Human Resource Flows (194120090)                                         UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)




     1. Introduction
The Construction Industry is attached on three market categories; the residential market,
the non-residential market and the infrastructure market. Overall, for all the three market
segments, it appears that innovation will have to respond to an increasingly differentiated
ownership and usage of premises and facility services, as well as to sustainability issues and
life-cycle considerations which will become important decision-making criteria (COM, 2007).
Creating a sustainable construction industry was and will be the constant driver of change
and performance improvement shaping the shareholders’ values and affecting
Buyer/Supplier relationships. In the building industry, designing, constructing, and supplying
parties work together in constantly changing coalitions on different building projects
(O'Brien, Fischer, & Jucker, 1995). Contractors, architects, suppliers negotiate through
bilateral contracts when following the traditional building recipe.
However, the inherent complexity of the industry reflects on a high market share in the EU-
27 family as the next table presents (Table 1). The construction industry in general, plays a
key role in the EU economy (10.4% of EU GDP in 2008), in employment (7.6% of total EU
employment) and in climate change policies (buildings are currently responsible for 42% of
EU final energy consumption and produce about 35% of all greenhouse gas emissions).

Table 1. Key figures | Activity 2011

                                            CONSTRUCTION IN EUROPE (EU-27)

 Total Construction Output              9.6% of GDP             51.5% of Gross Fixed Capital
                                                                         Formation
    Jobs in Construction            7% of Employment                 30.7% of Industrial
                                                                        Employment
Total Number of Enterprises        95% of <20 workers              3.1 million enterprises
           (source: European Construction Industry Federation, June 2012 Edition)

In the pursue of designing with the optimal way strategies for maximizing the performance
of the three construction submarkets several problems emerge fragmenting the flow
production process of the end-products; facilities management and maintenance of
infrastructural projects. Regulatory framework, including safety standards, design rules,
sensitive operations, and high-risk working practices constrain the adoption of innovation
and the rise of productivity.
The construction sector recently (in 2006) was recognized as a Lead Market by the European
Commission which set an agenda of transforming the construction industry in a knowledge-
based innovation platform. Lead markets aim to leverage innovation in with a high growth
potential in Europe and globally. EU industry should have the potential to develop
competitive advantage in these areas to lead global markets, while the public sector should
have the potential to significantly impact market development, whether as regulator,
customer or facilitator. Finally, lead markets should provide solutions to economic and
societal challenges in areas such as health, energy, environment or transport (COM, 2007, p.
3). Under this scope the Egan Report (2002) formulated the target group for improvement
(fig. 1) which constitutes the central concept behind the Talent Management framework
that will be constructed in the following sections.




                                             [4]
Managing Human Resource Flows (194120090)                                         UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)


The end-product of this research approach is to show what has to be changed in this modern
War for Talent in order to accomplish the selected targets after a scenario planning for the
construction firm assigned. The Supply Chain Management will be the main point of view
when analyzing the case. For doing so we have to assess how the construction employment
was developed in some baseline countries, looking them as guide examples.

    2. Background
Around the 1990s a new approach was adopted towards explaining the inside structure of
the industry; and that was a shift from dealing with the Construction Industry as being a
unified Sector System. Given that the fictitious company of this article is a multinational
large construction firm with over 50,000 employees and operating several European
countries, it is wise to present the general past picture in some example construction
industries.
For this reason the following national cases are used to present how the employment rates
fluctuated during the previous decade as it is seen important in making assumptions in the
proposed framework.

2.1 Denmark-case
In the 1990s, the Danish economy has moved from an initial period of stagnation and falling
employment to a period of economic boom and a return to the previous employment levels.
The lean years in the early 1990s showed an average annual economic growth of less than
0.6 percent. This development was turned around at the end of 1993 when a strong
economic recovery began. The average annual growth in GDP was 3.4 percent from 1994 to
2000 (CIB, 2004, p. 58)
What became clear through these years is that the construction employment followed the
productivity of the sector. In the 1990s, the lowest construction employment level occurred
in 1993, after which it increased slowly during the second part of the decade and made six
percent of the total workforce in 2000 (CIB, 2004).

Table 2. Danish construction employment in the 1990s (× 1000)
                                1990 1992 1994 1996 1998               2000    2002
                National        2794 1792 2808 2773 2778               2786    2803
              Employment
             Construction       171   162     140     154     161       168     173
              Employment
          Construction/Total     6.1  5.8      5.0    5.7     5.8       6.0     6.2
                   (%)
(source: Statistics Denmark, 2003)

2.2 France-case
In France, the share of repair and maintenance is nearly a half of all construction works
because of the importance of the stock built after a Second World War. The construction
sector system is made up of four very big firms, SMEs and self-employed. The fragmentation
of the sector system allows a high flexibility in cyclical situations. The sector system is so
heterogeneous that several construction sub-systems can be analyzed. The influence of
central government on the institutional regulations remains high.




                                             [5]
Managing Human Resource Flows (194120090)                                       UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)




        Figure 2: Employment in the French construction sector in 2001 (CIB, 2004)

2.3 Netherlands-case
The Dutch construction industry’s capability to deliver difficult and innovative projects is
equal to that of any national construction industry worldwide. The production of the
construction industry in the Netherlands represents 11 % of the GNP. Also in terms of
employment, construction is important for the Dutch economy. Including all construction
related employment, the employment in the construction industry amounts to 9.5 % of the
total employment in the Netherlands (PSIB, 2004).

2.4 Germany-case
In 2000, the German construction industry had about 2.76 million employees, which
corresponds to 6.6 percent of the total workforce (CIB, 2004, p. 96). The construction
employment rate in 2000 was the lowest since the reunification in 1990 (see Table 2).

Table 3. Construction Employment in Total Work Force (× 1000)
                            1991      1994      1995      1996        1999      2000

   Total workforce          40689      40583        40524   40692     41431     41769

   Total unemployment       2190       3304         3194    3482      3416      3133

   Total Construction       2796       3165         3227    3126      2851      2761

   Employees                2536       2849         2887    2757      2453      2356
   Self-employed            260        316          340     369       398       405
   Construction in Total 6.9           7.8          8.0     7.7       6.9       6.6
   Workforce (%)


2.4 Portugal-case
The growth in construction activity is also visible in employment. Table 4 shows data on
construction employment, total employment and the contribution of construction to total
employment. The share of construction employment in total employment reached 12.2% in
2002, one of the highest levels in the European Economic Area.




                                              [6]
Managing Human Resource Flows (194120090)                                       UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)



Table 4. Portuguese construction employment in 1990s (× 1000)
                          1990     1992   1994     1996     1998        2000   2002
   National               4466.3 4340.7 4251.1 4250.5 4863.3            5028.9 5106.5
   Employment
   Construction           352.6 346.2 330.8 340 3           343 1       596.4    622.3
   Employment
   Construction/Total     7.9      7.9    7.8      8.1      10.9        12.1     12.2
   (%)

      3. Situation analysis
Is it easy now however to foresee what is the hot-potato emerging in the built environment
in correlation to which is the ideal proactive talent management strategy to copy with the
potential threats? To answer somebody this question he needs to pre-think on the basis of
what happens inside the construction world.
Firstly what became prevalent, after 2008 where the crisis brought a new cadre of
transactions, negotiations, employment relations, and labor rules; is the everyday trade-off
between recession and recovery, something that both employees and employers are aware.
This new picture created a parallel thinking in HR-managers mindset, calling them to balance
the unemployment rates with the changes in labor income (Fig. 3).




          Figure 3: The change in unemployment and labor income (OECD, 2012)




                                            [7]
Managing Human Resource Flows (194120090)                                          UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)


The aforementioned analysis showed till now how much turbulent is the market formation
not only for the construction sector but in general the employment situation in the
construction field is too fluid to be predicted with a degree of safety.
Given now the situation inside the construction market, the main hypothesis before thinking
how to produce a holistic framework concerning the talent management strategies followed
by the large scale company is the lack of skills is the timeless problem inside the
construction world. The following graphic illustrates how current projections are perceived
in the entire EU family and it is considered to align lack of skills to age, education and
contract type.




Figure 4: The change in employment and average hours worked by age, education and type
contract (OECD, 2012)

     4. Scenario planning
Scenarios are claimed to support strategic decision makers. They are especially effective in
dealing with uncertainties (Postma & Liebl, 2005). The traditional uses of scenarios and
scenario development are evaluation and selection of strategies, integration of various kinds
of future-oriented data, exploration of the future and identification of future possibilities.
More recently, scenarios aim at making managers aware of environmental uncertainties,
stretching managers’ mental models, and triggering and accelerating processes of
organizational learning (Postma & Liebl, 2005, p. 2).
In order to visualize the location of the hidden uncertainties and their impact on the
organization we need to reply or quantify the next questions. After replying them a picture
(Fig. 5) can be sketched to illustrate predictability and impact lead to the final selection of
the most high-risk case.

     How big could be a change in the construction employment in the upcoming years
      (Fig. 5)?

                                              [8]
Managing Human Resource Flows (194120090)                                       UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)


    Is there any possibility to predict the amount and the type of skills needed in the
     future in specific operations (Fig. 7)?
    Would be wise to narrow down our effort of restructuring talent management
     policies focusing on specific performance improvements (Fig. 8)?




     Figure 5: Scenario construction, adapted from (Heijden, Bradfield, & Burt, 2002)




Figure 6: Past and forecast employment changes by economic sector (CEDEFOP, 2012, p. 23)




                                           [9]
Managing Human Resource Flows (194120090)                                         UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)




          Figure 7: Future job opportunities by occupation (CEDEFOP, 2012, p. 24)




  Figure 8: Future job opportunities by broad level of qualifications (CEDEFOP, 2012, p. 25)

After translating the managerial meaning of Kvetan et al. (2012) research paper entitled
“Cedefop’s skills supply and demand forecast: 2011 update and reflections on the approach”
(CEDEFOP, 2012) a table with potential scenarios was constructed. The following table
illustrates the projections of figures 6 & 7 in terms of Risk Priority Numbers (RPN).

The RPN is not a measure of risk, but of risk priority (eq. 1). Thus we will apply the worst-
case scenario to the talent management framework. The RPN gives generally a model to
allocate these resources.

Equation (1): RPN = S × P × D

S: Severity (1-10 scale) = Replacement Demand (Fig. 7)
P: Probability score (1-10 scale) = Replacement Demand (Fig. 6)
D: Detectability score (1-10 scale) = Subjective determination

The values of S, D taken from the two pictures are divided by 40; the max. Value of the X-
axis.

PC = 0.80 × 0.40 × 0.04 = 0.013

                                            [10]
Managing Human Resource Flows (194120090)                                          UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)


PC+ = 0.45 × 0.40 × 0.80 = 0.144
TC = 0.80 × 0.20 × 0.60 = 0.096
TC+ = 0.45 × 0.20 × 0.80 = 0.072

Table 5. Selecting scenarios
                                   Change (C) in Construction
Professionals (P)                  PC: RPN=0.013                  PC+: RPN=0.144
Technicians (T)                    TC: RPN=0.096                  TC+: RPN=0.072

Summarizing this preparatory section of the article the main proposition is that the following
managerial approach will be focused on how HR-mangers have to reconsider their working
philosophy when they design organizational routines to attract, develop, retain and mobilize
the recruited highly-qualified professionals who are potentially ranked as the most crucial
human resources.



                                               PC+
                                                    High


                                    Low                    High
                         TC+                                      TC



                                            Low

                                               PC


                     Figure 9: Scenario construction and selection of PC+

    5. Naming the pain
When trying to interpret what is the missing link between an effective talent management
policy and the actual acting strategy of the firm a main question was borne; in a highly
fragmented industry as the construction one, where employment data are changing
continuously which segment and why has to be selected as the most critical one?
Lack of skills was assumed as the main problem precursor. Highly skilled professionals such
as architects, contractors, supply chain specialist, procurement officers and purchasing
managers do play a vital role in the evolution and growth of construction activities.
Traditionally, however the construction sector has been dependent on the government,
which acts in various roles: client, regulator, or business-cycle manager (Voordijk, Haan, &
Joosten, 2000).

Having now defined the target group (highly qualified professionals) and the route-cause of
the problem (lack of skills), what’s remaining is to specify the firm’s operation-related
department for which the framework will be designed.
Manufacturers, contractors and architects are becoming dominant parties in the building
process. Different supply chains have to be managed as recently it is observed a significant



                                               [11]
Managing Human Resource Flows (194120090)                                           UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)


turn from the traditional integrated design delivery system to a more product-specialized
contract approach.

The main problems threatening the sustainability of construction are
     The fragmented regulation
     The focus of public procurement on the lowest-bid rather than on MEAT (Most
       Economically Advantageous Tender) criteria
     The training gap for delivering employees of higher adding-value and higher
       organizational commitment

Aligning these three construction-related threats a clear transition can be done through the
first picture, where predictability is now selected as the main driver for our Talent
Management related framework.

In other words, the required increase of 20% in the predictability is translated in the
following three core outcomes:
      Predictability of legislation
      Procurement innovation
      Investment in training

    6. Problem statement
Based on the analysis already done the problem to address this framework is reflected by
the research question asking;

“How the talent management system of a large multinational European construction firm
can become more adaptive, more proactive, and enhance predictability by increasing the
inflow and retention rate of highly skilled professional in Supply Chain operations?”

     7. The relevance triangle
Is the research question relevant enough to the core Human Resources issues concerning
the arenas composing the construction industry? In other words, are the interests (stakes) of
society (individuals: employees/employers and public agencies), academy (science:
institutions) and market (industry/organizations) sufficiently represented in the problem
statement?
The construction sector is characterized by demand from different sources. Not only private
demand for residential or office buildings also public infrastructure projects are of particular
importance for the market. The public sector is a major client of the construction industry
and is expected to boost further development by targeted and criteria-oriented
procurement. Moreover, regulatory frameworks, e.g. in terms of quality and environmental
standards, have substantial impact on technological direction and sector-specific R&D
activities, may induce innovation in the construction sector and shift public and private
demand to specific products and services (Loikkanen & Hyvönen, 2011, p. 88).
The major levers for change of the construction sector are the industry / client forums,
governments and procurers. The other, rather dependent focal area is the project team and
at a more abstract level “society” groupings and education and training have the potential to
make longer terms impacts (Barrett, 2005).




                                             [12]
Managing Human Resource Flows (194120090)                                            UT. / M-BA
                       DIMITRIOS KORDAS (M-CME/s1231901)




Macro-level
                                                                                Meso-level
 (Industry)
                                                                                   (Firm)



                                                                                 Micro-level

                                                                                  (Individual)




                Figure 10: Summary disposition of stakeholders (Barrett, 2005, p. 62)



    The problem to be outlined is relevant to the industry/clients needs as clients nowadays
    more than ever know how to assess and maintain long term relationships with their
    suppliers. In that role the HR department of the assigned firm has to create a strategy
    through which maintaining Buyer/Supplier relationships will be one of the most innovative
    and fundamental competitive advantage of the internal human capital.
    This condition between the industry and the Talent Management (TM) structure brings into
    the light the need for designing specific skills packages and prioritizing them. If this approach
    is adopted, predicting the legislative changes will constitute a central strategic implication
    for talent.
    The government often participates in high market-share construction projects, knows as
    Public Private Partnerships (PPPs) which demand the employment of highly-educated
    personnel who will be enable to understand the market dynamics and the legal agreements
    among various parties formulating often Joint Ventures (JVs). Segmenting the talent pool to
    be designed is a solution for the firm to differentiate from their competitors.
    In the project arena, procurement is the black-box for the construction sector containing the
    bulk of the mainstream talent management tools, like talent analytics, mentoring,
    integrating newcomers, empowering older workers, etc.
    The final stage of this five-component procedure of Talent Management (Lewis & Heckman,
    2006) leads to the creation and implementation of talent practices.

                                                  [13]
Managing Human Resource Flows (194120090)                                           UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)



Table 6. Aligning TM stages to working (to be tested) assumptions
Talent Management (TM) Assumptions / Mediating                       Skills required
Component                        variables
Strategy to create competitive Identify firm’s mission              Locus of control &
advantages                       Maintaining       Buyer/Supplier   Perception of future
                                 relationships                      growth
Strategic implications for Managing firm’s positions                Market            dynamics
talent                                                              understanding (PPPs /
                                                                    JVs)
Talent pool strategy              Manage workforce portfolio        Fit & Flexibility
TM Systems                        Enhance      creativity,  trust, Talent analytics
                                  motivation,         productivity,
                                  commitment
Talent practices                  If the framework applied, Retaining                   critical
                                  predictability targets will be knowledge (create a
                                  achieved (+20% increase)          knowledge
                                                                    infrastructure) & Solving
                                                                    the     Age/Employment
                                                                    paradox


      7.1 Strategy to create competitive advantages
Dealing in a context of multilateral relations and ongoing transactions, the construction
professionals will be quickly confronted with the dynamic 4Cs character of the industry (Fig.
10). Most construction companies operate in a decentralized network of suppliers and
customers in which they acquire production capacity from external suppliers. Construction
projects can be viewed as temporary organizations among firms. The development and
management of long term Buyer/Supplier relationships at the cross-project level is therefore
difficult, as project teams and product designs change from project to project (Bemelmans,
Voordijk, Vos, & Buter, 2012).
This fact leads to consider constantly the maturity level of Buyer/Supplier relationships as it
constitutes the core integration factor between operational processes and value creation
ones. The management of Buyer / Supplier relationship embodies five aspects:

       Optimize the supply base
       Manage the supplier relationships
       Integrate suppliers into the operational processes
       Integrate suppliers into the value-creation processes
       Develop suppliers

Once all the five key-areas are combined into one employee’s competencies package then
he will be able to relocate the locus of control related to his decisions and reconsider to
which extent he acts towards the accomplishment of the strategic vision of the firm; 20%
predictability increase in logistical defects.




                                             [14]
Managing Human Resource Flows (194120090)                                           UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)




                     Figure 11: Dynamic 4Cs model (Barrett, 2005, p. 60)

    7.2 Strategic implications for talent
Prime contractors spend up to 90% of a construction project’s turnover on buying goods and
services, and thus suppliers have a large impact on project performance. Therefore, the
purchasing function management of the prime contractor has a large influence on the
overall performance: the more developed (i.e. mature or professional) this function is the
greater its positive contribution (Bemelmans & Voordijk, 2012).

The highly-skilled professionals required by the firm have to work on the basis of developing
the most profitable and sustainable coalitions with private or public partners. For this reason
candidates must be characterized by a systemic thinking like the one in Figure 12.




Figure 12: Research framework for a designing an effective purchasing management tool
(Bemelmans & Voordijk,2012)

    7.3 Talent pool strategy
Before an HR-manager thinks about the characteristics, the size, the depth and type of the
talent pool to create in this predictability-seeking organization he/she should initially define
the meaning of Strategic Human Resource Management (SHRM). Human resource
deployments and organizational activities when combined with such way to achieve growth
goals reveal the strategic direction of formulating the talent pool.




                                             [15]
Managing Human Resource Flows (194120090)                                          UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)


According to (Wright & Snell, 1997) speaking in terms of SHRM, two are the central
dimensions to be explored; the fit and the flexibility.

Fit is all about the matching between the HR-practices and the strategy. First, vertical fit
involves the alignment of human resource management (HRM) practices and the strategic
management process of the firm. Second, horizontal fit implies congruence among the
various HRM practices. Achievement of horizontal fit is viewed as instrumental for efficiently
allocating human resources. Vertical fit, in turn, is viewed as directing those resources
toward the primary initiatives of the organization.

Flexibility provides organizations with the ability to modify current practices in response to
non-transient changes in the environment. Weick (1979) argues that flexibility requires
detecting changes in the environment and retaining a sufficient pool of novel actions so that
these changes can be accommodated.
Resource flexibility: refers to the extent to which a resource can be applied to a larger range
of alternative uses, the costs and difficulty of switching the use of a resource from one
alternative use to another, and the time required to switch from one use to another.
Coordination flexibility: consists of the extent to which the firm can "resynthesize" the
strategy, "reconfigure" the chain of resources, and "redeploy" the resources.
In the construction firm case, the two dimensions of SHRM are translated as the following
table shows;

Table 7. Fit & Flexibility in the a construction firm
Fit             Vertical           Directing production/work towards the predictability target
                Horizontal         Allocation of talents to appropriate positions (legislation,
                                   procurement, training)
Flexibility     Resources          Tangible products easy to be reused (formal contracts, cost
                                   forms, time planning programs)
                Coordination Modular components of the supply chain (metrics, routines,
                                   production models)


    7.4 Talent Management systems
Competing in a world searching for novelty, the construction company needs to organize its
HR functions around the three strategic targets; predictability of legislation, procurement
innovation, and investment in training, having as guidelines not only on how to measure the
talent, but firstly how boost creativity, trust, motivation, productivity, and organizational
commitment is seen much more important. So before going to the Talent Analytics, simple
topics such as the interrelation between passion for work (intrinsic motivation) affecting
external motivation has to be chartered by the HR managers and thereafter to design the
social interaction process for enhancing them.
A new approach on how to design the social processes inside the firm is to align the
quadrant in which each talent is classified correlated with his personal perception on his
basic needs. Thus a prediction map of where (under which performance conditions) and
when an employee could react through a future burnout or how strong is his/her self-
esteem.




                                             [16]
Managing Human Resource Flows (194120090)                                           UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)




           Figure 13: Talent/Potential matrix in relation with Scharlow’s pyramid

Talent Analytics
Using sophisticated and high-tech performance monitoring systems of analyzing employee
data to enhance their personal competitive advantages are always needed. The true
evaluation of the value of human capital assets and their value-contribution calls for
complete accountability of employees. In the case of the construction firm, HR managers
need surely to calculate the optimal number o f staff member in the positions of legal
consultants (legislation predictability), procurement officers (procurement innovation) and
investment in training (productivity of Learning & Development programs). Applying talent
analytics includes six steps (Davenport, Harris, & Shapiro, 2012);

   1. Human capital facts: What are the key-indicators of my organization’s health?
           Employee engagement and financial performance
   2. Analytical Human Resource: Which units, departments, or employees need
      attention?
           Real-time review, feedback channels, mentoring, coaching
   3. Human capital investment analysis: Which actions have the greatest impact on my
      business?
           Monitoring of satisfaction levels, and maintain them
   4. Workforce forecasts: How do I know when to staff up or cut back?
           Scenario planning analysis, Demand & Supply analysis
   5. Talent value model: Why do employees choose to stay or leave the company?
           Re-placement of employees, evaluation of positions held by poor
              performers, fix out possible mismatches
   6. Talent supply chain: How should the workforce needs to adapt to changes in the
      business environment?
           Predict the education tends and the market demands, design job
              opportunities based on the power of the existing workforce and expand the
              orders’ experience into fresher’s motivation for learning and challenge.

    7.5 Talent practices
Proactive behavior in the organization
To efficiently mobilize the talent selected and retained the company has to build up a
Proactive Personality Scale (PPS) in the HR department. The four attributes of proactive
behavior have to be realized in practice as (Crant, 2000) had identified them are; proactive
personality, personal initiative, role breadth self-efficacy, and taking charge overlap

                                            [17]
Managing Human Resource Flows (194120090)                                          UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)


conceptually. In particular, the constructs share a common behavioral domain. Each
construct considers the way in which an employee approaches and defines his or her work
role, focusing on efforts to improve things in the workplace. Thus, the conceptual
underpinnings of each construct incorporate employee changes to the work environment
(Crant, 2000, p. 443).
In the effort of developing and retaining the talented highly-skilled professional the firm has
to take also context-specific proactive measures like socialization (networking), proactive
feedback seeking, issue selling, promotion of (external) innovation to rise the champions,
career management strategies for mapping the evolution of each employee separately.

Coping with stress and burnouts
Over the past 30 years, interest in burnout, from academics and managers alike, has
increased dramatically as we have begun to understand the significant negative impact it has
on employees (Halbesleben & Buckley, 2004). Burnout was defined by Maslach (1982) as “a
syndrome of emotional exhaustion, depersonalization, and reduced personal
accomplishment that can occur among individuals who do ‘people work’ of some kind.”
The JD-R model of (Schaufeli, Bakker, & Rhenen, 2009) proved clearly that increase in Job
Demands and decrease in Resources available predicts burnout and that increase in job
Resources predicts job engagement.
Apart from the structural model’s results what is very important to notify is the obligation of
HR-management to point out exactly the job context and boundaries in order to minimize
unrealistic expectations because this misfit between the organization and the employee
often leads to burnout symptoms. In the end, the HR-managers of the construction company
is strongly recommended to use Realistic Job Interviews and Expectation Lowering
Procedures to manage recruitment, increase organizational commitment, and reduce
turnover (Halbesleben & Buckley, 2004, p. 873)


Solving the Age/Employment paradox
Several strategies have been already analyzed by academics. The main issue that will be
discussed here is how far away the construction industry (in large scale) is from increasing or
maintaining the normative commitment of older employers? It is a fact that flexible work
options, job design, mature employee training, manager training, compensation, etc are
some strategies to engage older employees on HR practices according to (Armstrong-
Stassen, 2008). However given the situation that there is a serious lack of highly and
specialized professionals in the multi-faced departments and submarkets of the construction
sector, the dominant approach on attaching older employees better and with a social,
creative way is the teaching method. I named this attitude of mentoring when an employee,
close to the retirement age is assigned to develop a beginner and bring into the pool some
new, well-selected talents. The picture below endorses the previous statement (Fig. 14).




                                             [18]
Managing Human Resource Flows (194120090)                                          UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)




                            (a)                                 (b)

Figure 14: (a) Iv-Oil & Gas: Structural designer (23 years) / Structural design coordinator (65
years)
           (b) Iv-Infra: Constructor (28 years) / Chief design engineer (54 years)

      8. A tool for thinking (TM Framework)
In the construction of the Talent Management framework there are three components that
till now are not fully clarified. These are
      - The visibility line: It represents the critical moment where we decompose the
         problem after the scenario planning and based on the chosen less-advantageous
         one we move on the analysis of the case. The term “visibility line” is borrowed from
         the terminology of Project Management. It illustrates practically the start of the
         actual business process while all the IT resources are mobilized to optimize the
         portfolio management.
      - The High Reliability Organizations (HROs): type of organizations operating on the
         edge while being reliable is too critical for the societal benefits. HROs are governed
         by the five attributes of mindfulness or enriched awareness.
      - The Complex Production Systems (CoPS): an integrated approach of concentrating
         around key-roles (System Integrators) several stakeholders and interconnecting the
         system’s centre with the superstructure and infrastructure.




                                             [19]
Managing Human Resource Flows (194120090)                                          UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)




Figure 15: A thinking tool on designing Talent Management strategies for large construction
firms

   9. Managerial implications
The last picture depicts the line of reasoning of the whole approach. Said differently, if the
HR-managers of the construction firm should put in practice the above framework they
should follow the roadmap described (Fig. 16).

Additional ideas from academics to be explored inside the Construction Industry;

    -   “Organizations that move quickly to seize new opportunities compete through
        flexibility and do not develop employee competencies from within. (Cappelli &
        Crocker-Hefter, 2001)”
    -   Think twice before outsourcing for your personnel, as (Cappelli & Crocker-Hefter,
        2001) has stated: “Organizations that compete through their dominance in a market
        rely on organization-specific capabilities developed internally…”
    -   Balance and map, the HR-departments’ competencies with the business strategies
        that flow from them.




                                            [20]
Managing Human Resource Flows (194120090)                                      UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)



                      Attract Talent

      Think about future staffing needs: design
       positions,    instead    of    employees (e.g.
       procurement officers)
      Be sure about who recruits for your company
       (hire industry related people)
      Identify and communicate what the project will
       teach and why (open the agenda)
      Adjust newcomers’ expectations and learning
       goals with firm’s experiences                         Develop Talent

                                             Link employees: internal networking as
                                              collaboration-driven innovation
                                             Mentor       employees:       reverse-traditional-
                                              anonymous-micro feedback
                                             Make mentoring a reciprocal relationship
                                             Don’t     exclude     inside-outsiders   internal
                                              candidates
                                             Give time and space for employees to react
                      Retain Talent

      Provide room to grow towards the strategic
        direction of predictability
      Enrich the personal experiences continuously
        (role games, virtual cases, external training,
        create schools)
      Express satisfaction, and
A comprehensive end-to-end process reward wisely and
        transparently
      Transform employee routine in a hunting for
        entrepreneurship
      Challenge your top-performers
                                                             Mobilize Talent

                                                Share a proactive behavior vision
                                                Make stars part of the planning process
                                                Personalize as much as possible L&D programs
                                                Reinforce the vision: by focusing on the right
                                                 assessors, rather than on the assessment
Figure 16: End-to End process for TM             technique (Fernadez-Araoz, Groysberg, & Nohria,
                                                 2009)
                                                Manage the A positions, manage B&C positions
                                                Inspire B or C performers to become A players
                                                Conceptualize the future framework for
                                                 attracting & retaining the Z-Generation
                                        [21]    Consider talent pools in BRIC economies
Managing Human Resource Flows (194120090)                                       UT. / M-BA
                                    DIMITRIOS KORDAS (M-CME/s1231901)


                     10. Further discussion
                 After designing this action plan and incorporating all the stages of talent management for a
                 large European construction firm an ambition will be created to open the window for further
                 research on HRM literature and Strategic Talent Management. The first relies on the theory
                 of Complex Production Systems (CoPS), dealing with the question “How we can still create
                 some focus on our internal processes and distinguish our self as a company by recognizing
                 the role of HR managers like the one of Systems Integrators (Winch, 1998)?”




                         Figure 17: Construction as a complex system industry (Winch, 1998, p. 270)

                 Moving from the typical role of System Integrators (architect & contactor) it would be very
                 interesting to conceptualize a modern role of the HR managers. This role could be the two
                 faces of the same coin; the first would be the role of performance boosters and the other
                 the reputation builders. Is it feasible to execute some research on the following figure?


                              Sourcing             Retention                           Engagement

Functionality Zone            Development          Assimilation

                              Deployment           Performance Management


                                                           HR-managers as

                                                         Performance Boosters

                                                      Corporate Branding Builders


 Vitality Zone
                                Talent Staff               Talent Pool                 Executive Team

                                                                                       Line Managers


                                                             [22]
Managing Human Resource Flows (194120090)                                            UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)



Secondly what will be outlined is the emerging importance of High Reliability Theory (HRT),
which calls for exploring deeper the question “To which extent HRM and HRD processes are
mindful in the construction industry? Is there enough systemic space and organizational
willingness to apply the five attributes of enriched awareness as (Weick, Sutcliffe, &
Obstfeld, 1999) have mapped them?” HRT, if applied, is expected to enlighten what we can
learn from B performers. A new game plan can be conceptualized for C Players as Beth
Axelrod, Helen Jones, and Ed Michaels have stated in their correspondent article in Harvard
Business Review (2012).

When people in HROs focus on failures, tendencies to simplify, current operations,
capabilities for resilience, and temptations to over structure the system, these concerns
cover a broader range of unexpected events. As shown in Figure 17, these separate concerns
are tied together by their joint capability to induce a rich awareness of discriminatory detail
and a capacity for action. We label this capability mindfulness. It is this enriched awareness,
induced by the distinctive concerns of HROs with potentials for catastrophe that facilitates
the construction, discovery, and correction of unexpected events capable of escalation.

The five processes of HRT can be the weapon against the appearance of organizational
(human capital) silos. The role of each process could be the answer in the continuous effort
for improving Coordination and Communication efficiency among internal silos (e.g. finance,
operations and quality assurance, administration).




  Figure 17: A mindful infrastructure for high reliability (Weick, Sutcliffe, & Obstfeld, 1999)

The conclusion of this last paragraph is that both topics introduced in the field of HRM and
HRD will create a quite radical scope, a more lean approach enabling companies to operate
within smaller time frames, in a friendlier and more efficient HR-environment.




                                              [23]
Managing Human Resource Flows (194120090)                                          UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)



References
Armstrong-Stassen, M. (2008). Human resource practices for mature workers - And why
aren't employers using them? Asia Pacific Journal of Human Resources , pp. 334-352.
Barrett, P. (2005). Revaluing Construction - A Global CIB Agenda. University of Salford, UK,
CIB General Secretariat. Rotterdam: CIB.
Bemelmans, J., & Voordijk, H. (2012). Designing a tool for an effective assessment of
purchasing maturity in construction. Dissertation, Enschede.
Bemelmans, J., Voordijk, H., Vos, B., & Buter, J. (2012, January). Assessing Buyer-Supplier
Relationship Management: Multiple Case-Study in the Dutch Construction Industry. Journal
of Construction Engineering and Management , pp. 163-176.
Cappelli, P., & Crocker-Hefter, A. (2001). Distinctive Human Resources Are Firms’ Core
Competencies. pp. 7-22.
CEDEFOP. (2012). Building on skills forecasts — Comparing methods and applications.
Conference proceedings (No. 18), pp. pp. 1-284.
CIB. (2004). The Construction Sector System Approach: An International Framework. Centre
Scientifique et Technique du Bâtiment – Paris. CIB Rotterdam .
COM. (2007). Accelerating the Development of the Sustainable Construction Market in
Europe. A Lead Market Initiative for Europe. European Commission.
Consulting, S. (2008). 2020 Vision – The Future of UK Construction. A scenario based report,
St Andrews Management Institute, Experian.
Crant, M. J. (2000). Proactive Behavior in Organizations. Vol. 26 (No. 3), pp. 435–462.
Davenport, T. H., Harris, J., & Shapiro, J. (2012, Winter). Competing on Talent Analytics.
Harvard Business Review OnPoint , pp. pp. 120-126.
Egan, J. (2002). Accelerating Change. London: Strategic Forum For Construction.
Fernadez-Araoz, C., Groysberg, B., & Nohria, N. (2009, May). The Definitive Guide to
Recruiting in Good Times and Bad. Harvard Business Review .
Halbesleben, J. R., & Buckley, R. M. (2004). Burnout in Organizational Life. Journal of
Management , Vol. 30 (No. 6), pp. 859–879.
Heijden, K. v., Bradfield, R., & Burt, G. (2002). The Sixth Sense: Accelerating Organizational
Learning with Scenarios. Chichester: Wiley.
Lewis, R. E., & Heckman, R. J. (2006). Talent management: A critical review. Human Resource
Management Review , Vol. 16, pp. 139–154.
Lewis, R. E., & Heckman, R. J. (2006). Talent management: A critical review. Human Resource
Management Review , Vol. 16, pp. 139–154.
Loikkanen, T., & Hyvönen, J. (2011). Sectoral Innovation Watch Construction Sector.
Competitiveness and Innovation Framework Programme, Consortium Europe INNOVA.
European Commission.
NAO. (2001). Modernising Construction. House of Commons. London: National Audit Office.
O'Brien, M. J., Fischer, M. A., & Jucker, J. V. (1995). An economic view on project co-
ordination. Construction Management and Economics , Vol. 13 (No. 5), pp. 393-400.


                                             [24]
Managing Human Resource Flows (194120090)                                            UT. / M-BA
                   DIMITRIOS KORDAS (M-CME/s1231901)


OECD. (2012). What Makes Labor Markets Resilient During Recessions? Employment
Outlook.
Postma, T. J., & Liebl, F. (2005). How to improve scenario analysis as a strategic management
tool? Technological Forecasting & Social Change , Vol. 72, pp. 161–173.
PSIB. (2004). Process And System Innovation In The Dutch Construction Industry. Project Plan
for a Research and Development Programme.
Schaufeli, W. B., Bakker, A. B., & Rhenen, W. v. (2009). How changes in job demands and
resources predict burnout, work engagement, and sickness absenteeism. Journal of
Organizational Behavior , pp. 893–917.
Voordijk, H., Haan, J. d., & Joosten, G.-J. (2000). Changing governance of supply chains in the
building industry: a multiple case study. European Journal of Purchasing & Supply
Management , Vol. 6, pp. 217-225.
Weick, K. E., Sutcliffe, K. M., & Obstfeld, D. (1999). Organizing for High Reliability: Processes
of Collective Mindfulness. Research in Organizational Behavior , Vol. 1, pp. 81–123.
Winch, G. (1998). Zephyrs of creative destruction: understanding the management of
innovation in construction. Building Research & Information , Vol. 26 (No. 4), pp. 268–279.
Wright, P. M., & Snell, S. A. (1997). Toward a Unifying Framework for Exploring Fit and
Flexibility in Strategic Human Resource Management. (C. U. School, Ed.) pp. 1-40.




                                              [25]

Más contenido relacionado

Similar a TALENT MANAGEMENT: A Conceptual Framework For The Construction Industry

Leanmanufacturingtoolinengineertoorderenvironment-Projectcostdeployment.pdf
Leanmanufacturingtoolinengineertoorderenvironment-Projectcostdeployment.pdfLeanmanufacturingtoolinengineertoorderenvironment-Projectcostdeployment.pdf
Leanmanufacturingtoolinengineertoorderenvironment-Projectcostdeployment.pdfTharulWickramarathna
 
Dual Engineering And Integrated Product Development
Dual Engineering And Integrated Product DevelopmentDual Engineering And Integrated Product Development
Dual Engineering And Integrated Product DevelopmentTracy Berry
 
Achieving Agility Using Cladistics: An Evolutionary Analysis
Achieving Agility Using Cladistics: An Evolutionary AnalysisAchieving Agility Using Cladistics: An Evolutionary Analysis
Achieving Agility Using Cladistics: An Evolutionary AnalysisIan McCarthy
 
Fisher Stenner2011b Full Formatted Paper3
Fisher Stenner2011b Full Formatted Paper3Fisher Stenner2011b Full Formatted Paper3
Fisher Stenner2011b Full Formatted Paper3wpfisherjr
 
Entrepreneurial Mindset for Engineering Undergraduates
Entrepreneurial Mindset for Engineering UndergraduatesEntrepreneurial Mindset for Engineering Undergraduates
Entrepreneurial Mindset for Engineering UndergraduatesEditorIJAERD
 
Virtual R&D teams and SMEs growth: A comparative study between Iranian and Ma...
Virtual R&D teams and SMEs growth: A comparative study between Iranian and Ma...Virtual R&D teams and SMEs growth: A comparative study between Iranian and Ma...
Virtual R&D teams and SMEs growth: A comparative study between Iranian and Ma...Nader Ale Ebrahim
 
Research proposal final draft
Research proposal final draftResearch proposal final draft
Research proposal final draftSyafiq Zariful
 
Emerging Industry Workforce Strategy report 01226010
Emerging Industry Workforce Strategy report 01226010Emerging Industry Workforce Strategy report 01226010
Emerging Industry Workforce Strategy report 01226010rogersons
 
WEF_Navigating_the_Industrial_Metaverse_A_Blueprint_2024.pdf
WEF_Navigating_the_Industrial_Metaverse_A_Blueprint_2024.pdfWEF_Navigating_the_Industrial_Metaverse_A_Blueprint_2024.pdf
WEF_Navigating_the_Industrial_Metaverse_A_Blueprint_2024.pdfChris Skinner
 
Research Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and ScienceResearch Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and Scienceresearchinventy
 
Research Proposal - University of Sunderland
Research Proposal - University of SunderlandResearch Proposal - University of Sunderland
Research Proposal - University of SunderlandPrachi K Petkar
 
Critical Factors for New Product Developments in SMEs Virtual Team
Critical Factors for New Product Developments in SMEs Virtual TeamCritical Factors for New Product Developments in SMEs Virtual Team
Critical Factors for New Product Developments in SMEs Virtual TeamNader Ale Ebrahim
 
Interest in Engineering Economic
Interest in Engineering Economic Interest in Engineering Economic
Interest in Engineering Economic Nzar Braim
 
The Effectiveness of Virtual R&D Teams in SMEs: Experiences of Malaysian SMEs
The Effectiveness of Virtual R&D Teams in SMEs: Experiences of Malaysian SMEsThe Effectiveness of Virtual R&D Teams in SMEs: Experiences of Malaysian SMEs
The Effectiveness of Virtual R&D Teams in SMEs: Experiences of Malaysian SMEsNader Ale Ebrahim
 
Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Alexander Decker
 
Application and Results of a Skilled Labor Demand Forecast Model for the US C...
Application and Results of a Skilled Labor Demand Forecast Model for the US C...Application and Results of a Skilled Labor Demand Forecast Model for the US C...
Application and Results of a Skilled Labor Demand Forecast Model for the US C...inventionjournals
 
Crosscheck: Intergation Methods, Supply Chain Management and the Boeing 787 D...
Crosscheck: Intergation Methods, Supply Chain Management and the Boeing 787 D...Crosscheck: Intergation Methods, Supply Chain Management and the Boeing 787 D...
Crosscheck: Intergation Methods, Supply Chain Management and the Boeing 787 D...Herbert Ferguson-Augustus
 

Similar a TALENT MANAGEMENT: A Conceptual Framework For The Construction Industry (20)

Leanmanufacturingtoolinengineertoorderenvironment-Projectcostdeployment.pdf
Leanmanufacturingtoolinengineertoorderenvironment-Projectcostdeployment.pdfLeanmanufacturingtoolinengineertoorderenvironment-Projectcostdeployment.pdf
Leanmanufacturingtoolinengineertoorderenvironment-Projectcostdeployment.pdf
 
Dual Engineering And Integrated Product Development
Dual Engineering And Integrated Product DevelopmentDual Engineering And Integrated Product Development
Dual Engineering And Integrated Product Development
 
Achieving Agility Using Cladistics: An Evolutionary Analysis
Achieving Agility Using Cladistics: An Evolutionary AnalysisAchieving Agility Using Cladistics: An Evolutionary Analysis
Achieving Agility Using Cladistics: An Evolutionary Analysis
 
Fisher Stenner2011b Full Formatted Paper3
Fisher Stenner2011b Full Formatted Paper3Fisher Stenner2011b Full Formatted Paper3
Fisher Stenner2011b Full Formatted Paper3
 
Entrepreneurial Mindset for Engineering Undergraduates
Entrepreneurial Mindset for Engineering UndergraduatesEntrepreneurial Mindset for Engineering Undergraduates
Entrepreneurial Mindset for Engineering Undergraduates
 
Virtual R&D teams and SMEs growth: A comparative study between Iranian and Ma...
Virtual R&D teams and SMEs growth: A comparative study between Iranian and Ma...Virtual R&D teams and SMEs growth: A comparative study between Iranian and Ma...
Virtual R&D teams and SMEs growth: A comparative study between Iranian and Ma...
 
Research proposal final draft
Research proposal final draftResearch proposal final draft
Research proposal final draft
 
Emerging Industry Workforce Strategy report 01226010
Emerging Industry Workforce Strategy report 01226010Emerging Industry Workforce Strategy report 01226010
Emerging Industry Workforce Strategy report 01226010
 
WEF_Navigating_the_Industrial_Metaverse_A_Blueprint_2024.pdf
WEF_Navigating_the_Industrial_Metaverse_A_Blueprint_2024.pdfWEF_Navigating_the_Industrial_Metaverse_A_Blueprint_2024.pdf
WEF_Navigating_the_Industrial_Metaverse_A_Blueprint_2024.pdf
 
Research Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and ScienceResearch Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and Science
 
Research Proposal - University of Sunderland
Research Proposal - University of SunderlandResearch Proposal - University of Sunderland
Research Proposal - University of Sunderland
 
Critical Factors for New Product Developments in SMEs Virtual Team
Critical Factors for New Product Developments in SMEs Virtual TeamCritical Factors for New Product Developments in SMEs Virtual Team
Critical Factors for New Product Developments in SMEs Virtual Team
 
Interest in Engineering Economic
Interest in Engineering Economic Interest in Engineering Economic
Interest in Engineering Economic
 
The Effectiveness of Virtual R&D Teams in SMEs: Experiences of Malaysian SMEs
The Effectiveness of Virtual R&D Teams in SMEs: Experiences of Malaysian SMEsThe Effectiveness of Virtual R&D Teams in SMEs: Experiences of Malaysian SMEs
The Effectiveness of Virtual R&D Teams in SMEs: Experiences of Malaysian SMEs
 
Essay Construction
Essay ConstructionEssay Construction
Essay Construction
 
Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...
 
Application and Results of a Skilled Labor Demand Forecast Model for the US C...
Application and Results of a Skilled Labor Demand Forecast Model for the US C...Application and Results of a Skilled Labor Demand Forecast Model for the US C...
Application and Results of a Skilled Labor Demand Forecast Model for the US C...
 
Cloud mfg paper
Cloud mfg paperCloud mfg paper
Cloud mfg paper
 
Crosscheck: Intergation Methods, Supply Chain Management and the Boeing 787 D...
Crosscheck: Intergation Methods, Supply Chain Management and the Boeing 787 D...Crosscheck: Intergation Methods, Supply Chain Management and the Boeing 787 D...
Crosscheck: Intergation Methods, Supply Chain Management and the Boeing 787 D...
 
Pag i 0562 0566 ie 2020i .docx
Pag i 0562 0566 ie 2020i .docxPag i 0562 0566 ie 2020i .docx
Pag i 0562 0566 ie 2020i .docx
 

Más de Dimitrios Kordas

RISK SHARING IN TRADITIONAL CONSTRUCTION CONTRACTS FOR BUILDING PROJECTS
RISK SHARING IN TRADITIONAL CONSTRUCTION CONTRACTS FOR BUILDING PROJECTSRISK SHARING IN TRADITIONAL CONSTRUCTION CONTRACTS FOR BUILDING PROJECTS
RISK SHARING IN TRADITIONAL CONSTRUCTION CONTRACTS FOR BUILDING PROJECTSDimitrios Kordas
 
Esssay. Relational vs Transactional psychological contracts
Esssay. Relational vs Transactional psychological contractsEsssay. Relational vs Transactional psychological contracts
Esssay. Relational vs Transactional psychological contractsDimitrios Kordas
 
Operations management certificate
Operations management certificate   Operations management certificate
Operations management certificate Dimitrios Kordas
 
HRM in Automotive Industry - Capita selecta
HRM in Automotive Industry - Capita selectaHRM in Automotive Industry - Capita selecta
HRM in Automotive Industry - Capita selectaDimitrios Kordas
 
SoA. "Property and Liability: An Introduction to Law and Economics"
SoA. "Property and Liability: An Introduction to Law and Economics"SoA. "Property and Liability: An Introduction to Law and Economics"
SoA. "Property and Liability: An Introduction to Law and Economics"Dimitrios Kordas
 
(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 Sigma(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 SigmaDimitrios Kordas
 
M.Eng Thesis (Kordas & Thanopoulos, 2011)
M.Eng Thesis (Kordas & Thanopoulos, 2011)M.Eng Thesis (Kordas & Thanopoulos, 2011)
M.Eng Thesis (Kordas & Thanopoulos, 2011)Dimitrios Kordas
 
e-Recruitment & Selection
e-Recruitment & Selection e-Recruitment & Selection
e-Recruitment & Selection Dimitrios Kordas
 
CHANGES IN LABOR MARKETS AND EMPLOYEE CHARACTERISTICS
CHANGES IN LABOR MARKETS AND EMPLOYEE CHARACTERISTICSCHANGES IN LABOR MARKETS AND EMPLOYEE CHARACTERISTICS
CHANGES IN LABOR MARKETS AND EMPLOYEE CHARACTERISTICSDimitrios Kordas
 
International summer school (July 2012, Enschede)
International summer school (July 2012, Enschede)International summer school (July 2012, Enschede)
International summer school (July 2012, Enschede)Dimitrios Kordas
 

Más de Dimitrios Kordas (13)

RISK SHARING IN TRADITIONAL CONSTRUCTION CONTRACTS FOR BUILDING PROJECTS
RISK SHARING IN TRADITIONAL CONSTRUCTION CONTRACTS FOR BUILDING PROJECTSRISK SHARING IN TRADITIONAL CONSTRUCTION CONTRACTS FOR BUILDING PROJECTS
RISK SHARING IN TRADITIONAL CONSTRUCTION CONTRACTS FOR BUILDING PROJECTS
 
Esssay. Relational vs Transactional psychological contracts
Esssay. Relational vs Transactional psychological contractsEsssay. Relational vs Transactional psychological contracts
Esssay. Relational vs Transactional psychological contracts
 
Operations management certificate
Operations management certificate   Operations management certificate
Operations management certificate
 
Six sigma certification
Six sigma certificationSix sigma certification
Six sigma certification
 
HRM in Automotive Industry - Capita selecta
HRM in Automotive Industry - Capita selectaHRM in Automotive Industry - Capita selecta
HRM in Automotive Industry - Capita selecta
 
SoA. "Property and Liability: An Introduction to Law and Economics"
SoA. "Property and Liability: An Introduction to Law and Economics"SoA. "Property and Liability: An Introduction to Law and Economics"
SoA. "Property and Liability: An Introduction to Law and Economics"
 
(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 Sigma(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 Sigma
 
HRO & LEAN 6-SIGMA
HRO & LEAN 6-SIGMAHRO & LEAN 6-SIGMA
HRO & LEAN 6-SIGMA
 
TALENT MANAGEMENT
TALENT MANAGEMENTTALENT MANAGEMENT
TALENT MANAGEMENT
 
M.Eng Thesis (Kordas & Thanopoulos, 2011)
M.Eng Thesis (Kordas & Thanopoulos, 2011)M.Eng Thesis (Kordas & Thanopoulos, 2011)
M.Eng Thesis (Kordas & Thanopoulos, 2011)
 
e-Recruitment & Selection
e-Recruitment & Selection e-Recruitment & Selection
e-Recruitment & Selection
 
CHANGES IN LABOR MARKETS AND EMPLOYEE CHARACTERISTICS
CHANGES IN LABOR MARKETS AND EMPLOYEE CHARACTERISTICSCHANGES IN LABOR MARKETS AND EMPLOYEE CHARACTERISTICS
CHANGES IN LABOR MARKETS AND EMPLOYEE CHARACTERISTICS
 
International summer school (July 2012, Enschede)
International summer school (July 2012, Enschede)International summer school (July 2012, Enschede)
International summer school (July 2012, Enschede)
 

Último

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 

Último (20)

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 

TALENT MANAGEMENT: A Conceptual Framework For The Construction Industry

  • 1. End-Assignment Enschede (29-01-2013) “Winning the Race for Talent in the Construction Industry. How to keep the correct players to the correct positions? Anticipating or Designing Tomorrow?” Abstract The construction market constantly struggles to find the ideal balance between the exploration and exploitation forces which affect directly the innovation capabilities of the industry. The aforementioned issue is like trying to solve the so called Competition Policy dilemma in a dynamic environment where construction firms collaborate and simultaneously compete to charter, acquire and retain their brilliant minds. In particular, graduate programs, several cycles of pre-hiring training and interviews hamper the initial enthusiasm of candidates. If construction firms do not articulate clearly the spirit of pre- occupation with what is the match wanted from both sides; the employer and the employee, this demand and supply gap in all levels; industry (macro), organization (meso), and individual (micro), will not be bridged. The purpose of this article is to provide a practical framework linking the work abilities (Human Resources) with the insight of the construction work environment and make interconnections with all the talent-analytics around the pipeline. The framework selects specific change drivers and will aid to develop a comprehensive end-to-end process illustrating the transition from poor practices to best, and latter on to implementation challenges. Hopefully, this framework will induce academic research on exploring applications of Complex Production Systems and High Reliability Organizations in the work of HR professionals. Key-words: Talent management, Construction industry, Talent analytics
  • 2. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) Contents “Winning the Race for Talent in the Construction Industry. How to keep the correct players to the correct positions? Anticipating or Designing Tomorrow?” ............................ 1 1. Introduction .................................................................................................................. 4 2. Background ................................................................................................................... 5 2.1 Denmark-case ................................................................................................................... 5 2.2 France-case ...................................................................................................................... 5 2.3 Netherlands-case ............................................................................................................. 6 2.4 Germany-case .................................................................................................................. 6 2.4 Portugal-case ................................................................................................................... 6 3. Situation analysis .......................................................................................................... 7 4. Scenario planning ......................................................................................................... 8 5. Naming the pain ......................................................................................................... 11 6. Problem statement ..................................................................................................... 12 7. The relevance triangle ................................................................................................ 12 7.1 Strategy to create competitive advantages................................................................ 14 7.2 Strategic implications for talent ................................................................................. 15 7.3 Talent pool strategy .................................................................................................... 15 7.4 Talent Management systems ..................................................................................... 16 7.5 Talent practices .......................................................................................................... 17 8. A tool for thinking (TM Framework) ........................................................................... 19 9. Managerial implications ............................................................................................. 20 10. Further discussion ...................................................................................................... 22 [2]
  • 3. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) Executive Summary Many critics have been written the last decade for the limited productivity and the low adoption rate of innovation in the construction industry. Several conceptual models are already developed to explain the ‘inside’ and ‘outside’ character of the construction sector and to visualize the need for looking in and looking out in order to gain a common shared vision amongst stakeholders (Barrett, 2005). National and European reports are structured to evaluate the present productivity capacities and innovation capabilities of large construction firms in order to design guidelines for the future transformation of the industry. Today’s construction recipe must be urgently modernized to deliver the highest customer-value by improving the construction performance, improving client and supplier performance and procuring and managing Construction. Modernizing construction (NAO, 2001) however entails not only technical and engineering approaches to the central themes of the industry; it leads to the need for re-designing the Human Resource departments’ working philosophy. Nowadays more than ever construction industry increases its pace to keep up with other industries and become more competitive moving towards the targets for improvements illustrated in the following picture. Figure 1: Drivers for Change in Rethinking Construction (Egan, 2002) For many years now the construction industry has lost out to other sectors in attracting the very best people. This has been partly because of economic circumstances - boom and bust cycles have denied the industry the opportunity to train and provide long term careers for its workforce. The consequence is that we now have an aging workforce and too few people entering the industry (Egan, 2002, p. 29). This reality calls for sketching an holistic framework concerning all the Talent Management components; as they are identified by (Lewis & Heckman, 2006), which are; strategy to create sustainable competitive advantages, strategy implications for talent, talent pool strategy, talent management systems, and talent practices. The restructuring of the talent hierarchy creates new views on the need for specialist skills, for multi-skilling, or for de-skilling. In practice the term de-skilling is probably more accurately re-skilling. In some scenarios there may be a narrowing of the existing skill base of some trades, but all trades are likely to need training and re-training to cope with the new methods and materials that may emerge in the innovative scenarios, even if their use is apparently simpler. On balance the most probable outcome appears likely to be a blend of specialist skill, multi-skilling and re-skilling, but in any given scenario there will be a different blend (Consulting, 2008). [3]
  • 4. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) 1. Introduction The Construction Industry is attached on three market categories; the residential market, the non-residential market and the infrastructure market. Overall, for all the three market segments, it appears that innovation will have to respond to an increasingly differentiated ownership and usage of premises and facility services, as well as to sustainability issues and life-cycle considerations which will become important decision-making criteria (COM, 2007). Creating a sustainable construction industry was and will be the constant driver of change and performance improvement shaping the shareholders’ values and affecting Buyer/Supplier relationships. In the building industry, designing, constructing, and supplying parties work together in constantly changing coalitions on different building projects (O'Brien, Fischer, & Jucker, 1995). Contractors, architects, suppliers negotiate through bilateral contracts when following the traditional building recipe. However, the inherent complexity of the industry reflects on a high market share in the EU- 27 family as the next table presents (Table 1). The construction industry in general, plays a key role in the EU economy (10.4% of EU GDP in 2008), in employment (7.6% of total EU employment) and in climate change policies (buildings are currently responsible for 42% of EU final energy consumption and produce about 35% of all greenhouse gas emissions). Table 1. Key figures | Activity 2011 CONSTRUCTION IN EUROPE (EU-27) Total Construction Output 9.6% of GDP 51.5% of Gross Fixed Capital Formation Jobs in Construction 7% of Employment 30.7% of Industrial Employment Total Number of Enterprises 95% of <20 workers 3.1 million enterprises (source: European Construction Industry Federation, June 2012 Edition) In the pursue of designing with the optimal way strategies for maximizing the performance of the three construction submarkets several problems emerge fragmenting the flow production process of the end-products; facilities management and maintenance of infrastructural projects. Regulatory framework, including safety standards, design rules, sensitive operations, and high-risk working practices constrain the adoption of innovation and the rise of productivity. The construction sector recently (in 2006) was recognized as a Lead Market by the European Commission which set an agenda of transforming the construction industry in a knowledge- based innovation platform. Lead markets aim to leverage innovation in with a high growth potential in Europe and globally. EU industry should have the potential to develop competitive advantage in these areas to lead global markets, while the public sector should have the potential to significantly impact market development, whether as regulator, customer or facilitator. Finally, lead markets should provide solutions to economic and societal challenges in areas such as health, energy, environment or transport (COM, 2007, p. 3). Under this scope the Egan Report (2002) formulated the target group for improvement (fig. 1) which constitutes the central concept behind the Talent Management framework that will be constructed in the following sections. [4]
  • 5. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) The end-product of this research approach is to show what has to be changed in this modern War for Talent in order to accomplish the selected targets after a scenario planning for the construction firm assigned. The Supply Chain Management will be the main point of view when analyzing the case. For doing so we have to assess how the construction employment was developed in some baseline countries, looking them as guide examples. 2. Background Around the 1990s a new approach was adopted towards explaining the inside structure of the industry; and that was a shift from dealing with the Construction Industry as being a unified Sector System. Given that the fictitious company of this article is a multinational large construction firm with over 50,000 employees and operating several European countries, it is wise to present the general past picture in some example construction industries. For this reason the following national cases are used to present how the employment rates fluctuated during the previous decade as it is seen important in making assumptions in the proposed framework. 2.1 Denmark-case In the 1990s, the Danish economy has moved from an initial period of stagnation and falling employment to a period of economic boom and a return to the previous employment levels. The lean years in the early 1990s showed an average annual economic growth of less than 0.6 percent. This development was turned around at the end of 1993 when a strong economic recovery began. The average annual growth in GDP was 3.4 percent from 1994 to 2000 (CIB, 2004, p. 58) What became clear through these years is that the construction employment followed the productivity of the sector. In the 1990s, the lowest construction employment level occurred in 1993, after which it increased slowly during the second part of the decade and made six percent of the total workforce in 2000 (CIB, 2004). Table 2. Danish construction employment in the 1990s (× 1000) 1990 1992 1994 1996 1998 2000 2002 National 2794 1792 2808 2773 2778 2786 2803 Employment Construction 171 162 140 154 161 168 173 Employment Construction/Total 6.1 5.8 5.0 5.7 5.8 6.0 6.2 (%) (source: Statistics Denmark, 2003) 2.2 France-case In France, the share of repair and maintenance is nearly a half of all construction works because of the importance of the stock built after a Second World War. The construction sector system is made up of four very big firms, SMEs and self-employed. The fragmentation of the sector system allows a high flexibility in cyclical situations. The sector system is so heterogeneous that several construction sub-systems can be analyzed. The influence of central government on the institutional regulations remains high. [5]
  • 6. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) Figure 2: Employment in the French construction sector in 2001 (CIB, 2004) 2.3 Netherlands-case The Dutch construction industry’s capability to deliver difficult and innovative projects is equal to that of any national construction industry worldwide. The production of the construction industry in the Netherlands represents 11 % of the GNP. Also in terms of employment, construction is important for the Dutch economy. Including all construction related employment, the employment in the construction industry amounts to 9.5 % of the total employment in the Netherlands (PSIB, 2004). 2.4 Germany-case In 2000, the German construction industry had about 2.76 million employees, which corresponds to 6.6 percent of the total workforce (CIB, 2004, p. 96). The construction employment rate in 2000 was the lowest since the reunification in 1990 (see Table 2). Table 3. Construction Employment in Total Work Force (× 1000) 1991 1994 1995 1996 1999 2000 Total workforce 40689 40583 40524 40692 41431 41769 Total unemployment 2190 3304 3194 3482 3416 3133 Total Construction 2796 3165 3227 3126 2851 2761 Employees 2536 2849 2887 2757 2453 2356 Self-employed 260 316 340 369 398 405 Construction in Total 6.9 7.8 8.0 7.7 6.9 6.6 Workforce (%) 2.4 Portugal-case The growth in construction activity is also visible in employment. Table 4 shows data on construction employment, total employment and the contribution of construction to total employment. The share of construction employment in total employment reached 12.2% in 2002, one of the highest levels in the European Economic Area. [6]
  • 7. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) Table 4. Portuguese construction employment in 1990s (× 1000) 1990 1992 1994 1996 1998 2000 2002 National 4466.3 4340.7 4251.1 4250.5 4863.3 5028.9 5106.5 Employment Construction 352.6 346.2 330.8 340 3 343 1 596.4 622.3 Employment Construction/Total 7.9 7.9 7.8 8.1 10.9 12.1 12.2 (%) 3. Situation analysis Is it easy now however to foresee what is the hot-potato emerging in the built environment in correlation to which is the ideal proactive talent management strategy to copy with the potential threats? To answer somebody this question he needs to pre-think on the basis of what happens inside the construction world. Firstly what became prevalent, after 2008 where the crisis brought a new cadre of transactions, negotiations, employment relations, and labor rules; is the everyday trade-off between recession and recovery, something that both employees and employers are aware. This new picture created a parallel thinking in HR-managers mindset, calling them to balance the unemployment rates with the changes in labor income (Fig. 3). Figure 3: The change in unemployment and labor income (OECD, 2012) [7]
  • 8. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) The aforementioned analysis showed till now how much turbulent is the market formation not only for the construction sector but in general the employment situation in the construction field is too fluid to be predicted with a degree of safety. Given now the situation inside the construction market, the main hypothesis before thinking how to produce a holistic framework concerning the talent management strategies followed by the large scale company is the lack of skills is the timeless problem inside the construction world. The following graphic illustrates how current projections are perceived in the entire EU family and it is considered to align lack of skills to age, education and contract type. Figure 4: The change in employment and average hours worked by age, education and type contract (OECD, 2012) 4. Scenario planning Scenarios are claimed to support strategic decision makers. They are especially effective in dealing with uncertainties (Postma & Liebl, 2005). The traditional uses of scenarios and scenario development are evaluation and selection of strategies, integration of various kinds of future-oriented data, exploration of the future and identification of future possibilities. More recently, scenarios aim at making managers aware of environmental uncertainties, stretching managers’ mental models, and triggering and accelerating processes of organizational learning (Postma & Liebl, 2005, p. 2). In order to visualize the location of the hidden uncertainties and their impact on the organization we need to reply or quantify the next questions. After replying them a picture (Fig. 5) can be sketched to illustrate predictability and impact lead to the final selection of the most high-risk case.  How big could be a change in the construction employment in the upcoming years (Fig. 5)? [8]
  • 9. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901)  Is there any possibility to predict the amount and the type of skills needed in the future in specific operations (Fig. 7)?  Would be wise to narrow down our effort of restructuring talent management policies focusing on specific performance improvements (Fig. 8)? Figure 5: Scenario construction, adapted from (Heijden, Bradfield, & Burt, 2002) Figure 6: Past and forecast employment changes by economic sector (CEDEFOP, 2012, p. 23) [9]
  • 10. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) Figure 7: Future job opportunities by occupation (CEDEFOP, 2012, p. 24) Figure 8: Future job opportunities by broad level of qualifications (CEDEFOP, 2012, p. 25) After translating the managerial meaning of Kvetan et al. (2012) research paper entitled “Cedefop’s skills supply and demand forecast: 2011 update and reflections on the approach” (CEDEFOP, 2012) a table with potential scenarios was constructed. The following table illustrates the projections of figures 6 & 7 in terms of Risk Priority Numbers (RPN). The RPN is not a measure of risk, but of risk priority (eq. 1). Thus we will apply the worst- case scenario to the talent management framework. The RPN gives generally a model to allocate these resources. Equation (1): RPN = S × P × D S: Severity (1-10 scale) = Replacement Demand (Fig. 7) P: Probability score (1-10 scale) = Replacement Demand (Fig. 6) D: Detectability score (1-10 scale) = Subjective determination The values of S, D taken from the two pictures are divided by 40; the max. Value of the X- axis. PC = 0.80 × 0.40 × 0.04 = 0.013 [10]
  • 11. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) PC+ = 0.45 × 0.40 × 0.80 = 0.144 TC = 0.80 × 0.20 × 0.60 = 0.096 TC+ = 0.45 × 0.20 × 0.80 = 0.072 Table 5. Selecting scenarios Change (C) in Construction Professionals (P) PC: RPN=0.013 PC+: RPN=0.144 Technicians (T) TC: RPN=0.096 TC+: RPN=0.072 Summarizing this preparatory section of the article the main proposition is that the following managerial approach will be focused on how HR-mangers have to reconsider their working philosophy when they design organizational routines to attract, develop, retain and mobilize the recruited highly-qualified professionals who are potentially ranked as the most crucial human resources. PC+ High Low High TC+ TC Low PC Figure 9: Scenario construction and selection of PC+ 5. Naming the pain When trying to interpret what is the missing link between an effective talent management policy and the actual acting strategy of the firm a main question was borne; in a highly fragmented industry as the construction one, where employment data are changing continuously which segment and why has to be selected as the most critical one? Lack of skills was assumed as the main problem precursor. Highly skilled professionals such as architects, contractors, supply chain specialist, procurement officers and purchasing managers do play a vital role in the evolution and growth of construction activities. Traditionally, however the construction sector has been dependent on the government, which acts in various roles: client, regulator, or business-cycle manager (Voordijk, Haan, & Joosten, 2000). Having now defined the target group (highly qualified professionals) and the route-cause of the problem (lack of skills), what’s remaining is to specify the firm’s operation-related department for which the framework will be designed. Manufacturers, contractors and architects are becoming dominant parties in the building process. Different supply chains have to be managed as recently it is observed a significant [11]
  • 12. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) turn from the traditional integrated design delivery system to a more product-specialized contract approach. The main problems threatening the sustainability of construction are  The fragmented regulation  The focus of public procurement on the lowest-bid rather than on MEAT (Most Economically Advantageous Tender) criteria  The training gap for delivering employees of higher adding-value and higher organizational commitment Aligning these three construction-related threats a clear transition can be done through the first picture, where predictability is now selected as the main driver for our Talent Management related framework. In other words, the required increase of 20% in the predictability is translated in the following three core outcomes:  Predictability of legislation  Procurement innovation  Investment in training 6. Problem statement Based on the analysis already done the problem to address this framework is reflected by the research question asking; “How the talent management system of a large multinational European construction firm can become more adaptive, more proactive, and enhance predictability by increasing the inflow and retention rate of highly skilled professional in Supply Chain operations?” 7. The relevance triangle Is the research question relevant enough to the core Human Resources issues concerning the arenas composing the construction industry? In other words, are the interests (stakes) of society (individuals: employees/employers and public agencies), academy (science: institutions) and market (industry/organizations) sufficiently represented in the problem statement? The construction sector is characterized by demand from different sources. Not only private demand for residential or office buildings also public infrastructure projects are of particular importance for the market. The public sector is a major client of the construction industry and is expected to boost further development by targeted and criteria-oriented procurement. Moreover, regulatory frameworks, e.g. in terms of quality and environmental standards, have substantial impact on technological direction and sector-specific R&D activities, may induce innovation in the construction sector and shift public and private demand to specific products and services (Loikkanen & Hyvönen, 2011, p. 88). The major levers for change of the construction sector are the industry / client forums, governments and procurers. The other, rather dependent focal area is the project team and at a more abstract level “society” groupings and education and training have the potential to make longer terms impacts (Barrett, 2005). [12]
  • 13. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) Macro-level Meso-level (Industry) (Firm) Micro-level (Individual) Figure 10: Summary disposition of stakeholders (Barrett, 2005, p. 62) The problem to be outlined is relevant to the industry/clients needs as clients nowadays more than ever know how to assess and maintain long term relationships with their suppliers. In that role the HR department of the assigned firm has to create a strategy through which maintaining Buyer/Supplier relationships will be one of the most innovative and fundamental competitive advantage of the internal human capital. This condition between the industry and the Talent Management (TM) structure brings into the light the need for designing specific skills packages and prioritizing them. If this approach is adopted, predicting the legislative changes will constitute a central strategic implication for talent. The government often participates in high market-share construction projects, knows as Public Private Partnerships (PPPs) which demand the employment of highly-educated personnel who will be enable to understand the market dynamics and the legal agreements among various parties formulating often Joint Ventures (JVs). Segmenting the talent pool to be designed is a solution for the firm to differentiate from their competitors. In the project arena, procurement is the black-box for the construction sector containing the bulk of the mainstream talent management tools, like talent analytics, mentoring, integrating newcomers, empowering older workers, etc. The final stage of this five-component procedure of Talent Management (Lewis & Heckman, 2006) leads to the creation and implementation of talent practices. [13]
  • 14. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) Table 6. Aligning TM stages to working (to be tested) assumptions Talent Management (TM) Assumptions / Mediating Skills required Component variables Strategy to create competitive Identify firm’s mission Locus of control & advantages Maintaining Buyer/Supplier Perception of future relationships growth Strategic implications for Managing firm’s positions Market dynamics talent understanding (PPPs / JVs) Talent pool strategy Manage workforce portfolio Fit & Flexibility TM Systems Enhance creativity, trust, Talent analytics motivation, productivity, commitment Talent practices If the framework applied, Retaining critical predictability targets will be knowledge (create a achieved (+20% increase) knowledge infrastructure) & Solving the Age/Employment paradox 7.1 Strategy to create competitive advantages Dealing in a context of multilateral relations and ongoing transactions, the construction professionals will be quickly confronted with the dynamic 4Cs character of the industry (Fig. 10). Most construction companies operate in a decentralized network of suppliers and customers in which they acquire production capacity from external suppliers. Construction projects can be viewed as temporary organizations among firms. The development and management of long term Buyer/Supplier relationships at the cross-project level is therefore difficult, as project teams and product designs change from project to project (Bemelmans, Voordijk, Vos, & Buter, 2012). This fact leads to consider constantly the maturity level of Buyer/Supplier relationships as it constitutes the core integration factor between operational processes and value creation ones. The management of Buyer / Supplier relationship embodies five aspects:  Optimize the supply base  Manage the supplier relationships  Integrate suppliers into the operational processes  Integrate suppliers into the value-creation processes  Develop suppliers Once all the five key-areas are combined into one employee’s competencies package then he will be able to relocate the locus of control related to his decisions and reconsider to which extent he acts towards the accomplishment of the strategic vision of the firm; 20% predictability increase in logistical defects. [14]
  • 15. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) Figure 11: Dynamic 4Cs model (Barrett, 2005, p. 60) 7.2 Strategic implications for talent Prime contractors spend up to 90% of a construction project’s turnover on buying goods and services, and thus suppliers have a large impact on project performance. Therefore, the purchasing function management of the prime contractor has a large influence on the overall performance: the more developed (i.e. mature or professional) this function is the greater its positive contribution (Bemelmans & Voordijk, 2012). The highly-skilled professionals required by the firm have to work on the basis of developing the most profitable and sustainable coalitions with private or public partners. For this reason candidates must be characterized by a systemic thinking like the one in Figure 12. Figure 12: Research framework for a designing an effective purchasing management tool (Bemelmans & Voordijk,2012) 7.3 Talent pool strategy Before an HR-manager thinks about the characteristics, the size, the depth and type of the talent pool to create in this predictability-seeking organization he/she should initially define the meaning of Strategic Human Resource Management (SHRM). Human resource deployments and organizational activities when combined with such way to achieve growth goals reveal the strategic direction of formulating the talent pool. [15]
  • 16. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) According to (Wright & Snell, 1997) speaking in terms of SHRM, two are the central dimensions to be explored; the fit and the flexibility. Fit is all about the matching between the HR-practices and the strategy. First, vertical fit involves the alignment of human resource management (HRM) practices and the strategic management process of the firm. Second, horizontal fit implies congruence among the various HRM practices. Achievement of horizontal fit is viewed as instrumental for efficiently allocating human resources. Vertical fit, in turn, is viewed as directing those resources toward the primary initiatives of the organization. Flexibility provides organizations with the ability to modify current practices in response to non-transient changes in the environment. Weick (1979) argues that flexibility requires detecting changes in the environment and retaining a sufficient pool of novel actions so that these changes can be accommodated. Resource flexibility: refers to the extent to which a resource can be applied to a larger range of alternative uses, the costs and difficulty of switching the use of a resource from one alternative use to another, and the time required to switch from one use to another. Coordination flexibility: consists of the extent to which the firm can "resynthesize" the strategy, "reconfigure" the chain of resources, and "redeploy" the resources. In the construction firm case, the two dimensions of SHRM are translated as the following table shows; Table 7. Fit & Flexibility in the a construction firm Fit Vertical Directing production/work towards the predictability target Horizontal Allocation of talents to appropriate positions (legislation, procurement, training) Flexibility Resources Tangible products easy to be reused (formal contracts, cost forms, time planning programs) Coordination Modular components of the supply chain (metrics, routines, production models) 7.4 Talent Management systems Competing in a world searching for novelty, the construction company needs to organize its HR functions around the three strategic targets; predictability of legislation, procurement innovation, and investment in training, having as guidelines not only on how to measure the talent, but firstly how boost creativity, trust, motivation, productivity, and organizational commitment is seen much more important. So before going to the Talent Analytics, simple topics such as the interrelation between passion for work (intrinsic motivation) affecting external motivation has to be chartered by the HR managers and thereafter to design the social interaction process for enhancing them. A new approach on how to design the social processes inside the firm is to align the quadrant in which each talent is classified correlated with his personal perception on his basic needs. Thus a prediction map of where (under which performance conditions) and when an employee could react through a future burnout or how strong is his/her self- esteem. [16]
  • 17. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) Figure 13: Talent/Potential matrix in relation with Scharlow’s pyramid Talent Analytics Using sophisticated and high-tech performance monitoring systems of analyzing employee data to enhance their personal competitive advantages are always needed. The true evaluation of the value of human capital assets and their value-contribution calls for complete accountability of employees. In the case of the construction firm, HR managers need surely to calculate the optimal number o f staff member in the positions of legal consultants (legislation predictability), procurement officers (procurement innovation) and investment in training (productivity of Learning & Development programs). Applying talent analytics includes six steps (Davenport, Harris, & Shapiro, 2012); 1. Human capital facts: What are the key-indicators of my organization’s health?  Employee engagement and financial performance 2. Analytical Human Resource: Which units, departments, or employees need attention?  Real-time review, feedback channels, mentoring, coaching 3. Human capital investment analysis: Which actions have the greatest impact on my business?  Monitoring of satisfaction levels, and maintain them 4. Workforce forecasts: How do I know when to staff up or cut back?  Scenario planning analysis, Demand & Supply analysis 5. Talent value model: Why do employees choose to stay or leave the company?  Re-placement of employees, evaluation of positions held by poor performers, fix out possible mismatches 6. Talent supply chain: How should the workforce needs to adapt to changes in the business environment?  Predict the education tends and the market demands, design job opportunities based on the power of the existing workforce and expand the orders’ experience into fresher’s motivation for learning and challenge. 7.5 Talent practices Proactive behavior in the organization To efficiently mobilize the talent selected and retained the company has to build up a Proactive Personality Scale (PPS) in the HR department. The four attributes of proactive behavior have to be realized in practice as (Crant, 2000) had identified them are; proactive personality, personal initiative, role breadth self-efficacy, and taking charge overlap [17]
  • 18. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) conceptually. In particular, the constructs share a common behavioral domain. Each construct considers the way in which an employee approaches and defines his or her work role, focusing on efforts to improve things in the workplace. Thus, the conceptual underpinnings of each construct incorporate employee changes to the work environment (Crant, 2000, p. 443). In the effort of developing and retaining the talented highly-skilled professional the firm has to take also context-specific proactive measures like socialization (networking), proactive feedback seeking, issue selling, promotion of (external) innovation to rise the champions, career management strategies for mapping the evolution of each employee separately. Coping with stress and burnouts Over the past 30 years, interest in burnout, from academics and managers alike, has increased dramatically as we have begun to understand the significant negative impact it has on employees (Halbesleben & Buckley, 2004). Burnout was defined by Maslach (1982) as “a syndrome of emotional exhaustion, depersonalization, and reduced personal accomplishment that can occur among individuals who do ‘people work’ of some kind.” The JD-R model of (Schaufeli, Bakker, & Rhenen, 2009) proved clearly that increase in Job Demands and decrease in Resources available predicts burnout and that increase in job Resources predicts job engagement. Apart from the structural model’s results what is very important to notify is the obligation of HR-management to point out exactly the job context and boundaries in order to minimize unrealistic expectations because this misfit between the organization and the employee often leads to burnout symptoms. In the end, the HR-managers of the construction company is strongly recommended to use Realistic Job Interviews and Expectation Lowering Procedures to manage recruitment, increase organizational commitment, and reduce turnover (Halbesleben & Buckley, 2004, p. 873) Solving the Age/Employment paradox Several strategies have been already analyzed by academics. The main issue that will be discussed here is how far away the construction industry (in large scale) is from increasing or maintaining the normative commitment of older employers? It is a fact that flexible work options, job design, mature employee training, manager training, compensation, etc are some strategies to engage older employees on HR practices according to (Armstrong- Stassen, 2008). However given the situation that there is a serious lack of highly and specialized professionals in the multi-faced departments and submarkets of the construction sector, the dominant approach on attaching older employees better and with a social, creative way is the teaching method. I named this attitude of mentoring when an employee, close to the retirement age is assigned to develop a beginner and bring into the pool some new, well-selected talents. The picture below endorses the previous statement (Fig. 14). [18]
  • 19. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) (a) (b) Figure 14: (a) Iv-Oil & Gas: Structural designer (23 years) / Structural design coordinator (65 years) (b) Iv-Infra: Constructor (28 years) / Chief design engineer (54 years) 8. A tool for thinking (TM Framework) In the construction of the Talent Management framework there are three components that till now are not fully clarified. These are - The visibility line: It represents the critical moment where we decompose the problem after the scenario planning and based on the chosen less-advantageous one we move on the analysis of the case. The term “visibility line” is borrowed from the terminology of Project Management. It illustrates practically the start of the actual business process while all the IT resources are mobilized to optimize the portfolio management. - The High Reliability Organizations (HROs): type of organizations operating on the edge while being reliable is too critical for the societal benefits. HROs are governed by the five attributes of mindfulness or enriched awareness. - The Complex Production Systems (CoPS): an integrated approach of concentrating around key-roles (System Integrators) several stakeholders and interconnecting the system’s centre with the superstructure and infrastructure. [19]
  • 20. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) Figure 15: A thinking tool on designing Talent Management strategies for large construction firms 9. Managerial implications The last picture depicts the line of reasoning of the whole approach. Said differently, if the HR-managers of the construction firm should put in practice the above framework they should follow the roadmap described (Fig. 16). Additional ideas from academics to be explored inside the Construction Industry; - “Organizations that move quickly to seize new opportunities compete through flexibility and do not develop employee competencies from within. (Cappelli & Crocker-Hefter, 2001)” - Think twice before outsourcing for your personnel, as (Cappelli & Crocker-Hefter, 2001) has stated: “Organizations that compete through their dominance in a market rely on organization-specific capabilities developed internally…” - Balance and map, the HR-departments’ competencies with the business strategies that flow from them. [20]
  • 21. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) Attract Talent  Think about future staffing needs: design positions, instead of employees (e.g. procurement officers)  Be sure about who recruits for your company (hire industry related people)  Identify and communicate what the project will teach and why (open the agenda)  Adjust newcomers’ expectations and learning goals with firm’s experiences Develop Talent  Link employees: internal networking as collaboration-driven innovation  Mentor employees: reverse-traditional- anonymous-micro feedback  Make mentoring a reciprocal relationship  Don’t exclude inside-outsiders internal candidates  Give time and space for employees to react Retain Talent  Provide room to grow towards the strategic direction of predictability  Enrich the personal experiences continuously (role games, virtual cases, external training, create schools)  Express satisfaction, and A comprehensive end-to-end process reward wisely and transparently  Transform employee routine in a hunting for entrepreneurship  Challenge your top-performers Mobilize Talent  Share a proactive behavior vision  Make stars part of the planning process  Personalize as much as possible L&D programs  Reinforce the vision: by focusing on the right assessors, rather than on the assessment Figure 16: End-to End process for TM technique (Fernadez-Araoz, Groysberg, & Nohria, 2009)  Manage the A positions, manage B&C positions  Inspire B or C performers to become A players  Conceptualize the future framework for attracting & retaining the Z-Generation [21]  Consider talent pools in BRIC economies
  • 22. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) 10. Further discussion After designing this action plan and incorporating all the stages of talent management for a large European construction firm an ambition will be created to open the window for further research on HRM literature and Strategic Talent Management. The first relies on the theory of Complex Production Systems (CoPS), dealing with the question “How we can still create some focus on our internal processes and distinguish our self as a company by recognizing the role of HR managers like the one of Systems Integrators (Winch, 1998)?” Figure 17: Construction as a complex system industry (Winch, 1998, p. 270) Moving from the typical role of System Integrators (architect & contactor) it would be very interesting to conceptualize a modern role of the HR managers. This role could be the two faces of the same coin; the first would be the role of performance boosters and the other the reputation builders. Is it feasible to execute some research on the following figure? Sourcing Retention Engagement Functionality Zone Development Assimilation Deployment Performance Management HR-managers as Performance Boosters Corporate Branding Builders Vitality Zone Talent Staff Talent Pool Executive Team Line Managers [22]
  • 23. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) Secondly what will be outlined is the emerging importance of High Reliability Theory (HRT), which calls for exploring deeper the question “To which extent HRM and HRD processes are mindful in the construction industry? Is there enough systemic space and organizational willingness to apply the five attributes of enriched awareness as (Weick, Sutcliffe, & Obstfeld, 1999) have mapped them?” HRT, if applied, is expected to enlighten what we can learn from B performers. A new game plan can be conceptualized for C Players as Beth Axelrod, Helen Jones, and Ed Michaels have stated in their correspondent article in Harvard Business Review (2012). When people in HROs focus on failures, tendencies to simplify, current operations, capabilities for resilience, and temptations to over structure the system, these concerns cover a broader range of unexpected events. As shown in Figure 17, these separate concerns are tied together by their joint capability to induce a rich awareness of discriminatory detail and a capacity for action. We label this capability mindfulness. It is this enriched awareness, induced by the distinctive concerns of HROs with potentials for catastrophe that facilitates the construction, discovery, and correction of unexpected events capable of escalation. The five processes of HRT can be the weapon against the appearance of organizational (human capital) silos. The role of each process could be the answer in the continuous effort for improving Coordination and Communication efficiency among internal silos (e.g. finance, operations and quality assurance, administration). Figure 17: A mindful infrastructure for high reliability (Weick, Sutcliffe, & Obstfeld, 1999) The conclusion of this last paragraph is that both topics introduced in the field of HRM and HRD will create a quite radical scope, a more lean approach enabling companies to operate within smaller time frames, in a friendlier and more efficient HR-environment. [23]
  • 24. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) References Armstrong-Stassen, M. (2008). Human resource practices for mature workers - And why aren't employers using them? Asia Pacific Journal of Human Resources , pp. 334-352. Barrett, P. (2005). Revaluing Construction - A Global CIB Agenda. University of Salford, UK, CIB General Secretariat. Rotterdam: CIB. Bemelmans, J., & Voordijk, H. (2012). Designing a tool for an effective assessment of purchasing maturity in construction. Dissertation, Enschede. Bemelmans, J., Voordijk, H., Vos, B., & Buter, J. (2012, January). Assessing Buyer-Supplier Relationship Management: Multiple Case-Study in the Dutch Construction Industry. Journal of Construction Engineering and Management , pp. 163-176. Cappelli, P., & Crocker-Hefter, A. (2001). Distinctive Human Resources Are Firms’ Core Competencies. pp. 7-22. CEDEFOP. (2012). Building on skills forecasts — Comparing methods and applications. Conference proceedings (No. 18), pp. pp. 1-284. CIB. (2004). The Construction Sector System Approach: An International Framework. Centre Scientifique et Technique du Bâtiment – Paris. CIB Rotterdam . COM. (2007). Accelerating the Development of the Sustainable Construction Market in Europe. A Lead Market Initiative for Europe. European Commission. Consulting, S. (2008). 2020 Vision – The Future of UK Construction. A scenario based report, St Andrews Management Institute, Experian. Crant, M. J. (2000). Proactive Behavior in Organizations. Vol. 26 (No. 3), pp. 435–462. Davenport, T. H., Harris, J., & Shapiro, J. (2012, Winter). Competing on Talent Analytics. Harvard Business Review OnPoint , pp. pp. 120-126. Egan, J. (2002). Accelerating Change. London: Strategic Forum For Construction. Fernadez-Araoz, C., Groysberg, B., & Nohria, N. (2009, May). The Definitive Guide to Recruiting in Good Times and Bad. Harvard Business Review . Halbesleben, J. R., & Buckley, R. M. (2004). Burnout in Organizational Life. Journal of Management , Vol. 30 (No. 6), pp. 859–879. Heijden, K. v., Bradfield, R., & Burt, G. (2002). The Sixth Sense: Accelerating Organizational Learning with Scenarios. Chichester: Wiley. Lewis, R. E., & Heckman, R. J. (2006). Talent management: A critical review. Human Resource Management Review , Vol. 16, pp. 139–154. Lewis, R. E., & Heckman, R. J. (2006). Talent management: A critical review. Human Resource Management Review , Vol. 16, pp. 139–154. Loikkanen, T., & Hyvönen, J. (2011). Sectoral Innovation Watch Construction Sector. Competitiveness and Innovation Framework Programme, Consortium Europe INNOVA. European Commission. NAO. (2001). Modernising Construction. House of Commons. London: National Audit Office. O'Brien, M. J., Fischer, M. A., & Jucker, J. V. (1995). An economic view on project co- ordination. Construction Management and Economics , Vol. 13 (No. 5), pp. 393-400. [24]
  • 25. Managing Human Resource Flows (194120090) UT. / M-BA DIMITRIOS KORDAS (M-CME/s1231901) OECD. (2012). What Makes Labor Markets Resilient During Recessions? Employment Outlook. Postma, T. J., & Liebl, F. (2005). How to improve scenario analysis as a strategic management tool? Technological Forecasting & Social Change , Vol. 72, pp. 161–173. PSIB. (2004). Process And System Innovation In The Dutch Construction Industry. Project Plan for a Research and Development Programme. Schaufeli, W. B., Bakker, A. B., & Rhenen, W. v. (2009). How changes in job demands and resources predict burnout, work engagement, and sickness absenteeism. Journal of Organizational Behavior , pp. 893–917. Voordijk, H., Haan, J. d., & Joosten, G.-J. (2000). Changing governance of supply chains in the building industry: a multiple case study. European Journal of Purchasing & Supply Management , Vol. 6, pp. 217-225. Weick, K. E., Sutcliffe, K. M., & Obstfeld, D. (1999). Organizing for High Reliability: Processes of Collective Mindfulness. Research in Organizational Behavior , Vol. 1, pp. 81–123. Winch, G. (1998). Zephyrs of creative destruction: understanding the management of innovation in construction. Building Research & Information , Vol. 26 (No. 4), pp. 268–279. Wright, P. M., & Snell, S. A. (1997). Toward a Unifying Framework for Exploring Fit and Flexibility in Strategic Human Resource Management. (C. U. School, Ed.) pp. 1-40. [25]