 Breakwater:
Breakwater are the structures constructed
to enclose the harbours to protect them from
the effect of wind generated waves by
reflecting and dissipating their force or
energy.
Such a construction makes it possible
to use the area thus enclosed as a safe
anchorage for ships and to facilitate loading
and unloading of water by means of wave
breakers.
 Classification of Breakwaters:
 Vertical wall breakwater.
 Heap or mound breakwater.
 Mound with super structure.
Vertical wall breakwater:
The construction of vertical breakwater is
found advantageous under the following
situations
 The depth of water is sufficiently large to
prevent the breaking of waves.
 Sea bed is resistant to erosion.
 Foundations are not subject to uneven
settlement.
Heap or mound breakwater:
It is simplest type of breakwater and
constructed by dumping of rubbles, stones
into the sea till the heap or mound emerges
out of water. The rubble mound breakwater
comparatively is safe. The looseness of the
elements permits them to settle with out
damage. In this way they provide a broad
base. This helps in distributing the load on a
larger area.
Usually the concrete cap should be cased
after two years of dumping the rubble. The
quantity of rubble depends upon the depth,
rise of tides and exposure.
Mound with super structure:
There are two cases:
 Mound with super structure founded at low
water level.
 Mounds with super structure below low water
level.
 Mound with super structure founded at low water
level.
A solid super structure consisting of a quay
protected by a parapet on the sea face is constructed
on the top of rubble mound. Such a construction is
founded about the low water level.
 Mounds with super structure below low water level.
In this type of construction, the superstructure can
be founded well below the level of disturbance. The
maximum disturbance is created between the low
and high water levels. Thus at such low levels below
the low water level, waves practically have no
disturbing effect. This type of construction is very
economical in terms of mound material in deep
waters.
 Jetties:
A jetty is a narrow structure projecting from
the shore into the water with berths one or both
sides and sometimes at the end also.
These are structures in the form of piles
projections. They are built from the shore to the
deep water. They may be constructed in the sea
or in a navigable river.
In the sea, jetties are provided at places
where harbour entrance is affected by littoral
drift or the sea is shallow for a long distance. The
jetties extend from the shore to the deep sea to
receive the ship.
Jetties are exposed to severe wave action
and their structural design is similar to that of
breakwaters. The impact caused by the
berthing ships depends upon the local
conditions of the currents, winds, waves and
the skill of the navigation officer coupled with
the efficiency of the tug assistance. Some
authorities advocate that the berthing effect
should be taken into account while designing
the jetties, while others do not agree to this.
 Note that the wharf is a berth parallel to the
shore, where as a jetty is perpendicular to the
shore or breakwater.
 Groynes:
Groynes are structures constructed
traverse to the shore and extend from the
shore into the water far enough up to a limit
to accomplish their purpose. Groynes are
constructed for the following purposes:
 To build up a protective beach.
 To retard erosion of an existing or restored
beach by trapping of littoral drift.
 To protect the toes of sea water or bulk
heads.
 Types of Groynes:
Classification according to the function it
serves:
 Attracting Groynes.
 Deflecting Groynes.
 Repelling Groynes.
Classification according to the materials of
construction:
 Permeable Groynes.
 Impermeable Groynes.
According to the condition of construction:
 Fixed.
 Adjustable.
According to their size as:
 Long
 Short.
 High.
 Low.
 Attracting Groynes:
These groynes are constructed at the shore in
such a way that it points towards the
downstream of the direction of normal flow. Its
inclination varies from 45 degrees to 60 degrees.
 Deflecting Groynes:
This type of groynes are constructed at right
angle to the shore to deflect the flow.
 Repelling Groynes:
This type of groyne is constructed in such a way
that it points up stream at an angle of 10 degrees
to 30 degrees to the line of normal to the shore.
The head deflects the current at right angles to
itself.
Permeable Groynes:
They permit the flow of water through
them. They dampen the velocity and reduce
the erosive action of the stream. The
permeability of the groyne helps in avoiding
abrupt offset in a shore. A part of materials
and littoral drift pass through the groyne. This
results in sand deposition on both sides of
groyne.
High and low groynes:
High groynes compeletly block sand
moving in the zone of its influence and called
terminal groynes.i-e they act as impermeable
groynes. Where as low groynes serve the
same purpose as that of a permeable groynes
i-e thay allow sand supply down stream.

Más contenido relacionado

La actualidad más candente

Design principles and requirements of harbours
Design principles and requirements of harboursDesign principles and requirements of harbours
Design principles and requirements of harbours
Latif Hyder Wadho
 
Site selection for a harbour
Site selection for a harbourSite selection for a harbour
Site selection for a harbour
Latif Hyder Wadho
 
Docks and their classification
Docks and their classificationDocks and their classification
Docks and their classification
Latif Hyder Wadho
 
Dredging and Marine Works (EN) V2015-3
Dredging and Marine Works (EN)  V2015-3Dredging and Marine Works (EN)  V2015-3
Dredging and Marine Works (EN) V2015-3
Séamus Day
 
Terms related to docks and harbours
Terms related to docks and harboursTerms related to docks and harbours
Terms related to docks and harbours
Latif Hyder Wadho
 

La actualidad más candente (20)

Harbours and docks
Harbours and docksHarbours and docks
Harbours and docks
 
Harbour
HarbourHarbour
Harbour
 
Design principles and requirements of harbours
Design principles and requirements of harboursDesign principles and requirements of harbours
Design principles and requirements of harbours
 
Vertical wall type breakwaters
Vertical wall type breakwatersVertical wall type breakwaters
Vertical wall type breakwaters
 
Break waters
Break watersBreak waters
Break waters
 
Site selection for a harbour
Site selection for a harbourSite selection for a harbour
Site selection for a harbour
 
Cofferdams
Cofferdams Cofferdams
Cofferdams
 
Harbour engineering by Shankaregowda MIT Mysore
Harbour engineering by Shankaregowda MIT MysoreHarbour engineering by Shankaregowda MIT Mysore
Harbour engineering by Shankaregowda MIT Mysore
 
Docks, Harbour and Ports
Docks, Harbour and PortsDocks, Harbour and Ports
Docks, Harbour and Ports
 
Docks and their classification
Docks and their classificationDocks and their classification
Docks and their classification
 
Breakwaters
BreakwatersBreakwaters
Breakwaters
 
Marine structures
Marine structuresMarine structures
Marine structures
 
Dredging and Marine Works (EN) V2015-3
Dredging and Marine Works (EN)  V2015-3Dredging and Marine Works (EN)  V2015-3
Dredging and Marine Works (EN) V2015-3
 
Breakwaters and types
Breakwaters and types Breakwaters and types
Breakwaters and types
 
Breakwaters
BreakwatersBreakwaters
Breakwaters
 
H & d ppt 05 wet docks
H & d ppt 05 wet docksH & d ppt 05 wet docks
H & d ppt 05 wet docks
 
Chapter 2 coffer-dam
Chapter 2 coffer-damChapter 2 coffer-dam
Chapter 2 coffer-dam
 
Gravity dam
Gravity damGravity dam
Gravity dam
 
Terms related to docks and harbours
Terms related to docks and harboursTerms related to docks and harbours
Terms related to docks and harbours
 
HARBOURS ENGINEERING
HARBOURS ENGINEERING HARBOURS ENGINEERING
HARBOURS ENGINEERING
 

Similar a Breakwater, jetties and groins.

Similar a Breakwater, jetties and groins. (20)

breakwaters-160417214939-170205074559.pdf
breakwaters-160417214939-170205074559.pdfbreakwaters-160417214939-170205074559.pdf
breakwaters-160417214939-170205074559.pdf
 
Design of Rubble Mound Seawall
Design of Rubble Mound SeawallDesign of Rubble Mound Seawall
Design of Rubble Mound Seawall
 
marine coastal structures
marine coastal structuresmarine coastal structures
marine coastal structures
 
Coastal structure
Coastal structureCoastal structure
Coastal structure
 
Advanced technologies for costal protection
Advanced technologies for costal protectionAdvanced technologies for costal protection
Advanced technologies for costal protection
 
Costal Protection
Costal ProtectionCostal Protection
Costal Protection
 
Costal Protection
Costal ProtectionCostal Protection
Costal Protection
 
Costal Protection
Costal ProtectionCostal Protection
Costal Protection
 
Aahe ppt grp 5 (2).pptx
Aahe ppt grp 5 (2).pptxAahe ppt grp 5 (2).pptx
Aahe ppt grp 5 (2).pptx
 
M3_IE_D&HE.pdf
M3_IE_D&HE.pdfM3_IE_D&HE.pdf
M3_IE_D&HE.pdf
 
Coastal structure.pdf
 Coastal structure.pdf Coastal structure.pdf
Coastal structure.pdf
 
7. SEAPORT MAINTENANCE (PHE) GTU 3170623
7. SEAPORT MAINTENANCE (PHE) GTU 31706237. SEAPORT MAINTENANCE (PHE) GTU 3170623
7. SEAPORT MAINTENANCE (PHE) GTU 3170623
 
Design of hydraulic structures ce 413
Design of hydraulic structures ce 413Design of hydraulic structures ce 413
Design of hydraulic structures ce 413
 
Coastal defences
Coastal defencesCoastal defences
Coastal defences
 
Design of Rubble Mound Seawall
Design of Rubble Mound SeawallDesign of Rubble Mound Seawall
Design of Rubble Mound Seawall
 
Coastal erosion mitigation
Coastal erosion mitigationCoastal erosion mitigation
Coastal erosion mitigation
 
Diversion Headwork in Canal
 Diversion Headwork in Canal  Diversion Headwork in Canal
Diversion Headwork in Canal
 
Chapter 5 coastal structures
Chapter  5 coastal structuresChapter  5 coastal structures
Chapter 5 coastal structures
 
Design of flood control structures
Design of flood control structuresDesign of flood control structures
Design of flood control structures
 
DIVERSION HEAD WORKS
DIVERSION HEAD WORKSDIVERSION HEAD WORKS
DIVERSION HEAD WORKS
 

Más de Latif Hyder Wadho

Más de Latif Hyder Wadho (20)

Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control  Internal Checking Internal Auditing - Auditing By LATiFHRWInternal Control  Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
 
Supply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWSupply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRW
 
Surveying and Leveling
Surveying and LevelingSurveying and Leveling
Surveying and Leveling
 
Energy crisis in Pakistan
Energy crisis in PakistanEnergy crisis in Pakistan
Energy crisis in Pakistan
 
SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018
 
SPSC CCE 2013 Pcs past papers
SPSC  CCE 2013 Pcs past papersSPSC  CCE 2013 Pcs past papers
SPSC CCE 2013 Pcs past papers
 
SPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testSPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening test
 
Engineering drawing
Engineering drawingEngineering drawing
Engineering drawing
 
Why is english as a global language
Why is english as a global languageWhy is english as a global language
Why is english as a global language
 
Bricks
BricksBricks
Bricks
 
Introduction to Geo technical Engineering 2
 Introduction to Geo technical Engineering 2 Introduction to Geo technical Engineering 2
Introduction to Geo technical Engineering 2
 
Introdction to Geo technical Engineering
Introdction to Geo technical EngineeringIntrodction to Geo technical Engineering
Introdction to Geo technical Engineering
 
Sub surface exploration part 2
Sub surface exploration part 2Sub surface exploration part 2
Sub surface exploration part 2
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footing
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of piles
 
Settlement of piles
Settlement of pilesSettlement of piles
Settlement of piles
 
Plate load test
Plate load testPlate load test
Plate load test
 
Subsurface exploration (part-3)
Subsurface exploration (part-3)Subsurface exploration (part-3)
Subsurface exploration (part-3)
 
Sub surface exploration (part-1)
Sub surface exploration (part-1)Sub surface exploration (part-1)
Sub surface exploration (part-1)
 
Introduction to Foundation Engineering
Introduction to Foundation EngineeringIntroduction to Foundation Engineering
Introduction to Foundation Engineering
 

Último

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 

Último (20)

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 

Breakwater, jetties and groins.

  • 2.  Breakwater: Breakwater are the structures constructed to enclose the harbours to protect them from the effect of wind generated waves by reflecting and dissipating their force or energy. Such a construction makes it possible to use the area thus enclosed as a safe anchorage for ships and to facilitate loading and unloading of water by means of wave breakers.
  • 3.  Classification of Breakwaters:  Vertical wall breakwater.  Heap or mound breakwater.  Mound with super structure. Vertical wall breakwater: The construction of vertical breakwater is found advantageous under the following situations  The depth of water is sufficiently large to prevent the breaking of waves.
  • 4.  Sea bed is resistant to erosion.  Foundations are not subject to uneven settlement. Heap or mound breakwater: It is simplest type of breakwater and constructed by dumping of rubbles, stones into the sea till the heap or mound emerges out of water. The rubble mound breakwater comparatively is safe. The looseness of the elements permits them to settle with out damage. In this way they provide a broad base. This helps in distributing the load on a larger area.
  • 5. Usually the concrete cap should be cased after two years of dumping the rubble. The quantity of rubble depends upon the depth, rise of tides and exposure. Mound with super structure: There are two cases:  Mound with super structure founded at low water level.  Mounds with super structure below low water level.
  • 6.  Mound with super structure founded at low water level. A solid super structure consisting of a quay protected by a parapet on the sea face is constructed on the top of rubble mound. Such a construction is founded about the low water level.  Mounds with super structure below low water level. In this type of construction, the superstructure can be founded well below the level of disturbance. The maximum disturbance is created between the low and high water levels. Thus at such low levels below the low water level, waves practically have no disturbing effect. This type of construction is very economical in terms of mound material in deep waters.
  • 7.  Jetties: A jetty is a narrow structure projecting from the shore into the water with berths one or both sides and sometimes at the end also. These are structures in the form of piles projections. They are built from the shore to the deep water. They may be constructed in the sea or in a navigable river. In the sea, jetties are provided at places where harbour entrance is affected by littoral drift or the sea is shallow for a long distance. The jetties extend from the shore to the deep sea to receive the ship.
  • 8. Jetties are exposed to severe wave action and their structural design is similar to that of breakwaters. The impact caused by the berthing ships depends upon the local conditions of the currents, winds, waves and the skill of the navigation officer coupled with the efficiency of the tug assistance. Some authorities advocate that the berthing effect should be taken into account while designing the jetties, while others do not agree to this.
  • 9.  Note that the wharf is a berth parallel to the shore, where as a jetty is perpendicular to the shore or breakwater.
  • 10.  Groynes: Groynes are structures constructed traverse to the shore and extend from the shore into the water far enough up to a limit to accomplish their purpose. Groynes are constructed for the following purposes:  To build up a protective beach.  To retard erosion of an existing or restored beach by trapping of littoral drift.  To protect the toes of sea water or bulk heads.
  • 11.  Types of Groynes: Classification according to the function it serves:  Attracting Groynes.  Deflecting Groynes.  Repelling Groynes. Classification according to the materials of construction:  Permeable Groynes.  Impermeable Groynes.
  • 12. According to the condition of construction:  Fixed.  Adjustable. According to their size as:  Long  Short.  High.  Low.
  • 13.  Attracting Groynes: These groynes are constructed at the shore in such a way that it points towards the downstream of the direction of normal flow. Its inclination varies from 45 degrees to 60 degrees.  Deflecting Groynes: This type of groynes are constructed at right angle to the shore to deflect the flow.  Repelling Groynes: This type of groyne is constructed in such a way that it points up stream at an angle of 10 degrees to 30 degrees to the line of normal to the shore. The head deflects the current at right angles to itself.
  • 14. Permeable Groynes: They permit the flow of water through them. They dampen the velocity and reduce the erosive action of the stream. The permeability of the groyne helps in avoiding abrupt offset in a shore. A part of materials and littoral drift pass through the groyne. This results in sand deposition on both sides of groyne.
  • 15. High and low groynes: High groynes compeletly block sand moving in the zone of its influence and called terminal groynes.i-e they act as impermeable groynes. Where as low groynes serve the same purpose as that of a permeable groynes i-e thay allow sand supply down stream.