What facility managers
need to know to get the
most out of their largest
facility expense
AIR BALANCE
101
Presented by:
Melinktb.com
AGENDA
WHAT IS BUILDING PRESSURE? SLIDE 3
WHAT ARE SYMPTOMS OF NEGATIVE BUILDING PRESSURE? SLIDE 4
WHAT’S AN EXAMPLE COST SCENARIO OF AN UNBALANCED FACILITY? SLIDES 5-6
WHAT CAUSES BUILDINGS TO BECOME UNBALANCED? SLIDES 7-8
WHAT IS AN AIR BALANCE? SLIDE 9
CASE STUDY
SLIDES 10-14WHAT DO YOU GET OUT OF AN AIR BALANCE?
SLIDE 15
MELINK T&BMELINK CORPORATION
STAY POSITIVE
WHAT IS BUILDING PRESSURE?
A BALANCED BUILDING
MELINK T&BMELINK CORPORATION
Calculated by the amount of fresh air/makeup air
being introduced to the building through the HVAC
system verses the amount of exhaust air being
exhausted from the building through the HVAC
system. The difference in these two measurements
will determine your building pressure. The fresh
air/makeup air being introduced to the building
should be higher than the airflow being exhausted
from the building. This will help achieve a slight
positive building pressure.
Building Pressure is a large factor in Customer
Comfort, Smoke Capture, Condensation Issues,
Energy Efficiency, Door Pull Issues, Insect
Issues, and more…
ALL INDICATE YOUR BUILDING IS OUT OF BALANCE
SYMPTOMS OF NEGATIVE BUILDING PRESSURE
MELINK T&BMELINK CORPORATION
MELINK T&B
“Hidden energy, O&M, and other costs can go undetected for years
until they are discovered in a retro-commissioning project. Without
retro-commissioning or a TAB check, the extra costs are never
found, and the owner pays high utility costs unnecessarily built into
an operating budget.”
-Dave McFarlane, Environmental Engineering, The High Cost of
Improperly Balanced Buildings
STUDY PUBLISHED IN CONSULTING-SPECIFYING ENGINEER MAGAZINE
THE COST OF IMPROPERLY BALANCED BUILDINGS
MELINK T&BMELINK CORPORATION
Issue Yearly Cost Savings 20-Yr Cost Savings
Excessive fan air flow $17,400 $350,000
Excessive reheat requirements $25,000 $500,000
Excessive fan static pressure $5,500 $110,000
Excessive exhaust makeup air
costs
$25,000 $500,000
Excessive pump static pressure $3,000 $60,000
Leaky reheat valves causing a
3 F air temp rise
$14,800 $300,000
Total $90,700 $1,820,000
• 100,000 sq. ft. building
• Design Airflow: 110,000 CFM
• Design Motor Load: 110 Horsepower
• Actual Airflow: 130,000 CFM
• Actual Motor Load: 180 Horsepower
• Operates: 16 hr/day, 5 day/week
• Energy cost: $.08/kWh
THE 4 COMMON EQUIPMENT CAUSES
WHAT CAUSES A BUILDING TO BECOME UNBALANCED?
Outside air dampers not properly set Exhaust fans not operating to design
Rooftop units not operating to design Make up air not operating to design
MELINK T&BMELINK CORPORATION
THE 6 COMMON POOR PREVENTATIVE MAINTENANCE CAUSES
WHAT CAUSES A BUILDING TO BECOME UNBALANCED?
Dirty Indoor Filters Dirty RTU Blower Fans Worn or broken belts
Dirty/Clogged Evaporator Coils Dirty/Damaged Grease Filters Dirty Outdoor Air Filters
MELINK T&BMELINK CORPORATION
ALSO KNOWN AS “TEST & BALANCE”
WHAT IS AN AIR BALANCE?
An "air balance" is a process for measuring the performance of an HVAC system, and for providing the
occupants with a comfortably conditioned space according to design specifications. In other words, it is
an overall health check for your HVAC systems to make sure the equipment is mechanically sound, that
there is positive building pressure and that the thermostat and air flow are adjusted properly.
~Greg DuChane, Trane
MELINK T&BMELINK CORPORATION
T&B ASSURES:
WHY IS TEST & BALANCE CRUCIAL?
Return on Investment
HVAC installation and operation verification
Energy Efficiency
Setting Fan Volume for Needed Airflow
Comfort
Proper airflow and elimination of drafts to keep occupants comfortable
Health
Proper Fresh/Outside Air Volume, Air Turn-Over
Life Expectancy
Building & HVAC System Equipment
1
2
3
4
5
MELINK T&BMELINK CORPORATION
IN BOTH EXISTING & NEW LOCATIONS
WHEN TO HAVE AN AIR BALANCE?
Investigation of HVAC comfort
issues and inefficiencies
COMFORT ISSUES
Changes in floorplans or
placement of cooking equipment
REMODELNEW CONSTRUCTION
Full system balance after start up to bring
into design specification
Installation and operation verification
for new HVAC equipment
EQUIPMENT CHANGES
MELINK T&BMELINK CORPORATION
Rebalancing the existing
HVAC system every 5 years
REBALANCE
• Have all the HVAC maintenance items
completed BEFORE the balance
• Provide access to all areas of the restaurant
where HVAC equipment is located
• Provide mechanical prints
• Bring mechanical contractor or HVAC
contactor onsite during the balance
INFORMATION NEEDED FROM FACILITY MANAGERS
GET THE MOST OUT OF AN AIR BALANCE
MELINK T&BMELINK CORPORATION
THE BALANCE REPORT DELIVERABLE
Detailed Field Summary Detailed Punch List
Detailed Inspections, Airflows
MELINK T&BMELINK CORPORATION
Photos of Findings
NO MORE GUESSWORK
BENEFITS OF A T&B REPORT
Record of
Equipment
Record of
Balanced Airflow
Reference for
Owner & Maintenance
MELINK T&BMELINK CORPORATION
Final operating data Control set points and gives
confidence that systems are
operating and installed as
designed, to maximum
efficiency
Baseline for preventative
maintenance decisions
MAY 2015
CASE STUDY
Sample Of What We Found:
The Challenge:
During spring 2015, Melink was hired for a pilot
service to audit the balance of a previous contractor
during the new construction phase at a fast casual
restaurant in TX. Comfort complaints were the main
cause of the suspicion that the balance was not
performed correctly.
Results:
Melink found several HVAC deficiencies and was asked to
service an additional 3 stores. Across these 4 locations, Melink
found 60 deficiencies. Melink brought each store into balance
with a positive pressure according to design and the facilities
team team received reports with punch lists for all locations.
FAST CASUAL REBALANCE PROGRAM
MELINK T&B
4 Businesses,1 Energy Mission
WHAT WE DO
• Developer & EPC Contractor
• Commercial Ground Mount,
Roof Mount, & Parking
Structures
• National HVAC Test & Balance
Contractor
• 100% Self Performing NEBB
Certified Technicians
• Pioneer & DCKV Industry
Standard
• Global Installation & Project
Management
• Pre-Engineered Pump
Package
• Ground-loop Commissioning
• Ground-loop Financing
Integrity. Service Excellence. Innovation.
Since 1987
MELINK ABOUT USMELINK CORPORATION
3 EASY WAYS TO CONTACT MELINK
NEED TO SCHEDULE A BALANCE?
513-965-7300
TBestimating@melinkcorp.com
MELINK T&B
Fill out a contact us form on melinkcorp.com
MELINK CORPORATION
Speaking Event:
Is your HVAC system
tuned to sing your
praises?
MELINK THANK YOU
TEXT “AIRBALANCE” TO
22828 TO GET THE FRESH
AIR NEWSLETTER
WANT TO LEARN MORE
ABOUT MANAGING AIRFLOW?
MELINK CORPORATION
THANK YOU
MELINK CORPORATION

Más contenido relacionado

La actualidad más candente

Optimizing Building Performance with Building Management Systems (BMS): Benef...
Optimizing Building Performance with Building Management Systems (BMS): Benef...Optimizing Building Performance with Building Management Systems (BMS): Benef...
Optimizing Building Performance with Building Management Systems (BMS): Benef...
Ashraf El Desoky
 
Centralized ac system
Centralized ac systemCentralized ac system
Centralized ac system
Febin Siby
 
BS2 Hvac ventilation 1
BS2 Hvac ventilation 1BS2 Hvac ventilation 1
BS2 Hvac ventilation 1
Est
 

La actualidad más candente (20)

Optimizing Building Performance with Building Management Systems (BMS): Benef...
Optimizing Building Performance with Building Management Systems (BMS): Benef...Optimizing Building Performance with Building Management Systems (BMS): Benef...
Optimizing Building Performance with Building Management Systems (BMS): Benef...
 
ACMV SYSTEM
ACMV SYSTEM ACMV SYSTEM
ACMV SYSTEM
 
HVAC: Ventillation
HVAC: Ventillation HVAC: Ventillation
HVAC: Ventillation
 
HVAC Systems- A Complete Guide
HVAC Systems- A Complete GuideHVAC Systems- A Complete Guide
HVAC Systems- A Complete Guide
 
HVAC FOR ENERGY EFFICIENT BUILDING
HVAC FOR ENERGY EFFICIENT BUILDINGHVAC FOR ENERGY EFFICIENT BUILDING
HVAC FOR ENERGY EFFICIENT BUILDING
 
ASHRAE Standard 62.1 Update
ASHRAE Standard 62.1 UpdateASHRAE Standard 62.1 Update
ASHRAE Standard 62.1 Update
 
Underground car parking ventilation system
Underground car parking ventilation systemUnderground car parking ventilation system
Underground car parking ventilation system
 
Air Conditioning & Hvac Systems
Air Conditioning & Hvac SystemsAir Conditioning & Hvac Systems
Air Conditioning & Hvac Systems
 
Hvac
HvacHvac
Hvac
 
Building Management System BMS Introduction
Building Management System BMS  IntroductionBuilding Management System BMS  Introduction
Building Management System BMS Introduction
 
HVAC operation and Maintenance
HVAC operation and Maintenance HVAC operation and Maintenance
HVAC operation and Maintenance
 
Energy efficient hvac
Energy efficient hvac Energy efficient hvac
Energy efficient hvac
 
Building Service 2 Presentation
Building Service 2 PresentationBuilding Service 2 Presentation
Building Service 2 Presentation
 
Centralized ac system
Centralized ac systemCentralized ac system
Centralized ac system
 
HVAC, Heating Ventilation Air Conditioning BMS
HVAC, Heating Ventilation Air Conditioning BMSHVAC, Heating Ventilation Air Conditioning BMS
HVAC, Heating Ventilation Air Conditioning BMS
 
Presentation mechanical car parking ventilation system
Presentation mechanical car parking ventilation systemPresentation mechanical car parking ventilation system
Presentation mechanical car parking ventilation system
 
Air Conditioning Systems in Refrigeration and Air Conditioning
Air Conditioning Systems in Refrigeration and Air ConditioningAir Conditioning Systems in Refrigeration and Air Conditioning
Air Conditioning Systems in Refrigeration and Air Conditioning
 
Basics of HVAC - Part 1 (Heating Ventilation Air Conditioning)
Basics of HVAC - Part 1 (Heating Ventilation Air Conditioning)Basics of HVAC - Part 1 (Heating Ventilation Air Conditioning)
Basics of HVAC - Part 1 (Heating Ventilation Air Conditioning)
 
Design of air conditioning and ventilation system for a multi storey office b...
Design of air conditioning and ventilation system for a multi storey office b...Design of air conditioning and ventilation system for a multi storey office b...
Design of air conditioning and ventilation system for a multi storey office b...
 
BS2 Hvac ventilation 1
BS2 Hvac ventilation 1BS2 Hvac ventilation 1
BS2 Hvac ventilation 1
 

Destacado

Hvac Presentation
Hvac PresentationHvac Presentation
Hvac Presentation
Choong KW
 
3 cf ch-006_hvac_systems
3 cf ch-006_hvac_systems3 cf ch-006_hvac_systems
3 cf ch-006_hvac_systems
bhattbhai
 
Reading strategies
Reading strategiesReading strategies
Reading strategies
BIM Myanmar
 
MEP Design Draughtsman Ducoment
MEP Design Draughtsman DucomentMEP Design Draughtsman Ducoment
MEP Design Draughtsman Ducoment
Hussain Sajid
 
PM : Shop Drawings
PM : Shop DrawingsPM : Shop Drawings
PM : Shop Drawings
Todd Wyatt
 
21 hvac design manual
21 hvac design manual21 hvac design manual
21 hvac design manual
bhattbhai
 

Destacado (19)

Hvac Presentation
Hvac PresentationHvac Presentation
Hvac Presentation
 
Aa
AaAa
Aa
 
3 cf ch-006_hvac_systems
3 cf ch-006_hvac_systems3 cf ch-006_hvac_systems
3 cf ch-006_hvac_systems
 
Centralized AC System- S Menon & S Dayakar
Centralized AC System-  S Menon & S DayakarCentralized AC System-  S Menon & S Dayakar
Centralized AC System- S Menon & S Dayakar
 
Reading strategies
Reading strategiesReading strategies
Reading strategies
 
Doing more with less
Doing more with lessDoing more with less
Doing more with less
 
MEP Design Draughtsman Ducoment
MEP Design Draughtsman DucomentMEP Design Draughtsman Ducoment
MEP Design Draughtsman Ducoment
 
REVIT MEP COURSE
REVIT MEP COURSEREVIT MEP COURSE
REVIT MEP COURSE
 
REVIT MEP
REVIT MEP REVIT MEP
REVIT MEP
 
Dwyer's Air Balancing Tools: Mobile Meter Software App, UHH2, & Probes
Dwyer's Air Balancing Tools: Mobile Meter Software App, UHH2, & ProbesDwyer's Air Balancing Tools: Mobile Meter Software App, UHH2, & Probes
Dwyer's Air Balancing Tools: Mobile Meter Software App, UHH2, & Probes
 
Shop Drawing Review
Shop Drawing ReviewShop Drawing Review
Shop Drawing Review
 
PM : Shop Drawings
PM : Shop DrawingsPM : Shop Drawings
PM : Shop Drawings
 
IntegraCAD 2011 - HVAC calculation and drawing software
IntegraCAD 2011 - HVAC calculation and drawing softwareIntegraCAD 2011 - HVAC calculation and drawing software
IntegraCAD 2011 - HVAC calculation and drawing software
 
Autodesk Revit MEP
Autodesk Revit MEPAutodesk Revit MEP
Autodesk Revit MEP
 
MEP BIM design
MEP BIM designMEP BIM design
MEP BIM design
 
21 hvac design manual
21 hvac design manual21 hvac design manual
21 hvac design manual
 
Cold Water Supply Distribution In Building
Cold Water Supply Distribution In BuildingCold Water Supply Distribution In Building
Cold Water Supply Distribution In Building
 
Hvac presentation for beginers
Hvac presentation for beginersHvac presentation for beginers
Hvac presentation for beginers
 
12 Cooling Load Calculations
12 Cooling Load Calculations12 Cooling Load Calculations
12 Cooling Load Calculations
 

Similar a HVAC Air Balance 101

EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reduction
Keith Beattie
 
ACHRNEWS.COM AUGUST 15, 2016.docx
                            ACHRNEWS.COM     AUGUST 15, 2016.docx                            ACHRNEWS.COM     AUGUST 15, 2016.docx
ACHRNEWS.COM AUGUST 15, 2016.docx
hallettfaustina
 
Chilled Water Plant Optimization
Chilled Water Plant OptimizationChilled Water Plant Optimization
Chilled Water Plant Optimization
JoePessa
 
Quality Installation Check list
Quality Installation Check listQuality Installation Check list
Quality Installation Check list
Gary Tate
 
Final danny krueger lime energy july 2010
Final danny krueger lime energy july 2010Final danny krueger lime energy july 2010
Final danny krueger lime energy july 2010
limeenergysurveys
 
commissioning-federal-facilities.pdf
commissioning-federal-facilities.pdfcommissioning-federal-facilities.pdf
commissioning-federal-facilities.pdf
Vincent Bui
 
Owenton HSE Presentation Greenwood October 2011
Owenton HSE Presentation Greenwood October 2011Owenton HSE Presentation Greenwood October 2011
Owenton HSE Presentation Greenwood October 2011
carroll sams
 

Similar a HVAC Air Balance 101 (20)

kitchen.services-The Only HVAC Tune-Up Checklist You Need.pdf
kitchen.services-The Only HVAC Tune-Up Checklist You Need.pdfkitchen.services-The Only HVAC Tune-Up Checklist You Need.pdf
kitchen.services-The Only HVAC Tune-Up Checklist You Need.pdf
 
Innovations in Multifamily Building Energy Savings
Innovations in Multifamily Building Energy SavingsInnovations in Multifamily Building Energy Savings
Innovations in Multifamily Building Energy Savings
 
Case Study: National Sandwich Chain Rebalance
Case Study: National Sandwich Chain RebalanceCase Study: National Sandwich Chain Rebalance
Case Study: National Sandwich Chain Rebalance
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy Limited
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reduction
 
ACHRNEWS.COM AUGUST 15, 2016.docx
                            ACHRNEWS.COM     AUGUST 15, 2016.docx                            ACHRNEWS.COM     AUGUST 15, 2016.docx
ACHRNEWS.COM AUGUST 15, 2016.docx
 
Chilled Water Plant Optimization
Chilled Water Plant OptimizationChilled Water Plant Optimization
Chilled Water Plant Optimization
 
Bpe Mc Quay Final
Bpe Mc Quay FinalBpe Mc Quay Final
Bpe Mc Quay Final
 
The Energy Network: Energy Upgrade California Home Upgrade
The Energy Network: Energy Upgrade California Home UpgradeThe Energy Network: Energy Upgrade California Home Upgrade
The Energy Network: Energy Upgrade California Home Upgrade
 
Combi Systems: Lessons Learned from the Field
Combi Systems: Lessons Learned from the FieldCombi Systems: Lessons Learned from the Field
Combi Systems: Lessons Learned from the Field
 
HVAC Control Systems— Get it Right the First Time! (Part 3)
HVAC Control Systems— Get it Right the First Time! (Part 3)HVAC Control Systems— Get it Right the First Time! (Part 3)
HVAC Control Systems— Get it Right the First Time! (Part 3)
 
Quality Installation Check list
Quality Installation Check listQuality Installation Check list
Quality Installation Check list
 
Restoration of Energy Efficiency In Cooling Systems
Restoration of Energy Efficiency In Cooling SystemsRestoration of Energy Efficiency In Cooling Systems
Restoration of Energy Efficiency In Cooling Systems
 
Daimler Trucks of North America
Daimler Trucks of North AmericaDaimler Trucks of North America
Daimler Trucks of North America
 
Energy Savings from Air Sealing Large Buildings
Energy Savings from Air Sealing Large BuildingsEnergy Savings from Air Sealing Large Buildings
Energy Savings from Air Sealing Large Buildings
 
Final danny krueger lime energy july 2010
Final danny krueger lime energy july 2010Final danny krueger lime energy july 2010
Final danny krueger lime energy july 2010
 
Jonathan woolley talk
Jonathan woolley talkJonathan woolley talk
Jonathan woolley talk
 
commissioning-federal-facilities.pdf
commissioning-federal-facilities.pdfcommissioning-federal-facilities.pdf
commissioning-federal-facilities.pdf
 
Enhancing competitiveness and achieving sustainability
Enhancing competitiveness and achieving sustainabilityEnhancing competitiveness and achieving sustainability
Enhancing competitiveness and achieving sustainability
 
Owenton HSE Presentation Greenwood October 2011
Owenton HSE Presentation Greenwood October 2011Owenton HSE Presentation Greenwood October 2011
Owenton HSE Presentation Greenwood October 2011
 

Último

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 

HVAC Air Balance 101

  • 1. What facility managers need to know to get the most out of their largest facility expense AIR BALANCE 101 Presented by: Melinktb.com
  • 2. AGENDA WHAT IS BUILDING PRESSURE? SLIDE 3 WHAT ARE SYMPTOMS OF NEGATIVE BUILDING PRESSURE? SLIDE 4 WHAT’S AN EXAMPLE COST SCENARIO OF AN UNBALANCED FACILITY? SLIDES 5-6 WHAT CAUSES BUILDINGS TO BECOME UNBALANCED? SLIDES 7-8 WHAT IS AN AIR BALANCE? SLIDE 9 CASE STUDY SLIDES 10-14WHAT DO YOU GET OUT OF AN AIR BALANCE? SLIDE 15 MELINK T&BMELINK CORPORATION
  • 3. STAY POSITIVE WHAT IS BUILDING PRESSURE? A BALANCED BUILDING MELINK T&BMELINK CORPORATION Calculated by the amount of fresh air/makeup air being introduced to the building through the HVAC system verses the amount of exhaust air being exhausted from the building through the HVAC system. The difference in these two measurements will determine your building pressure. The fresh air/makeup air being introduced to the building should be higher than the airflow being exhausted from the building. This will help achieve a slight positive building pressure. Building Pressure is a large factor in Customer Comfort, Smoke Capture, Condensation Issues, Energy Efficiency, Door Pull Issues, Insect Issues, and more…
  • 4. ALL INDICATE YOUR BUILDING IS OUT OF BALANCE SYMPTOMS OF NEGATIVE BUILDING PRESSURE MELINK T&BMELINK CORPORATION
  • 5. MELINK T&B “Hidden energy, O&M, and other costs can go undetected for years until they are discovered in a retro-commissioning project. Without retro-commissioning or a TAB check, the extra costs are never found, and the owner pays high utility costs unnecessarily built into an operating budget.” -Dave McFarlane, Environmental Engineering, The High Cost of Improperly Balanced Buildings
  • 6. STUDY PUBLISHED IN CONSULTING-SPECIFYING ENGINEER MAGAZINE THE COST OF IMPROPERLY BALANCED BUILDINGS MELINK T&BMELINK CORPORATION Issue Yearly Cost Savings 20-Yr Cost Savings Excessive fan air flow $17,400 $350,000 Excessive reheat requirements $25,000 $500,000 Excessive fan static pressure $5,500 $110,000 Excessive exhaust makeup air costs $25,000 $500,000 Excessive pump static pressure $3,000 $60,000 Leaky reheat valves causing a 3 F air temp rise $14,800 $300,000 Total $90,700 $1,820,000 • 100,000 sq. ft. building • Design Airflow: 110,000 CFM • Design Motor Load: 110 Horsepower • Actual Airflow: 130,000 CFM • Actual Motor Load: 180 Horsepower • Operates: 16 hr/day, 5 day/week • Energy cost: $.08/kWh
  • 7. THE 4 COMMON EQUIPMENT CAUSES WHAT CAUSES A BUILDING TO BECOME UNBALANCED? Outside air dampers not properly set Exhaust fans not operating to design Rooftop units not operating to design Make up air not operating to design MELINK T&BMELINK CORPORATION
  • 8. THE 6 COMMON POOR PREVENTATIVE MAINTENANCE CAUSES WHAT CAUSES A BUILDING TO BECOME UNBALANCED? Dirty Indoor Filters Dirty RTU Blower Fans Worn or broken belts Dirty/Clogged Evaporator Coils Dirty/Damaged Grease Filters Dirty Outdoor Air Filters MELINK T&BMELINK CORPORATION
  • 9. ALSO KNOWN AS “TEST & BALANCE” WHAT IS AN AIR BALANCE? An "air balance" is a process for measuring the performance of an HVAC system, and for providing the occupants with a comfortably conditioned space according to design specifications. In other words, it is an overall health check for your HVAC systems to make sure the equipment is mechanically sound, that there is positive building pressure and that the thermostat and air flow are adjusted properly. ~Greg DuChane, Trane MELINK T&BMELINK CORPORATION
  • 10. T&B ASSURES: WHY IS TEST & BALANCE CRUCIAL? Return on Investment HVAC installation and operation verification Energy Efficiency Setting Fan Volume for Needed Airflow Comfort Proper airflow and elimination of drafts to keep occupants comfortable Health Proper Fresh/Outside Air Volume, Air Turn-Over Life Expectancy Building & HVAC System Equipment 1 2 3 4 5 MELINK T&BMELINK CORPORATION
  • 11. IN BOTH EXISTING & NEW LOCATIONS WHEN TO HAVE AN AIR BALANCE? Investigation of HVAC comfort issues and inefficiencies COMFORT ISSUES Changes in floorplans or placement of cooking equipment REMODELNEW CONSTRUCTION Full system balance after start up to bring into design specification Installation and operation verification for new HVAC equipment EQUIPMENT CHANGES MELINK T&BMELINK CORPORATION Rebalancing the existing HVAC system every 5 years REBALANCE
  • 12. • Have all the HVAC maintenance items completed BEFORE the balance • Provide access to all areas of the restaurant where HVAC equipment is located • Provide mechanical prints • Bring mechanical contractor or HVAC contactor onsite during the balance INFORMATION NEEDED FROM FACILITY MANAGERS GET THE MOST OUT OF AN AIR BALANCE MELINK T&BMELINK CORPORATION
  • 13. THE BALANCE REPORT DELIVERABLE Detailed Field Summary Detailed Punch List Detailed Inspections, Airflows MELINK T&BMELINK CORPORATION Photos of Findings
  • 14. NO MORE GUESSWORK BENEFITS OF A T&B REPORT Record of Equipment Record of Balanced Airflow Reference for Owner & Maintenance MELINK T&BMELINK CORPORATION Final operating data Control set points and gives confidence that systems are operating and installed as designed, to maximum efficiency Baseline for preventative maintenance decisions
  • 15. MAY 2015 CASE STUDY Sample Of What We Found: The Challenge: During spring 2015, Melink was hired for a pilot service to audit the balance of a previous contractor during the new construction phase at a fast casual restaurant in TX. Comfort complaints were the main cause of the suspicion that the balance was not performed correctly. Results: Melink found several HVAC deficiencies and was asked to service an additional 3 stores. Across these 4 locations, Melink found 60 deficiencies. Melink brought each store into balance with a positive pressure according to design and the facilities team team received reports with punch lists for all locations. FAST CASUAL REBALANCE PROGRAM MELINK T&B
  • 16. 4 Businesses,1 Energy Mission WHAT WE DO • Developer & EPC Contractor • Commercial Ground Mount, Roof Mount, & Parking Structures • National HVAC Test & Balance Contractor • 100% Self Performing NEBB Certified Technicians • Pioneer & DCKV Industry Standard • Global Installation & Project Management • Pre-Engineered Pump Package • Ground-loop Commissioning • Ground-loop Financing Integrity. Service Excellence. Innovation. Since 1987 MELINK ABOUT USMELINK CORPORATION
  • 17. 3 EASY WAYS TO CONTACT MELINK NEED TO SCHEDULE A BALANCE? 513-965-7300 TBestimating@melinkcorp.com MELINK T&B Fill out a contact us form on melinkcorp.com MELINK CORPORATION Speaking Event: Is your HVAC system tuned to sing your praises?
  • 18. MELINK THANK YOU TEXT “AIRBALANCE” TO 22828 TO GET THE FRESH AIR NEWSLETTER WANT TO LEARN MORE ABOUT MANAGING AIRFLOW? MELINK CORPORATION