SlideShare una empresa de Scribd logo
1 de 19
Six TVA
Nuclear Reactors
  in or near
  Tennessee
Browns Ferry Plant (3 reactors) near Athens, AL
Browns Ferry’s Record
 Built between 1966 and 1977, TVA’s oldest
 Same GE design as Fukushima
 Almost 1 million pop. within 50 mi. radius
 Only reactor in nation to have NRC RED FLAG
inspection rating (worst)
 Contains 3.1 million lbs. radioactive “spent” fuel
      in cooling pools
 Since 1980 BF has reported more than 1700
“events” to the NRC, has had repeated
shutdowns
Licenses of 3 reactors were renewed in May of
2006 to operate until 2033, 2034, and 2036
Tornados April 27, 2011
Sequoyah




Two reactors
Located not far from downtown Chattanooga
Built in 1980 & 1981, license renewed to 2041
Over 1 million people within 50 mi. radius
Watts Bar




Located between Chattanooga and Knoxville
One reactor operating, 2nd under construction since
2007, supposed to open in 2012, again delayed 2 yrs or
more , $2 BILLION OVER ESTIMATED COST
Bellefonte
                                   The ZOMBIE
                                         REACTOR
                                       Located near
                                      Scottsboro, AL
                                      Begun In 1974.
                                     stopped in 1988,
                                       cannibalized
                                    for parts by TVA in
                                        2006 & 07.
RESURRECTED in 2008 when TVA asked NRC to reinstate
deferred license. Approved by TVA Board for
construction after Watts Bar 2 begins operating.
Estimated cost, $4 to $5 BILLION.
TVA has 6 nuclear reactors on the Tennessee River
+
One more in construction at Watts Bar +
One more planned at Bellefonte= 8 reactors

Each reactor uses about 24 million gallons of water
per day.

Current water usage = c. 144 million gal/day

Projected water usage = c. 192 million gal./day
Water consumption by type of electricity generation:




   This article was corrected on 12 September 2011
A typical nuclear power plant in a
year generates 20 metric tons of
used nuclear fuel. The nuclear
industry generates a total of about
2,000 - 2,300 metric tons of used
fuel per year.

That accounts only for high level
waste.
The USA has 104 nuclear reactors
churning out tons of radioactive waste
every year. Spent fuel rods are stored in
pools to cool and then placed in casks on
site. No place for permanent disposal.
“Low-level” waste is sent to TN, processed
and then for buried or incinerated. Now
radioactive metals are being recycled into
objects for commercial use. Dog dishes
and kleenex boxes today. Cooking pots
tomorrow?
There is no such thing as real
nuclear clean-up, just an effort
 to incinerate, to sort, to bury,
and to move radioactive waste
 from one location to another.
Some lethal radionuclides will
  be with the earth for up to a
          million years.

Más contenido relacionado

Destacado

David Lochbaum Got Water-20120629
David Lochbaum Got Water-20120629David Lochbaum Got Water-20120629
David Lochbaum Got Water-20120629
MATRRorg
 
Оverview АР1000 reduced
Оverview АР1000 reducedОverview АР1000 reduced
Оverview АР1000 reduced
Ilona Zayets
 
Technical Briefing of nuclear safety aspects of the situation in Japan, 20 Ma...
Technical Briefing of nuclear safety aspects of the situation in Japan, 20 Ma...Technical Briefing of nuclear safety aspects of the situation in Japan, 20 Ma...
Technical Briefing of nuclear safety aspects of the situation in Japan, 20 Ma...
International Atomic Energy Agency
 
Technical Briefing of nuclear safety aspects of the situation in Japan, March 18
Technical Briefing of nuclear safety aspects of the situation in Japan, March 18Technical Briefing of nuclear safety aspects of the situation in Japan, March 18
Technical Briefing of nuclear safety aspects of the situation in Japan, March 18
International Atomic Energy Agency
 

Destacado (9)

David Lochbaum Got Water-20120629
David Lochbaum Got Water-20120629David Lochbaum Got Water-20120629
David Lochbaum Got Water-20120629
 
Atomic Radiation Is More Harmful To Women and Children_Mary Olson_NIRS
Atomic Radiation Is More Harmful To Women and Children_Mary Olson_NIRSAtomic Radiation Is More Harmful To Women and Children_Mary Olson_NIRS
Atomic Radiation Is More Harmful To Women and Children_Mary Olson_NIRS
 
Courtney Hanson Nuclear Economics-20120630
Courtney Hanson Nuclear Economics-20120630Courtney Hanson Nuclear Economics-20120630
Courtney Hanson Nuclear Economics-20120630
 
David Lochbaum High Level Nuclear Waste-20120630
David Lochbaum High Level Nuclear Waste-20120630David Lochbaum High Level Nuclear Waste-20120630
David Lochbaum High Level Nuclear Waste-20120630
 
Оverview АР1000 reduced
Оverview АР1000 reducedОverview АР1000 reduced
Оverview АР1000 reduced
 
Tom Clements Tritium Production 6.2012
Tom Clements Tritium Production 6.2012Tom Clements Tritium Production 6.2012
Tom Clements Tritium Production 6.2012
 
Technical Briefing of nuclear safety aspects of the situation in Japan, 20 Ma...
Technical Briefing of nuclear safety aspects of the situation in Japan, 20 Ma...Technical Briefing of nuclear safety aspects of the situation in Japan, 20 Ma...
Technical Briefing of nuclear safety aspects of the situation in Japan, 20 Ma...
 
Technical Briefing of nuclear safety aspects of the situation in Japan, March 18
Technical Briefing of nuclear safety aspects of the situation in Japan, March 18Technical Briefing of nuclear safety aspects of the situation in Japan, March 18
Technical Briefing of nuclear safety aspects of the situation in Japan, March 18
 
Tom Clements MOX Plutonium briefing 6.29.2012
Tom Clements MOX Plutonium briefing 6.29.2012Tom Clements MOX Plutonium briefing 6.29.2012
Tom Clements MOX Plutonium briefing 6.29.2012
 

Último

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 

Último (20)

Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 

Nuclear Issues in Tennessee -pt. 3

  • 1. Six TVA Nuclear Reactors in or near Tennessee
  • 2. Browns Ferry Plant (3 reactors) near Athens, AL
  • 3. Browns Ferry’s Record  Built between 1966 and 1977, TVA’s oldest  Same GE design as Fukushima  Almost 1 million pop. within 50 mi. radius  Only reactor in nation to have NRC RED FLAG inspection rating (worst)  Contains 3.1 million lbs. radioactive “spent” fuel in cooling pools  Since 1980 BF has reported more than 1700 “events” to the NRC, has had repeated shutdowns Licenses of 3 reactors were renewed in May of 2006 to operate until 2033, 2034, and 2036
  • 5.
  • 6. Sequoyah Two reactors Located not far from downtown Chattanooga Built in 1980 & 1981, license renewed to 2041 Over 1 million people within 50 mi. radius
  • 7. Watts Bar Located between Chattanooga and Knoxville One reactor operating, 2nd under construction since 2007, supposed to open in 2012, again delayed 2 yrs or more , $2 BILLION OVER ESTIMATED COST
  • 8. Bellefonte The ZOMBIE REACTOR Located near Scottsboro, AL Begun In 1974. stopped in 1988, cannibalized for parts by TVA in 2006 & 07. RESURRECTED in 2008 when TVA asked NRC to reinstate deferred license. Approved by TVA Board for construction after Watts Bar 2 begins operating. Estimated cost, $4 to $5 BILLION.
  • 9.
  • 10. TVA has 6 nuclear reactors on the Tennessee River + One more in construction at Watts Bar + One more planned at Bellefonte= 8 reactors Each reactor uses about 24 million gallons of water per day. Current water usage = c. 144 million gal/day Projected water usage = c. 192 million gal./day
  • 11.
  • 12. Water consumption by type of electricity generation: This article was corrected on 12 September 2011
  • 13.
  • 14.
  • 15.
  • 16. A typical nuclear power plant in a year generates 20 metric tons of used nuclear fuel. The nuclear industry generates a total of about 2,000 - 2,300 metric tons of used fuel per year. That accounts only for high level waste.
  • 17.
  • 18. The USA has 104 nuclear reactors churning out tons of radioactive waste every year. Spent fuel rods are stored in pools to cool and then placed in casks on site. No place for permanent disposal. “Low-level” waste is sent to TN, processed and then for buried or incinerated. Now radioactive metals are being recycled into objects for commercial use. Dog dishes and kleenex boxes today. Cooking pots tomorrow?
  • 19. There is no such thing as real nuclear clean-up, just an effort to incinerate, to sort, to bury, and to move radioactive waste from one location to another. Some lethal radionuclides will be with the earth for up to a million years.