CENTER FOR SUSTAINABLE SHALE DEVELOPMENT
PERFORMANCE STANDARDS AND REGULATORY STANDARDS
ACROSS THE APPALACHIAN BASIN

This document is for general information purposes only and should not be construed as legal advice, legal opinion or any other advice on any specific facts or circumstances. The information in this document is subject to change without notice
due to changed circumstances. You should not rely on this information or its applicability to any specific circumstance without first seeking professional advice. Use of the information does not create an attorney-client relationship between
the user and Eckert Seamans. Eckert Seamans and contributing authors expressly disclaim all liability to any person in respect of the consequences of anything done or omitted to be done wholly or partly in reliance upon the use or contents of
this document.
If you have any questions, please contact Erin McDowell at 412.566.6070 or Jessica Sharrow at 412.566.5941.
Center for Sustainable Shale Development
Performance Standards and Regulatory Standards Across the Appalachian Basin
WATER STANDARDS
NO. CSSD PERFORMANCE STANDARD

PENNSYLVANIA

2.1

Operators shall maintain zero discharge of wastewater (including drilling,
flowback and produced waters) to Waters of the Commonwealth of
Pennsylvania and other states until such time as CSSD adopts a standard
for treating shale wastewater to allow for safe discharge. Such standard will
be adopted by September 1, 2014. Note: This standard does not apply to
nor prohibit disposal of wastewater by deep well injection.



Operators must control and dispose of wastewater consistent
with Pennsylvania’s Clean Streams Law/NPDES program.1



Paragraph (3) requires that the discharge may not contain
more than 500 mg/L TDS, 250 mg/L total chlorides, 10 mg/L
total barium, 10 mg/L total strontium (monthly average).

OHIO

Except as provided in paragraph (3) (allowing discharge to
POTWS) there may be no discharge of wastewater into
waters of this Commonwealth from any source associated
with fracturing, production, field exploration, drilling or well
completion of natural gas wells.2



1.1

Note: By voluntary agreement with PA DEP, operators agreed to
no longer discharge wastewater to POTWs in Pennsylvania.
Operators shall maintain a plan to recycle flowback and produced water, for  Recycling allowed; Operators must submit, prior to drilling,
usage in drilling or fracturing a well, to the maximum extent possible.
a source reduction strategy in connection with flowback and
produced waters, or prepare a waste stream characterization. 6



No person shall place or cause to be placed in ground
water or in or on the land or discharge or cause to be
discharged in surface water brine, crude oil, natural gas,
or other fluids associated with the exploration,
development, well stimulation, production operations, or
plugging of oil and gas resources that causes or could
reasonably be anticipated to cause damage or injury to
public health or safety or the environment.3



WEST VIRGINIA

Land application of brine is permitted.4



Recycling allowed; Operators must submit as part of its
drilling permit a plan for disposal of drilling wastewater.7



Operators may dispose of wastewater by
underground injection well,
NPDES/POTWs, or re-use. Currently, land
application of completion returns is
prohibited.5



WV DEP strongly encourages operators to
recycle flowback and produced
wastewater.8



2.2

By September 24, 2014 or date of an operator’s initial application for
certification (whichever is later), Operators must recycle a minimum of
90% of the flowback and produced water, by volume, from its wells in all
core operating areas in which an Operator is a net water user.

No required recycling minimum.

No required recycling minimum.

Re-use of wastewater must be reported in
water management plan.9
No required recycling minimum.

2.3

CSSD will consider a recycling standard for a net water producer within
one year. Operators will maximize the use of recycled water to the extent
possible during this time.

See 2.2 above.

See 2.2 above.

See 2.2 above.

1

58 Pa. C.S. § 3217
25 Pa. Code § 95.10(b)
3 Ohio Rev. Code § 1509.22
4 Ohio Rev. Code § 1509.226
5 W. Va. Code § 22-6-7; James A. Martin, WVDEP Chief, Completion Returns from the Marcellus Shale formation (July 30, 2013).
6 25 Pa. Code § 287.53
7 Ohio Admin. Code § 1501:9-1-02
8 WVDEP Guidance, Large Volume Water Fracture Treatments (Jan. 8, 2010)
9 W. Va. Code § 22-6A-7; W. Va Code R. § 35-8-5.6
2

{J1807517.1}

1
Center for Sustainable Shale Development
Performance Standards and Regulatory Standards Across the Appalachian Basin
WATER STANDARDS
NO. CSSD PERFORMANCE STANDARD
3.1
3.2

3.3

PENNSYLVANIA

Any new pits designed shall be double-lined and equipped with leak
detection.
Operators, by March 20, 2014 or initial date of application for certification
(whichever is later), shall contain drilling fluid, when using oil-containing
drilling fluids to drill a well, in a closed loop system at the well pad
(e.g. no ground pits).
Operators, by March 20, 2015 or initial date of application for certification
(whichever is later), shall contain drilling fluid and flowback water in a
closed loop system at the well pad, eliminating the use of pits for all wells.



Single-lined pits on the well pad permitted.



OHIO

Ground pits permitted.13

10

Closed loop system not required, see 3.2 above.



Pits on the well pad must be constructed and maintained to 
prevent escape of brine.11
Ground pits permitted.14


Closed loop system not required, see 3.2 above.

Closed loop system not required, see 3.2 above.

When utilizing an impoundment for the storage of flowback
and/or produced waters, Operators shall ensure that free hydrocarbons are
removed from the water prior to storage and that new impoundments are
double-lined with an impermeable material, equipped with leak detection
and take measures to reasonably prevent hazards to wildlife. Total
hydrocarbons should be substantially removed.

4.2

Additionally, CSSD will facilitate research designed to determine the extent See 4.1 above.
of hydrocarbon emissions from these waters so that by September 1, 2014, a
decision can be made as to whether, and to what extent, this standard should
be amended.

See 4.1 above.

 Pits and impoundments holding >5,000
barrels of wastewater must be designed to
minimize “adverse environmental
effects and to assure safety to the
public”.17
 Impoundments must be double-lined and
equipped with leak detection (including
upgradient and downgradient monitoring
wells).18
See 4.1 above.

5.1

Operators shall establish an Area of Review (AOR), prior to drilling a well, No Area of Review requirement.
which encompasses both the vertical and horizontal legs of the planned
well. Within the AOR, the operator must conduct a comprehensive
 Note: PA has proposed an area of review risk
characterization of subsurface geology, including a risk analysis, that
assessment for drilling permits as part of new chapter
demonstrates the presence of an adequate confining layer(s) above the
78 regulations.
production zone that will prevent adverse migration of hydraulic fracturing
fluids. As part of the risk analysis, and before proceeding with hydraulic
fracturing, the operator must also conduct a thorough investigation of any
active or abandoned wellbores within such area of review or other
geologic vulnerabilities (e.g., faults) that penetrate the confining layer and
adequately address identified risks.

No Area of Review requirement.

No Area of Review requirement.

Impoundments must be double-lined and equipped with leak
detection (including upgradient and downgradient monitoring
wells).16

25 Pa. Code § 78.56
Ohio Rev. Code § 1509.22
12 W. Va Code R. § 35-8-12.4
13 25 Pa. Code § 78.56
14 Ohio Rev. Code § 1509.22
15 W. Va Code R. § 35-8-12.4
16 32 P.S. § 693.1; 25 Pa. Code § 105; see also Pennsylvania Design and Construction Standards for Centralized Impoundments.
17 Safety of Centralized Large Pits and Impoundments Used in the Drilling of Horizontal Natural Gas Wells (March 7, 2013).
18 West Virginia Design and Construction Standards for Centralized Pits; W. Va. Code R. § 35-8-16, 17
19 W. Va. Code R. § 35-8-6.2.j.
11

{J1807517.1}

2



Single-lined pits on the well pad
permitted.12
Ground pits permitted.15

4.1

10





WEST VIRGINIA



Ohio is currently drafting regulations governing
impoundments.

Note: Ohio ODNR, as part of each permit application,
performs a geological risk analysis and may require an
operator to plug or rebuild an abandoned well.



Note: Each well permit, with depth greater
than 300 feet must identify all wells
within 2,400 feet of the surface location of
the new well and 500 feet of the horizontal
section of the wellbore.19
Center for Sustainable Shale Development
Performance Standards and Regulatory Standards Across the Appalachian Basin
WATER STANDARDS
NO. CSSD PERFORMANCE STANDARD
6.1

6.2

6.3

6.4
7.1

7.2

PENNSYLVANIA

OHIO

Operators shall develop and implement a plan for monitoring existing water  Pre-drilling water survey may be completed by an operator to  The operator must submit as part of its drilling permit the
sources, including aquifers and surface waters within a 2,500 foot radius of
avoid a presumption of liability for contamination of a water
results of sampling water wells within 1,500 feet of the
the wellhead (or greater distance, if a need is clearly indicated by geologic
supply within 2,500 feet of the vertical wellbore.20
proposed horizontal wellhead prior to commencement of
characterization), and demonstrate that water quality and chemistry measured
drilling.21
during a pre-drilling assessment are not impacted by operations.
Operators must conduct periodic monitoring for at least one year following No required post-completion water monitoring.
No required post-completion water monitoring.
completion of the well. Such monitoring must be extended if results indicate
potentially adverse impacts on water quality or chemistry by operations.
In the event that monitoring establishes a possible link between an Operator’s  PA DEP may issue orders necessary to aid in enforcement of  Ohio DNR shall enforce this chapter and the rules, terms
activities and contamination of a water source, the Operator shall develop
statutory, regulatory and permit requirements. 23
and conditions of permits and registration certificates, and
and implement an investigative plan and, if a positive link is established,
orders adopted or issued pursuant thereto. 24
implement a corrective action plan.
The testing and monitoring plan should provide for additional monitoring in See 6.1 above.
See 6.1 above.
the event a well is re-stimulated.
Operators shall design and install casing and cement to completely isolate
 String(s) of casing shall be run and permanently cemented
 A well shall be constructed using sufficient steel or
the well and all drilling and produced fluids from surface waters and
to prevent migration of gas or fluids into sources of fresh
conductor casing in a manner that supports unconsolidated
aquifers, to preserve the geologic seal that separates fracture network
groundwater.26
sediments, that protects and isolates all underground
development from aquifers, and prevent vertical movement of fluids in the
sources of drinking water, as identified by ODNR, and that
annulus.
provides a base for a blowout preventer or other well
control equipment that is necessary to control formation
pressures and fluids during the drilling of the well and
other operations to complete the well. 27
Operators will not use diesel fuel in their hydraulic fracturing fluids. 29
No prohibition on diesel (see foonote 29).
 Diesel is permitted below cemented surface casing (see
footnote 29).30

20

58 Pa. C.S. § 3218
Ohio Rev. C § 1509.06(A)(8)(c)
22 W. Va. Code § 22-6A-18; W. Va. Code R. § 35-8-15
23 58 Pa. C.S. § 3253; see also 25 Pa. Code § 78.89, 25 Pa. Code § 91.33
24 Ohio Rev. C § 1509.04
25 W. Va. Code § 22-6A-19
26 58 Pa. C.S. § 3217; 25 Pa. Code § 78.71; 25 Pa. Code § 78.81; 25 Pa. Code § 78.83; 25 Pa. Code § 78.83a; 25 Pa. Code § 78.83b; 25 Pa. Code § 78.83c; 25 Pa. Code § 78.84; 25 Pa. Code § 78.85
27 Ohio Rev. Code § 1509.17; Ohio Admin. Code § 1501:9-1-08
28 W. Va. Code § 22-6A-24; W. Va. Code R. § 35-8-5.7, 9.2
29 Federal regulation requires that operators who inject diesel fuels during hydraulic fracturing obtain an Underground Injection Control (UIC) permit prior to injection. This requirement must be met in Pennsylvania, Ohio and West Virginia.
30 Ohio Admin. Code § 1501:9-1-08(C)
21

{J1807517.1}

3

WEST VIRGINIA


Operators must sample and analyze water
from any one known and existing well or
spring within 1,500 feet of the proposed
well.22

No required post-completion water monitoring.


WV DEP is responsible for enforcing
offenses to article 6 (oil and gas) or any
permit issued pursuant to this article.25

See 6.1 above.


Case and cement horizontal wells to prevent
the migration of gas and other fluids into
the fresh ground-water and coal seams, and
prevent pollution of or diminution of fresh
groundwater; installation and use of
blow out preventer and other well control
equipment.28

No prohibition on diesel (see footnote 29).
Center for Sustainable Shale Development
Performance Standards and Regulatory Standards Across the Appalachian Basin
WATER STANDARDS
NO. CSSD PERFORMANCE STANDARD
7.3

PENNSYLVANIA

OHIO

Operators will publically disclose the chemical constituents intentionally
 Operators must submit well completion reports to PA DEP

used in well stimulation fluids. Disclosures will include: information
and a chemical disclosure form to Frac Focus with the
identifying the well, the operator and the dates of the well stimulation; the
following: (i) A descriptive list of the chemical additives in the
type and total volume of the base fluid; the type and amount of any
stimulation fluids, including any acid, biocide, breaker, brine,
proppant; all chemical additive products used in a well stimulation,
corrosion inhibitor, crosslinker, demulsifier, friction reducer,
including the name under which the product is marketed or sold, the vendor, and a gel, iron control, oxygen scavenger, PH adjusting agent,
descriptor of additive's purpose or purposes (e.g. biocide, breaker, corrosion
proppant, scale inhibitor and surfactant. (ii) The trade name,
inhibitor, etc.); the common name and Chemical Abstracts Service registry
vendor and a brief descriptor of the intended use or function
number for each chemical ingredient used in a stimulation fluid; the actual
of each chemical additive in the stimulation fluid. (iii) A list
or maximum concentration of each chemical ingredient, expressed as a
of the chemicals intentionally added to the stimulation fluid,
percent by mass of the total stimulation fluid. Chemical ingredients should
by name and chemical abstract service number. (iv) The
be disclosed in a manner that does not link them to their respective chemical
maximum concentration, in percent by mass, of each
additive products. Disclosure of the above information will be offered to the
chemical intentionally added to the stimulation fluid. (v) The
relevant state agency and will also be posted on FracFocus.org. If an
total volume of the base fluid. (vi) A list of water sources
operator, service company or vendor claims that the identity of a chemical
used under the approved water management plan and the
ingredient is entitled to trade secret protection, the operator will include in its
volume of water used. (vii) The pump rates and pressure used
disclosures a notation that trade secret protection has been asserted and will
in the well. (viii) The total volume of recycled water used.31
instead disclose the relevant chemical family name. Operators will
implement measures consistent with state law to assist medical professionals  Trade secret protection available; chemicals covered by trade
in quickly obtaining trade secret information from the operator, service
secret protections must be provided to medical professional
company or vendor holding the trade secret that may be needed for clinical
upon execution of a confidentiality agreement.32
diagnosis or treatment purposes.

31

58 Pa. C.S. § 3222
58 Pa. C.S. § 3222.1
33 Ohio Rev. Code § 1509.10(A)(9)
34 W. Va. Code § 22-6A-7; W. Va. Code § 22-6A-7(e)(5); W. Va. Code R. § 35-8-10
32

{J1807517.1}

4

WEST VIRGINIA

Operators must submit to the Ohio DNR or Frac Focus the  Operators must submit to WV DEP and
following: (a) If applicable, the trade name and the
Frac Focus the following:
total amount of all products, fluids, and substances,
The additives used in the hydraulic
and the supplier of each product, fluid, or substance,
fracturing or stimulation process,
not including cement and its constituents and lost
including each additive’s specific trade
circulation materials, intentionally added to facilitate the
name, supplier, and purpose. The operator
drilling of any portion of the well until the surface casing
shall also list the chemical components of
is set and properly sealed. The owner shall identify each
each additive, along with each chemical’s
additive used and provide a brief description of the purpose
CAS registry number, its maximum
for which the additive is used. In addition, the owner shall
concentration in the additive, and its
include a list of all chemicals, not including any
maximum concentration in the fracturing
information that is designed as a trade secret pursuant to
fluid, including the carrier (base) fluid, and
division (I)(1) of this section, intentionally added to all
the volume of the carrier fluid used. The
products, fluids, or substances and include each chemical’s
concentrations shall be expressed as a mass
corresponding chemical abstracts service number and the
percent. The operator or service provider
maximum concentration of each chemical. The owner shall
may designate the information regarding
obtain the chemical information, not including any
chemical components as confidential trade
information that is designated as a trade secret pursuant to
secrets not to be disclosed by the agency to
division (I)(1) of this section, from the company that drilled
the general public, but the operator or
the well, provided service at the well, or supplied the
service provider shall provide that
chemicals. If the company that drilled the well, provided
information upon request to a health care
service at the well, or supplied the chemicals provides
professional in a medical emergency or for
incomplete or inaccurate chemical information, the owner
diagnostic or treatment purposes.34
shall make reasonable efforts to obtain the required
information from the company or supplier. (b) For purposes
of division (A)(9)(a) of this section, if recycled fluid was
used, the total volume of recycled fluid and the well that is
the source of the recycled fluid or the centralized facility
that is the source of the recycled fluid. 33
Center for Sustainable Shale Development
Performance Standards and Regulatory Standards Across the Appalachian Basin
WATER STANDARDS
NO. CSSD PERFORMANCE STANDARD
7.4
7.5

PENNSYLVANIA

CSSD will develop a standard relating to the public disclosure of chemicals No requirement.
other than well stimulation fluids by September 1, 2013.
Operators will also work toward use of more environmentally neutral
 Operators must prepare and submit a waste stream source
additives for hydraulic fracturing fluid.
reduction strategy report.35

OHIO

WEST VIRGINIA

No requirement.

No requirement.

No requirement.

No requirement.

7.6

Mechanical integrity tests shall be performed when refracturing an existing
well.



Operators must conduct quarterly inspections of wells to
ensure compliance with well construction and operating
requirements. 36



Well pressure testing requirements. 37



Casing must possess an internal pressure
rating 20% greater than the anticipated
maximum pressure.38

8.1

Operators shall design each well pad to minimize the risk that drilling
related fluids and wastes come in contact with surface waters and fresh
groundwater.



Unconventional well sites must be designed and constructed
to prevent spills to the ground surface or spills off the well
site.39



Operators must utilize best management practices in well
site construction.40





Operators must implement erosion and
sediment control plans and site construction
plans in well site development.41

Note: Ohio has proposed more detailed rules in connection
with well pad construction which will require engineer

certified plans and Ohio DNR oversight.
Signage and security measures at well site required.44


8.2

In preparation for any spill or release event, Operators shall prior to
commencement of drilling, develop and implement an emergency response
plan, ensure local responders have appropriate training in the event of an
emergency, and work with the local governing body, in which the well is
located, to verify that local responders have appropriate equipment to
respond to an emergency at a well.



Operators must develop and implement an emergency
response plan for each well site that provides for equipment,
procedures, training and documentation to properly respond
to emergencies.43



8.3

In addition, in the event of spill or release, beyond the well pad, operators
shall immediately provide notification to the local governing body and any
affected landowner.



Operators must immediately notify PA DEP of a spill and
downstream users of water.46



35

Operator must provide Ohio EPA verbal notification within 
30 minutes of knowledge of the release unless notification
within that time frame is impractical due to uncertain
circumstances.47

25 Pa. Code § 287.53
25 Pa. Code § 78.88
37 Ohio Admin. Code § 1501:9-1-08(N); Ohio Admin. Code § 1501:9-1-08(D)(3)
38 W. Va. Code R. § 35-8-9.2; West Virginia DEP, Office of Oil and Gas, Casing and Cementing Standards and Best Management Practices (December 10, 2012)
39 58 Pa. C.S. § 3218.2; 25 Pa. Code § 78.53; 25 Pa. Code § 78.55; 25 Pa. Code § 91.34
40 Ohio Admin. Code § 1501:9-1-07
41 W. Va. Code R. § 35-8-5.4, 5.5
42 West Virginia General Water Pollution Control Permit, Stormwater Runoff from Oil and Gas Field Construction (June 13, 2013); W. Va. Code § 22-6A-7(g)(5); W. Va. Code R. § 35-8-9, 18
43 35 Pa. C.S. § 7321; 25 Pa. Code § 78.55
44 Ohio Admin. Code § 1501:9-9-05
45 W. Va. Code § 22-6A-7; W. Va. Code R. § 35-8-5.7
46 25 Pa. Code § 91.33
47 Ohio Admin. Code § 3750-25-25
48 W. Va. Code R. § 35-8-18.9
36

{J1807517.1}

5

Operators must prevent surface and
underground water pollution.42
Safety plan must accompany each drilling
permit and detail weekly training sessions,
location of schools and public buildings
within 1 mile radius of the well, and
maintain plan to notify affected residents
of an emergency event and provide to local
emergency responders.45
Operators must immediately notify
WV DEP of a spill.48
Center for Sustainable Shale Development
Performance Standards and Regulatory Standards Across the Appalachian Basin
AIR STANDARDS
NO.
9

CSSD PERFORMANCE STANDARD

FEDERAL49

PENNSYLVANIA50

OHIO51

Reduced Emissions Completions (REC)

NSPS Subpart OOOO

Exemption Category No. 3858

Current










Beginning on 1/1/14 – direct all pipelinequality gas during completion of
development wells and re-completion or
workover of any well into a pipeline for
sales.

Beginning 10/15/12:
o



No venting allowed – must be flared in
accordance with CSSD Performance
Standard No. 10.
Acceptable reasons for flaring – low content
of flammable gas and safety reasons.

o

Unacceptable reasons for flaring – i) lack of
pipeline connection except for exploratory
or extension wells; ii) inadequate water
disposal capacity; iii) inadequate or lack of
flowback equipment or operating personnel.

o

o

49

Must capture and direct flowback emissions to a
completion combustion device, except in conditions
that may result in a fire hazard or explosion.53

Beginning 1/1/15:
o



REC equipment required for all wells besides those
classified as wildcat, delineation or low pressure. 54

Well drilling, completion and work-over activities are
exempted from permitting requirements.59
o



General duty to safely maximize resource recovery
and minimize releases to the atmosphere during
flowback and subsequent recovery.57



No state-specific REC
requirements in addition to
NSPS Subpart OOOO.



No state-specific REC
requirements in addition to
NSPS Subpart OOOO



Flaring required except for gas
releases by a properly
functioning relief device and gas
released by controlled venting
for testing, blowing down and
cleaning out wells.60



Compliance with NSPS
Subpart OOOO
requirements is required by
General Permit G70-A62;
(however, permit is not
required to be obtained
prior to well completion
activities.)63

Open flaring is only allowed under the following
circumstances:
o

Salable quality gas must be routed to the gas flow
line “as soon as practicable.”55
Emissions that cannot be directed to the gas flow
must be directed to a completion combustion device
(e.g., flare) with a continuous ignition source except
in conditions that may result in a fire hazard or
explosion.56

No state-specific REC requirements in addition to
NSPS Subpart OOOO.

Flaring used at exploration wells to determine whether
oil and/or gas exists in geological formations or to
appraise the physical extent, reserves and likely
production rate of an oil or gas field.

o

Flaring used for repair, maintenance, emergency or
safety purposes.

o

WEST VIRGINIA52

Proposed


Natural Gas Completion Permitby-Rule61 – requires compliance
with NSPS Subpart OOOO.

Flaring used for other operations at a wellhead or
facility to comply with 40 CFR Part 60, Subpart
OOOO requirements.

Compliance with Federal air regulations is required in all states regardless of whether or not a permit is required to be obtained. Additionally, the Federal New Source Performance Standards, 40 C.F.R. Part 60, are self-implementing in Pennsylvania and West Virginia. See 25 Pa. Code § 122.3;
W. Va. Code R. § 45-16-4.
50
Pursuant to the Pennsylvania Air Pollution Control Act (APCA), 35 P.S. §4001 et seq. and 25 Pa. Code § 127.14 (relating to exemptions), the Pennsylvania Department of Environmental Protection (PADEP) may determine sources or classes of sources to be exempt from the plan approval and
permitting requirements of 25 Pa. Code Chapter 127 (relating to construction, modification, reactivation and operation of sources). If a source does not meet the qualifying criteria for one of PADEP’s Air Quality Permit Exemptions, it is subject to plan approval and permitting requirements (unless
a request for determination on a case-by-case basis for an exemption is sought and granted by PADEP). See Pennsylvania’s Air Quality Permit Exemptions.
51 Unless subject to an exemption or a permit-by-rule, a facility that contains an “air contaminant source” is required to obtain either an individual permit-to-install/permit-to-operate or may be eligible for a general permit-to-install/permit-to-operate if one exists. See Ohio Rev. Code § 3704.03(F)(G); Ohio Rev. Code § 3704.011; Ohio Admin. Code § 3745-15-05; Ohio Admin. Code § 3745-31-01; Ohio Admin Code § 3745-31-02; Ohio Admin. Code § 3745-31-03.
52 In West Virginia, a facility that meets the definition of a “stationary source” must obtain either an individual air permit or may be eligible for a general permit if one exists. See W. Va. Code R. § 45-13-2.24; W. Va. Code R. § 45-13-5.
53 40 C.F.R. § 60.5375(a)
54 40 C.F.R. § 60.5375(a)
55 40 C.F.R. § 60.5375(a)(2)
56 40 C.F.R. § 60.5375(a)(3)
57 40 C.F.R. § 60.5375(a)(4)
58 Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11
59 PADEP Frequently Asked Questions, General Permit 5 (GP-5) and Exemption Category No. 38, December 27, 2013, Question/Answer No. 24, at p. 6.
60 Ohio Admin. Code § 1501:9-9-05(B)
61 Ohio’s Draft Natural Gas Completion Draft Permit-by-Rule
62 WVDEP General Permit G70-A, Section 5.1
63 WVDEP Response to Public Comment #33 on General Permit G70-A

{J1807517.1}

6
Center for Sustainable Shale Development
Performance Standards and Regulatory Standards Across the Appalachian Basin
AIR STANDARDS
NO.
10

CSSD PERFORMANCE STANDARD

FEDERAL

PENNSYLVANIA

OHIO

Flaring

NSPS Subpart OOOO

Exemption Category No. 3865

Current





When flaring is permitted during well
completion, re-completions or workovers of
any well (pursuant to Standard No. 9) meet
the following requirements:

Completion combustion devices
(e.g. flares) are required to have a
continuous ignition source.64

Open flaring during completions requires compliance with
NSPS Subpart OOOO.

Other Requirements

o Raised/elevated flares or engineered
combustion device with a reliable
continuous ignition source.



Opacity is limited to 20% or greater for an aggregated 3
minute period in any 1 hour, but cannot be equal to or greater
than 60% opacity at any time. 66



Requires “properly functioning relief
device”67



o

34 tons/yr VOCs.
1.7 tons/yr NOx.
9.3 tons/yr CO.

o

o Exploratory/Extension wells: flaring no
more than 30-days (for life of well).

“Temporary” flaring allowed for
30-days before a permit is
required.69
o

Emissions limitations for completion
operations:

o

o Development well: flaring no more than
14-days (for life of well).



Proposed Natural Gas Completion Permit-byRule68

o

o 98% destruction efficiency.

0.82 tons/yr HAP.



64

40 C.F.R § 60.5375(a)(3)
Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11
66 25 Pa. Code § 123.41
67 Ohio Admin. Code § 1501:9-9-05(B)
68 Ohio’s Proposed Natural Gas Completion Permit-by-Rule
69 W. Va. Code R. § 45-6-6.1a
70 W. Va. Code R. § 45-6-4.1, 4.3
71 WVDEP General Permit G70-A, Section 5.1.5
72 WVDEP Response to Public Comment #33 on General Permit G70-A
65

7

20% opacity limitation and
PM emissions limit set
according to a formula70

General Permit G70A: 20%
opacity limitation and PM
emissions limit set according to a
formula.71
o

o No visible emissions from flares except
for periods not to exceed a total of five
minutes during any two consecutive
hours.

{J1807517.1}



WEST VIRGINIA

However, permit is not
required to be obtained prior to
well completion activities.72
Center for Sustainable Shale Development
Performance Standards and Regulatory Standards Across the Appalachian Basin
AIR STANDARDS
NO.
11.1

CSSD PERFORMANCE STANDARD

FEDERAL

OHIO

WEST VIRGINIA

Diesel Non-road Drilling Rig Engines


Meet EPA Tier 2 standards by March 20, 2013.



25% of owner/operator engine utilization (hp) meeting EPA
Tier 4 standards for PM by March 20, 2015.



75% of owner/operator engine utilization (hp) meeting EPA
Tier 4 standards for PM by September 24, 2015.



95% of owner/operator engine utilization meeting EPA Tier
4 standards for PM by September 24, 2016.



11.2(a)

PENNSYLVANIA

 U.S. EPA regulates emissions from non-road diesel
engines according to varying “tiered” levels based on the
engine’s manufacturing date.73



Non-road engines are exempt from
permitting requirements under Exemption
Category No. 38.75



Non-road engines exempt
from permitting requirements
provided engines meet 20%
opacity limitation.76



Non-road engines are exempt
from permitting
requirements.77

Use ultra-low sulfur diesel (15 ppm of sulfur) at all times.



Non-road engines are exempt from
permitting requirements under Exemption
Category No. 38.80



Non-road engines exempt
from permitting requirements
provided engines meet 20%
opacity limitation.81



Non-road engines are exempt
from permitting
requirements.82

 Starting in 2010, diesel produced for use in non-road
engines required to meet ultra-low sulfur (15 ppm of
sulfur) requirement.74

Diesel Non-road Fracturing Pump Engines


Meet EPA Tier 2 standards by March 20, 2014.



25% of owner/operator engine utilization (hp) meeting EPA
Tier 4 standards for PM by September 24, 2015.



75% of owner/operator engine utilization (hp) meeting EPA
Tier 4 standards for PM by September 24, 2016.



95% of owner/operator engine utilization meeting EPA Tier
4 standards for PM by September 24, 2017.



Use ultra-low sulfur diesel (15 ppm of sulfur) at all times.

73

 U.S. EPA regulates emissions from non-road diesel
engines according to varying “tiered” levels based on the
engine’s manufacturing date78
 Starting in 2010, diesel produced for use in non-road
engines required to meet ultra-low sulfur (15 ppm of
sulfur) requirement.79

40 C.F.R. Part 89; 40 C.F.R. Part 1039
40 C.F.R. Part 80
75 Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11. Additionally, states are generally precluded from establishing emissions limitations for portable non-road engines. See Clean Air Act Section 209, 42 U.S.C. § 7543.
76 Ohio Admin. Code § 3745-31-03-(A)(1)(pp). Additionally, states are generally precluded from establishing emissions limitations for portable non-road engines. See Clean Air Act Section 209, 42 U.S.C. § 7543.
77 W. Va. Code R. § 45-13-1. Additionally, states are generally precluded from establishing emissions limitations for portable non-road engines. See Clean Air Act Section 209, 42 U.S.C. § 7543.
78 40 C.F.R. Part 89; 40 C.F.R. Part 1039
79 40 C.F.R. Part 80
80 Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11. Additionally, states are generally precluded from establishing emissions limitations for portable non-road engines. See Clean Air Act Section 209, 42 U.S.C. § 7543.
81 Ohio Admin. Code § 3745-31-03-(A)(1)(pp). Additionally, states are generally precluded from establishing emissions limitations for portable non-road engines. See Clean Air Act Section 209, 42 U.S.C. § 7543.
82 W. Va. Code R. § 45-13-1. Additionally, states are generally precluded from establishing emissions limitations for portable non-road engines. See Clean Air Act Section 209, 42 U.S.C. § 7543.
74

{J1807517.1}

8
Center for Sustainable Shale Development
Performance Standards and Regulatory Standards Across the Appalachian Basin
AIR STANDARDS
NO.
11.2(b)

CSSD PERFORMANCE STANDARD

FEDERAL

Diesel Heavy-Duty Vehicle Fracturing Pump Engines
 50% of engines meeting EPA 2007 and Later Model Year
Highway Heavy-Duty Vehicles and Engines emissions
standards for PM by March 20, 2013.

PENNSYLVANIA



U.S. EPA regulates engine emissions from highway
heavy-duty vehicles based on the vehicle’s model year. 83



None.85



WEST VIRGINIA

Starting in 2006, highway diesel fuel required to meet
ultra-low sulfur (15 ppm of sulfur) requirement.84

 80% of engines meeting EPA 2007 and Later Model Year
Highway Heavy-Duty Vehicles and Engines emissions
standards for PM by September 24, 2017.



OHIO
None.86



None.87

 Use ultra-low sulfur diesel (15 ppm of sulfur) at all times.

12.1

Existing Compressor Engines


By March 20, 2014 – 1.5 g/hp-hr NOx emission limitation
for existing compressor engines greater than 100 hp.

NSPS Subpart JJJJ (Standards of Performance for Stationary
Spark Ignition Internal Combustion Engines)



Previous Exemption Category No. 38


Applies to constructed, reconstructed, and modified
engines after June 12, 2006.88
Emissions limitations for engines manufactured between
2007/2008 and 2010/2011 greater than 100 hp:89

Existing compressor engines (those installed prior to August
10, 2013) – exempt from any permitting or emission
limitation requirements if less than 100 hp.

Previous GP-5


o

2.0 g/hp-hr for NOx.

o

4.0 g/hp-hr for CO.
1.0 g/hp-hr for VOCs.

o

2.0 g/hp-hr CO.

o

2.0 g/hp-hr VOCs.

Compressor engines are also subject to the National Emission
Standards for Hazardous Air Pollutants (NESHAP) for
Stationary Reciprocating Internal Combustion Engines (RICE)
at 40 C.F.R. 63, Subpart ZZZZ (i.e., the “RICE MACT”)90

83

Engines over 100 HP compliance with NSPS
Subpart JJJJ.

2.0 g/hp-hr NOx.

o



Prior to February 2013 - compressor engines greater than or
equal to 100 hp and less than 1500 hp were subject to the
previous GP-5 emissions limitations:

o

Natural Gas Compressor
Station General Permit
Number G33-A91

40 C.F.R. Part 86
40 C.F.R. Part 80
85 States (except California) are precluded from establishing any emissions limitations other than those required in 40 C.F.R. Part 86. See Clean Air Act Section 209, 42 U.S.C. § 7543.
86 States (except California) are precluded from establishing any emissions limitations other than those required in 40 C.F.R. Part 86. See Clean Air Act Section 209, 42 U.S.C. § 7543
87 States (except California) are precluded from establishing any emissions limitations other than those required in 40 C.F.R. Part 86. See Clean Air Act Section 209, 42 U.S.C. § 7543. Additionally, motor vehicles are exempted from permitting requirements. See W. Va. Code R. § 45-13-1
88 40 C.F.R. § 60.4230
89 40 C.F.R. Part 60, Subpart JJJJ, Table 1
90 40 C.F.R. Part 63, Subpart ZZZZ
91 WVDEP General Permit G33-A, Section 6.0
84

{J1807517.1}

9
Center for Sustainable Shale Development
Performance Standards and Regulatory Standards Across the Appalachian Basin
AIR STANDARDS
NO.

CSSD PERFORMANCE STANDARD

FEDERAL

PENNSYLVANIA

OHIO

WEST VIRGINIA

12.2

“New” Lean-Burn Compressor
Engines

NSPS Subpart JJJJ (Standards of
Performance for Stationary Spark Ignition
Internal Combustion Engines)

Exemption Category No. 38 (Compressor Engines at the Wellpad)94

Oil and Gas Well-Site Production Operations, General
Permit 12

Natural Gas
Production Facility
Class II General
Permit G70-A

 Emissions limitations for new,
purchased, replacement,
reconstructed, or relocated leanburn engines greater than 100
hp:



 Emissions limitations for engines
manufactured on or after 2010/2011
greater than 100 hp engine models
(depending on engine size) 92:

o

0.5 g/hp-hr NOx.

o

1.0 g/hp-hr for NOx.

o

2.0 g/hp-hr CO.

o

2.0 g/hp-hr for CO.

o

0.7 g/hp-hr VOCs.

o

0.7 g/hp-hr for VOCs.

Compressor engines are also subject to
the National Emission Standards for
Hazardous Air Pollutants (NESHAP) for
Stationary Reciprocating Internal
Combustion Engines (RICE) at 40 C.F.R.
63, Subpart ZZZZ (i.e., the “RICE
MACT”)93

GP-5 (Compressor Engines at Natural Gas Compression and/or Processing Facilities) (Feb.
2013)





92

Compressor engines are the wellpad (those installed on or after August 10, 2013) are
exempt from permitting requirements under Exemption Category No. 38 provided that:
o NOx emissions from stationary internal combustion engines at the wells, and
wellheads are less than 100 lbs/hr, 1000 lbs/day, 2.75 tons per ozone season (May 1
to September 30), and 6.6 tons per year on a 12-month rolling basis.
o Combined VOC emissions from all the sources at the facility are less than 2.7 tons
on a 12-month rolling basis. Additionally, combined HAP emissions at the facility
must be less than 1000 lbs of a single HAP or one ton of a combination of HAPs in
any consecutive 12-month period. If the VOCs emissions include HAPs, this HAP
exemption criteria is met.95

Natural gas fired lean burn less than 100 hp96
o 2.0 g/hp-hr for NOx.
o 2.0 g/hp-hr for CO.
Natural gas lean burn greater than 100 hp and less than or equal to 500 hp 97
o 1.0 g/hp-hr for NOx.
o 2.0 g/hp-hr for CO.
o 0.7 g/hp-hr for non- methane/non-ethane hydrocarbons (except formaldehyde).
Natural gas lean burn greater than 500 hp98
o 0.5 g/hp-hr for NOx.
o 93% reduction for CO.
o 0.25 g/hp-hr for non-methane/non-ethane hydrocarbons (except formaldehyde).
o 0.05 g/hp-hr for formaldehyde.

Engines must comply with NSPS Subpart JJJJ
standards.99
 Specific emissions limitations:100
o 20% opacity, 6-min average.
o Particulate Emissions (PE):
 0.310 lb/MMBtu for engines ≤ 600 hp.
 0.062 lb/MMBtu for engines > 600 hp.
o 2.6 tons of SO2/year.
o Total combined engine power less than or equal
to 1,300 hp:
 2.0 g/hp-hr NOx or 160 ppmvd at 15% O2 for
engines ≥ 100 hp.
 4.0 g/hp-hr CO or 540 ppmvd at 15% O2 for
engines ≥ 100 hp.
 1.0 g/hp-hr VOCs or 86 ppmvd at 15% O2 for
engines ≥ 100 hp.
o Total combined engine power greater than 1,300
hp:101
 1.0 g/hp-hr NOx /or 82 ppmvd at 15% O2 for
engines ≥ 100 hp.
 2.0 g/hp-hr CO/or 270 ppmvd at 15% O2 for
engines ≥ 100 hp.
 0.7 g/hp-hr VOCs or 60 ppmvd at 15% O2 for
engines ≥ 100 hp.

 Requires compliance
with NSPS Subpart
JJJJ.102

40 C.F.R. Part 60, Subpart JJJJ, Table 1
40 C.F.R. Part 63, Subpart ZZZZ
94 Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11
95 This VOC and HAP exemption emission threshold does not include emissions from sources that are approved by DEP in plan approvals or general plan approvals/general operating permits at the facility, nor do they include emissions from sources meeting the criteria specified in Subparagraphs i
(components in LDAR), ii (storage vessels/tanks with 95% VOC reduction controls) and iv (allowed flaring activities) in Exemption Category No. 38. See Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11. Additionally, a release from any equipment or component
designed by the manufacturer to protect the equipment, controller, or personnel or to prevent ground water contamination, gas migration, or an emergency situation is not required to be included for the VOC emissions threshold of 2.7 tpy. See PADEP Frequently Asked Questions, General Permit 5
(GP-5) and Exemption Category No. 38, December 27, 2013, Question/Answer No. 25, at p. 6.
96 Pennsylvania GP-5 - Natural Gas Compression and/or Processing Facilities, Section B
97 Pennsylvania GP-5 - Natural Gas Compression and/or Processing Facilities, Section B
98 Pennsylvania GP-5 - Natural Gas Compression and/or Processing Facilities, Section B
99 Ohio GP-12, at pp. 12-14
100 Ohio GP-12, at pp. 12-14
101 The total combined total engine horsepower must also be no more than 1,800 hp for the site in order to qualify for Ohio’s GP-12. See Ohio GP-12, at pp. 12. Additionally, where the total combined engine power exceeds 1,300 hp the engines must have a manufacturing date of no earlier than
January 1, 2011 for engines less than 500 HP or no earlier than July 1, 2010 for engines 500 hp or greater. Id.
102 WVDEP General Permit G70-A, Section 13
93

{J1807517.1}

10
Center for Sustainable Shale Development
Performance Standards and Regulatory Standards Across the Appalachian Basin
AIR STANDARDS
NO.

CSSD PERFORMANCE STANDARD

FEDERAL

PENNSYLVANIA

OHIO

12.3

“New” Rich-Burn Compressor Engines
Emissions limitations for new,
purchased, replacement, reconstructed,
or relocated rich-burn engines greater
than 100 hp:
o 0.3 g/hp-hr NOx.
o 2.0 g/hp-hr CO.
o 0.7 g/hp-hr VOCSs.

NSPS Subpart JJJJ (Standards of
Performance for Stationary Spark
Ignition Internal Combustion Engines)
 Emissions limitations for engines
manufactured on or after 2010/2011
greater than 100 hp engine models
(depending on engine size):103
o 1.0 g/hp-hr for NOx.
o 2.0 g/hp-hr for CO.
o 0.7 g/hp-hr for VOCs.
Compressor engines are also subject to
the National Emission Standards for
Hazardous Air Pollutants (NESHAP)
for Stationary Reciprocating Internal
Combustion Engines (RICE) at 40
C.F.R. 63, Subpart ZZZZ (i.e., the
“RICE MACT”)104

Exemption Category No. 38 (Compressor Engines at the Wellpad)105
 Compressor engines are the wellpad (those installed on or after August 10, 2013)
exempt from permitting where:
o NOx emissions from stationary internal combustion engines at the wells, and
wellheads are less than 100 lbs/hr, 1000 lbs/day, 2.75 tons per ozone season
(May 1 to September 30), and 6.6 tons per year on a 12-month rolling basis.
o Combined VOC emissions from all the sources at the facility are less than 2.7
tons on a 12-month rolling basis. Additionally, combined HAP emissions at
the facility must be less than 1000 lbs of a single HAP or one ton of a
combination of HAPs in any consecutive 12-month period. If the VOCs
emissions include HAPs, this HAP exemption criteria is met.106

Oil and Gas Well-Site Production Operations, General
Permit 12
Engines must comply with NSPS Subpart JJJJ
standards.110
 Specific emissions limitations:111
o 20% opacity, 6-min average.
o Particulate Emissions (PE):
 0.310 lb/MMBtu for engines ≤ 600 hp.
 0.062 lb/MMBtu for engines > 600 hp.
o 2.6 tons of SO2/year.
o Total engine power less than or equal to 1,300 hp:
 2.0 g/hp-hr NOx or 160 ppmvd at 15% O2 for
engines ≥ 100 hp.
 4.0 g/hp-hr CO or 540 ppmvd at 15% O2 for
engines ≥ 100 hp.
 1.0 g/hp-hr VOCs or 86 ppmvd at 15% O2 for
engines ≥ 100 hp.
o Total engine power greater than 1,300 hp:112
 1.0 g/hp-hr NOx /or 82 ppmvd at 15% O2 for
engines ≥ 100 hp.
 2.0 g/hp-hr CO/or 270 ppmvd at 15% O2 for
engines ≥ 100 hp.
 0.7 g/hp-hr VOCs or 60 ppmvd at 15% O2 for
engines ≥ 100 hp.

103

Coverage under GP-5 (Compressor Engines at Natural Gas Compression and/or
Processing Facilities) (Feb. 2013)
 Natural gas fired rich burn less than 100 hp:107
o 2.0 g/hp-hr NOx.
o 2.0 g/hp-hr CO.
 Natural gas rich burn greater than 100 hp and less than or equal to 500 hp: 108
o 0.25 g/hp-hr NOx.
o 0.30 g/hp-hr CO;
o 0.2 g/hp-hr for non-methane/non-ethane hydrocarbons (except formaldehyde).
 Natural gas rich burn greater than 500 hp: 109
o 0.20 g/hp-hr NOx.
o 0.30 g/hp-hr CO.
o 0.20 g/hp-hr for non-methane/non-ethane hydrocarbons (except formaldehyde).
o 76% reduction for formaldehyde.

WEST VIRGINIA
Natural Gas Production
Facility Class II General
Permit G70-A
Compliance with NSPS
Subpart JJJJ.113

40 C.F.R. Part 60, Subpart JJJJ, Table 1
40 C.F.R. Part 63, Subpart ZZZZ
105 Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11
106 This VOC and HAP exemption emission threshold does not include emissions from sources that are approved by PADEP in plan approvals or general plan approvals/general operating permits at the facility, nor do they include emissions from sources meeting the criteria specified in
Subparagraphs i (components in LDAR), ii (storage vessels/tanks with 95% VOC reduction controls) and iv (allowed flaring activities) in Exemption Category No. 38. See Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11. Additionally, a release from any equipment or
component designed by the manufacturer to protect the equipment, controller, or personnel or to prevent ground water contamination, gas migration, or an emergency situation is not required to be included for the VOC emissions threshold of 2.7 tpy. See PADEP Frequently Asked Questions,
General Permit 5 (GP-5) and Exemption Category No. 38, December 27, 2013, Question/Answer No. 25, at p. 6.
107 Pennsylvania GP-5 - Natural Gas Compression and/or Processing Facilities, Section B
108 Pennsylvania GP-5 - Natural Gas Compression and/or Processing Facilities, Section B
109 Pennsylvania GP-5 - Natural Gas Compression and/or Processing Facilities, Section B
110 Ohio GP-12, at pp. 12-14
111 Ohio GP-12, at pp. 12-14
112 The total combined total engine horsepower must also be no more than 1,800 hp for the site in order to qualify for Ohio’s GP-12. See Ohio GP-12, at pp. 12. Additionally, where the total combined engine power exceeds 1,300 hp the engines must have a manufacturing date of no earlier than
January 1, 2011 for engines less than 500 HP or no earlier than July 1, 2010 for engines 500 hp or greater. Id.
113 WVDEP General Permit G70-A, Section 13
104

{J1807517.1}

11
Center for Sustainable Shale Development
Performance Standards and Regulatory Standards Across the Appalachian Basin
AIR STANDARDS
NO.
13

CSSD PERFORMANCE STANDARD

FEDERAL

PENNSYLVANIA

OHIO

WEST VIRGINIA

Storage Vessels

NSPS Subpart OOOO

Exemption Category No. 38120

Oil and Gas Well-Site Production
Operations, General Permit 12

Natural Gas Production
Facility Class II General
Permit G70-A



By October 15, 2013 – all existing
and new individual storage vessels
at the wellpad with VOC emissions
equal to or greater than 6 tpy must
install controls to achieve at least a
95% reduction in VOC emissions.

 “New” Group 1 storage vessels (constructed, modified, or reconstructed
after August 23, 2011 and before April 12, 2013) that have potential VOC
emissions equal to or greater than 6 tons per year (tpy) - at least a 95%
reduction in VOC emissions by April 15, 2015.114
 “New” Group 2 storage vessels (constructed, modified, or reconstructed
after April 12, 2013) that have potential VOC emissions equal to or greater
than 6 tons per year (tpy) - at least a 95% reduction in VOC emissions by
April 15, 2014 or within 60-days of startup (whichever is later).115





Storage tanks can qualify for the exemption if combined
VOC emissions from all the sources at the facility are
less than 2.7 tons on a 12-month rolling basis. Combined
HAP emissions at the facility must be less than 1000 lbs
of a single HAP or one ton of a combination of HAPs in
any consecutive 12-month period in order to qualify for
the exemption. If the VOCs emissions include HAPs,
this HAP exemption criteria is met.121



 Control devices (installed to achieve the 95% reduction in VOC emissions
discussed above) may be removed if emissions from the storage vessel
have been below 4 tpy on an uncontrolled basis for 12 consecutive
months.118

 Total VOC emissions from all tanks
combined at the site (including
breathing losses, tank working losses,
flash losses and truck loading losses)
may not exceed 51.3 tons per rolling
12-month period.122

 Requires compliance with
NSPS Subpart OOOO123

No de minimis emission threshold per tank as allowed in
NSPS Subpart OOOO (i.e., must reduce storage
tank/storage vessel VOC emissions by 95% if combined
VOC emissions from storage vessels/storage tanks are
above 2.7 tpy in order to qualify for exemption).

o 6 tpy VOC determination may take into account enforceable limits in
an operating permit or other requirement established under a Federal,
State, local or tribal authority. 116
o Emissions from a storage vessel that are recovered and routed to a
process through a vapor recovery unit (VRU) can be excluded from
the 6 tpy VOC determination provided certain requirements are
met.117

Storage vessels/storage tanks are exempt from permit
requirements if they are equipped with VOC emission
controls achieving emission reduction of 95% or greater.

o Control device must be reinstalled: (1) if a well feeding the storage
vessel undergoes fracturing or refracturing; or (2) the monthly
emissions from the uncontrolled storage vessel increase to 4 tpy or
greater.119

114

40 C.F.R. § 60.5395(b)
40 C.F.R. § 60.5395(c)
116 40 C.F.R. § 60.5365(e)
117 40 C.F.R. § 60.5365(e)
118 40 C.F.R. § 60.5395(d)(2)
119 40 C.F.R. § 60.5395(d)(2)
120 Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11
121 This VOC and HAP exemption emission threshold does not include emissions from sources that are approved by PADEP in plan approvals or general plan approvals/general operating permits at the facility, nor do they include emissions from sources meeting the criteria specified in
Subparagraphs i (components in LDAR), ii (storage vessels/tanks with 95% VOC reduction controls) and iv (allowed flaring activities) in Exemption Category No. 38. See Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11. Additionally, a release from any equipment or
component designed by the manufacturer to protect the equipment, controller, or personnel or to prevent ground water contamination, gas migration, or an emergency situation is not required to be included for the VOC emissions threshold of 2.7 tpy. See PADEP Frequently Asked Questions,
General Permit 5 (GP-5) and Exemption Category No. 38, December 27, 2013, Question/Answer No. 25, at p. 6.
122 Ohio GP-12, at p. 41
123 WVDEP General Permit G70-A, Section 12.1
115

{J1807517.1}

12
Center for Sustainable Shale Development
Performance Standards and Regulatory Standards Across the Appalachian Basin
AIR STANDARDS
NO.
14.1

CSSD PERFORMANCE STANDARD

FEDERAL

Rod Packing at Reciprocating Compressors

NSPS Subpart OOOO



14.2

Change rod packing at all
reciprocating compressors (both
existing and new), including those at
the wellhead, either every 26,000
hours of operation or after 36 months.

Pneumatic Controllers


By October 15, 2013, pneumatic
controllers (both existing and
new):
o

o

14.3

Low – bleed, with a natural
gas bleed rate limit of 6.0 scfh
or less.



No state-specific requirements.

WEST VIRGINIA

 No state-specific requirements.

 No state-specific requirements.

 “New” reciprocating compressors (those installed after August 23, 2011) –
change rod packing either every 26,000 hours of operation or every 36 months
as well as new reciprocating compressors.124
 Reciprocating compressors located at a well site or an adjacent well site and
servicing more than one well site are excluded from this requirement. 125

NSPS Subpart OOOO
 “New” pneumatic controllers (those constructed (installed), modified or
reconstructed on or after October 15, 2013) located between the wellhead and a
natural gas processing plant: bleed rate of 6.0 scfh or less. 126

GP-5 - Natural Gas Compression
and/or Processing Facilities


 Exception to 6.0 scfh bleed rate – where use of a greater bleed rate is required
based on functional needs, including response time, safety and positive
actuation.127

New centrifugal compressors may not
contain wet oil seals.
Replace worn out wet seals on
existing centrifugal compressors with
dry seals.

NSPS Subpart OOOO
 For centrifugal compressors installed after August 23, 2011 - must reduce VOC
emissions from each centrifugal compressor wet seal fluid degassing system by
95 % or greater.130
o

If a control device is used to reduce emissions, must equip the wet seal
fluid degassing system with a cover that meets the requirements of 40
CFR §60.5411(b), that is connected through a closed vent system that
meets the requirements of 40 CFR §60.5411(a) and routed to a control
device that meets the conditions specified in 40 CFR §60.5412(a), (b) and
(c). As an alternative to routing the closed vent system to a control device,
may route the closed vent system to a process.

 Not applicable to centrifugal compressors located at a well site or at an adjacent
well site and servicing more than one well site. 131

124

40 C.F.R. § 60.5385(a)
40 C.F.R. § 60.5365(c)
126 40 C.F.R. § 60.5390(c)(1)
127 40 C.F.R. § 60.5390(a)
128 Pennsylvania GP-5 - Natural Gas Compression and/or Processing Facilities, Section A.3.
129 WVDEP General Permit G70-A, Section 8
130 40 C.F.R. § 60.5380(a)
131 40 C.F.R. § 60.5365(b)
132 Pennsylvania GP-5 - Natural Gas Compression and/or Processing Facilities, Section D
125

{J1807517.1}



OHIO

Lists pneumatic controllers as a
covered device, however, it
contains no state-specific
requirements for such
controllers.128

 No state-specific requirements.
 Proposed revisions to Ohio’s Oil and Gas
Well-Site Production Operations, General
Permit 12 require compliance with Subpart
OOOO requirements for pneumatic
controllers.

Natural Gas Production Facility Class
II General Permit G70-A
 Requires compliance with NSPS
Subpart OOOO requirements for
pneumatic controllers.129

Zero bleed when electricity
(3-phase electrical power) is
on-site.

Centrifugal Compressors


PENNSYLVANIA

13

GP-5 - Natural Gas Compression
and/or Processing Facilities


Compliance with NSPS Subpart
OOOO requirements for
centrifugal compressors.132

 No state-specific requirements.

 No state-specific requirements.
Center for Sustainable Shale Development
Performance Standards and Regulatory Standards Across the Appalachian Basin
AIR STANDARDS
NO.
14.4

CSSD PERFORMANCE STANDARD

FEDERAL

PENNSYLVANIA

OHIO

WEST VIRGINIA

Directed Inspection and Maintenance
Program

NSPS Subpart OOOO

Exemption Category No. 38134

Oil and Gas Well-Site Production
Operations, General Permit 12

G70-A

 By March 20, 2014 – implement a
directed inspection and maintenance
program (DI&M) for equipment
leaks from all existing and new
valves, pump seals, flanges,
compressor seals, pressure relief
valves, open-ended lines, tanks and
other process and operation
components that result in fugitive
emissions.

 Cover and closed vent inspections for “new”
storage vessels with potential to emit VOC
emissions equal to or greater than 6 tpy.133
o

o



o

 Complete repair within 30 days.

o Monitored by a weekly visual,
auditory, and olfactory check.

 Apply grease to deteriorating or cracked
gaskets to improve the seal while
awaiting repair.

o Yearly mechanical or instrument
check to detect leaks.

 Delay permissible if repair requires
shutdown or if emissions during repair
would be greater than delay of repair
until shutdown.

o Repair detected significant leaks
in a timely manner.

Conduct on valves, flanges, connectors, storage vessels/storage tanks, and
compressor seals in natural gas or hydrocarbon liquids service

o

If leak detected:

Use of optical gas imaging camera (such as FLIR), gas leak detector, or other leak
detection monitoring devices approved by PADEP.

o

Monthly olfactory, visual and auditory
inspections for defects that could result in
air emissions.
 Within 5 days – make first repair
attempt.

Perform a leak detection and repair (LDAR) program inspection within 60 days after
the well is put into production and an annual inspection thereafter.

If leak is discovered – repair within in 15 days unless facility shutdown is required
or ordering replacement parts are necessary for the repair.
o

Leaks shall be repaired as soon as
possible following detection.137



For storage vessels, leak detection and repair is to be performed in accordance with
NSPS Subpart OOOO.

o



A leak is considered repaired if one of the following can be demonstrated:

Total VOC emissions may not
exceed 10.6 tons per rolling 12month period from fugitive
equipment leaks.138

{J1807517.1}

14

o

No detectable emissions consistent with EPA Method 21 specified in 40 CFR Part
60, Appendix A.

o

A concentration of 2.5% methane or less using a gas leak detector and a VOC
concentration of 500 ppm or less.
No visible leak image when using an optical gas imaging camera.
No bubbling at leak interface using a soap solution bubble test specified in EPA
Method 21.

o

40 C.F.R. § 60.5416(c)
Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11
135 Ohio GP-12, at p.38
136 Id.
137 Ohio GP-12, at p.37
138 Id.
139 WVDEP General Permit G70-A, Section 12

Initial and annual inspection with
an analyzer that meets U.S. EPA
Method 21. 136

Upon written requesting documenting justification – PADEP may grant extension for
leak detection deadlines or repairs.

o

134

o



o

133

 Implement a leak detection and repair
program designed to monitor and
repair leaks from ancillary equipment
and compressors associated with gas
well site production operations.135

Any other method approved in writing by PADEP.

 Compliance with
NSPS Subpart OOOO
inspection
requirements for
storage vessels.139
Center for Sustainable Shale Development
Performance Standards and Regulatory Standards Across the Appalachian Basin
AIR STANDARDS
NO.
14.5

CSSD PERFORMANCE STANDARD

FEDERAL

PENNSYLVANIA

OHIO

WEST VIRGINIA

Well-bore freeze-up emissions

 None.



If facility-wide VOC emissions exceed 2.7 tpy,
Exemption Category No. 38 is not applicable and
Plan Approval (case-by-case BAT) may be
required.140

 None.

 None.

 None.



If facility-wide VOC emissions exceed 2.7 tpy,
Exemption Category No. 38 is not applicable and
Plan Approval (case-by-case BAT) may be
required.141

 None.

 None.

 U.S. EPA regulates engine emissions from highway
heavy-duty vehicles based on the vehicle’s model
year.142



None.143

 None.144

 None.145

 Starting in 2006, highway diesel fuel required to
meet ultra-low sulfur (15ppm of sulfur)
requirement.146



Motor vehicles with gross weight of 10,001 lbs or
more – 5 minute idling limit in any continuous 60minute period.148

 Eliminate VOC emissions associated with the prevention of well-bore
freeze-up (only de minimis emissions are permitted).

14.6

Blowdown emissions
 Existing and new compressors are required to be pressurized when
they are off-line for operational reasons in order to reduce blowdown
emissions.

15.1
15.2

Truck Emission Requirements


By March 20, 2014 - 80% of all trucks used to transport fresh water
or well flowback water must meet U.S. EPA’s Final Emission
Standards for 2007 and Later Model Year Highway Heavy-Duty
Vehicles and Engines for particulate matter (PM) emissions.
 By September 24, 2015 - 95% of all trucks used to transport fresh
wateror well flowback water must meet U.S. EPA’s Final Emission
Standards for 2007 and Later Model Year Highway Heavy-Duty
Vehicles and Engines for particulate matter (PM) emissions.

15.3
15.4

Truck Idling and Fuel Requirements
 All on-road vehicles and equipment - limit unnecessary idling to 5
minutes, or abide by applicable local or state laws if they are more
stringent.
 All on-road and non-road vehicles and equipment - use Ultra-Low
Sulfur Diesel fuel (15 ppm of sulfur) at all times.

 Starting in 2010, diesel produced for use in nonroad engines required to meet ultra-low sulfur
(15ppm of sulfur) requirement.147

Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 1, 8-11
Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 1, 8-11
142 40 C.F.R. Part 86
143 States (except California) are precluded from establishing any emissions limitations other than those required in 40 C.F.R. Part 86. See Clean Air Act Section 209, 42 U.S.C. § 7543.
144 States (except California) are precluded from establishing any emissions limitations other than those required in 40 C.F.R. Part 86. See Clean Air Act Section 209, 42 U.S.C. § 7543.
145 States (except California) are precluded from establishing any emissions limitations other than those required in 40 C.F.R. Part 86. See Clean Air Act Section 209, 42 U.S.C. § 7543.
146 40 C.F.R. Part 80
147 40 C.F.R. Part 80
148 35 P.S. § 4603(a)
149 W. Va. Code § 17C-13A-2
140
141

{J1807517.1}

15

 No state-wide
regulation.

 15-minute idling limit for
diesel-powered motor
vehicles with a gross
vehicle weight of 10,001
lbs or more.149

Más contenido relacionado

La actualidad más candente

Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...Kevin Perry
 
Subsea Survery Presentation
Subsea Survery PresentationSubsea Survery Presentation
Subsea Survery PresentationSubseaTechnology
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Charlie Reith
 
Operation and Maintenance Manual Master SFT WRC-C1 Water Remedial Process System
Operation and Maintenance Manual Master SFT WRC-C1 Water Remedial Process SystemOperation and Maintenance Manual Master SFT WRC-C1 Water Remedial Process System
Operation and Maintenance Manual Master SFT WRC-C1 Water Remedial Process SystemRees Westley
 
Field Experience from a Biotechnology Approach to Water Flood Improvement
Field Experience from a Biotechnology Approach to Water Flood ImprovementField Experience from a Biotechnology Approach to Water Flood Improvement
Field Experience from a Biotechnology Approach to Water Flood ImprovementBill-NewAERO
 
Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...
Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...
Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...LOWaterkeeper
 
Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...
Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...
Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...LOWaterkeeper
 
General Water Permit - Ed Puchi
General Water Permit - Ed PuchiGeneral Water Permit - Ed Puchi
General Water Permit - Ed PuchiAGC of California
 
Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?
Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?
Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?Society of Petroleum Engineers
 
Environmental code of practice for aboveground storage tank containing petrol...
Environmental code of practice for aboveground storage tank containing petrol...Environmental code of practice for aboveground storage tank containing petrol...
Environmental code of practice for aboveground storage tank containing petrol...Jin Chen
 
Thriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van DomelenThriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van DomelenSociety of Petroleum Engineers
 

La actualidad más candente (19)

Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
 
Spe 164580-ms
Spe 164580-msSpe 164580-ms
Spe 164580-ms
 
Subsea Survery Presentation
Subsea Survery PresentationSubsea Survery Presentation
Subsea Survery Presentation
 
Spe 151819-ms
Spe 151819-msSpe 151819-ms
Spe 151819-ms
 
Charles Hinrichsen
Charles HinrichsenCharles Hinrichsen
Charles Hinrichsen
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
 
Spe 123010-ms
Spe 123010-msSpe 123010-ms
Spe 123010-ms
 
Operation and Maintenance Manual Master SFT WRC-C1 Water Remedial Process System
Operation and Maintenance Manual Master SFT WRC-C1 Water Remedial Process SystemOperation and Maintenance Manual Master SFT WRC-C1 Water Remedial Process System
Operation and Maintenance Manual Master SFT WRC-C1 Water Remedial Process System
 
Field Experience from a Biotechnology Approach to Water Flood Improvement
Field Experience from a Biotechnology Approach to Water Flood ImprovementField Experience from a Biotechnology Approach to Water Flood Improvement
Field Experience from a Biotechnology Approach to Water Flood Improvement
 
Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...
Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...
Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...
 
SPE-174119
SPE-174119SPE-174119
SPE-174119
 
Recap final celeus 1
Recap final celeus 1Recap final celeus 1
Recap final celeus 1
 
Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...
Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...
Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...
 
General Water Permit - Ed Puchi
General Water Permit - Ed PuchiGeneral Water Permit - Ed Puchi
General Water Permit - Ed Puchi
 
SPE-164580
SPE-164580SPE-164580
SPE-164580
 
Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?
Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?
Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?
 
Compactsolutionforcso
CompactsolutionforcsoCompactsolutionforcso
Compactsolutionforcso
 
Environmental code of practice for aboveground storage tank containing petrol...
Environmental code of practice for aboveground storage tank containing petrol...Environmental code of practice for aboveground storage tank containing petrol...
Environmental code of practice for aboveground storage tank containing petrol...
 
Thriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van DomelenThriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van Domelen
 

Destacado

Assessing the Impacts of Shale Drilling County Case Studies
Assessing the Impacts of Shale Drilling County Case StudiesAssessing the Impacts of Shale Drilling County Case Studies
Assessing the Impacts of Shale Drilling County Case StudiesMarcellus Drilling News
 
EIA Drilling Productivity Report Nov 2013
EIA Drilling Productivity Report Nov 2013EIA Drilling Productivity Report Nov 2013
EIA Drilling Productivity Report Nov 2013Marcellus Drilling News
 
Understanding the Marcellus Shale Supply Chain
Understanding the Marcellus Shale Supply ChainUnderstanding the Marcellus Shale Supply Chain
Understanding the Marcellus Shale Supply ChainMarcellus Drilling News
 
NTSB Final Report on Columbia Gas Transmission Pipeline Explosion Near Sisson...
NTSB Final Report on Columbia Gas Transmission Pipeline Explosion Near Sisson...NTSB Final Report on Columbia Gas Transmission Pipeline Explosion Near Sisson...
NTSB Final Report on Columbia Gas Transmission Pipeline Explosion Near Sisson...Marcellus Drilling News
 
GE Report: The Age of Gas & The Power of Networks
GE Report: The Age of Gas & The Power of NetworksGE Report: The Age of Gas & The Power of Networks
GE Report: The Age of Gas & The Power of NetworksMarcellus Drilling News
 
EPA: Petroleum Refinery Sector Risk and Technology Review and New Source Perf...
EPA: Petroleum Refinery Sector Risk and Technology Review and New Source Perf...EPA: Petroleum Refinery Sector Risk and Technology Review and New Source Perf...
EPA: Petroleum Refinery Sector Risk and Technology Review and New Source Perf...Marcellus Drilling News
 

Destacado (7)

Assessing the Impacts of Shale Drilling County Case Studies
Assessing the Impacts of Shale Drilling County Case StudiesAssessing the Impacts of Shale Drilling County Case Studies
Assessing the Impacts of Shale Drilling County Case Studies
 
EIA Drilling Productivity Report Nov 2013
EIA Drilling Productivity Report Nov 2013EIA Drilling Productivity Report Nov 2013
EIA Drilling Productivity Report Nov 2013
 
Understanding the Marcellus Shale Supply Chain
Understanding the Marcellus Shale Supply ChainUnderstanding the Marcellus Shale Supply Chain
Understanding the Marcellus Shale Supply Chain
 
NTSB Final Report on Columbia Gas Transmission Pipeline Explosion Near Sisson...
NTSB Final Report on Columbia Gas Transmission Pipeline Explosion Near Sisson...NTSB Final Report on Columbia Gas Transmission Pipeline Explosion Near Sisson...
NTSB Final Report on Columbia Gas Transmission Pipeline Explosion Near Sisson...
 
GE Report: The Age of Gas & The Power of Networks
GE Report: The Age of Gas & The Power of NetworksGE Report: The Age of Gas & The Power of Networks
GE Report: The Age of Gas & The Power of Networks
 
Write technical reports
Write technical reportsWrite technical reports
Write technical reports
 
EPA: Petroleum Refinery Sector Risk and Technology Review and New Source Perf...
EPA: Petroleum Refinery Sector Risk and Technology Review and New Source Perf...EPA: Petroleum Refinery Sector Risk and Technology Review and New Source Perf...
EPA: Petroleum Refinery Sector Risk and Technology Review and New Source Perf...
 

Similar a Center for Sustainable Shale Development Comparison to State/Federal Regulations

Recommended Practices for Pre-Drill Water Supply Surveys in Shale Gas Drilling
Recommended Practices for Pre-Drill Water Supply Surveys in Shale Gas DrillingRecommended Practices for Pre-Drill Water Supply Surveys in Shale Gas Drilling
Recommended Practices for Pre-Drill Water Supply Surveys in Shale Gas DrillingMarcellus Drilling News
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-finalJohn Grover
 
Storm Water manual
Storm Water manualStorm Water manual
Storm Water manualgscplanning
 
Cle thur mou_arapahoe
Cle thur mou_arapahoeCle thur mou_arapahoe
Cle thur mou_arapahoeFaryad Shah
 
WV Study: Air Quality Impacts Occurring from Horizontal Well Drilling and Rel...
WV Study: Air Quality Impacts Occurring from Horizontal Well Drilling and Rel...WV Study: Air Quality Impacts Occurring from Horizontal Well Drilling and Rel...
WV Study: Air Quality Impacts Occurring from Horizontal Well Drilling and Rel...Marcellus Drilling News
 
3 epa elg for const sites ksa 2010 w hidden slides
3 epa elg for const sites ksa 2010 w hidden slides3 epa elg for const sites ksa 2010 w hidden slides
3 epa elg for const sites ksa 2010 w hidden slidesguest7dbf4
 
NJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - MahonNJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - MahonNew Jersey Future
 
design of common hazardous waste treatment, storage and ....
 design of common hazardous waste treatment, storage and .... design of common hazardous waste treatment, storage and ....
design of common hazardous waste treatment, storage and ....arvind kumar
 
Environmental Auditing: Federal Compliance Guide Sample
Environmental Auditing: Federal Compliance Guide SampleEnvironmental Auditing: Federal Compliance Guide Sample
Environmental Auditing: Federal Compliance Guide SampleSpecialty Technical Publishers
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviiihydrologyproject001
 
IMO's Ballast Water Management Convention 2004
IMO's Ballast Water Management Convention 2004IMO's Ballast Water Management Convention 2004
IMO's Ballast Water Management Convention 2004Abdulla Wanis
 
Presentation at wr conference may 13 draft 1 ivs
Presentation at wr conference may 13  draft 1 ivsPresentation at wr conference may 13  draft 1 ivs
Presentation at wr conference may 13 draft 1 ivsIouri Vaisman
 
New Construction Stormwater Regulation in Minnesota
New Construction Stormwater Regulation in MinnesotaNew Construction Stormwater Regulation in Minnesota
New Construction Stormwater Regulation in MinnesotaDan Schleck
 
Stormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 FinalStormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 Finalaearles
 
3 swpp ps for const sites tonning ksa apr 2010
3 swpp ps for const sites   tonning ksa apr 20103 swpp ps for const sites   tonning ksa apr 2010
3 swpp ps for const sites tonning ksa apr 2010guest7dbf4
 
Law / NOC on Ground Water Utilization
Law / NOC on Ground Water UtilizationLaw / NOC on Ground Water Utilization
Law / NOC on Ground Water UtilizationIAAPI HQ
 

Similar a Center for Sustainable Shale Development Comparison to State/Federal Regulations (20)

Recommended Practices for Pre-Drill Water Supply Surveys in Shale Gas Drilling
Recommended Practices for Pre-Drill Water Supply Surveys in Shale Gas DrillingRecommended Practices for Pre-Drill Water Supply Surveys in Shale Gas Drilling
Recommended Practices for Pre-Drill Water Supply Surveys in Shale Gas Drilling
 
SPCC 2015
SPCC 2015SPCC 2015
SPCC 2015
 
Bakken_IPR_Slides
Bakken_IPR_SlidesBakken_IPR_Slides
Bakken_IPR_Slides
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-final
 
Storm Water manual
Storm Water manualStorm Water manual
Storm Water manual
 
Cle thur mou_arapahoe
Cle thur mou_arapahoeCle thur mou_arapahoe
Cle thur mou_arapahoe
 
WV Study: Air Quality Impacts Occurring from Horizontal Well Drilling and Rel...
WV Study: Air Quality Impacts Occurring from Horizontal Well Drilling and Rel...WV Study: Air Quality Impacts Occurring from Horizontal Well Drilling and Rel...
WV Study: Air Quality Impacts Occurring from Horizontal Well Drilling and Rel...
 
Design manual chapter7_revjan_2013
Design manual chapter7_revjan_2013Design manual chapter7_revjan_2013
Design manual chapter7_revjan_2013
 
3 epa elg for const sites ksa 2010 w hidden slides
3 epa elg for const sites ksa 2010 w hidden slides3 epa elg for const sites ksa 2010 w hidden slides
3 epa elg for const sites ksa 2010 w hidden slides
 
NJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - MahonNJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - Mahon
 
design of common hazardous waste treatment, storage and ....
 design of common hazardous waste treatment, storage and .... design of common hazardous waste treatment, storage and ....
design of common hazardous waste treatment, storage and ....
 
Environmental Auditing: Federal Compliance Guide Sample
Environmental Auditing: Federal Compliance Guide SampleEnvironmental Auditing: Federal Compliance Guide Sample
Environmental Auditing: Federal Compliance Guide Sample
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviii
 
IMO's Ballast Water Management Convention 2004
IMO's Ballast Water Management Convention 2004IMO's Ballast Water Management Convention 2004
IMO's Ballast Water Management Convention 2004
 
Presentation at wr conference may 13 draft 1 ivs
Presentation at wr conference may 13  draft 1 ivsPresentation at wr conference may 13  draft 1 ivs
Presentation at wr conference may 13 draft 1 ivs
 
New Construction Stormwater Regulation in Minnesota
New Construction Stormwater Regulation in MinnesotaNew Construction Stormwater Regulation in Minnesota
New Construction Stormwater Regulation in Minnesota
 
Stormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 FinalStormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 Final
 
Well Hydraulics
Well HydraulicsWell Hydraulics
Well Hydraulics
 
3 swpp ps for const sites tonning ksa apr 2010
3 swpp ps for const sites   tonning ksa apr 20103 swpp ps for const sites   tonning ksa apr 2010
3 swpp ps for const sites tonning ksa apr 2010
 
Law / NOC on Ground Water Utilization
Law / NOC on Ground Water UtilizationLaw / NOC on Ground Water Utilization
Law / NOC on Ground Water Utilization
 

Más de Marcellus Drilling News

Five facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strongFive facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strongMarcellus Drilling News
 
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)Marcellus Drilling News
 
Access Northeast Pipeline Project - Dec 2016 Update
Access Northeast Pipeline Project - Dec 2016 UpdateAccess Northeast Pipeline Project - Dec 2016 Update
Access Northeast Pipeline Project - Dec 2016 UpdateMarcellus Drilling News
 
Rover Pipeline Letter to FERC Requesting Final Certificate
Rover Pipeline Letter to FERC Requesting Final CertificateRover Pipeline Letter to FERC Requesting Final Certificate
Rover Pipeline Letter to FERC Requesting Final CertificateMarcellus Drilling News
 
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA CountriesDOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA CountriesMarcellus Drilling News
 
LSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. ManufacturingLSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. ManufacturingMarcellus Drilling News
 
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...Marcellus Drilling News
 
Report: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental ExternalitiesReport: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental ExternalitiesMarcellus Drilling News
 
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015Marcellus Drilling News
 
U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015Marcellus Drilling News
 
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids PlantsVelocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids PlantsMarcellus Drilling News
 
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...Marcellus Drilling News
 
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...Marcellus Drilling News
 
PA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsPA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsMarcellus Drilling News
 
US EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy OutlookUS EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy OutlookMarcellus Drilling News
 
Northeast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical GuideNortheast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical GuideMarcellus Drilling News
 
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee AuditPA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee AuditMarcellus Drilling News
 
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...Marcellus Drilling News
 
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final ReportClyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final ReportMarcellus Drilling News
 
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion ProjectFERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion ProjectMarcellus Drilling News
 

Más de Marcellus Drilling News (20)

Five facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strongFive facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strong
 
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
 
Access Northeast Pipeline Project - Dec 2016 Update
Access Northeast Pipeline Project - Dec 2016 UpdateAccess Northeast Pipeline Project - Dec 2016 Update
Access Northeast Pipeline Project - Dec 2016 Update
 
Rover Pipeline Letter to FERC Requesting Final Certificate
Rover Pipeline Letter to FERC Requesting Final CertificateRover Pipeline Letter to FERC Requesting Final Certificate
Rover Pipeline Letter to FERC Requesting Final Certificate
 
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA CountriesDOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
 
LSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. ManufacturingLSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. Manufacturing
 
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
 
Report: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental ExternalitiesReport: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental Externalities
 
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
 
U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015
 
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids PlantsVelocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
 
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
 
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
 
PA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsPA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas Operations
 
US EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy OutlookUS EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy Outlook
 
Northeast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical GuideNortheast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical Guide
 
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee AuditPA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
 
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
 
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final ReportClyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
 
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion ProjectFERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
 

Último

Foreign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxForeign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxunark75
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeAbdulGhani778830
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest2
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.NaveedKhaskheli1
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdfGerald Furnkranz
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxSasikiranMarri
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptUsmanKaran
 

Último (9)

Foreign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxForeign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptx
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for Justice
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global News
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptx
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.ppt
 

Center for Sustainable Shale Development Comparison to State/Federal Regulations

  • 1. CENTER FOR SUSTAINABLE SHALE DEVELOPMENT PERFORMANCE STANDARDS AND REGULATORY STANDARDS ACROSS THE APPALACHIAN BASIN This document is for general information purposes only and should not be construed as legal advice, legal opinion or any other advice on any specific facts or circumstances. The information in this document is subject to change without notice due to changed circumstances. You should not rely on this information or its applicability to any specific circumstance without first seeking professional advice. Use of the information does not create an attorney-client relationship between the user and Eckert Seamans. Eckert Seamans and contributing authors expressly disclaim all liability to any person in respect of the consequences of anything done or omitted to be done wholly or partly in reliance upon the use or contents of this document. If you have any questions, please contact Erin McDowell at 412.566.6070 or Jessica Sharrow at 412.566.5941.
  • 2. Center for Sustainable Shale Development Performance Standards and Regulatory Standards Across the Appalachian Basin WATER STANDARDS NO. CSSD PERFORMANCE STANDARD PENNSYLVANIA 2.1 Operators shall maintain zero discharge of wastewater (including drilling, flowback and produced waters) to Waters of the Commonwealth of Pennsylvania and other states until such time as CSSD adopts a standard for treating shale wastewater to allow for safe discharge. Such standard will be adopted by September 1, 2014. Note: This standard does not apply to nor prohibit disposal of wastewater by deep well injection.  Operators must control and dispose of wastewater consistent with Pennsylvania’s Clean Streams Law/NPDES program.1  Paragraph (3) requires that the discharge may not contain more than 500 mg/L TDS, 250 mg/L total chlorides, 10 mg/L total barium, 10 mg/L total strontium (monthly average). OHIO Except as provided in paragraph (3) (allowing discharge to POTWS) there may be no discharge of wastewater into waters of this Commonwealth from any source associated with fracturing, production, field exploration, drilling or well completion of natural gas wells.2  1.1 Note: By voluntary agreement with PA DEP, operators agreed to no longer discharge wastewater to POTWs in Pennsylvania. Operators shall maintain a plan to recycle flowback and produced water, for  Recycling allowed; Operators must submit, prior to drilling, usage in drilling or fracturing a well, to the maximum extent possible. a source reduction strategy in connection with flowback and produced waters, or prepare a waste stream characterization. 6  No person shall place or cause to be placed in ground water or in or on the land or discharge or cause to be discharged in surface water brine, crude oil, natural gas, or other fluids associated with the exploration, development, well stimulation, production operations, or plugging of oil and gas resources that causes or could reasonably be anticipated to cause damage or injury to public health or safety or the environment.3  WEST VIRGINIA Land application of brine is permitted.4  Recycling allowed; Operators must submit as part of its drilling permit a plan for disposal of drilling wastewater.7  Operators may dispose of wastewater by underground injection well, NPDES/POTWs, or re-use. Currently, land application of completion returns is prohibited.5  WV DEP strongly encourages operators to recycle flowback and produced wastewater.8  2.2 By September 24, 2014 or date of an operator’s initial application for certification (whichever is later), Operators must recycle a minimum of 90% of the flowback and produced water, by volume, from its wells in all core operating areas in which an Operator is a net water user. No required recycling minimum. No required recycling minimum. Re-use of wastewater must be reported in water management plan.9 No required recycling minimum. 2.3 CSSD will consider a recycling standard for a net water producer within one year. Operators will maximize the use of recycled water to the extent possible during this time. See 2.2 above. See 2.2 above. See 2.2 above. 1 58 Pa. C.S. § 3217 25 Pa. Code § 95.10(b) 3 Ohio Rev. Code § 1509.22 4 Ohio Rev. Code § 1509.226 5 W. Va. Code § 22-6-7; James A. Martin, WVDEP Chief, Completion Returns from the Marcellus Shale formation (July 30, 2013). 6 25 Pa. Code § 287.53 7 Ohio Admin. Code § 1501:9-1-02 8 WVDEP Guidance, Large Volume Water Fracture Treatments (Jan. 8, 2010) 9 W. Va. Code § 22-6A-7; W. Va Code R. § 35-8-5.6 2 {J1807517.1} 1
  • 3. Center for Sustainable Shale Development Performance Standards and Regulatory Standards Across the Appalachian Basin WATER STANDARDS NO. CSSD PERFORMANCE STANDARD 3.1 3.2 3.3 PENNSYLVANIA Any new pits designed shall be double-lined and equipped with leak detection. Operators, by March 20, 2014 or initial date of application for certification (whichever is later), shall contain drilling fluid, when using oil-containing drilling fluids to drill a well, in a closed loop system at the well pad (e.g. no ground pits). Operators, by March 20, 2015 or initial date of application for certification (whichever is later), shall contain drilling fluid and flowback water in a closed loop system at the well pad, eliminating the use of pits for all wells.  Single-lined pits on the well pad permitted.  OHIO Ground pits permitted.13 10 Closed loop system not required, see 3.2 above.  Pits on the well pad must be constructed and maintained to  prevent escape of brine.11 Ground pits permitted.14  Closed loop system not required, see 3.2 above. Closed loop system not required, see 3.2 above. When utilizing an impoundment for the storage of flowback and/or produced waters, Operators shall ensure that free hydrocarbons are removed from the water prior to storage and that new impoundments are double-lined with an impermeable material, equipped with leak detection and take measures to reasonably prevent hazards to wildlife. Total hydrocarbons should be substantially removed. 4.2 Additionally, CSSD will facilitate research designed to determine the extent See 4.1 above. of hydrocarbon emissions from these waters so that by September 1, 2014, a decision can be made as to whether, and to what extent, this standard should be amended. See 4.1 above.  Pits and impoundments holding >5,000 barrels of wastewater must be designed to minimize “adverse environmental effects and to assure safety to the public”.17  Impoundments must be double-lined and equipped with leak detection (including upgradient and downgradient monitoring wells).18 See 4.1 above. 5.1 Operators shall establish an Area of Review (AOR), prior to drilling a well, No Area of Review requirement. which encompasses both the vertical and horizontal legs of the planned well. Within the AOR, the operator must conduct a comprehensive  Note: PA has proposed an area of review risk characterization of subsurface geology, including a risk analysis, that assessment for drilling permits as part of new chapter demonstrates the presence of an adequate confining layer(s) above the 78 regulations. production zone that will prevent adverse migration of hydraulic fracturing fluids. As part of the risk analysis, and before proceeding with hydraulic fracturing, the operator must also conduct a thorough investigation of any active or abandoned wellbores within such area of review or other geologic vulnerabilities (e.g., faults) that penetrate the confining layer and adequately address identified risks. No Area of Review requirement. No Area of Review requirement. Impoundments must be double-lined and equipped with leak detection (including upgradient and downgradient monitoring wells).16 25 Pa. Code § 78.56 Ohio Rev. Code § 1509.22 12 W. Va Code R. § 35-8-12.4 13 25 Pa. Code § 78.56 14 Ohio Rev. Code § 1509.22 15 W. Va Code R. § 35-8-12.4 16 32 P.S. § 693.1; 25 Pa. Code § 105; see also Pennsylvania Design and Construction Standards for Centralized Impoundments. 17 Safety of Centralized Large Pits and Impoundments Used in the Drilling of Horizontal Natural Gas Wells (March 7, 2013). 18 West Virginia Design and Construction Standards for Centralized Pits; W. Va. Code R. § 35-8-16, 17 19 W. Va. Code R. § 35-8-6.2.j. 11 {J1807517.1} 2  Single-lined pits on the well pad permitted.12 Ground pits permitted.15 4.1 10   WEST VIRGINIA  Ohio is currently drafting regulations governing impoundments. Note: Ohio ODNR, as part of each permit application, performs a geological risk analysis and may require an operator to plug or rebuild an abandoned well.  Note: Each well permit, with depth greater than 300 feet must identify all wells within 2,400 feet of the surface location of the new well and 500 feet of the horizontal section of the wellbore.19
  • 4. Center for Sustainable Shale Development Performance Standards and Regulatory Standards Across the Appalachian Basin WATER STANDARDS NO. CSSD PERFORMANCE STANDARD 6.1 6.2 6.3 6.4 7.1 7.2 PENNSYLVANIA OHIO Operators shall develop and implement a plan for monitoring existing water  Pre-drilling water survey may be completed by an operator to  The operator must submit as part of its drilling permit the sources, including aquifers and surface waters within a 2,500 foot radius of avoid a presumption of liability for contamination of a water results of sampling water wells within 1,500 feet of the the wellhead (or greater distance, if a need is clearly indicated by geologic supply within 2,500 feet of the vertical wellbore.20 proposed horizontal wellhead prior to commencement of characterization), and demonstrate that water quality and chemistry measured drilling.21 during a pre-drilling assessment are not impacted by operations. Operators must conduct periodic monitoring for at least one year following No required post-completion water monitoring. No required post-completion water monitoring. completion of the well. Such monitoring must be extended if results indicate potentially adverse impacts on water quality or chemistry by operations. In the event that monitoring establishes a possible link between an Operator’s  PA DEP may issue orders necessary to aid in enforcement of  Ohio DNR shall enforce this chapter and the rules, terms activities and contamination of a water source, the Operator shall develop statutory, regulatory and permit requirements. 23 and conditions of permits and registration certificates, and and implement an investigative plan and, if a positive link is established, orders adopted or issued pursuant thereto. 24 implement a corrective action plan. The testing and monitoring plan should provide for additional monitoring in See 6.1 above. See 6.1 above. the event a well is re-stimulated. Operators shall design and install casing and cement to completely isolate  String(s) of casing shall be run and permanently cemented  A well shall be constructed using sufficient steel or the well and all drilling and produced fluids from surface waters and to prevent migration of gas or fluids into sources of fresh conductor casing in a manner that supports unconsolidated aquifers, to preserve the geologic seal that separates fracture network groundwater.26 sediments, that protects and isolates all underground development from aquifers, and prevent vertical movement of fluids in the sources of drinking water, as identified by ODNR, and that annulus. provides a base for a blowout preventer or other well control equipment that is necessary to control formation pressures and fluids during the drilling of the well and other operations to complete the well. 27 Operators will not use diesel fuel in their hydraulic fracturing fluids. 29 No prohibition on diesel (see foonote 29).  Diesel is permitted below cemented surface casing (see footnote 29).30 20 58 Pa. C.S. § 3218 Ohio Rev. C § 1509.06(A)(8)(c) 22 W. Va. Code § 22-6A-18; W. Va. Code R. § 35-8-15 23 58 Pa. C.S. § 3253; see also 25 Pa. Code § 78.89, 25 Pa. Code § 91.33 24 Ohio Rev. C § 1509.04 25 W. Va. Code § 22-6A-19 26 58 Pa. C.S. § 3217; 25 Pa. Code § 78.71; 25 Pa. Code § 78.81; 25 Pa. Code § 78.83; 25 Pa. Code § 78.83a; 25 Pa. Code § 78.83b; 25 Pa. Code § 78.83c; 25 Pa. Code § 78.84; 25 Pa. Code § 78.85 27 Ohio Rev. Code § 1509.17; Ohio Admin. Code § 1501:9-1-08 28 W. Va. Code § 22-6A-24; W. Va. Code R. § 35-8-5.7, 9.2 29 Federal regulation requires that operators who inject diesel fuels during hydraulic fracturing obtain an Underground Injection Control (UIC) permit prior to injection. This requirement must be met in Pennsylvania, Ohio and West Virginia. 30 Ohio Admin. Code § 1501:9-1-08(C) 21 {J1807517.1} 3 WEST VIRGINIA  Operators must sample and analyze water from any one known and existing well or spring within 1,500 feet of the proposed well.22 No required post-completion water monitoring.  WV DEP is responsible for enforcing offenses to article 6 (oil and gas) or any permit issued pursuant to this article.25 See 6.1 above.  Case and cement horizontal wells to prevent the migration of gas and other fluids into the fresh ground-water and coal seams, and prevent pollution of or diminution of fresh groundwater; installation and use of blow out preventer and other well control equipment.28 No prohibition on diesel (see footnote 29).
  • 5. Center for Sustainable Shale Development Performance Standards and Regulatory Standards Across the Appalachian Basin WATER STANDARDS NO. CSSD PERFORMANCE STANDARD 7.3 PENNSYLVANIA OHIO Operators will publically disclose the chemical constituents intentionally  Operators must submit well completion reports to PA DEP  used in well stimulation fluids. Disclosures will include: information and a chemical disclosure form to Frac Focus with the identifying the well, the operator and the dates of the well stimulation; the following: (i) A descriptive list of the chemical additives in the type and total volume of the base fluid; the type and amount of any stimulation fluids, including any acid, biocide, breaker, brine, proppant; all chemical additive products used in a well stimulation, corrosion inhibitor, crosslinker, demulsifier, friction reducer, including the name under which the product is marketed or sold, the vendor, and a gel, iron control, oxygen scavenger, PH adjusting agent, descriptor of additive's purpose or purposes (e.g. biocide, breaker, corrosion proppant, scale inhibitor and surfactant. (ii) The trade name, inhibitor, etc.); the common name and Chemical Abstracts Service registry vendor and a brief descriptor of the intended use or function number for each chemical ingredient used in a stimulation fluid; the actual of each chemical additive in the stimulation fluid. (iii) A list or maximum concentration of each chemical ingredient, expressed as a of the chemicals intentionally added to the stimulation fluid, percent by mass of the total stimulation fluid. Chemical ingredients should by name and chemical abstract service number. (iv) The be disclosed in a manner that does not link them to their respective chemical maximum concentration, in percent by mass, of each additive products. Disclosure of the above information will be offered to the chemical intentionally added to the stimulation fluid. (v) The relevant state agency and will also be posted on FracFocus.org. If an total volume of the base fluid. (vi) A list of water sources operator, service company or vendor claims that the identity of a chemical used under the approved water management plan and the ingredient is entitled to trade secret protection, the operator will include in its volume of water used. (vii) The pump rates and pressure used disclosures a notation that trade secret protection has been asserted and will in the well. (viii) The total volume of recycled water used.31 instead disclose the relevant chemical family name. Operators will implement measures consistent with state law to assist medical professionals  Trade secret protection available; chemicals covered by trade in quickly obtaining trade secret information from the operator, service secret protections must be provided to medical professional company or vendor holding the trade secret that may be needed for clinical upon execution of a confidentiality agreement.32 diagnosis or treatment purposes. 31 58 Pa. C.S. § 3222 58 Pa. C.S. § 3222.1 33 Ohio Rev. Code § 1509.10(A)(9) 34 W. Va. Code § 22-6A-7; W. Va. Code § 22-6A-7(e)(5); W. Va. Code R. § 35-8-10 32 {J1807517.1} 4 WEST VIRGINIA Operators must submit to the Ohio DNR or Frac Focus the  Operators must submit to WV DEP and following: (a) If applicable, the trade name and the Frac Focus the following: total amount of all products, fluids, and substances, The additives used in the hydraulic and the supplier of each product, fluid, or substance, fracturing or stimulation process, not including cement and its constituents and lost including each additive’s specific trade circulation materials, intentionally added to facilitate the name, supplier, and purpose. The operator drilling of any portion of the well until the surface casing shall also list the chemical components of is set and properly sealed. The owner shall identify each each additive, along with each chemical’s additive used and provide a brief description of the purpose CAS registry number, its maximum for which the additive is used. In addition, the owner shall concentration in the additive, and its include a list of all chemicals, not including any maximum concentration in the fracturing information that is designed as a trade secret pursuant to fluid, including the carrier (base) fluid, and division (I)(1) of this section, intentionally added to all the volume of the carrier fluid used. The products, fluids, or substances and include each chemical’s concentrations shall be expressed as a mass corresponding chemical abstracts service number and the percent. The operator or service provider maximum concentration of each chemical. The owner shall may designate the information regarding obtain the chemical information, not including any chemical components as confidential trade information that is designated as a trade secret pursuant to secrets not to be disclosed by the agency to division (I)(1) of this section, from the company that drilled the general public, but the operator or the well, provided service at the well, or supplied the service provider shall provide that chemicals. If the company that drilled the well, provided information upon request to a health care service at the well, or supplied the chemicals provides professional in a medical emergency or for incomplete or inaccurate chemical information, the owner diagnostic or treatment purposes.34 shall make reasonable efforts to obtain the required information from the company or supplier. (b) For purposes of division (A)(9)(a) of this section, if recycled fluid was used, the total volume of recycled fluid and the well that is the source of the recycled fluid or the centralized facility that is the source of the recycled fluid. 33
  • 6. Center for Sustainable Shale Development Performance Standards and Regulatory Standards Across the Appalachian Basin WATER STANDARDS NO. CSSD PERFORMANCE STANDARD 7.4 7.5 PENNSYLVANIA CSSD will develop a standard relating to the public disclosure of chemicals No requirement. other than well stimulation fluids by September 1, 2013. Operators will also work toward use of more environmentally neutral  Operators must prepare and submit a waste stream source additives for hydraulic fracturing fluid. reduction strategy report.35 OHIO WEST VIRGINIA No requirement. No requirement. No requirement. No requirement. 7.6 Mechanical integrity tests shall be performed when refracturing an existing well.  Operators must conduct quarterly inspections of wells to ensure compliance with well construction and operating requirements. 36  Well pressure testing requirements. 37  Casing must possess an internal pressure rating 20% greater than the anticipated maximum pressure.38 8.1 Operators shall design each well pad to minimize the risk that drilling related fluids and wastes come in contact with surface waters and fresh groundwater.  Unconventional well sites must be designed and constructed to prevent spills to the ground surface or spills off the well site.39  Operators must utilize best management practices in well site construction.40   Operators must implement erosion and sediment control plans and site construction plans in well site development.41 Note: Ohio has proposed more detailed rules in connection with well pad construction which will require engineer  certified plans and Ohio DNR oversight. Signage and security measures at well site required.44  8.2 In preparation for any spill or release event, Operators shall prior to commencement of drilling, develop and implement an emergency response plan, ensure local responders have appropriate training in the event of an emergency, and work with the local governing body, in which the well is located, to verify that local responders have appropriate equipment to respond to an emergency at a well.  Operators must develop and implement an emergency response plan for each well site that provides for equipment, procedures, training and documentation to properly respond to emergencies.43  8.3 In addition, in the event of spill or release, beyond the well pad, operators shall immediately provide notification to the local governing body and any affected landowner.  Operators must immediately notify PA DEP of a spill and downstream users of water.46  35 Operator must provide Ohio EPA verbal notification within  30 minutes of knowledge of the release unless notification within that time frame is impractical due to uncertain circumstances.47 25 Pa. Code § 287.53 25 Pa. Code § 78.88 37 Ohio Admin. Code § 1501:9-1-08(N); Ohio Admin. Code § 1501:9-1-08(D)(3) 38 W. Va. Code R. § 35-8-9.2; West Virginia DEP, Office of Oil and Gas, Casing and Cementing Standards and Best Management Practices (December 10, 2012) 39 58 Pa. C.S. § 3218.2; 25 Pa. Code § 78.53; 25 Pa. Code § 78.55; 25 Pa. Code § 91.34 40 Ohio Admin. Code § 1501:9-1-07 41 W. Va. Code R. § 35-8-5.4, 5.5 42 West Virginia General Water Pollution Control Permit, Stormwater Runoff from Oil and Gas Field Construction (June 13, 2013); W. Va. Code § 22-6A-7(g)(5); W. Va. Code R. § 35-8-9, 18 43 35 Pa. C.S. § 7321; 25 Pa. Code § 78.55 44 Ohio Admin. Code § 1501:9-9-05 45 W. Va. Code § 22-6A-7; W. Va. Code R. § 35-8-5.7 46 25 Pa. Code § 91.33 47 Ohio Admin. Code § 3750-25-25 48 W. Va. Code R. § 35-8-18.9 36 {J1807517.1} 5 Operators must prevent surface and underground water pollution.42 Safety plan must accompany each drilling permit and detail weekly training sessions, location of schools and public buildings within 1 mile radius of the well, and maintain plan to notify affected residents of an emergency event and provide to local emergency responders.45 Operators must immediately notify WV DEP of a spill.48
  • 7. Center for Sustainable Shale Development Performance Standards and Regulatory Standards Across the Appalachian Basin AIR STANDARDS NO. 9 CSSD PERFORMANCE STANDARD FEDERAL49 PENNSYLVANIA50 OHIO51 Reduced Emissions Completions (REC) NSPS Subpart OOOO Exemption Category No. 3858 Current      Beginning on 1/1/14 – direct all pipelinequality gas during completion of development wells and re-completion or workover of any well into a pipeline for sales. Beginning 10/15/12: o  No venting allowed – must be flared in accordance with CSSD Performance Standard No. 10. Acceptable reasons for flaring – low content of flammable gas and safety reasons. o Unacceptable reasons for flaring – i) lack of pipeline connection except for exploratory or extension wells; ii) inadequate water disposal capacity; iii) inadequate or lack of flowback equipment or operating personnel. o o 49 Must capture and direct flowback emissions to a completion combustion device, except in conditions that may result in a fire hazard or explosion.53 Beginning 1/1/15: o  REC equipment required for all wells besides those classified as wildcat, delineation or low pressure. 54 Well drilling, completion and work-over activities are exempted from permitting requirements.59 o  General duty to safely maximize resource recovery and minimize releases to the atmosphere during flowback and subsequent recovery.57  No state-specific REC requirements in addition to NSPS Subpart OOOO.  No state-specific REC requirements in addition to NSPS Subpart OOOO  Flaring required except for gas releases by a properly functioning relief device and gas released by controlled venting for testing, blowing down and cleaning out wells.60  Compliance with NSPS Subpart OOOO requirements is required by General Permit G70-A62; (however, permit is not required to be obtained prior to well completion activities.)63 Open flaring is only allowed under the following circumstances: o Salable quality gas must be routed to the gas flow line “as soon as practicable.”55 Emissions that cannot be directed to the gas flow must be directed to a completion combustion device (e.g., flare) with a continuous ignition source except in conditions that may result in a fire hazard or explosion.56 No state-specific REC requirements in addition to NSPS Subpart OOOO. Flaring used at exploration wells to determine whether oil and/or gas exists in geological formations or to appraise the physical extent, reserves and likely production rate of an oil or gas field. o Flaring used for repair, maintenance, emergency or safety purposes. o WEST VIRGINIA52 Proposed  Natural Gas Completion Permitby-Rule61 – requires compliance with NSPS Subpart OOOO. Flaring used for other operations at a wellhead or facility to comply with 40 CFR Part 60, Subpart OOOO requirements. Compliance with Federal air regulations is required in all states regardless of whether or not a permit is required to be obtained. Additionally, the Federal New Source Performance Standards, 40 C.F.R. Part 60, are self-implementing in Pennsylvania and West Virginia. See 25 Pa. Code § 122.3; W. Va. Code R. § 45-16-4. 50 Pursuant to the Pennsylvania Air Pollution Control Act (APCA), 35 P.S. §4001 et seq. and 25 Pa. Code § 127.14 (relating to exemptions), the Pennsylvania Department of Environmental Protection (PADEP) may determine sources or classes of sources to be exempt from the plan approval and permitting requirements of 25 Pa. Code Chapter 127 (relating to construction, modification, reactivation and operation of sources). If a source does not meet the qualifying criteria for one of PADEP’s Air Quality Permit Exemptions, it is subject to plan approval and permitting requirements (unless a request for determination on a case-by-case basis for an exemption is sought and granted by PADEP). See Pennsylvania’s Air Quality Permit Exemptions. 51 Unless subject to an exemption or a permit-by-rule, a facility that contains an “air contaminant source” is required to obtain either an individual permit-to-install/permit-to-operate or may be eligible for a general permit-to-install/permit-to-operate if one exists. See Ohio Rev. Code § 3704.03(F)(G); Ohio Rev. Code § 3704.011; Ohio Admin. Code § 3745-15-05; Ohio Admin. Code § 3745-31-01; Ohio Admin Code § 3745-31-02; Ohio Admin. Code § 3745-31-03. 52 In West Virginia, a facility that meets the definition of a “stationary source” must obtain either an individual air permit or may be eligible for a general permit if one exists. See W. Va. Code R. § 45-13-2.24; W. Va. Code R. § 45-13-5. 53 40 C.F.R. § 60.5375(a) 54 40 C.F.R. § 60.5375(a) 55 40 C.F.R. § 60.5375(a)(2) 56 40 C.F.R. § 60.5375(a)(3) 57 40 C.F.R. § 60.5375(a)(4) 58 Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11 59 PADEP Frequently Asked Questions, General Permit 5 (GP-5) and Exemption Category No. 38, December 27, 2013, Question/Answer No. 24, at p. 6. 60 Ohio Admin. Code § 1501:9-9-05(B) 61 Ohio’s Draft Natural Gas Completion Draft Permit-by-Rule 62 WVDEP General Permit G70-A, Section 5.1 63 WVDEP Response to Public Comment #33 on General Permit G70-A {J1807517.1} 6
  • 8. Center for Sustainable Shale Development Performance Standards and Regulatory Standards Across the Appalachian Basin AIR STANDARDS NO. 10 CSSD PERFORMANCE STANDARD FEDERAL PENNSYLVANIA OHIO Flaring NSPS Subpart OOOO Exemption Category No. 3865 Current   When flaring is permitted during well completion, re-completions or workovers of any well (pursuant to Standard No. 9) meet the following requirements: Completion combustion devices (e.g. flares) are required to have a continuous ignition source.64 Open flaring during completions requires compliance with NSPS Subpart OOOO. Other Requirements o Raised/elevated flares or engineered combustion device with a reliable continuous ignition source.  Opacity is limited to 20% or greater for an aggregated 3 minute period in any 1 hour, but cannot be equal to or greater than 60% opacity at any time. 66  Requires “properly functioning relief device”67  o 34 tons/yr VOCs. 1.7 tons/yr NOx. 9.3 tons/yr CO. o o Exploratory/Extension wells: flaring no more than 30-days (for life of well). “Temporary” flaring allowed for 30-days before a permit is required.69 o Emissions limitations for completion operations: o o Development well: flaring no more than 14-days (for life of well).  Proposed Natural Gas Completion Permit-byRule68 o o 98% destruction efficiency. 0.82 tons/yr HAP.  64 40 C.F.R § 60.5375(a)(3) Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11 66 25 Pa. Code § 123.41 67 Ohio Admin. Code § 1501:9-9-05(B) 68 Ohio’s Proposed Natural Gas Completion Permit-by-Rule 69 W. Va. Code R. § 45-6-6.1a 70 W. Va. Code R. § 45-6-4.1, 4.3 71 WVDEP General Permit G70-A, Section 5.1.5 72 WVDEP Response to Public Comment #33 on General Permit G70-A 65 7 20% opacity limitation and PM emissions limit set according to a formula70 General Permit G70A: 20% opacity limitation and PM emissions limit set according to a formula.71 o o No visible emissions from flares except for periods not to exceed a total of five minutes during any two consecutive hours. {J1807517.1}  WEST VIRGINIA However, permit is not required to be obtained prior to well completion activities.72
  • 9. Center for Sustainable Shale Development Performance Standards and Regulatory Standards Across the Appalachian Basin AIR STANDARDS NO. 11.1 CSSD PERFORMANCE STANDARD FEDERAL OHIO WEST VIRGINIA Diesel Non-road Drilling Rig Engines  Meet EPA Tier 2 standards by March 20, 2013.  25% of owner/operator engine utilization (hp) meeting EPA Tier 4 standards for PM by March 20, 2015.  75% of owner/operator engine utilization (hp) meeting EPA Tier 4 standards for PM by September 24, 2015.  95% of owner/operator engine utilization meeting EPA Tier 4 standards for PM by September 24, 2016.  11.2(a) PENNSYLVANIA  U.S. EPA regulates emissions from non-road diesel engines according to varying “tiered” levels based on the engine’s manufacturing date.73  Non-road engines are exempt from permitting requirements under Exemption Category No. 38.75  Non-road engines exempt from permitting requirements provided engines meet 20% opacity limitation.76  Non-road engines are exempt from permitting requirements.77 Use ultra-low sulfur diesel (15 ppm of sulfur) at all times.  Non-road engines are exempt from permitting requirements under Exemption Category No. 38.80  Non-road engines exempt from permitting requirements provided engines meet 20% opacity limitation.81  Non-road engines are exempt from permitting requirements.82  Starting in 2010, diesel produced for use in non-road engines required to meet ultra-low sulfur (15 ppm of sulfur) requirement.74 Diesel Non-road Fracturing Pump Engines  Meet EPA Tier 2 standards by March 20, 2014.  25% of owner/operator engine utilization (hp) meeting EPA Tier 4 standards for PM by September 24, 2015.  75% of owner/operator engine utilization (hp) meeting EPA Tier 4 standards for PM by September 24, 2016.  95% of owner/operator engine utilization meeting EPA Tier 4 standards for PM by September 24, 2017.  Use ultra-low sulfur diesel (15 ppm of sulfur) at all times. 73  U.S. EPA regulates emissions from non-road diesel engines according to varying “tiered” levels based on the engine’s manufacturing date78  Starting in 2010, diesel produced for use in non-road engines required to meet ultra-low sulfur (15 ppm of sulfur) requirement.79 40 C.F.R. Part 89; 40 C.F.R. Part 1039 40 C.F.R. Part 80 75 Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11. Additionally, states are generally precluded from establishing emissions limitations for portable non-road engines. See Clean Air Act Section 209, 42 U.S.C. § 7543. 76 Ohio Admin. Code § 3745-31-03-(A)(1)(pp). Additionally, states are generally precluded from establishing emissions limitations for portable non-road engines. See Clean Air Act Section 209, 42 U.S.C. § 7543. 77 W. Va. Code R. § 45-13-1. Additionally, states are generally precluded from establishing emissions limitations for portable non-road engines. See Clean Air Act Section 209, 42 U.S.C. § 7543. 78 40 C.F.R. Part 89; 40 C.F.R. Part 1039 79 40 C.F.R. Part 80 80 Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11. Additionally, states are generally precluded from establishing emissions limitations for portable non-road engines. See Clean Air Act Section 209, 42 U.S.C. § 7543. 81 Ohio Admin. Code § 3745-31-03-(A)(1)(pp). Additionally, states are generally precluded from establishing emissions limitations for portable non-road engines. See Clean Air Act Section 209, 42 U.S.C. § 7543. 82 W. Va. Code R. § 45-13-1. Additionally, states are generally precluded from establishing emissions limitations for portable non-road engines. See Clean Air Act Section 209, 42 U.S.C. § 7543. 74 {J1807517.1} 8
  • 10. Center for Sustainable Shale Development Performance Standards and Regulatory Standards Across the Appalachian Basin AIR STANDARDS NO. 11.2(b) CSSD PERFORMANCE STANDARD FEDERAL Diesel Heavy-Duty Vehicle Fracturing Pump Engines  50% of engines meeting EPA 2007 and Later Model Year Highway Heavy-Duty Vehicles and Engines emissions standards for PM by March 20, 2013. PENNSYLVANIA  U.S. EPA regulates engine emissions from highway heavy-duty vehicles based on the vehicle’s model year. 83  None.85  WEST VIRGINIA Starting in 2006, highway diesel fuel required to meet ultra-low sulfur (15 ppm of sulfur) requirement.84  80% of engines meeting EPA 2007 and Later Model Year Highway Heavy-Duty Vehicles and Engines emissions standards for PM by September 24, 2017.  OHIO None.86  None.87  Use ultra-low sulfur diesel (15 ppm of sulfur) at all times. 12.1 Existing Compressor Engines  By March 20, 2014 – 1.5 g/hp-hr NOx emission limitation for existing compressor engines greater than 100 hp. NSPS Subpart JJJJ (Standards of Performance for Stationary Spark Ignition Internal Combustion Engines)   Previous Exemption Category No. 38  Applies to constructed, reconstructed, and modified engines after June 12, 2006.88 Emissions limitations for engines manufactured between 2007/2008 and 2010/2011 greater than 100 hp:89 Existing compressor engines (those installed prior to August 10, 2013) – exempt from any permitting or emission limitation requirements if less than 100 hp. Previous GP-5  o 2.0 g/hp-hr for NOx. o 4.0 g/hp-hr for CO. 1.0 g/hp-hr for VOCs. o 2.0 g/hp-hr CO. o 2.0 g/hp-hr VOCs. Compressor engines are also subject to the National Emission Standards for Hazardous Air Pollutants (NESHAP) for Stationary Reciprocating Internal Combustion Engines (RICE) at 40 C.F.R. 63, Subpart ZZZZ (i.e., the “RICE MACT”)90 83 Engines over 100 HP compliance with NSPS Subpart JJJJ. 2.0 g/hp-hr NOx. o  Prior to February 2013 - compressor engines greater than or equal to 100 hp and less than 1500 hp were subject to the previous GP-5 emissions limitations: o Natural Gas Compressor Station General Permit Number G33-A91 40 C.F.R. Part 86 40 C.F.R. Part 80 85 States (except California) are precluded from establishing any emissions limitations other than those required in 40 C.F.R. Part 86. See Clean Air Act Section 209, 42 U.S.C. § 7543. 86 States (except California) are precluded from establishing any emissions limitations other than those required in 40 C.F.R. Part 86. See Clean Air Act Section 209, 42 U.S.C. § 7543 87 States (except California) are precluded from establishing any emissions limitations other than those required in 40 C.F.R. Part 86. See Clean Air Act Section 209, 42 U.S.C. § 7543. Additionally, motor vehicles are exempted from permitting requirements. See W. Va. Code R. § 45-13-1 88 40 C.F.R. § 60.4230 89 40 C.F.R. Part 60, Subpart JJJJ, Table 1 90 40 C.F.R. Part 63, Subpart ZZZZ 91 WVDEP General Permit G33-A, Section 6.0 84 {J1807517.1} 9
  • 11. Center for Sustainable Shale Development Performance Standards and Regulatory Standards Across the Appalachian Basin AIR STANDARDS NO. CSSD PERFORMANCE STANDARD FEDERAL PENNSYLVANIA OHIO WEST VIRGINIA 12.2 “New” Lean-Burn Compressor Engines NSPS Subpart JJJJ (Standards of Performance for Stationary Spark Ignition Internal Combustion Engines) Exemption Category No. 38 (Compressor Engines at the Wellpad)94 Oil and Gas Well-Site Production Operations, General Permit 12 Natural Gas Production Facility Class II General Permit G70-A  Emissions limitations for new, purchased, replacement, reconstructed, or relocated leanburn engines greater than 100 hp:   Emissions limitations for engines manufactured on or after 2010/2011 greater than 100 hp engine models (depending on engine size) 92: o 0.5 g/hp-hr NOx. o 1.0 g/hp-hr for NOx. o 2.0 g/hp-hr CO. o 2.0 g/hp-hr for CO. o 0.7 g/hp-hr VOCs. o 0.7 g/hp-hr for VOCs. Compressor engines are also subject to the National Emission Standards for Hazardous Air Pollutants (NESHAP) for Stationary Reciprocating Internal Combustion Engines (RICE) at 40 C.F.R. 63, Subpart ZZZZ (i.e., the “RICE MACT”)93 GP-5 (Compressor Engines at Natural Gas Compression and/or Processing Facilities) (Feb. 2013)    92 Compressor engines are the wellpad (those installed on or after August 10, 2013) are exempt from permitting requirements under Exemption Category No. 38 provided that: o NOx emissions from stationary internal combustion engines at the wells, and wellheads are less than 100 lbs/hr, 1000 lbs/day, 2.75 tons per ozone season (May 1 to September 30), and 6.6 tons per year on a 12-month rolling basis. o Combined VOC emissions from all the sources at the facility are less than 2.7 tons on a 12-month rolling basis. Additionally, combined HAP emissions at the facility must be less than 1000 lbs of a single HAP or one ton of a combination of HAPs in any consecutive 12-month period. If the VOCs emissions include HAPs, this HAP exemption criteria is met.95 Natural gas fired lean burn less than 100 hp96 o 2.0 g/hp-hr for NOx. o 2.0 g/hp-hr for CO. Natural gas lean burn greater than 100 hp and less than or equal to 500 hp 97 o 1.0 g/hp-hr for NOx. o 2.0 g/hp-hr for CO. o 0.7 g/hp-hr for non- methane/non-ethane hydrocarbons (except formaldehyde). Natural gas lean burn greater than 500 hp98 o 0.5 g/hp-hr for NOx. o 93% reduction for CO. o 0.25 g/hp-hr for non-methane/non-ethane hydrocarbons (except formaldehyde). o 0.05 g/hp-hr for formaldehyde. Engines must comply with NSPS Subpart JJJJ standards.99  Specific emissions limitations:100 o 20% opacity, 6-min average. o Particulate Emissions (PE):  0.310 lb/MMBtu for engines ≤ 600 hp.  0.062 lb/MMBtu for engines > 600 hp. o 2.6 tons of SO2/year. o Total combined engine power less than or equal to 1,300 hp:  2.0 g/hp-hr NOx or 160 ppmvd at 15% O2 for engines ≥ 100 hp.  4.0 g/hp-hr CO or 540 ppmvd at 15% O2 for engines ≥ 100 hp.  1.0 g/hp-hr VOCs or 86 ppmvd at 15% O2 for engines ≥ 100 hp. o Total combined engine power greater than 1,300 hp:101  1.0 g/hp-hr NOx /or 82 ppmvd at 15% O2 for engines ≥ 100 hp.  2.0 g/hp-hr CO/or 270 ppmvd at 15% O2 for engines ≥ 100 hp.  0.7 g/hp-hr VOCs or 60 ppmvd at 15% O2 for engines ≥ 100 hp.  Requires compliance with NSPS Subpart JJJJ.102 40 C.F.R. Part 60, Subpart JJJJ, Table 1 40 C.F.R. Part 63, Subpart ZZZZ 94 Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11 95 This VOC and HAP exemption emission threshold does not include emissions from sources that are approved by DEP in plan approvals or general plan approvals/general operating permits at the facility, nor do they include emissions from sources meeting the criteria specified in Subparagraphs i (components in LDAR), ii (storage vessels/tanks with 95% VOC reduction controls) and iv (allowed flaring activities) in Exemption Category No. 38. See Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11. Additionally, a release from any equipment or component designed by the manufacturer to protect the equipment, controller, or personnel or to prevent ground water contamination, gas migration, or an emergency situation is not required to be included for the VOC emissions threshold of 2.7 tpy. See PADEP Frequently Asked Questions, General Permit 5 (GP-5) and Exemption Category No. 38, December 27, 2013, Question/Answer No. 25, at p. 6. 96 Pennsylvania GP-5 - Natural Gas Compression and/or Processing Facilities, Section B 97 Pennsylvania GP-5 - Natural Gas Compression and/or Processing Facilities, Section B 98 Pennsylvania GP-5 - Natural Gas Compression and/or Processing Facilities, Section B 99 Ohio GP-12, at pp. 12-14 100 Ohio GP-12, at pp. 12-14 101 The total combined total engine horsepower must also be no more than 1,800 hp for the site in order to qualify for Ohio’s GP-12. See Ohio GP-12, at pp. 12. Additionally, where the total combined engine power exceeds 1,300 hp the engines must have a manufacturing date of no earlier than January 1, 2011 for engines less than 500 HP or no earlier than July 1, 2010 for engines 500 hp or greater. Id. 102 WVDEP General Permit G70-A, Section 13 93 {J1807517.1} 10
  • 12. Center for Sustainable Shale Development Performance Standards and Regulatory Standards Across the Appalachian Basin AIR STANDARDS NO. CSSD PERFORMANCE STANDARD FEDERAL PENNSYLVANIA OHIO 12.3 “New” Rich-Burn Compressor Engines Emissions limitations for new, purchased, replacement, reconstructed, or relocated rich-burn engines greater than 100 hp: o 0.3 g/hp-hr NOx. o 2.0 g/hp-hr CO. o 0.7 g/hp-hr VOCSs. NSPS Subpart JJJJ (Standards of Performance for Stationary Spark Ignition Internal Combustion Engines)  Emissions limitations for engines manufactured on or after 2010/2011 greater than 100 hp engine models (depending on engine size):103 o 1.0 g/hp-hr for NOx. o 2.0 g/hp-hr for CO. o 0.7 g/hp-hr for VOCs. Compressor engines are also subject to the National Emission Standards for Hazardous Air Pollutants (NESHAP) for Stationary Reciprocating Internal Combustion Engines (RICE) at 40 C.F.R. 63, Subpart ZZZZ (i.e., the “RICE MACT”)104 Exemption Category No. 38 (Compressor Engines at the Wellpad)105  Compressor engines are the wellpad (those installed on or after August 10, 2013) exempt from permitting where: o NOx emissions from stationary internal combustion engines at the wells, and wellheads are less than 100 lbs/hr, 1000 lbs/day, 2.75 tons per ozone season (May 1 to September 30), and 6.6 tons per year on a 12-month rolling basis. o Combined VOC emissions from all the sources at the facility are less than 2.7 tons on a 12-month rolling basis. Additionally, combined HAP emissions at the facility must be less than 1000 lbs of a single HAP or one ton of a combination of HAPs in any consecutive 12-month period. If the VOCs emissions include HAPs, this HAP exemption criteria is met.106 Oil and Gas Well-Site Production Operations, General Permit 12 Engines must comply with NSPS Subpart JJJJ standards.110  Specific emissions limitations:111 o 20% opacity, 6-min average. o Particulate Emissions (PE):  0.310 lb/MMBtu for engines ≤ 600 hp.  0.062 lb/MMBtu for engines > 600 hp. o 2.6 tons of SO2/year. o Total engine power less than or equal to 1,300 hp:  2.0 g/hp-hr NOx or 160 ppmvd at 15% O2 for engines ≥ 100 hp.  4.0 g/hp-hr CO or 540 ppmvd at 15% O2 for engines ≥ 100 hp.  1.0 g/hp-hr VOCs or 86 ppmvd at 15% O2 for engines ≥ 100 hp. o Total engine power greater than 1,300 hp:112  1.0 g/hp-hr NOx /or 82 ppmvd at 15% O2 for engines ≥ 100 hp.  2.0 g/hp-hr CO/or 270 ppmvd at 15% O2 for engines ≥ 100 hp.  0.7 g/hp-hr VOCs or 60 ppmvd at 15% O2 for engines ≥ 100 hp. 103 Coverage under GP-5 (Compressor Engines at Natural Gas Compression and/or Processing Facilities) (Feb. 2013)  Natural gas fired rich burn less than 100 hp:107 o 2.0 g/hp-hr NOx. o 2.0 g/hp-hr CO.  Natural gas rich burn greater than 100 hp and less than or equal to 500 hp: 108 o 0.25 g/hp-hr NOx. o 0.30 g/hp-hr CO; o 0.2 g/hp-hr for non-methane/non-ethane hydrocarbons (except formaldehyde).  Natural gas rich burn greater than 500 hp: 109 o 0.20 g/hp-hr NOx. o 0.30 g/hp-hr CO. o 0.20 g/hp-hr for non-methane/non-ethane hydrocarbons (except formaldehyde). o 76% reduction for formaldehyde. WEST VIRGINIA Natural Gas Production Facility Class II General Permit G70-A Compliance with NSPS Subpart JJJJ.113 40 C.F.R. Part 60, Subpart JJJJ, Table 1 40 C.F.R. Part 63, Subpart ZZZZ 105 Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11 106 This VOC and HAP exemption emission threshold does not include emissions from sources that are approved by PADEP in plan approvals or general plan approvals/general operating permits at the facility, nor do they include emissions from sources meeting the criteria specified in Subparagraphs i (components in LDAR), ii (storage vessels/tanks with 95% VOC reduction controls) and iv (allowed flaring activities) in Exemption Category No. 38. See Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11. Additionally, a release from any equipment or component designed by the manufacturer to protect the equipment, controller, or personnel or to prevent ground water contamination, gas migration, or an emergency situation is not required to be included for the VOC emissions threshold of 2.7 tpy. See PADEP Frequently Asked Questions, General Permit 5 (GP-5) and Exemption Category No. 38, December 27, 2013, Question/Answer No. 25, at p. 6. 107 Pennsylvania GP-5 - Natural Gas Compression and/or Processing Facilities, Section B 108 Pennsylvania GP-5 - Natural Gas Compression and/or Processing Facilities, Section B 109 Pennsylvania GP-5 - Natural Gas Compression and/or Processing Facilities, Section B 110 Ohio GP-12, at pp. 12-14 111 Ohio GP-12, at pp. 12-14 112 The total combined total engine horsepower must also be no more than 1,800 hp for the site in order to qualify for Ohio’s GP-12. See Ohio GP-12, at pp. 12. Additionally, where the total combined engine power exceeds 1,300 hp the engines must have a manufacturing date of no earlier than January 1, 2011 for engines less than 500 HP or no earlier than July 1, 2010 for engines 500 hp or greater. Id. 113 WVDEP General Permit G70-A, Section 13 104 {J1807517.1} 11
  • 13. Center for Sustainable Shale Development Performance Standards and Regulatory Standards Across the Appalachian Basin AIR STANDARDS NO. 13 CSSD PERFORMANCE STANDARD FEDERAL PENNSYLVANIA OHIO WEST VIRGINIA Storage Vessels NSPS Subpart OOOO Exemption Category No. 38120 Oil and Gas Well-Site Production Operations, General Permit 12 Natural Gas Production Facility Class II General Permit G70-A  By October 15, 2013 – all existing and new individual storage vessels at the wellpad with VOC emissions equal to or greater than 6 tpy must install controls to achieve at least a 95% reduction in VOC emissions.  “New” Group 1 storage vessels (constructed, modified, or reconstructed after August 23, 2011 and before April 12, 2013) that have potential VOC emissions equal to or greater than 6 tons per year (tpy) - at least a 95% reduction in VOC emissions by April 15, 2015.114  “New” Group 2 storage vessels (constructed, modified, or reconstructed after April 12, 2013) that have potential VOC emissions equal to or greater than 6 tons per year (tpy) - at least a 95% reduction in VOC emissions by April 15, 2014 or within 60-days of startup (whichever is later).115   Storage tanks can qualify for the exemption if combined VOC emissions from all the sources at the facility are less than 2.7 tons on a 12-month rolling basis. Combined HAP emissions at the facility must be less than 1000 lbs of a single HAP or one ton of a combination of HAPs in any consecutive 12-month period in order to qualify for the exemption. If the VOCs emissions include HAPs, this HAP exemption criteria is met.121   Control devices (installed to achieve the 95% reduction in VOC emissions discussed above) may be removed if emissions from the storage vessel have been below 4 tpy on an uncontrolled basis for 12 consecutive months.118  Total VOC emissions from all tanks combined at the site (including breathing losses, tank working losses, flash losses and truck loading losses) may not exceed 51.3 tons per rolling 12-month period.122  Requires compliance with NSPS Subpart OOOO123 No de minimis emission threshold per tank as allowed in NSPS Subpart OOOO (i.e., must reduce storage tank/storage vessel VOC emissions by 95% if combined VOC emissions from storage vessels/storage tanks are above 2.7 tpy in order to qualify for exemption). o 6 tpy VOC determination may take into account enforceable limits in an operating permit or other requirement established under a Federal, State, local or tribal authority. 116 o Emissions from a storage vessel that are recovered and routed to a process through a vapor recovery unit (VRU) can be excluded from the 6 tpy VOC determination provided certain requirements are met.117 Storage vessels/storage tanks are exempt from permit requirements if they are equipped with VOC emission controls achieving emission reduction of 95% or greater. o Control device must be reinstalled: (1) if a well feeding the storage vessel undergoes fracturing or refracturing; or (2) the monthly emissions from the uncontrolled storage vessel increase to 4 tpy or greater.119 114 40 C.F.R. § 60.5395(b) 40 C.F.R. § 60.5395(c) 116 40 C.F.R. § 60.5365(e) 117 40 C.F.R. § 60.5365(e) 118 40 C.F.R. § 60.5395(d)(2) 119 40 C.F.R. § 60.5395(d)(2) 120 Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11 121 This VOC and HAP exemption emission threshold does not include emissions from sources that are approved by PADEP in plan approvals or general plan approvals/general operating permits at the facility, nor do they include emissions from sources meeting the criteria specified in Subparagraphs i (components in LDAR), ii (storage vessels/tanks with 95% VOC reduction controls) and iv (allowed flaring activities) in Exemption Category No. 38. See Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11. Additionally, a release from any equipment or component designed by the manufacturer to protect the equipment, controller, or personnel or to prevent ground water contamination, gas migration, or an emergency situation is not required to be included for the VOC emissions threshold of 2.7 tpy. See PADEP Frequently Asked Questions, General Permit 5 (GP-5) and Exemption Category No. 38, December 27, 2013, Question/Answer No. 25, at p. 6. 122 Ohio GP-12, at p. 41 123 WVDEP General Permit G70-A, Section 12.1 115 {J1807517.1} 12
  • 14. Center for Sustainable Shale Development Performance Standards and Regulatory Standards Across the Appalachian Basin AIR STANDARDS NO. 14.1 CSSD PERFORMANCE STANDARD FEDERAL Rod Packing at Reciprocating Compressors NSPS Subpart OOOO  14.2 Change rod packing at all reciprocating compressors (both existing and new), including those at the wellhead, either every 26,000 hours of operation or after 36 months. Pneumatic Controllers  By October 15, 2013, pneumatic controllers (both existing and new): o o 14.3 Low – bleed, with a natural gas bleed rate limit of 6.0 scfh or less.  No state-specific requirements. WEST VIRGINIA  No state-specific requirements.  No state-specific requirements.  “New” reciprocating compressors (those installed after August 23, 2011) – change rod packing either every 26,000 hours of operation or every 36 months as well as new reciprocating compressors.124  Reciprocating compressors located at a well site or an adjacent well site and servicing more than one well site are excluded from this requirement. 125 NSPS Subpart OOOO  “New” pneumatic controllers (those constructed (installed), modified or reconstructed on or after October 15, 2013) located between the wellhead and a natural gas processing plant: bleed rate of 6.0 scfh or less. 126 GP-5 - Natural Gas Compression and/or Processing Facilities   Exception to 6.0 scfh bleed rate – where use of a greater bleed rate is required based on functional needs, including response time, safety and positive actuation.127 New centrifugal compressors may not contain wet oil seals. Replace worn out wet seals on existing centrifugal compressors with dry seals. NSPS Subpart OOOO  For centrifugal compressors installed after August 23, 2011 - must reduce VOC emissions from each centrifugal compressor wet seal fluid degassing system by 95 % or greater.130 o If a control device is used to reduce emissions, must equip the wet seal fluid degassing system with a cover that meets the requirements of 40 CFR §60.5411(b), that is connected through a closed vent system that meets the requirements of 40 CFR §60.5411(a) and routed to a control device that meets the conditions specified in 40 CFR §60.5412(a), (b) and (c). As an alternative to routing the closed vent system to a control device, may route the closed vent system to a process.  Not applicable to centrifugal compressors located at a well site or at an adjacent well site and servicing more than one well site. 131 124 40 C.F.R. § 60.5385(a) 40 C.F.R. § 60.5365(c) 126 40 C.F.R. § 60.5390(c)(1) 127 40 C.F.R. § 60.5390(a) 128 Pennsylvania GP-5 - Natural Gas Compression and/or Processing Facilities, Section A.3. 129 WVDEP General Permit G70-A, Section 8 130 40 C.F.R. § 60.5380(a) 131 40 C.F.R. § 60.5365(b) 132 Pennsylvania GP-5 - Natural Gas Compression and/or Processing Facilities, Section D 125 {J1807517.1}  OHIO Lists pneumatic controllers as a covered device, however, it contains no state-specific requirements for such controllers.128  No state-specific requirements.  Proposed revisions to Ohio’s Oil and Gas Well-Site Production Operations, General Permit 12 require compliance with Subpart OOOO requirements for pneumatic controllers. Natural Gas Production Facility Class II General Permit G70-A  Requires compliance with NSPS Subpart OOOO requirements for pneumatic controllers.129 Zero bleed when electricity (3-phase electrical power) is on-site. Centrifugal Compressors  PENNSYLVANIA 13 GP-5 - Natural Gas Compression and/or Processing Facilities  Compliance with NSPS Subpart OOOO requirements for centrifugal compressors.132  No state-specific requirements.  No state-specific requirements.
  • 15. Center for Sustainable Shale Development Performance Standards and Regulatory Standards Across the Appalachian Basin AIR STANDARDS NO. 14.4 CSSD PERFORMANCE STANDARD FEDERAL PENNSYLVANIA OHIO WEST VIRGINIA Directed Inspection and Maintenance Program NSPS Subpart OOOO Exemption Category No. 38134 Oil and Gas Well-Site Production Operations, General Permit 12 G70-A  By March 20, 2014 – implement a directed inspection and maintenance program (DI&M) for equipment leaks from all existing and new valves, pump seals, flanges, compressor seals, pressure relief valves, open-ended lines, tanks and other process and operation components that result in fugitive emissions.  Cover and closed vent inspections for “new” storage vessels with potential to emit VOC emissions equal to or greater than 6 tpy.133 o o  o  Complete repair within 30 days. o Monitored by a weekly visual, auditory, and olfactory check.  Apply grease to deteriorating or cracked gaskets to improve the seal while awaiting repair. o Yearly mechanical or instrument check to detect leaks.  Delay permissible if repair requires shutdown or if emissions during repair would be greater than delay of repair until shutdown. o Repair detected significant leaks in a timely manner. Conduct on valves, flanges, connectors, storage vessels/storage tanks, and compressor seals in natural gas or hydrocarbon liquids service o If leak detected: Use of optical gas imaging camera (such as FLIR), gas leak detector, or other leak detection monitoring devices approved by PADEP. o Monthly olfactory, visual and auditory inspections for defects that could result in air emissions.  Within 5 days – make first repair attempt. Perform a leak detection and repair (LDAR) program inspection within 60 days after the well is put into production and an annual inspection thereafter. If leak is discovered – repair within in 15 days unless facility shutdown is required or ordering replacement parts are necessary for the repair. o Leaks shall be repaired as soon as possible following detection.137  For storage vessels, leak detection and repair is to be performed in accordance with NSPS Subpart OOOO. o  A leak is considered repaired if one of the following can be demonstrated: Total VOC emissions may not exceed 10.6 tons per rolling 12month period from fugitive equipment leaks.138 {J1807517.1} 14 o No detectable emissions consistent with EPA Method 21 specified in 40 CFR Part 60, Appendix A. o A concentration of 2.5% methane or less using a gas leak detector and a VOC concentration of 500 ppm or less. No visible leak image when using an optical gas imaging camera. No bubbling at leak interface using a soap solution bubble test specified in EPA Method 21. o 40 C.F.R. § 60.5416(c) Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 8-11 135 Ohio GP-12, at p.38 136 Id. 137 Ohio GP-12, at p.37 138 Id. 139 WVDEP General Permit G70-A, Section 12 Initial and annual inspection with an analyzer that meets U.S. EPA Method 21. 136 Upon written requesting documenting justification – PADEP may grant extension for leak detection deadlines or repairs. o 134 o  o 133  Implement a leak detection and repair program designed to monitor and repair leaks from ancillary equipment and compressors associated with gas well site production operations.135 Any other method approved in writing by PADEP.  Compliance with NSPS Subpart OOOO inspection requirements for storage vessels.139
  • 16. Center for Sustainable Shale Development Performance Standards and Regulatory Standards Across the Appalachian Basin AIR STANDARDS NO. 14.5 CSSD PERFORMANCE STANDARD FEDERAL PENNSYLVANIA OHIO WEST VIRGINIA Well-bore freeze-up emissions  None.  If facility-wide VOC emissions exceed 2.7 tpy, Exemption Category No. 38 is not applicable and Plan Approval (case-by-case BAT) may be required.140  None.  None.  None.  If facility-wide VOC emissions exceed 2.7 tpy, Exemption Category No. 38 is not applicable and Plan Approval (case-by-case BAT) may be required.141  None.  None.  U.S. EPA regulates engine emissions from highway heavy-duty vehicles based on the vehicle’s model year.142  None.143  None.144  None.145  Starting in 2006, highway diesel fuel required to meet ultra-low sulfur (15ppm of sulfur) requirement.146  Motor vehicles with gross weight of 10,001 lbs or more – 5 minute idling limit in any continuous 60minute period.148  Eliminate VOC emissions associated with the prevention of well-bore freeze-up (only de minimis emissions are permitted). 14.6 Blowdown emissions  Existing and new compressors are required to be pressurized when they are off-line for operational reasons in order to reduce blowdown emissions. 15.1 15.2 Truck Emission Requirements  By March 20, 2014 - 80% of all trucks used to transport fresh water or well flowback water must meet U.S. EPA’s Final Emission Standards for 2007 and Later Model Year Highway Heavy-Duty Vehicles and Engines for particulate matter (PM) emissions.  By September 24, 2015 - 95% of all trucks used to transport fresh wateror well flowback water must meet U.S. EPA’s Final Emission Standards for 2007 and Later Model Year Highway Heavy-Duty Vehicles and Engines for particulate matter (PM) emissions. 15.3 15.4 Truck Idling and Fuel Requirements  All on-road vehicles and equipment - limit unnecessary idling to 5 minutes, or abide by applicable local or state laws if they are more stringent.  All on-road and non-road vehicles and equipment - use Ultra-Low Sulfur Diesel fuel (15 ppm of sulfur) at all times.  Starting in 2010, diesel produced for use in nonroad engines required to meet ultra-low sulfur (15ppm of sulfur) requirement.147 Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 1, 8-11 Pennsylvania’s Air Quality Permit Exemptions, Category No. 38, at pp. 1, 8-11 142 40 C.F.R. Part 86 143 States (except California) are precluded from establishing any emissions limitations other than those required in 40 C.F.R. Part 86. See Clean Air Act Section 209, 42 U.S.C. § 7543. 144 States (except California) are precluded from establishing any emissions limitations other than those required in 40 C.F.R. Part 86. See Clean Air Act Section 209, 42 U.S.C. § 7543. 145 States (except California) are precluded from establishing any emissions limitations other than those required in 40 C.F.R. Part 86. See Clean Air Act Section 209, 42 U.S.C. § 7543. 146 40 C.F.R. Part 80 147 40 C.F.R. Part 80 148 35 P.S. § 4603(a) 149 W. Va. Code § 17C-13A-2 140 141 {J1807517.1} 15  No state-wide regulation.  15-minute idling limit for diesel-powered motor vehicles with a gross vehicle weight of 10,001 lbs or more.149