1. Wan-ting Chiang _ Katerina Myrizaki _ Elaine Morales
RECOVERY PLAN FOR
OFUNATO & SATARI
Recovery Stage – Long Term Planning
2. Ofunato, Japan- Masterplan
Guidelines for a Post-Disaster Planning
General
Structure the planning process covering land use planning, physical planning, and strategic planning.
Local government should determine how existing land uses and construction technologies contributed to
disaster impacts and to determine how regulations should be modified to reduce future disaster risk.
Carry out a stakeholder mapping, and structure systematic and meaningful community
participation at all stages of planning.
Integrate relocation areas into the existing fabric of the NEW sites.
For Ofunato
Plan for growth ---- Consolidate unused land ---- Restore Connectivity ---- Create development nodes.
At the sites
Integrate land uses ---- avoid segregation ---- plan for emergency access.
5. MasterPlan
The Guidelines from the Existing plan
1 Recognize the coast area as a
special zoning area.
2 Improve the connections and
transportation networks as
prevention.
3 Relocate Housing to Higher
Land.
4 Encourage the regeneration
of the town with activities.
*acupuncture
6. MasterPlan
The Guidelines from the Proposed Plan
1 Encouraging mix-use instead of
concentrated single land use
zoning
2 Give up sinking coastal area
3 Retrieving facilities and
infrastructure backwards from the
seaside to prevent total destruction
of the city's livelihood.
4 Replacing the idea of high-rise
levee with buffer park(rising
maximum 3m, when the rest of the
flat land is finally raised)
7. MasterPlan
Proposal
1 Zoning
• Buffer park
• Recreational Flooding Zone
• Levee (different location)
• Aquaculture / fish farming
• Mix-use / decentralization
• Tourism / coastal activity hotspot
New
Residential
Area
Sunken Area
Residential
Residential
Original
Touristic
Flexible
Cement Factory
Aguaculture
Fish Market
8. MasterPlan
Proposal
2 Evacuation and connection:
• New motorway junction (near hospital)
• Move the schools
• Wider main roads towards mountain area
• Connect traffic light/sign system to
tsunami/earthquake siren system
New
Residential
Area
Sunken Area
Residential
Residential
Original
Touristic
Flexible
Cement Factory
Aguaculture
Fish Market
14. Tsunami Safety Guidelines
From the masterplan - physical
1 Accept the frequency of tsunamis
and the continuous rising of the
water and setback the border of
Mangroves are remarkably efficient
constructions.
in resisting a tsunami surge.
2 Improve the evacuation paths
from the dangerous zones and
create physical buffers as
prevention.
3 Move to higher land basic
services and housing.
4 Invest in the design tsunami A well maintained forest land at the
shore land is a useful and
resistant structures at hazard zones sustainable buffer for tsunami
and its urban location. impact.
15. Tsunami Safety Guidelines
For the design of the structures – it is not all about floating
Try to avoid the full force impact of the tsunami
and explore new possibilities. A
VS
Building B is safer than
A B Building A, because is not
hit by full force.
Tsunami Safe(r) House
Increase the Porosity of Constructions
16. Tsunami Safety Guidelines
Governance and Regulations
1 Keep on the Education for the Floor pattern at the 3 kilometers
next generations MEMORIAL border.
Support Offices and improve
2 Shoreline monitoring system communications and warning
systems
18. Tsunami Safety Guidelines
Governance and Regulations
3 Include the community in meetings and trainings about tsunami.
4 Create new routes for easy evacuation and improve the existing
ones.