SlideShare una empresa de Scribd logo
1 de 5
Descargar para leer sin conexión
2/5/15
DEPARTMENTOFTHEARMY
84thEngineerBattalion(ConstructionEffects)
142ndEngineerDetachment(Survey&Design)
SchofieldBarracks,HI,96857
G-1
51SHEET: OF
SIZE:SCALE:
D
REVISION:
0
PROJECT NUMBER: DATE:
142:13:
MCBHRIEASBUILT
DRAWNBY:
SSGGALDAMEZ
AS SHOWN
TEAMLEADER:
SQUADLEADER:
CONSTRUCTIONTECH:
CW2ALLEN
SSGGALDAMEZ
SSGGALDAMEZ
CPT SHAFFER
APPROVED BY
S3
SEC T IO N O
I
C
C
REVIEWERNOTES
INDEX OF DRAWINGS
SHT. NO.
G-1
C-1
C-2
C-3
C-4
DESCRIPTION
TITLE SHEET, VICINITY, LOCATION MAPS AND INDEX OF DRAWINGS
OVERALL SITE PLAN
MIT 1,2,3,4
MIT 5,6,7,8
MIT 9 & SACON PAD 1,2
NOTES
VICINITY
LOCATION
K-BAY
TITLEPAGE,SHEETSLIST,LOCATIONSAND
VICINITYMAPSANDINDEXOFDRAWINGS
HI 14-034
MCBH RIE AS BUILT
HI 14-034
241.000
242.000
235.00
240.00
235.00
240.00
230.00
225.00
220.00
215.00
210.00
205.00
230.00
2/5/15
DEPARTMENTOFTHEARMY
84thEngineerBattalion(ConstructionEffects)
142ndEngineerDetachment(Survey&Design)
SchofieldBarracks,HI,96857
C-1
52SHEET: OF
SIZE:SCALE:
D
REVISION:
0
PROJECT NUMBER: DATE:
MCBHRIEASBUILT
OVERALLSITEPLAN
DRAWNBY:
SSGGALDAMEZ
AS SHOWN
TEAMLEADER:
SQUADLEADER:
CONSTRUCTIONTECH:
CW2ALLEN
SSGGALDAMEZ
SSGGALDAMEZ
CPT SHAFFER
APPROVED BY
S3
SEC T IO N O
I
C
C
REVIEWERNOTES
OVERALL SITE PLAN
SCALE:31/128" = 1'-0"
142:13:HI 14-034
OVERALL SITE PLAN
230.00
2/5/15
DEPARTMENTOFTHEARMY
84thEngineerBattalion(ConstructionEffects)
142ndEngineerDetachment(Survey&Design)
SchofieldBarracks,HI,96857
C-2
53SHEET: OF
SIZE:SCALE:
D
REVISION:
0
PROJECT NUMBER: DATE:
MCBHRIEASBUILT
MITS1,2,3,4
DRAWNBY:
SSGGALDAMEZ
AS SHOWN
TEAMLEADER:
SQUADLEADER:
CONSTRUCTIONTECH:
CW2ALLEN
SSGGALDAMEZ
SSGGALDAMEZ
CPT SHAFFER
APPROVED BY
S3
SEC T IO N O
I
C
C
REVIEWERNOTES
MIT 1,2,3,4
SCALE:1 27/256" = 1'-0"
142:13:HI 14-034
2/5/15
DEPARTMENTOFTHEARMY
84thEngineerBattalion(ConstructionEffects)
142ndEngineerDetachment(Survey&Design)
SchofieldBarracks,HI,96857
C-3
54SHEET: OF
SIZE:SCALE:
D
REVISION:
0
PROJECT NUMBER: DATE:
MCBHRIEASBUILT
MIT5,6,7,8
DRAWNBY:
SSGGALDAMEZ
AS SHOWN
TEAMLEADER:
SQUADLEADER:
CONSTRUCTIONTECH:
CW2ALLEN
SSGGALDAMEZ
SSGGALDAMEZ
CPT SHAFFER
APPROVED BY
S3
SEC T IO N O
I
C
C
REVIEWERNOTES
MIT 5,6,7,8
SCALE:253/256" = 1'-0"
142:13:HI 14-034
2/5/15
DEPARTMENTOFTHEARMY
84thEngineerBattalion(ConstructionEffects)
142ndEngineerDetachment(Survey&Design)
SchofieldBarracks,HI,96857
C-4
55SHEET: OF
SIZE:SCALE:
D
REVISION:
0
PROJECT NUMBER: DATE:
MCBHRIEASBUILT
MIT9&SACONPAD1,2
DRAWNBY:
SSGGALDAMEZ
AS SHOWN
TEAMLEADER:
SQUADLEADER:
CONSTRUCTIONTECH:
CW2ALLEN
SSGGALDAMEZ
SSGGALDAMEZ
CPT SHAFFER
APPROVED BY
S3
SEC T IO N O
I
C
C
REVIEWERNOTES
MIT 9 & SACON PAD 1,2
SCALE:1 105/256" = 1'-0"
142:13:HI 14-034

Más contenido relacionado

Similar a KBAY AS BUILT 3FEB15

Galactic Aztec Airframe.PDF
Galactic Aztec Airframe.PDFGalactic Aztec Airframe.PDF
Galactic Aztec Airframe.PDF
Arlindo Bork
 
115.74 120 489.88 600 520.docx
 115.74  120 489.88  600  520.docx 115.74  120 489.88  600  520.docx
115.74 120 489.88 600 520.docx
aryan532920
 
482 LEC 02 Construction Project Scheduling and Control - Bar Charts.pdf
482 LEC 02 Construction Project Scheduling and Control - Bar Charts.pdf482 LEC 02 Construction Project Scheduling and Control - Bar Charts.pdf
482 LEC 02 Construction Project Scheduling and Control - Bar Charts.pdf
SeanCassar1
 
2015_01_28 CORNUTA COLOR ELEVATIONS & BOARD
2015_01_28 CORNUTA COLOR ELEVATIONS & BOARD2015_01_28 CORNUTA COLOR ELEVATIONS & BOARD
2015_01_28 CORNUTA COLOR ELEVATIONS & BOARD
wedway
 
MS0002 - SUPPORT CW. HW. CA
MS0002 - SUPPORT CW. HW. CAMS0002 - SUPPORT CW. HW. CA
MS0002 - SUPPORT CW. HW. CA
Wafik Zakhary
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
Sunit Dhingra
 
Pipe Insulation System_2
Pipe Insulation System_2Pipe Insulation System_2
Pipe Insulation System_2
Wafik Zakhary
 

Similar a KBAY AS BUILT 3FEB15 (20)

TOWER AS BUILT 5 FEB 15
TOWER AS BUILT 5 FEB 15TOWER AS BUILT 5 FEB 15
TOWER AS BUILT 5 FEB 15
 
PROYECTO EN ILUSTRATOR
PROYECTO EN ILUSTRATORPROYECTO EN ILUSTRATOR
PROYECTO EN ILUSTRATOR
 
Galactic Aztec Airframe.PDF
Galactic Aztec Airframe.PDFGalactic Aztec Airframe.PDF
Galactic Aztec Airframe.PDF
 
HXT Gasket installtion tool
HXT Gasket installtion toolHXT Gasket installtion tool
HXT Gasket installtion tool
 
72715-A1
72715-A172715-A1
72715-A1
 
PV Array
PV ArrayPV Array
PV Array
 
12 - SD - SIGNAGE.pdf
12 - SD - SIGNAGE.pdf12 - SD - SIGNAGE.pdf
12 - SD - SIGNAGE.pdf
 
MinterEllison Gold Coast Planning Act Wayfinder
MinterEllison Gold Coast Planning Act WayfinderMinterEllison Gold Coast Planning Act Wayfinder
MinterEllison Gold Coast Planning Act Wayfinder
 
115.74 120 489.88 600 520.docx
 115.74  120 489.88  600  520.docx 115.74  120 489.88  600  520.docx
115.74 120 489.88 600 520.docx
 
SALVACION-SAN-FRANCISCO.pdf road design final
SALVACION-SAN-FRANCISCO.pdf road design finalSALVACION-SAN-FRANCISCO.pdf road design final
SALVACION-SAN-FRANCISCO.pdf road design final
 
482 LEC 02 Construction Project Scheduling and Control - Bar Charts.pdf
482 LEC 02 Construction Project Scheduling and Control - Bar Charts.pdf482 LEC 02 Construction Project Scheduling and Control - Bar Charts.pdf
482 LEC 02 Construction Project Scheduling and Control - Bar Charts.pdf
 
482 LEC 02 Construction Project Scheduling and Control - Bar Charts.pdf
482 LEC 02 Construction Project Scheduling and Control - Bar Charts.pdf482 LEC 02 Construction Project Scheduling and Control - Bar Charts.pdf
482 LEC 02 Construction Project Scheduling and Control - Bar Charts.pdf
 
WCD 1
WCD 1 WCD 1
WCD 1
 
2015_01_28 CORNUTA COLOR ELEVATIONS & BOARD
2015_01_28 CORNUTA COLOR ELEVATIONS & BOARD2015_01_28 CORNUTA COLOR ELEVATIONS & BOARD
2015_01_28 CORNUTA COLOR ELEVATIONS & BOARD
 
Visio arquitectura dcs petrocedeño
Visio arquitectura dcs petrocedeñoVisio arquitectura dcs petrocedeño
Visio arquitectura dcs petrocedeño
 
Farmers Executive Fitness Wilshire Blvd LA CA
Farmers Executive Fitness Wilshire Blvd LA CAFarmers Executive Fitness Wilshire Blvd LA CA
Farmers Executive Fitness Wilshire Blvd LA CA
 
SUB 1
SUB 1SUB 1
SUB 1
 
MS0002 - SUPPORT CW. HW. CA
MS0002 - SUPPORT CW. HW. CAMS0002 - SUPPORT CW. HW. CA
MS0002 - SUPPORT CW. HW. CA
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
 
Pipe Insulation System_2
Pipe Insulation System_2Pipe Insulation System_2
Pipe Insulation System_2
 

KBAY AS BUILT 3FEB15