Millwood Proposed New Firehouse
Lunch & Learn
Presentation to Residents, March 2011
Tonight’s Meeting
!  Brief History
!  Design Parameters
!  Schematic Design
!  Site
!  Landscape Plan
!  Building Elevation
!  Floor Plans
!  Schematic Construction Budget
!  Fiscal Impact
!  Next Steps
The Road to the Bond Vote
Action Date
DEIS Scoping 9/8/09
Pre-Design 3/15/2010
Schematic Design 7/11/2010
DEIS Accepted as Complete 12/6/2010
Public Hearing DEIS 1/12 & 24/2011
Written Comments on DEIS 2/7/2011
FEIS Accepted as Complete 2/28/2011
Statement of Findings Accepted 3/11/2011
New Firehouse Bond Resolution 3/11/2011
BOND VOTE SCHEDULED FOR 4/12/2011
1926 – Station #1 Built for Brockway
Station # built with community
donations
For apparatus smaller than many
of today’s SUVs
1926 – Calvin Coolidge President
Calvin Coolidge was President
1955 – Two Bays Added
1982 – Station #2 Built
Station # 2 Built
to house
modern
apparatus
1990 – Recommend Demolish & Rebuild
Helms report
commissioned.
Recommends
Station #1 be
demolished and
rebuilt
1999 – $1 Purchase
Firefighters
transfer
ownership to
District for $1
2001 – Emergency Repairs
Emergency
repairs to
stabilize load
bearing wall
Firefighters
provide
equipment and
logistic support
at Ground Zero
2007 – Emergency Repairs
Emergency
repairs to
stabilize second
floor and roof
Time for a New Firehouse
Station #1 has outlived
its useful life
Philosophical Approach
!  Build a new firehouse that the community can be
proud of.”
Tom Curley, Resident Expert
!  A functional, safe building providing a professional work
environment
!  A building that respects residents’ tax dollars
!  A building that our pride in our firefighters and that
retains and attracts volunteers
JLN Needs Assessment Study
!  5 Back-in Bays
!  Radio Room
!  Ready Room
!  Offices:
!  Chiefs’ office (3 work stations)
!  Line Officers’ office (2 work stations)
!  Company office (2 work stations)
!  District office (2 work stations)
!  Ladies Aux. office (1 work station)
!  Multi-purpose room (max capacity = 100)
!  Kitchen
!  Membership Room
!  Exercise Room
!  Lobby Space for Antique Apparatus
New firehouse
building program
based on
independent
review of the
Millwood Fire
District and
NFPA standards.
Cost Estimate
Construction Assumptions
"  Building Envelope
!  Standard Concrete Foundation
System (Footings/Piers/Walls)
!  No Basement (Slab on Grade)
!  Structural Steel Frame & Metal Floor
and Roof Decking
!  Exterior Cavity Wall Construction (8”
CMU & Roman Brick Veneer)
!  EPDM Roofing System
!  Energy Efficient Aluminum Curtain
Wall & Window System
!  14’ x 14’ Apparatus Bay Doors
"  Interiors
!  Glazed 8” CMU Walls in Apparatus
Bays
!  Metal Stud & Drywall Interior Walls
"  Interiors (cont.)
!  Spray on Fireproofing on Structural
Steel
!  Skylights in Apparatus Bays
!  Hollow Metal Frames/Doors &
Windows
!  Acoustic Sheetrock & Ceiling Systems
!  Sheet Resilient Flooring
!  Ceramic & Porcelain Tiles
!  Commercial Kitchen
!  2-Stop Elevator
!  Motorized Operable Wall System
!  Metal Lockers/Toilers Accessories Etc.
Construction Assumptions
"  MEP
!  Roof Top A/C Units and Ducted
Systems
!  Fire Protection Sprinkler System
!  Oil-fired Burner and Fin Tube
Radiation
!  Apparatus Bay Radiant Heating
!  Energy Efficient Lighting
Green Initiatives Included
!  Dark Sky Compliant
!  Lighting sensors
!  Focused parking lights
!  Driveway lighting
!  Wetlands Enhancement
!  Pond manages storm water &
encourages biodiversity
!  Bio swales
!  No-Mow Areas
!  Water Mitigation
!  Permeable pavers
!  Grasscrete
!  Paving Surfaces (reduce
heat-sink effect)
!  Permeable pavers
!  Grasscrete
!  Light-colored concrete apron
!  Energy Star Compliant
Construction
!  Insulation, windows,
construction, mechanicals
!  Appliances
!  Building Orientation
!  Significantly Reduced Steep
Slopes Disturbance
Green Alternatives NOT included
!  Green Roof
!  Apparatus Roof
!  Building Roof
!  Solar Hot Water Heating
!  Geothermal Well
!  Photovoltaics
The cost of these alternatives were not financially viable.
Construction Costs
Construction Cost
Building Construction $6,826,308
Site Work $2,334,014
Landscape $528,805
Traffic Light $150,000
Total $9,839,127
Building Cost/SF $379
Construction Cost/SF $546
Construction Costs
Soft & Other Costs
Consultant Fees $1,681,411
Owner Fees $295,000
Testing & Inspection $45,000
Interior Systems &
Furnishings
$100,000
Soft & Other Costs $2,121,411
Total Costs
TOTAL
Construction $9,839,127
Soft Costs & Other Fees $2,121,411
Contingency $1,501,801
TOTAL $13,462,339
• FINANCING TO INCLUDE up to $2.25 million in Capital Reserve, Sale of 108 Millwood Road and 60
Millwood Road and a 25-year Bond.
• Bond = $9.95 million
Fiscal Impact Analysis
Fire District Levy History
Year
Tax Levy
House Value/2010 Assessed Value
$500,000 $750,000 $1,000,000
Tax Rate/
$000 AV
$83,1000 $124,650 $166,200
2011 $1,489,775 $4.57 $380 $570 $760
2010 $1,411,768 $4.33 $360 $540 $720
2009 $1,709,090 $5.17 $429 $644 $859
2008 $1,690,008 $5.15 $428 $642 $856
2007 $1,437,885 $4.32 $360 $538 $718
2006 $1,489,223 $4.42 $367 $551 $735
Source: Westchester.gov and 2010 RAR, 2011 MFD Budget
Long-Range Planning Assumptions
!  Major Purchase Planning
(Equipment Reserve)
!  2010-2025 Apparatus and
Equipment
!  Purchases > $25,000
!  Inflation
!  Operating Expenses: 3%
annual inflation
!  Major Purchase: 3% inflation
between 2012-2014; 5%
inflation between 2017-2020;
7% inflation 2023-2025
!  LOSAP reasonably funded
!  Operating Budget Base =
2010
!  Station #1 utilities & grounds
costs increase by 50% once
new firehouse complete
!  Bond
!  Rating AA
!  Rate = 4.25%
!  Term = 25 Years
!  Short-Term Financing
!  Rate = 1%
!  Term = 2 Years
!  All Volunteer Fire Company
Major Equipment Purchase
Vehicle Cost ($ 2010)
Purchase
Year
Years in Service
Chief’s Car $58,000 2010 11
Mini Attack $325,000 2010 21
Cascade/Compressor $65,000 2012 22
Chief’s Car $58,000 2012 10
Rescue/Engine* $650,000 2014 24
Chief’s Car $58,000 2015 10
Tanker $675,000 2018 24
E-247* $600,000 2020 23
E-248 $600,000 2024 20
TOTAL $3,089,000 **$167,000 annual contribution
to ER is budgeted
** The Board is considering a combined rescue pumper that saves money
with no loss of safety. That evaluation is not complete as of this meeting.
Risks to Projections
!  “Combo” or “career” firefighting force is required
!  Bond interest rate increase
!  Cost of ConEd easement
!  Environmental mitigation at Station #1
!  Additional LOSAP funding required
10-YEAR LEVY PROJECTION
YEAR
OPERATING
BUDGET
EQUIP
RESERVE
CAPITAL
RESERVE
LONG TERM
FINANCING
SHORT
TERM
FINANCING
TOTAL % Change
Avg.
2007-2010
$711,000* $240,000 $691,000 – – $1,661,000 –
2011 $639,766** $100,000 $750,000 $0 $9,000 $1,489,775 5%
2012 $738,021*** $167,000 $50,000 $656,600 $18,000 $1,629,621 9%
2013 $778,162 $167,000 $50,000 $656,600 $1,651,762 1%
2014 $801,506 $167,000 $50,000 $656,600 $1,675,106 1%
2015 $825,552 $167,000 $50,000 $656,600 $1,699,152 1%
2016 $850,318 $167,000 $50,000 $656,600 $1,723,918 1%
2017 $875,828 $167,000 $50,000 $656,600 $1,749,428 1%
2018 $902,103 $167,000 $50,000 $656,600 $1,775,703 2%
2019 $929,166 $167,000 $50,000 $656,600 $1,802,766 2%
2020 $957,041 $167,000 $50,000 $656,600 $1,830,641 2%
• 2010 Operating Expense; ** 2011 Budget; *** 2012 + $18,000 for increased heat, electricity, grounds
• Note: 2011 increase of 5 % versus 2010
10-Year Fiscal Impact Projection
Year
Tax Levy
Tax Rate/
$000 AV
House Value/Levy
$500,000 $750,000 $1,000,000
Avg.
2007-2010
$1,661,000 $5.09 $423.35 $635.02 $846.69
2011 $1,489,755 $4.58 $380.00 $570.00 $760.00
2012 $1,629,621 $5.00 $415.35 $623.02 $830.70
2013 $1,651,762 $5.07 $420.99 $631.49 $841.98
2014 $1,675,106 $5.14 $426.94 $640.41 $853.88
2015 $1,699,152 $5.21 $433.07 $649.60 $866.14
2016 $1,723,918 $5.29 $439.38 $659.07 $878.76
2017 $1,749,428 $5.37 $445.88 $668.83 $891.77
2018 $1,775,703 $5.45 $452.58 $678.87 $905.16
2019 $1,802,766 $5.53 $459.48 $689.22 $918.96
2020 $1,830,641 $5.61 $466.58 $699.87 $933.17
10-Year Fiscal Impact By Parcel Quartile
Quartile 1 Quartile 2 Quartile 3 Quartile 4
Parcels 487 487 487 487
% of AV 9% 18% 26% 47%
Median AV $59,250 $120,000 $163,800 $260,000
Residential MV $356,598 $722,021 $986,560 $1,564,380
2007-2010 Tax Rate $5.09 $5.09 $5.09 $5.09
2007-2010 Avg. Levy $301.58 $610.9 $833.74 $1,323.40
2020 Tax Rate $5.69 $5.69 $5.69 $5.69
2020 Levy $332.39 $673.20 $932.02 $1,479.40
Median Levy Variance
2020 v. 2010
$30.81 $62.30 $98.28 $156.00
% Change 2020 Levy v.. Avg. 2007-2010 Levy = 12%
Fiscal Impact Summary
!  The new firehouse impact is tax neutral
!  It is a good time to borrow – interest rates are low
!  The Millwood Fire District tax levy will not exceed the
2007-2010 average until 2014
!  The District anticipates a 1-2% per year increase in tax levy
driven by inflation on the operating budget using reasonable
assumptions
!  Retaining an all-volunteer fire department is the most cost
effective approach for the District
!  Going “combo” would increase taxes by $400,00 - $800,000
based on staffing needs
!  Going “paid” would increase taxes by $2.5 - $3.2 million
“Build a new firehouse that the
community can be proud of.”
!  A functional, safe building providing a professional
workspace
!  Space requirements based on JLN needs assessment study of
the Millwood Fire District using NFPA standards
!  Design input from SCN, the nation’s leading firematic consultant
!  Millwood Fire Company an equal partner in program and design
development
!  Site plan and internal layout emphasizes firematic efficiency
“Build a new firehouse that the
community can be proud of.”
!  A building that respects residents’ tax dollars
!  Site plan minimizes work on a challenging property
!  High-quality, proven construction
!  Honest, straightforward materials and finishes
!  Energy efficiency, durability and low maintenance are priorities
!  Building designed to retain and attract volunteer manpower (but
allows for conversion should a career force become needed)
!  Design plan allows for additional bay – future expansion
!  Building designed to beat or meet strict budget parameters
which keep construction “tax neutral”
“Build a new firehouse that the
community can be proud of.”
!  A building that shows pride in our volunteer
firefighters
!  Distinctive appearance
!  Safe, efficient and modern work environment
!  Comfortable, practical amenities promoting morale
!  New firehouse is a “draw” in a competitive environment for
committed volunteer firefighters
!  Improved interior training facilities
!  All-weather bailout training, mass confidence course,
flexible classroom space
!  Firehouse reflects our community’s support for all-volunteer
MFC Company #1
Questions?
Please share your thoughts!
BoFC
PO Box 140
Millwood, NY 10546
millwoodfire@gmail.com
Risks to Projections
Volunteer firefighters save money in addition
to lives and property
!  NFPA recommends a shift of 6 (2 in/2 out + incident commander and
pump operator) for Millwood’s population density
!  Economic demands placed on volunteers living in Millwood may erode
the volunteer base
!  The first-need for career/paid firefighters will be daytime drivers
!  Once a department goes “career”, pressure to go fully-paid is almost
inevitable
Risks to Projections
Volunteer firefighters save money in addition
to lives and property
!  Profile of a full-time career department for Millwood based on NFPA
recommendations:
!  One Chief Officer
!  Two Assistant Chief Officers
!  4 Captain or Lt. Officers
!  8 Drivers/Firefighters (assuming Ladder/Rescue and Engine Company)
!  24 Firefighters (2 firefighters for Engine ops, 4 firefighters for Ladder/Rescue
per Shift)
!  One Administrative Clerk
!  Total 32-40 Employees = $2.5-$3.2 million approx (salary + benefits)

Más contenido relacionado

La actualidad más candente

Coastal Seminar; 2+ Years After Superstorm Sandy...Now What?
Coastal Seminar; 2+ Years After Superstorm Sandy...Now What?Coastal Seminar; 2+ Years After Superstorm Sandy...Now What?
Coastal Seminar; 2+ Years After Superstorm Sandy...Now What?Jim Flanagan
 
SVN Live 03.07.22 Weekly Property Broadcast
SVN Live 03.07.22 Weekly Property BroadcastSVN Live 03.07.22 Weekly Property Broadcast
SVN Live 03.07.22 Weekly Property BroadcastSVN International Corp.
 
Nicola Wealth Real Estate: 2021 Year-End Update
Nicola Wealth Real Estate: 2021 Year-End UpdateNicola Wealth Real Estate: 2021 Year-End Update
Nicola Wealth Real Estate: 2021 Year-End UpdateNicola Wealth
 
SVN Live 03.29.21 Weekly Property Broadcast
SVN Live 03.29.21 Weekly Property BroadcastSVN Live 03.29.21 Weekly Property Broadcast
SVN Live 03.29.21 Weekly Property BroadcastSVN International Corp.
 

La actualidad más candente (6)

Anaerobic Digestion in SC vs NC
Anaerobic Digestion in SC vs NCAnaerobic Digestion in SC vs NC
Anaerobic Digestion in SC vs NC
 
xel_051706c
xel_051706cxel_051706c
xel_051706c
 
Coastal Seminar; 2+ Years After Superstorm Sandy...Now What?
Coastal Seminar; 2+ Years After Superstorm Sandy...Now What?Coastal Seminar; 2+ Years After Superstorm Sandy...Now What?
Coastal Seminar; 2+ Years After Superstorm Sandy...Now What?
 
SVN Live 03.07.22 Weekly Property Broadcast
SVN Live 03.07.22 Weekly Property BroadcastSVN Live 03.07.22 Weekly Property Broadcast
SVN Live 03.07.22 Weekly Property Broadcast
 
Nicola Wealth Real Estate: 2021 Year-End Update
Nicola Wealth Real Estate: 2021 Year-End UpdateNicola Wealth Real Estate: 2021 Year-End Update
Nicola Wealth Real Estate: 2021 Year-End Update
 
SVN Live 03.29.21 Weekly Property Broadcast
SVN Live 03.29.21 Weekly Property BroadcastSVN Live 03.29.21 Weekly Property Broadcast
SVN Live 03.29.21 Weekly Property Broadcast
 

Similar a Lunch and learn 3.19.11 copy

Tim dettlaff presentation fmli nov 13 2014
Tim dettlaff presentation   fmli nov 13 2014Tim dettlaff presentation   fmli nov 13 2014
Tim dettlaff presentation fmli nov 13 2014MikeWorsfold
 
OKIE811 - State of the Company 2017
OKIE811 - State of the Company 2017OKIE811 - State of the Company 2017
OKIE811 - State of the Company 2017Susan Bohl
 
HVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 PresentationHVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 Presentationpennsouthoffice
 
2014 NAIOP Real Estate Challenge Proposal - Gas Works Flats
2014 NAIOP Real Estate Challenge Proposal - Gas Works Flats2014 NAIOP Real Estate Challenge Proposal - Gas Works Flats
2014 NAIOP Real Estate Challenge Proposal - Gas Works Flatsehadden
 
Michael Bowen Oil & Gas Underwriting&Analyzing the Return Potential
Michael Bowen Oil & Gas Underwriting&Analyzing the Return PotentialMichael Bowen Oil & Gas Underwriting&Analyzing the Return Potential
Michael Bowen Oil & Gas Underwriting&Analyzing the Return PotentialMichael Bowen oil and gas
 
Investors seminar 2011 final presentation
Investors seminar 2011 final presentationInvestors seminar 2011 final presentation
Investors seminar 2011 final presentationDafydd Singleton
 
Making the Case for Future Facilities Funding_CAPPA 2015
Making the Case for Future Facilities Funding_CAPPA 2015Making the Case for Future Facilities Funding_CAPPA 2015
Making the Case for Future Facilities Funding_CAPPA 2015Sightlines
 
Zen pitch power point draft 3
Zen pitch power point draft 3Zen pitch power point draft 3
Zen pitch power point draft 3EAN-VT
 
Residential Construction Practices
Residential Construction PracticesResidential Construction Practices
Residential Construction Practicestigerrealestate
 
Funding our future community information session nov 2013
Funding our future community information session nov 2013Funding our future community information session nov 2013
Funding our future community information session nov 2013maitlandyoursay
 
3rd annual Marcus & Millichap / IPA West and Central Florida Multifamily Forum
3rd annual Marcus & Millichap / IPA West and Central Florida Multifamily Forum3rd annual Marcus & Millichap / IPA West and Central Florida Multifamily Forum
3rd annual Marcus & Millichap / IPA West and Central Florida Multifamily ForumRyan Slack
 
User Effective Applications
User Effective ApplicationsUser Effective Applications
User Effective ApplicationsStevegrund
 
2015 Penn South Annual Meeting Financial Presentation
2015 Penn South Annual Meeting Financial Presentation2015 Penn South Annual Meeting Financial Presentation
2015 Penn South Annual Meeting Financial Presentationpennsouthoffice
 
The Economics & Financial Options in Retrofitting Commercial Buildings
The Economics & Financial Options in Retrofitting Commercial BuildingsThe Economics & Financial Options in Retrofitting Commercial Buildings
The Economics & Financial Options in Retrofitting Commercial BuildingsCenter for Sustainable Energy
 
5_2 AGASEC 04/29 /2007
5_2 AGASEC 04/29 /20075_2 AGASEC 04/29 /2007
5_2 AGASEC 04/29 /2007finance26
 
xcel energy 5_2A GASEC04/29/2007
xcel energy  5_2A GASEC04/29/2007xcel energy  5_2A GASEC04/29/2007
xcel energy 5_2A GASEC04/29/2007finance26
 
RV 2014: TOD Market Dreams + Reality by John Breitinger
RV 2014: TOD Market Dreams + Reality by John BreitingerRV 2014: TOD Market Dreams + Reality by John Breitinger
RV 2014: TOD Market Dreams + Reality by John BreitingerRail~Volution
 

Similar a Lunch and learn 3.19.11 copy (20)

Tim dettlaff presentation fmli nov 13 2014
Tim dettlaff presentation   fmli nov 13 2014Tim dettlaff presentation   fmli nov 13 2014
Tim dettlaff presentation fmli nov 13 2014
 
OKIE811 - State of the Company 2017
OKIE811 - State of the Company 2017OKIE811 - State of the Company 2017
OKIE811 - State of the Company 2017
 
HVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 PresentationHVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 Presentation
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
2014 NAIOP Real Estate Challenge Proposal - Gas Works Flats
2014 NAIOP Real Estate Challenge Proposal - Gas Works Flats2014 NAIOP Real Estate Challenge Proposal - Gas Works Flats
2014 NAIOP Real Estate Challenge Proposal - Gas Works Flats
 
FY13 BVSWMA Budget
FY13 BVSWMA BudgetFY13 BVSWMA Budget
FY13 BVSWMA Budget
 
Michael Bowen Oil & Gas Underwriting&Analyzing the Return Potential
Michael Bowen Oil & Gas Underwriting&Analyzing the Return PotentialMichael Bowen Oil & Gas Underwriting&Analyzing the Return Potential
Michael Bowen Oil & Gas Underwriting&Analyzing the Return Potential
 
Investors seminar 2011 final presentation
Investors seminar 2011 final presentationInvestors seminar 2011 final presentation
Investors seminar 2011 final presentation
 
Making the Case for Future Facilities Funding_CAPPA 2015
Making the Case for Future Facilities Funding_CAPPA 2015Making the Case for Future Facilities Funding_CAPPA 2015
Making the Case for Future Facilities Funding_CAPPA 2015
 
Zen pitch power point draft 3
Zen pitch power point draft 3Zen pitch power point draft 3
Zen pitch power point draft 3
 
Residential Construction Practices
Residential Construction PracticesResidential Construction Practices
Residential Construction Practices
 
Funding our future community information session nov 2013
Funding our future community information session nov 2013Funding our future community information session nov 2013
Funding our future community information session nov 2013
 
3rd annual Marcus & Millichap / IPA West and Central Florida Multifamily Forum
3rd annual Marcus & Millichap / IPA West and Central Florida Multifamily Forum3rd annual Marcus & Millichap / IPA West and Central Florida Multifamily Forum
3rd annual Marcus & Millichap / IPA West and Central Florida Multifamily Forum
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
User Effective Applications
User Effective ApplicationsUser Effective Applications
User Effective Applications
 
2015 Penn South Annual Meeting Financial Presentation
2015 Penn South Annual Meeting Financial Presentation2015 Penn South Annual Meeting Financial Presentation
2015 Penn South Annual Meeting Financial Presentation
 
The Economics & Financial Options in Retrofitting Commercial Buildings
The Economics & Financial Options in Retrofitting Commercial BuildingsThe Economics & Financial Options in Retrofitting Commercial Buildings
The Economics & Financial Options in Retrofitting Commercial Buildings
 
5_2 AGASEC 04/29 /2007
5_2 AGASEC 04/29 /20075_2 AGASEC 04/29 /2007
5_2 AGASEC 04/29 /2007
 
xcel energy 5_2A GASEC04/29/2007
xcel energy  5_2A GASEC04/29/2007xcel energy  5_2A GASEC04/29/2007
xcel energy 5_2A GASEC04/29/2007
 
RV 2014: TOD Market Dreams + Reality by John Breitinger
RV 2014: TOD Market Dreams + Reality by John BreitingerRV 2014: TOD Market Dreams + Reality by John Breitinger
RV 2014: TOD Market Dreams + Reality by John Breitinger
 

Último

Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeAbdulGhani778830
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkbhavenpr
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdfGerald Furnkranz
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012ankitnayak356677
 
Experience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendExperience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendFabwelt
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest2
 
Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkbhavenpr
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.NaveedKhaskheli1
 
Quiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsQuiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsnaxymaxyy
 

Último (10)

Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for Justice
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf
 
VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012
 
Experience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendExperience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming Trend
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global News
 
Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpk
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.
 
Quiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsQuiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the rounds
 

Lunch and learn 3.19.11 copy

  • 1. Millwood Proposed New Firehouse Lunch & Learn Presentation to Residents, March 2011
  • 2. Tonight’s Meeting !  Brief History !  Design Parameters !  Schematic Design !  Site !  Landscape Plan !  Building Elevation !  Floor Plans !  Schematic Construction Budget !  Fiscal Impact !  Next Steps
  • 3. The Road to the Bond Vote Action Date DEIS Scoping 9/8/09 Pre-Design 3/15/2010 Schematic Design 7/11/2010 DEIS Accepted as Complete 12/6/2010 Public Hearing DEIS 1/12 & 24/2011 Written Comments on DEIS 2/7/2011 FEIS Accepted as Complete 2/28/2011 Statement of Findings Accepted 3/11/2011 New Firehouse Bond Resolution 3/11/2011 BOND VOTE SCHEDULED FOR 4/12/2011
  • 4. 1926 – Station #1 Built for Brockway Station # built with community donations For apparatus smaller than many of today’s SUVs
  • 5. 1926 – Calvin Coolidge President Calvin Coolidge was President
  • 6. 1955 – Two Bays Added
  • 7. 1982 – Station #2 Built Station # 2 Built to house modern apparatus
  • 8. 1990 – Recommend Demolish & Rebuild Helms report commissioned. Recommends Station #1 be demolished and rebuilt
  • 9. 1999 – $1 Purchase Firefighters transfer ownership to District for $1
  • 10. 2001 – Emergency Repairs Emergency repairs to stabilize load bearing wall Firefighters provide equipment and logistic support at Ground Zero
  • 11. 2007 – Emergency Repairs Emergency repairs to stabilize second floor and roof
  • 12. Time for a New Firehouse Station #1 has outlived its useful life
  • 13. Philosophical Approach !  Build a new firehouse that the community can be proud of.” Tom Curley, Resident Expert !  A functional, safe building providing a professional work environment !  A building that respects residents’ tax dollars !  A building that our pride in our firefighters and that retains and attracts volunteers
  • 14. JLN Needs Assessment Study !  5 Back-in Bays !  Radio Room !  Ready Room !  Offices: !  Chiefs’ office (3 work stations) !  Line Officers’ office (2 work stations) !  Company office (2 work stations) !  District office (2 work stations) !  Ladies Aux. office (1 work station) !  Multi-purpose room (max capacity = 100) !  Kitchen !  Membership Room !  Exercise Room !  Lobby Space for Antique Apparatus New firehouse building program based on independent review of the Millwood Fire District and NFPA standards.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 22. Construction Assumptions "  Building Envelope !  Standard Concrete Foundation System (Footings/Piers/Walls) !  No Basement (Slab on Grade) !  Structural Steel Frame & Metal Floor and Roof Decking !  Exterior Cavity Wall Construction (8” CMU & Roman Brick Veneer) !  EPDM Roofing System !  Energy Efficient Aluminum Curtain Wall & Window System !  14’ x 14’ Apparatus Bay Doors "  Interiors !  Glazed 8” CMU Walls in Apparatus Bays !  Metal Stud & Drywall Interior Walls "  Interiors (cont.) !  Spray on Fireproofing on Structural Steel !  Skylights in Apparatus Bays !  Hollow Metal Frames/Doors & Windows !  Acoustic Sheetrock & Ceiling Systems !  Sheet Resilient Flooring !  Ceramic & Porcelain Tiles !  Commercial Kitchen !  2-Stop Elevator !  Motorized Operable Wall System !  Metal Lockers/Toilers Accessories Etc.
  • 23. Construction Assumptions "  MEP !  Roof Top A/C Units and Ducted Systems !  Fire Protection Sprinkler System !  Oil-fired Burner and Fin Tube Radiation !  Apparatus Bay Radiant Heating !  Energy Efficient Lighting
  • 24. Green Initiatives Included !  Dark Sky Compliant !  Lighting sensors !  Focused parking lights !  Driveway lighting !  Wetlands Enhancement !  Pond manages storm water & encourages biodiversity !  Bio swales !  No-Mow Areas !  Water Mitigation !  Permeable pavers !  Grasscrete !  Paving Surfaces (reduce heat-sink effect) !  Permeable pavers !  Grasscrete !  Light-colored concrete apron !  Energy Star Compliant Construction !  Insulation, windows, construction, mechanicals !  Appliances !  Building Orientation !  Significantly Reduced Steep Slopes Disturbance
  • 25. Green Alternatives NOT included !  Green Roof !  Apparatus Roof !  Building Roof !  Solar Hot Water Heating !  Geothermal Well !  Photovoltaics The cost of these alternatives were not financially viable.
  • 26. Construction Costs Construction Cost Building Construction $6,826,308 Site Work $2,334,014 Landscape $528,805 Traffic Light $150,000 Total $9,839,127 Building Cost/SF $379 Construction Cost/SF $546
  • 27. Construction Costs Soft & Other Costs Consultant Fees $1,681,411 Owner Fees $295,000 Testing & Inspection $45,000 Interior Systems & Furnishings $100,000 Soft & Other Costs $2,121,411
  • 28. Total Costs TOTAL Construction $9,839,127 Soft Costs & Other Fees $2,121,411 Contingency $1,501,801 TOTAL $13,462,339 • FINANCING TO INCLUDE up to $2.25 million in Capital Reserve, Sale of 108 Millwood Road and 60 Millwood Road and a 25-year Bond. • Bond = $9.95 million
  • 30. Fire District Levy History Year Tax Levy House Value/2010 Assessed Value $500,000 $750,000 $1,000,000 Tax Rate/ $000 AV $83,1000 $124,650 $166,200 2011 $1,489,775 $4.57 $380 $570 $760 2010 $1,411,768 $4.33 $360 $540 $720 2009 $1,709,090 $5.17 $429 $644 $859 2008 $1,690,008 $5.15 $428 $642 $856 2007 $1,437,885 $4.32 $360 $538 $718 2006 $1,489,223 $4.42 $367 $551 $735 Source: Westchester.gov and 2010 RAR, 2011 MFD Budget
  • 31. Long-Range Planning Assumptions !  Major Purchase Planning (Equipment Reserve) !  2010-2025 Apparatus and Equipment !  Purchases > $25,000 !  Inflation !  Operating Expenses: 3% annual inflation !  Major Purchase: 3% inflation between 2012-2014; 5% inflation between 2017-2020; 7% inflation 2023-2025 !  LOSAP reasonably funded !  Operating Budget Base = 2010 !  Station #1 utilities & grounds costs increase by 50% once new firehouse complete !  Bond !  Rating AA !  Rate = 4.25% !  Term = 25 Years !  Short-Term Financing !  Rate = 1% !  Term = 2 Years !  All Volunteer Fire Company
  • 32. Major Equipment Purchase Vehicle Cost ($ 2010) Purchase Year Years in Service Chief’s Car $58,000 2010 11 Mini Attack $325,000 2010 21 Cascade/Compressor $65,000 2012 22 Chief’s Car $58,000 2012 10 Rescue/Engine* $650,000 2014 24 Chief’s Car $58,000 2015 10 Tanker $675,000 2018 24 E-247* $600,000 2020 23 E-248 $600,000 2024 20 TOTAL $3,089,000 **$167,000 annual contribution to ER is budgeted ** The Board is considering a combined rescue pumper that saves money with no loss of safety. That evaluation is not complete as of this meeting.
  • 33. Risks to Projections !  “Combo” or “career” firefighting force is required !  Bond interest rate increase !  Cost of ConEd easement !  Environmental mitigation at Station #1 !  Additional LOSAP funding required
  • 34. 10-YEAR LEVY PROJECTION YEAR OPERATING BUDGET EQUIP RESERVE CAPITAL RESERVE LONG TERM FINANCING SHORT TERM FINANCING TOTAL % Change Avg. 2007-2010 $711,000* $240,000 $691,000 – – $1,661,000 – 2011 $639,766** $100,000 $750,000 $0 $9,000 $1,489,775 5% 2012 $738,021*** $167,000 $50,000 $656,600 $18,000 $1,629,621 9% 2013 $778,162 $167,000 $50,000 $656,600 $1,651,762 1% 2014 $801,506 $167,000 $50,000 $656,600 $1,675,106 1% 2015 $825,552 $167,000 $50,000 $656,600 $1,699,152 1% 2016 $850,318 $167,000 $50,000 $656,600 $1,723,918 1% 2017 $875,828 $167,000 $50,000 $656,600 $1,749,428 1% 2018 $902,103 $167,000 $50,000 $656,600 $1,775,703 2% 2019 $929,166 $167,000 $50,000 $656,600 $1,802,766 2% 2020 $957,041 $167,000 $50,000 $656,600 $1,830,641 2% • 2010 Operating Expense; ** 2011 Budget; *** 2012 + $18,000 for increased heat, electricity, grounds • Note: 2011 increase of 5 % versus 2010
  • 35. 10-Year Fiscal Impact Projection Year Tax Levy Tax Rate/ $000 AV House Value/Levy $500,000 $750,000 $1,000,000 Avg. 2007-2010 $1,661,000 $5.09 $423.35 $635.02 $846.69 2011 $1,489,755 $4.58 $380.00 $570.00 $760.00 2012 $1,629,621 $5.00 $415.35 $623.02 $830.70 2013 $1,651,762 $5.07 $420.99 $631.49 $841.98 2014 $1,675,106 $5.14 $426.94 $640.41 $853.88 2015 $1,699,152 $5.21 $433.07 $649.60 $866.14 2016 $1,723,918 $5.29 $439.38 $659.07 $878.76 2017 $1,749,428 $5.37 $445.88 $668.83 $891.77 2018 $1,775,703 $5.45 $452.58 $678.87 $905.16 2019 $1,802,766 $5.53 $459.48 $689.22 $918.96 2020 $1,830,641 $5.61 $466.58 $699.87 $933.17
  • 36. 10-Year Fiscal Impact By Parcel Quartile Quartile 1 Quartile 2 Quartile 3 Quartile 4 Parcels 487 487 487 487 % of AV 9% 18% 26% 47% Median AV $59,250 $120,000 $163,800 $260,000 Residential MV $356,598 $722,021 $986,560 $1,564,380 2007-2010 Tax Rate $5.09 $5.09 $5.09 $5.09 2007-2010 Avg. Levy $301.58 $610.9 $833.74 $1,323.40 2020 Tax Rate $5.69 $5.69 $5.69 $5.69 2020 Levy $332.39 $673.20 $932.02 $1,479.40 Median Levy Variance 2020 v. 2010 $30.81 $62.30 $98.28 $156.00 % Change 2020 Levy v.. Avg. 2007-2010 Levy = 12%
  • 37. Fiscal Impact Summary !  The new firehouse impact is tax neutral !  It is a good time to borrow – interest rates are low !  The Millwood Fire District tax levy will not exceed the 2007-2010 average until 2014 !  The District anticipates a 1-2% per year increase in tax levy driven by inflation on the operating budget using reasonable assumptions !  Retaining an all-volunteer fire department is the most cost effective approach for the District !  Going “combo” would increase taxes by $400,00 - $800,000 based on staffing needs !  Going “paid” would increase taxes by $2.5 - $3.2 million
  • 38. “Build a new firehouse that the community can be proud of.” !  A functional, safe building providing a professional workspace !  Space requirements based on JLN needs assessment study of the Millwood Fire District using NFPA standards !  Design input from SCN, the nation’s leading firematic consultant !  Millwood Fire Company an equal partner in program and design development !  Site plan and internal layout emphasizes firematic efficiency
  • 39. “Build a new firehouse that the community can be proud of.” !  A building that respects residents’ tax dollars !  Site plan minimizes work on a challenging property !  High-quality, proven construction !  Honest, straightforward materials and finishes !  Energy efficiency, durability and low maintenance are priorities !  Building designed to retain and attract volunteer manpower (but allows for conversion should a career force become needed) !  Design plan allows for additional bay – future expansion !  Building designed to beat or meet strict budget parameters which keep construction “tax neutral”
  • 40. “Build a new firehouse that the community can be proud of.” !  A building that shows pride in our volunteer firefighters !  Distinctive appearance !  Safe, efficient and modern work environment !  Comfortable, practical amenities promoting morale !  New firehouse is a “draw” in a competitive environment for committed volunteer firefighters !  Improved interior training facilities !  All-weather bailout training, mass confidence course, flexible classroom space !  Firehouse reflects our community’s support for all-volunteer MFC Company #1
  • 42. Please share your thoughts! BoFC PO Box 140 Millwood, NY 10546 millwoodfire@gmail.com
  • 43. Risks to Projections Volunteer firefighters save money in addition to lives and property !  NFPA recommends a shift of 6 (2 in/2 out + incident commander and pump operator) for Millwood’s population density !  Economic demands placed on volunteers living in Millwood may erode the volunteer base !  The first-need for career/paid firefighters will be daytime drivers !  Once a department goes “career”, pressure to go fully-paid is almost inevitable
  • 44. Risks to Projections Volunteer firefighters save money in addition to lives and property !  Profile of a full-time career department for Millwood based on NFPA recommendations: !  One Chief Officer !  Two Assistant Chief Officers !  4 Captain or Lt. Officers !  8 Drivers/Firefighters (assuming Ladder/Rescue and Engine Company) !  24 Firefighters (2 firefighters for Engine ops, 4 firefighters for Ladder/Rescue per Shift) !  One Administrative Clerk !  Total 32-40 Employees = $2.5-$3.2 million approx (salary + benefits)