Milton Chamber of Commerce
Transportation Milton 2016-2031
Highway 401 Improvements
through Milton
September 17, 2013
Background
• Highway 401 from Trafalgar Road to Regional Road 25
is a six-lane divided freeway with a median barrier.
• Each day approximately 108,000 – 143,000 vehicles use
Highway 401 in Milton.
• Highway 401 in Mississauga currently is a six lane
divided freeway. East of Highway 401/410/403
interchange, a 12-lane express-collector system is in
place.
• Each day approximately 127,000 - 188,000 vehicles use
Highway 401 in Mississauga
Current Status of Highway 401
• To have a complete picture of Highway 401
improvements, need to look at 2 separate areas.
1. Highway 401 through Mississauga
2. Highway 401 through Halton
Map of Highway 401 Through Mississauga
Highway 401 Expansion Through Mississauga
• Highway 401 expansion through the City of Mississauga
is planned, designed and constructed in three segments:
1. Highway 401/410/403 interchange to Hurontario Street (2.3km)
• the expansion of express/collector expansion ($106M) has
been under construction since 2009.
• By end of 2013, this section of the Highway 401 will be
expanded to a 12-lane core/collector system including
provision for HOV lanes in both directions.
1. Hurontario Street to east of Credit River (4.0 km)
• Design is underway for construction start in 2014 with the
widening of Mavis Road bridge.
• When complete, the 12-lane core/collector system will be
extended to west of Mavis Road, including HOV lanes in
both directions, at which time the HOV lanes will be opened.
Highway 401 widening- new express lanes were opened to traffic
on July 5, 2013 in the WB followed by EB opening on July 20, 2013
Hurontario Street bridge was demolished on the weekend of June
25, 2011
The Hurontario basket weave, direct exit from WB Express to
Hurontario, was opened on June 17, 2011
Highway 401 Expansion Through Mississauga
(continue)
3. Credit River to Trafalgar Road (9.7 km)
• The Preliminary Design and Environmental Study for this
section of Highway 401 has received environmental
clearance.
• The recommended plan includes widening Highway 401 to:
– a 12-lane core/collector system from Credit River to Winston
Churchill Boulevard,
– a 10-lane simple freeway from Winston Churchill Boulevard to
407 ETR, and
– a 12-lane core-collector from 407ETR to east of Trafalgar
Road.
– HOV lanes are included in both directions.
Map of Highway 401 Expansion Through Milton
Highway 401 Expansion Through Milton
• Highway 401 expansion through Halton Region is
planned in two segments:
1. Preliminary Design and Environmental Assessment Study from
Trafalgar Road to Regional Road 25 (9.0 km)
• Environmental clearance was received in the summer,
which will allow the Ministry to proceed with property
acquisition and initiate detail designs.
• The recommendations include:
– expansion of this section of Highway 401 from a 6-lane cross-
section to a 12-lane core/collector system between Trafalgar
Road to James Snow Parkway and a 10-lane cross-section
between James Snow Parkway to Regional Road 25;
– reserving the median Lane 1 for HOV traffic in both direction;
Highway 401 Expansion Through Milton
(continue)
• The Highway 401 Study has been aligned with the GTA West
Corridor Study.
• The GTA West Corridor Study is looking at longer term and
interregional transportation needs for an area between
Highway 400 in York Region to Highway 401 in the Regions
of Wellington and Halton.
• The Highway 401 Study provides the base corridor
recommendations to which the GTA West Corridor will be
built upon as part of its on-going Environmental Assessment
Process.
Highway 401 Expansion Through Milton
(continue)
2. Preliminary Design and Environmental Study for Highway 401
Structure Rehabilitation from Trafalgar Road to Halton
Regional Boundary.
• This study is to prepare a strategy to rehabilitate or replace
structures from Trafalgar Road to Halton Regional
Boundary in order to keep structures in good state of repair
and to advance bridge construction for the ultimate 401
widening.
• The strategy will consider upcoming Highway 401 widening
to optimize efficiency, minimize traffic impact and avoid
future throwaways.
• This study is anticipated to be completed by summer 2014.
Thank you
Questions

Más contenido relacionado

La actualidad más candente

20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_awardSamat Jain
 
PIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase IPIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase ISven Maedler
 
Nethermayne Site Planning Application
Nethermayne Site Planning ApplicationNethermayne Site Planning Application
Nethermayne Site Planning Applicationheppellf
 
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...Crosstown TO
 
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011Fairfax County
 
Canalside board update dec 2015
Canalside board update dec 2015Canalside board update dec 2015
Canalside board update dec 2015MetroPR
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open HouseCrosstown TO
 
Cts tradeshow remarks
Cts tradeshow remarksCts tradeshow remarks
Cts tradeshow remarksCrosstown TO
 
Lee Highway, U.S. Route 29 Phase III Widening
Lee Highway, U.S. Route 29 Phase III WideningLee Highway, U.S. Route 29 Phase III Widening
Lee Highway, U.S. Route 29 Phase III WideningFairfax County
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Toronto Public Consultation Unit
 
Second 20 year road plan
Second 20 year road planSecond 20 year road plan
Second 20 year road plan12cl0viren
 
Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017
Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017
Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017Fairfax County
 
Finch MSF EA Consultation July 7, 2014 - MSF specific
Finch MSF EA Consultation July 7, 2014 - MSF specificFinch MSF EA Consultation July 7, 2014 - MSF specific
Finch MSF EA Consultation July 7, 2014 - MSF specificCrosstown TO
 
Route 28 Widening: Citizens Information Meeting - April 3, 2018
Route 28 Widening: Citizens Information Meeting - April 3, 2018Route 28 Widening: Citizens Information Meeting - April 3, 2018
Route 28 Widening: Citizens Information Meeting - April 3, 2018Fairfax County
 

La actualidad más candente (20)

20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
PIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase IPIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase I
 
Nethermayne Site Planning Application
Nethermayne Site Planning ApplicationNethermayne Site Planning Application
Nethermayne Site Planning Application
 
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
 
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011
 
Canalside board update dec 2015
Canalside board update dec 2015Canalside board update dec 2015
Canalside board update dec 2015
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open House
 
Coordinated Transit Planning in Toronto
Coordinated Transit Planning in TorontoCoordinated Transit Planning in Toronto
Coordinated Transit Planning in Toronto
 
Cts tradeshow remarks
Cts tradeshow remarksCts tradeshow remarks
Cts tradeshow remarks
 
Lee Highway, U.S. Route 29 Phase III Widening
Lee Highway, U.S. Route 29 Phase III WideningLee Highway, U.S. Route 29 Phase III Widening
Lee Highway, U.S. Route 29 Phase III Widening
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
 
05.ENTRIPS
05.ENTRIPS05.ENTRIPS
05.ENTRIPS
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
Second 20 year road plan
Second 20 year road planSecond 20 year road plan
Second 20 year road plan
 
Mumbai sewage
Mumbai sewageMumbai sewage
Mumbai sewage
 
Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017
Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017
Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017
 
Finch MSF EA Consultation July 7, 2014 - MSF specific
Finch MSF EA Consultation July 7, 2014 - MSF specificFinch MSF EA Consultation July 7, 2014 - MSF specific
Finch MSF EA Consultation July 7, 2014 - MSF specific
 
Technical Report
Technical ReportTechnical Report
Technical Report
 
Route 28 Widening: Citizens Information Meeting - April 3, 2018
Route 28 Widening: Citizens Information Meeting - April 3, 2018Route 28 Widening: Citizens Information Meeting - April 3, 2018
Route 28 Widening: Citizens Information Meeting - April 3, 2018
 

Similar a Milton Chamber of Commerce Transportation Meeting on Highway 401 Improvements

Eastern Works Open House
Eastern Works Open House Eastern Works Open House
Eastern Works Open House Crosstown TO
 
Transportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton RegionTransportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton RegionMilton Chamber of Commerce
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Crosstown TO
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Toronto Public Consultation Unit
 
Hunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road StudyHunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road StudyFairfax County
 
Transform 66: Inside the Beltway
Transform 66: Inside the BeltwayTransform 66: Inside the Beltway
Transform 66: Inside the BeltwayFairfax County
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018Crosstown TO
 
Central Open House (Chaplin Station to Leaside Station) - spring 2018
Central Open House (Chaplin Station to Leaside Station) - spring 2018Central Open House (Chaplin Station to Leaside Station) - spring 2018
Central Open House (Chaplin Station to Leaside Station) - spring 2018Crosstown TO
 
Mount Pleasant Junior School Meeting May 5
Mount Pleasant Junior School Meeting May 5Mount Pleasant Junior School Meeting May 5
Mount Pleasant Junior School Meeting May 5Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingCrosstown TO
 
Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Crosstown TO
 
Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor WideCrosstown TO
 
Update on Tysons Transportation Projects - April 1, 2020
Update on Tysons Transportation Projects - April 1, 2020Update on Tysons Transportation Projects - April 1, 2020
Update on Tysons Transportation Projects - April 1, 2020Fairfax County
 
Substantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectSubstantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectFairfax County
 
Fall18 Open House Western Segment Works
Fall18 Open House   Western Segment WorksFall18 Open House   Western Segment Works
Fall18 Open House Western Segment WorksCrosstown TO
 

Similar a Milton Chamber of Commerce Transportation Meeting on Highway 401 Improvements (20)

Toronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting PresentationToronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting Presentation
 
2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG
 
Eastern Works Open House
Eastern Works Open House Eastern Works Open House
Eastern Works Open House
 
February Transit Update Presentation
February Transit Update PresentationFebruary Transit Update Presentation
February Transit Update Presentation
 
Transportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton RegionTransportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton Region
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
 
Hunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road StudyHunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road Study
 
Transform 66: Inside the Beltway
Transform 66: Inside the BeltwayTransform 66: Inside the Beltway
Transform 66: Inside the Beltway
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
 
Central Open House (Chaplin Station to Leaside Station) - spring 2018
Central Open House (Chaplin Station to Leaside Station) - spring 2018Central Open House (Chaplin Station to Leaside Station) - spring 2018
Central Open House (Chaplin Station to Leaside Station) - spring 2018
 
Mount Pleasant Junior School Meeting May 5
Mount Pleasant Junior School Meeting May 5Mount Pleasant Junior School Meeting May 5
Mount Pleasant Junior School Meeting May 5
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019
 
Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor Wide
 
Update on Tysons Transportation Projects - April 1, 2020
Update on Tysons Transportation Projects - April 1, 2020Update on Tysons Transportation Projects - April 1, 2020
Update on Tysons Transportation Projects - April 1, 2020
 
Comp Plan - UDO Annual Review
Comp Plan - UDO Annual ReviewComp Plan - UDO Annual Review
Comp Plan - UDO Annual Review
 
Substantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectSubstantial Completion: Lorton Road Project
Substantial Completion: Lorton Road Project
 
15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation
 
Fall18 Open House Western Segment Works
Fall18 Open House   Western Segment WorksFall18 Open House   Western Segment Works
Fall18 Open House Western Segment Works
 

Más de Milton Chamber of Commerce

Más de Milton Chamber of Commerce (11)

Breakfast with Pierre Cléroux, Vice President, Research and Chief Economist a...
Breakfast with Pierre Cléroux, Vice President, Research and Chief Economist a...Breakfast with Pierre Cléroux, Vice President, Research and Chief Economist a...
Breakfast with Pierre Cléroux, Vice President, Research and Chief Economist a...
 
2017 Mayor's Breakfast Presentation
2017 Mayor's Breakfast Presentation2017 Mayor's Breakfast Presentation
2017 Mayor's Breakfast Presentation
 
Anti-Spam Legislation Primer 02.20.14
Anti-Spam Legislation Primer 02.20.14Anti-Spam Legislation Primer 02.20.14
Anti-Spam Legislation Primer 02.20.14
 
Transportation Milton, presentation by Paul Cripps, Town of Milton
Transportation Milton, presentation by Paul Cripps, Town of MiltonTransportation Milton, presentation by Paul Cripps, Town of Milton
Transportation Milton, presentation by Paul Cripps, Town of Milton
 
Canada Chamber Unstuck
Canada Chamber UnstuckCanada Chamber Unstuck
Canada Chamber Unstuck
 
Small Town Rules Canada
Small Town Rules CanadaSmall Town Rules Canada
Small Town Rules Canada
 
Overdrive Social Media
Overdrive Social MediaOverdrive Social Media
Overdrive Social Media
 
Social Media Strategies, Presented by Chris Herbert
Social Media Strategies, Presented by Chris HerbertSocial Media Strategies, Presented by Chris Herbert
Social Media Strategies, Presented by Chris Herbert
 
How to Combat Entrepreneur Struggles and Grow Opportunities
How to Combat Entrepreneur Struggles and Grow Opportunities How to Combat Entrepreneur Struggles and Grow Opportunities
How to Combat Entrepreneur Struggles and Grow Opportunities
 
New Media Marketing, Presentation by Catharine Frith
New Media Marketing, Presentation by Catharine FrithNew Media Marketing, Presentation by Catharine Frith
New Media Marketing, Presentation by Catharine Frith
 
Being unstoppable,Prentation by David Cohen
Being unstoppable,Prentation by David CohenBeing unstoppable,Prentation by David Cohen
Being unstoppable,Prentation by David Cohen
 

Milton Chamber of Commerce Transportation Meeting on Highway 401 Improvements

  • 1. Milton Chamber of Commerce Transportation Milton 2016-2031 Highway 401 Improvements through Milton September 17, 2013
  • 2. Background • Highway 401 from Trafalgar Road to Regional Road 25 is a six-lane divided freeway with a median barrier. • Each day approximately 108,000 – 143,000 vehicles use Highway 401 in Milton. • Highway 401 in Mississauga currently is a six lane divided freeway. East of Highway 401/410/403 interchange, a 12-lane express-collector system is in place. • Each day approximately 127,000 - 188,000 vehicles use Highway 401 in Mississauga
  • 3. Current Status of Highway 401 • To have a complete picture of Highway 401 improvements, need to look at 2 separate areas. 1. Highway 401 through Mississauga 2. Highway 401 through Halton
  • 4. Map of Highway 401 Through Mississauga
  • 5. Highway 401 Expansion Through Mississauga • Highway 401 expansion through the City of Mississauga is planned, designed and constructed in three segments: 1. Highway 401/410/403 interchange to Hurontario Street (2.3km) • the expansion of express/collector expansion ($106M) has been under construction since 2009. • By end of 2013, this section of the Highway 401 will be expanded to a 12-lane core/collector system including provision for HOV lanes in both directions. 1. Hurontario Street to east of Credit River (4.0 km) • Design is underway for construction start in 2014 with the widening of Mavis Road bridge. • When complete, the 12-lane core/collector system will be extended to west of Mavis Road, including HOV lanes in both directions, at which time the HOV lanes will be opened.
  • 6. Highway 401 widening- new express lanes were opened to traffic on July 5, 2013 in the WB followed by EB opening on July 20, 2013
  • 7. Hurontario Street bridge was demolished on the weekend of June 25, 2011
  • 8. The Hurontario basket weave, direct exit from WB Express to Hurontario, was opened on June 17, 2011
  • 9. Highway 401 Expansion Through Mississauga (continue) 3. Credit River to Trafalgar Road (9.7 km) • The Preliminary Design and Environmental Study for this section of Highway 401 has received environmental clearance. • The recommended plan includes widening Highway 401 to: – a 12-lane core/collector system from Credit River to Winston Churchill Boulevard, – a 10-lane simple freeway from Winston Churchill Boulevard to 407 ETR, and – a 12-lane core-collector from 407ETR to east of Trafalgar Road. – HOV lanes are included in both directions.
  • 10. Map of Highway 401 Expansion Through Milton
  • 11. Highway 401 Expansion Through Milton • Highway 401 expansion through Halton Region is planned in two segments: 1. Preliminary Design and Environmental Assessment Study from Trafalgar Road to Regional Road 25 (9.0 km) • Environmental clearance was received in the summer, which will allow the Ministry to proceed with property acquisition and initiate detail designs. • The recommendations include: – expansion of this section of Highway 401 from a 6-lane cross- section to a 12-lane core/collector system between Trafalgar Road to James Snow Parkway and a 10-lane cross-section between James Snow Parkway to Regional Road 25; – reserving the median Lane 1 for HOV traffic in both direction;
  • 12. Highway 401 Expansion Through Milton (continue) • The Highway 401 Study has been aligned with the GTA West Corridor Study. • The GTA West Corridor Study is looking at longer term and interregional transportation needs for an area between Highway 400 in York Region to Highway 401 in the Regions of Wellington and Halton. • The Highway 401 Study provides the base corridor recommendations to which the GTA West Corridor will be built upon as part of its on-going Environmental Assessment Process.
  • 13. Highway 401 Expansion Through Milton (continue) 2. Preliminary Design and Environmental Study for Highway 401 Structure Rehabilitation from Trafalgar Road to Halton Regional Boundary. • This study is to prepare a strategy to rehabilitate or replace structures from Trafalgar Road to Halton Regional Boundary in order to keep structures in good state of repair and to advance bridge construction for the ultimate 401 widening. • The strategy will consider upcoming Highway 401 widening to optimize efficiency, minimize traffic impact and avoid future throwaways. • This study is anticipated to be completed by summer 2014.