SlideShare una empresa de Scribd logo
1 de 16
Table of Contents Acknowledgement Introduction Body of the Report Method Instruments Project Work Problems Observations Observation Table Pictures Conclusion Aims Conclusion Contour Map with Radial Lines Contour Map Names of Students Acknowledgement We owe a great many thanks to Sir Asim (Lecturer), who gave us the opportunity of implementing our skills in a project. This project means a lot to us as it gave us a lot of experience. We also thank the faculty of Surveying Lab, who co-operated with us in the matter of instruments. We would also like to thank our Vice Chancellor, Dean of Faculty and our University for giving us such great opportunities. Introduction Relief on a map enhances its utility. A map without relief representation is simply a plan on which relative positions of details are only shown in horizontal plane. Relative heights of various points on the map can be represented by many methods and one of them is Contouring. Contour is a line passing through points of known elevation or reduced level.The method of locating contours in a plan or map is known as Contouring. There are two methods of contouring by Direct method: Radiation Method (Radial Line Method) By Grid Method The Aim of this report are as follows: Perform a contour survey (by Radiation Method) of Parking Area of F and G Block of Sir Syed University of Engg. and Tech. Plot the Contour by means of AutoCAD. Prepare a Report regarding the Contour. Body of the Report The Students of Sir Syed University of Engineering and Technology, Civil Engineering Batch 2009 2nd Semester were assigned a project to perform a Contour Survey of different Areas of the University. Our Section i.e. Section C was given the Parking Area of F and G Block.  We had to perform a Contour Survey on the field first and then plot it on A3 size paper on the Computer i.e. AutoCAD and then to make a detailed Report of the Contour. Method: The method by which contour survey was to be performed was Radiation Method or Radial Line Method. Radiation Method In this method, a number of radial lines are set out at known angular interval at each station and points are marked at the ground at convenient distance apart on the rays that are set. Spot levels of these points are determined by leveling. The points are plotted to the scale of the map and spot levels are entered. The contours of desired values are then located by interpolation. This method is convenient in hilly terrain with level stations chosen at high points so as to command a large area from each. On Thursday 15th October 2009, Survey Contour was performed on Parking Area of F and G block. Instruments The Instruments used in the survey were: Automatic Level Levelling Staff Measuring Tape Ranging Rod Plumb Bob Project Work First the Area was divided into 2 parts in order to perform two contours. The Dimensions of the Area were measured by tape. A centre point was marked as a reference point and was considered as the origin. The x and y co-ordinates of the points (where the instruments were setup) were calculated in order to locate the points on AutoCAD. Then the contouring was performed by Radiation method. Readings were taken from the central point at 30 degree interval. All the readings were recorded on a paper and rough diagrams were drawn. These Diagrams and readings were combined and were plotted on AutoCAD. The points of same Reduced Level were joined by a line making contours. An image of the area taken from Google Earth was placed to make it more real. The Radial Lines were removed leaving the contour which were required. A detailed report was made containing all the information about the Contour Survey. Problems The Problems faced by the Students during the Survey are as follows: Due to the Hot Climate the students got exhausted after the survey. Due to the Dust on the field, problems were faced in contouring. The Cars parked on the field were creating problems in taking readings. Observations R.L. of Bench Mark: 50 Instrument A: Staff reading at bench mark: 4.8 Height of Instrument: 54.8 Instrument B: Staff reading at bench mark: 4.8 Height of Instrument: 54.8 Observation Table ADISTANCEANGLEBSISFSHIRLREMARK               BM = 50         at 0        4.8  54.850 15  4.9  49.9 30  4.99  49.81 45   5.25 49.55  at 30        5.25  54.849.55 15  4.92  49.88 30  4.99  49.81 45  5.25  49.55 60   5.77 49.03  at 60        5.77  54.849.03 15  4.91  49.89 30  4.99  49.81 45  5.1  49.7 60  5.2  49.6 75  5.25  49.55 90   5.77 49.03  at 90        5.77  54.849.03 15  4.86  49.94 30  4.87  49.93 45  4.99  49.81 60  4.97  49.83 75   5.25 49.55  at 120        5.25  54.849.55 15  4.8  50 30  4.75  50.05 45  4.75  50.05 60  4.8  50 75  4.99  49.81 90   5.25 49.55  at 150       5.25  54.849.55 15  4.8  50 30  4.75  50.05 45  4.75  50.05 60   4.75 50.05   at 180        4.75  54.850.05 15  4.8  50 30  4.69  50.11 45   4.69 50.11  at 210        4.69  54.850.11 15  4.69  50.11 30  4.8  50 45   4.58 50.22 60        at 240        4.58  54.850.22 15  4.69  50.11 30  4.69  50.11 45  4.8  50 60  4.99  49.81 75  5.25  49.55 90   5.79 49.01  at 270        5.79  54.849.01 15  4.7  50.1 30  4.8  50 45  4.99  49.81 60  5.25  49.55 75   5.79 49.01  at 300        5.79  54.849.01 15  4.8  50 30  4.8  50 45  4.99  49.81 60  5.05  49.75 75  5.25  49.55 90   5.77 49.03  at 330        5.77  54.849.03 15  5.79  49.01 30  4.99  49.81 45  5.25  49.55 60   5.77 49.03  Observation Table BDISTANCEANGLEBSISFSHIRLREMARK               BM = 50         at 0        4.8  54.850 15  4.75  50.05 30  4.79  50.01 45   4.8 50  at 30        4.8  54.850 15  4.68  50.12 30  4.75  50.05 45  4.75  50.05 60   4.75 50.05  at 60        4.75  54.850.05 15  4.73  50.07 30  4.73  50.07 45  4.75  50.05 60  4.75  50.05 75  4.99  49.81 90   5.25 49.55  at 90        5.25  54.849.55 15  5.27  49.53 30  4.93  49.87 45  4.75  50.05 60  4.8  50 75   4.99 49.81  at 120        4.99  54.849.81 15  4.75  50.05 30  4.8  50 45  4.81  49.99 60  4.99  49.81 75  5.77  49.03 90   5.77 49.03  at 150        5.77  54.849.03 15  4.8  50 30  4.81  4.99 45  4.99  49.81 60   5.77    at 180        5.77  54.849.03 15  4.8  50 30  4.99  49.81 45   5.77 49.03  at 210        5.77  54.849.03 15  4.8  50 30  4.9  49.9 45  5.77  49.03 60   5.77 49.03  at 240        5.77  54.849.03 15  4.58  49.22 30  4.58  49.22 45  4.58  49.22 60  4.99  49.81 75  5.05  49.75 90   5.77 49.03  at 270        5.79  54.849.01 15  4.56  50.24 30  4.58  50.22 45  4.99  49.81 60  5.25  49.55 75   5.79 49.01  at 300        5.79  54.849.01 15  4.8  50 30  4.58  50.22 45  4.99  49.81 60  5.25  49.55 75  5.79  49.01 90   5.68 49.12  at 330        5.68  54.849.12 15  4.8  50 30  4.58  50.22 45  4.66  50.14 60   4.58 50.22  Pictures         Conclusion Aims The Aims of this report are as follows: Perform a contour survey (by Radiation Method) of Parking Area of F and G Block of Sir Syed University of Engineering and Technology. Plot the Contour by means of AutoCAD. Prepare a detailed Report regarding the Contour, containing all the readings. Conclusion The Conclusions of this report are as follows: The surface of the Parking area has many up and downs. It is full of Sand and Dust. The dimensions of the Area are 193’ x 234’. The total Area of the Parking lot is approximately 45162’. Due to depressions and uneven surface, rain water remains there for a long time. The Surface should be leveled such that the rain water drains. The uneven surface is also dangerous for people coming on motorcycles. Sir Syed University of Engineering and Technology Civil Engineering Department Batch 2009 - Section C Group Leader:Ghulam Mustafa Vira2009-CV-136Group Members:Hafiz Abdus Sami2009-CV-138Ali Raza2009-CV-157Faizyab e Mustafa2009-CV-152Muhammad Shakir2009-CV-139Aamir Aleem2009-CV-149Ameer Faisal2009-CV-160Ismail Yar2009-CV-154Mubeen Patel2009-CV-181Wajid Ali2009-CV-171Muhammad Zohaib2009-CV-274Faisal Bilal2009-CV-271Saddam Hussain2009-CV-167Moula Bukhsh2009-CV-150Muhammad Saleem2009-CV-1512009-CV-185Mujtaba Ahmed Khan2009-CV-162Ali Shah2009-CV-143Shahrukh2009-CV-159Asadullah2009-CV-188Faizaan2009-CV-165Shabaaz2009-CV-140Mansoor2009-CV-180Umer Abid2009-CV-147Talha2009-CV-201Salman Aziz2009-CV-148Haseeb Mansoori2009-CV-1932009-CV-190Ahrar Khan2009-CV-1952009-CV-1722009-CV-163Saleem Mangrio2009-CV-184Jamhoor Alam2009-CV-158Yahya Jaan2009-CV-179Agha Naeem2009-CV-278naveed2009-CV-1532009-CV-1892009-CV-1962009-CV-1702009-CV-1762009-CV-1462009-CV-1872009-CV-1822009-CV-165 Im extremely sorry for the inconvenience that some of the names are missing but you can see all the roll numbers I guess Don’t copy plz Property of Sec C – CV - 2009 SSUET
Contouring Report
Contouring Report
Contouring Report
Contouring Report
Contouring Report
Contouring Report
Contouring Report
Contouring Report
Contouring Report
Contouring Report
Contouring Report
Contouring Report
Contouring Report
Contouring Report
Contouring Report

Más contenido relacionado

La actualidad más candente

Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Sem 2 Site surveying report 2
Sem 2 Site surveying report 2
Est
 
Fly Levelling
Fly LevellingFly Levelling
Fly Levelling
Bahzad5
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1
tfkc1212
 
Topic 2 area & volume
Topic 2   area & volumeTopic 2   area & volume
Topic 2 area & volume
kmasz kamal
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i
마 이환
 

La actualidad más candente (20)

levelling and contouring
levelling and contouringlevelling and contouring
levelling and contouring
 
Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Sem 2 Site surveying report 2
Sem 2 Site surveying report 2
 
Ss report 1 ----levelling eport
Ss report 1 ----levelling eportSs report 1 ----levelling eport
Ss report 1 ----levelling eport
 
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdfREPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
 
Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - Levelling
 
Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - Report
 
Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)
 
Assignment 2 - Traverse
Assignment 2 - TraverseAssignment 2 - Traverse
Assignment 2 - Traverse
 
Project report2 of contour
Project report2 of contourProject report2 of contour
Project report2 of contour
 
SITE SURVEYING: Transversing
SITE SURVEYING: TransversingSITE SURVEYING: Transversing
SITE SURVEYING: Transversing
 
Levelling
LevellingLevelling
Levelling
 
Tacheometry @surveyingreport
Tacheometry @surveyingreportTacheometry @surveyingreport
Tacheometry @surveyingreport
 
Fly Levelling
Fly LevellingFly Levelling
Fly Levelling
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1
 
Ukur aras-levelling
Ukur aras-levellingUkur aras-levelling
Ukur aras-levelling
 
Topic 2 area & volume
Topic 2   area & volumeTopic 2   area & volume
Topic 2 area & volume
 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sections
 
Site Surveying Levelling
Site Surveying Levelling Site Surveying Levelling
Site Surveying Levelling
 
Theodolite report
Theodolite reportTheodolite report
Theodolite report
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i
 

Destacado

Contouring pdf
Contouring pdfContouring pdf
Contouring pdf
Gokul Saud
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
XinYee Khoo
 
Reading a topographic map
Reading a topographic mapReading a topographic map
Reading a topographic map
Rachael Hubbard
 
Leveling surveying
Leveling surveyingLeveling surveying
Leveling surveying
Mohammed_82
 
Bhadhla report geotechnical layout contour survey
Bhadhla report geotechnical layout contour surveyBhadhla report geotechnical layout contour survey
Bhadhla report geotechnical layout contour survey
Sanman Rajput
 

Destacado (20)

Contouring
ContouringContouring
Contouring
 
Contouring pdf
Contouring pdfContouring pdf
Contouring pdf
 
Contouring
ContouringContouring
Contouring
 
Contouring - Surveying...for civil Engineering and Architecture..
Contouring - Surveying...for civil Engineering and Architecture..Contouring - Surveying...for civil Engineering and Architecture..
Contouring - Surveying...for civil Engineering and Architecture..
 
Contour diagrams
Contour diagramsContour diagrams
Contour diagrams
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
Levelling
LevellingLevelling
Levelling
 
surveying contouring
surveying contouring surveying contouring
surveying contouring
 
Geography Skills: Contours
Geography Skills: ContoursGeography Skills: Contours
Geography Skills: Contours
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)
 
LEVELING AND CONTOURING
LEVELING AND CONTOURINGLEVELING AND CONTOURING
LEVELING AND CONTOURING
 
Reading a topographic map
Reading a topographic mapReading a topographic map
Reading a topographic map
 
Leveling surveying
Leveling surveyingLeveling surveying
Leveling surveying
 
Geography M2 Drawing cross section
Geography M2 Drawing cross sectionGeography M2 Drawing cross section
Geography M2 Drawing cross section
 
Landforms 60 - PowerPoint - Version 2
Landforms 60 - PowerPoint - Version 2Landforms 60 - PowerPoint - Version 2
Landforms 60 - PowerPoint - Version 2
 
Bhadhla report geotechnical layout contour survey
Bhadhla report geotechnical layout contour surveyBhadhla report geotechnical layout contour survey
Bhadhla report geotechnical layout contour survey
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Intro to Contour
Intro to ContourIntro to Contour
Intro to Contour
 
WEB14103: Using Grid for Text
WEB14103: Using Grid for TextWEB14103: Using Grid for Text
WEB14103: Using Grid for Text
 

Similar a Contouring Report

ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)
Jing Chuang
 
Site survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSite survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversing
Sheng Zhe
 
Fpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_surveyFpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_survey
Rione Drevale
 
Miniproject final group 14
Miniproject final group 14Miniproject final group 14
Miniproject final group 14
Ashish Mundhra
 
Abijit sharma 201818510 survey report
Abijit sharma 201818510 survey reportAbijit sharma 201818510 survey report
Abijit sharma 201818510 survey report
SingayWangchuk2
 
Contour & Contouring Surveying
Contour & Contouring SurveyingContour & Contouring Surveying
Contour & Contouring Surveying
Bahzad5
 
Site surveying report ii
Site surveying   report iiSite surveying   report ii
Site surveying report ii
마 이환
 

Similar a Contouring Report (20)

Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)
 
Shahid nazir paray
Shahid nazir parayShahid nazir paray
Shahid nazir paray
 
Plane table survey
Plane table survey Plane table survey
Plane table survey
 
Site survey report 2
Site survey report 2Site survey report 2
Site survey report 2
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
 
Advanced surveying equipment ppt
Advanced surveying equipment pptAdvanced surveying equipment ppt
Advanced surveying equipment ppt
 
1 Introduction.pptx
1 Introduction.pptx1 Introduction.pptx
1 Introduction.pptx
 
Site survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSite survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversing
 
Plane table surveying
Plane table surveyingPlane table surveying
Plane table surveying
 
Fpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_surveyFpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_survey
 
Miniproject final group 14
Miniproject final group 14Miniproject final group 14
Miniproject final group 14
 
Radiacion poligonal abierta
Radiacion   poligonal abiertaRadiacion   poligonal abierta
Radiacion poligonal abierta
 
G03-Topografia-de-Obras.pdf
G03-Topografia-de-Obras.pdfG03-Topografia-de-Obras.pdf
G03-Topografia-de-Obras.pdf
 
Abijit sharma 201818510 survey report
Abijit sharma 201818510 survey reportAbijit sharma 201818510 survey report
Abijit sharma 201818510 survey report
 
Contour & Contouring Surveying
Contour & Contouring SurveyingContour & Contouring Surveying
Contour & Contouring Surveying
 
Site survey report 1
Site survey report 1Site survey report 1
Site survey report 1
 
2 nd report
2 nd report2 nd report
2 nd report
 
Site surveying report ii
Site surveying   report iiSite surveying   report ii
Site surveying report ii
 

Último

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Último (20)

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 

Contouring Report

  • 1. Table of Contents Acknowledgement Introduction Body of the Report Method Instruments Project Work Problems Observations Observation Table Pictures Conclusion Aims Conclusion Contour Map with Radial Lines Contour Map Names of Students Acknowledgement We owe a great many thanks to Sir Asim (Lecturer), who gave us the opportunity of implementing our skills in a project. This project means a lot to us as it gave us a lot of experience. We also thank the faculty of Surveying Lab, who co-operated with us in the matter of instruments. We would also like to thank our Vice Chancellor, Dean of Faculty and our University for giving us such great opportunities. Introduction Relief on a map enhances its utility. A map without relief representation is simply a plan on which relative positions of details are only shown in horizontal plane. Relative heights of various points on the map can be represented by many methods and one of them is Contouring. Contour is a line passing through points of known elevation or reduced level.The method of locating contours in a plan or map is known as Contouring. There are two methods of contouring by Direct method: Radiation Method (Radial Line Method) By Grid Method The Aim of this report are as follows: Perform a contour survey (by Radiation Method) of Parking Area of F and G Block of Sir Syed University of Engg. and Tech. Plot the Contour by means of AutoCAD. Prepare a Report regarding the Contour. Body of the Report The Students of Sir Syed University of Engineering and Technology, Civil Engineering Batch 2009 2nd Semester were assigned a project to perform a Contour Survey of different Areas of the University. Our Section i.e. Section C was given the Parking Area of F and G Block. We had to perform a Contour Survey on the field first and then plot it on A3 size paper on the Computer i.e. AutoCAD and then to make a detailed Report of the Contour. Method: The method by which contour survey was to be performed was Radiation Method or Radial Line Method. Radiation Method In this method, a number of radial lines are set out at known angular interval at each station and points are marked at the ground at convenient distance apart on the rays that are set. Spot levels of these points are determined by leveling. The points are plotted to the scale of the map and spot levels are entered. The contours of desired values are then located by interpolation. This method is convenient in hilly terrain with level stations chosen at high points so as to command a large area from each. On Thursday 15th October 2009, Survey Contour was performed on Parking Area of F and G block. Instruments The Instruments used in the survey were: Automatic Level Levelling Staff Measuring Tape Ranging Rod Plumb Bob Project Work First the Area was divided into 2 parts in order to perform two contours. The Dimensions of the Area were measured by tape. A centre point was marked as a reference point and was considered as the origin. The x and y co-ordinates of the points (where the instruments were setup) were calculated in order to locate the points on AutoCAD. Then the contouring was performed by Radiation method. Readings were taken from the central point at 30 degree interval. All the readings were recorded on a paper and rough diagrams were drawn. These Diagrams and readings were combined and were plotted on AutoCAD. The points of same Reduced Level were joined by a line making contours. An image of the area taken from Google Earth was placed to make it more real. The Radial Lines were removed leaving the contour which were required. A detailed report was made containing all the information about the Contour Survey. Problems The Problems faced by the Students during the Survey are as follows: Due to the Hot Climate the students got exhausted after the survey. Due to the Dust on the field, problems were faced in contouring. The Cars parked on the field were creating problems in taking readings. Observations R.L. of Bench Mark: 50 Instrument A: Staff reading at bench mark: 4.8 Height of Instrument: 54.8 Instrument B: Staff reading at bench mark: 4.8 Height of Instrument: 54.8 Observation Table ADISTANCEANGLEBSISFSHIRLREMARK               BM = 50         at 0        4.8  54.850 15  4.9  49.9 30  4.99  49.81 45   5.25 49.55  at 30        5.25  54.849.55 15  4.92  49.88 30  4.99  49.81 45  5.25  49.55 60   5.77 49.03  at 60        5.77  54.849.03 15  4.91  49.89 30  4.99  49.81 45  5.1  49.7 60  5.2  49.6 75  5.25  49.55 90   5.77 49.03  at 90        5.77  54.849.03 15  4.86  49.94 30  4.87  49.93 45  4.99  49.81 60  4.97  49.83 75   5.25 49.55  at 120        5.25  54.849.55 15  4.8  50 30  4.75  50.05 45  4.75  50.05 60  4.8  50 75  4.99  49.81 90   5.25 49.55  at 150       5.25  54.849.55 15  4.8  50 30  4.75  50.05 45  4.75  50.05 60   4.75 50.05   at 180        4.75  54.850.05 15  4.8  50 30  4.69  50.11 45   4.69 50.11  at 210        4.69  54.850.11 15  4.69  50.11 30  4.8  50 45   4.58 50.22 60        at 240        4.58  54.850.22 15  4.69  50.11 30  4.69  50.11 45  4.8  50 60  4.99  49.81 75  5.25  49.55 90   5.79 49.01  at 270        5.79  54.849.01 15  4.7  50.1 30  4.8  50 45  4.99  49.81 60  5.25  49.55 75   5.79 49.01  at 300        5.79  54.849.01 15  4.8  50 30  4.8  50 45  4.99  49.81 60  5.05  49.75 75  5.25  49.55 90   5.77 49.03  at 330        5.77  54.849.03 15  5.79  49.01 30  4.99  49.81 45  5.25  49.55 60   5.77 49.03  Observation Table BDISTANCEANGLEBSISFSHIRLREMARK               BM = 50         at 0        4.8  54.850 15  4.75  50.05 30  4.79  50.01 45   4.8 50  at 30        4.8  54.850 15  4.68  50.12 30  4.75  50.05 45  4.75  50.05 60   4.75 50.05  at 60        4.75  54.850.05 15  4.73  50.07 30  4.73  50.07 45  4.75  50.05 60  4.75  50.05 75  4.99  49.81 90   5.25 49.55  at 90        5.25  54.849.55 15  5.27  49.53 30  4.93  49.87 45  4.75  50.05 60  4.8  50 75   4.99 49.81  at 120        4.99  54.849.81 15  4.75  50.05 30  4.8  50 45  4.81  49.99 60  4.99  49.81 75  5.77  49.03 90   5.77 49.03  at 150        5.77  54.849.03 15  4.8  50 30  4.81  4.99 45  4.99  49.81 60   5.77    at 180        5.77  54.849.03 15  4.8  50 30  4.99  49.81 45   5.77 49.03  at 210        5.77  54.849.03 15  4.8  50 30  4.9  49.9 45  5.77  49.03 60   5.77 49.03  at 240        5.77  54.849.03 15  4.58  49.22 30  4.58  49.22 45  4.58  49.22 60  4.99  49.81 75  5.05  49.75 90   5.77 49.03  at 270        5.79  54.849.01 15  4.56  50.24 30  4.58  50.22 45  4.99  49.81 60  5.25  49.55 75   5.79 49.01  at 300        5.79  54.849.01 15  4.8  50 30  4.58  50.22 45  4.99  49.81 60  5.25  49.55 75  5.79  49.01 90   5.68 49.12  at 330        5.68  54.849.12 15  4.8  50 30  4.58  50.22 45  4.66  50.14 60   4.58 50.22  Pictures Conclusion Aims The Aims of this report are as follows: Perform a contour survey (by Radiation Method) of Parking Area of F and G Block of Sir Syed University of Engineering and Technology. Plot the Contour by means of AutoCAD. Prepare a detailed Report regarding the Contour, containing all the readings. Conclusion The Conclusions of this report are as follows: The surface of the Parking area has many up and downs. It is full of Sand and Dust. The dimensions of the Area are 193’ x 234’. The total Area of the Parking lot is approximately 45162’. Due to depressions and uneven surface, rain water remains there for a long time. The Surface should be leveled such that the rain water drains. The uneven surface is also dangerous for people coming on motorcycles. Sir Syed University of Engineering and Technology Civil Engineering Department Batch 2009 - Section C Group Leader:Ghulam Mustafa Vira2009-CV-136Group Members:Hafiz Abdus Sami2009-CV-138Ali Raza2009-CV-157Faizyab e Mustafa2009-CV-152Muhammad Shakir2009-CV-139Aamir Aleem2009-CV-149Ameer Faisal2009-CV-160Ismail Yar2009-CV-154Mubeen Patel2009-CV-181Wajid Ali2009-CV-171Muhammad Zohaib2009-CV-274Faisal Bilal2009-CV-271Saddam Hussain2009-CV-167Moula Bukhsh2009-CV-150Muhammad Saleem2009-CV-1512009-CV-185Mujtaba Ahmed Khan2009-CV-162Ali Shah2009-CV-143Shahrukh2009-CV-159Asadullah2009-CV-188Faizaan2009-CV-165Shabaaz2009-CV-140Mansoor2009-CV-180Umer Abid2009-CV-147Talha2009-CV-201Salman Aziz2009-CV-148Haseeb Mansoori2009-CV-1932009-CV-190Ahrar Khan2009-CV-1952009-CV-1722009-CV-163Saleem Mangrio2009-CV-184Jamhoor Alam2009-CV-158Yahya Jaan2009-CV-179Agha Naeem2009-CV-278naveed2009-CV-1532009-CV-1892009-CV-1962009-CV-1702009-CV-1762009-CV-1462009-CV-1872009-CV-1822009-CV-165 Im extremely sorry for the inconvenience that some of the names are missing but you can see all the roll numbers I guess Don’t copy plz Property of Sec C – CV - 2009 SSUET