NPR 7120.7 Enhancements and
Agency IT Governance Impacts




                         Lara Petze
                   February 10, 2010
Agenda


• Background
• NPR 7120.7* Modifications Under
  Consideration
  –Project baselining and rebaselining
  –Standard Level 2 Work Breakdown Structure
   (WBS)
  –Criteria for projects to be subject to NPR 7120.7
• I-Tools
• Summary
* NPR 7120.7, NASA Information Technology
and Institutional Infrastructure Program and Project
Management Requirements                                2
Project Project Baselining And Rebaselining
        Baselining And Rebaselining




                                          3
Background


 NPR 7120.7 identifies four types of IT and
 institutional infrastructure investments:
   – Information Technology (IT)
   – Construction of Facilities (CoF)
   – Environmental Compliance and Restoration (ECR)
   – Other Mission Support Investments (OMSI)

 This briefing addresses IT investments only

 The updates that we are discussing today are in
 draft only, and must be reviewed via the Agency’s
 policy approval process


                                                      4
Background


 NPR 7120.7, Information Technology and Institutional
  Infrastructure Program and Project Management
  Requirements, was issued in November 2008

 New requirements and Agency experience with using NPR
  7120.7 has resulted in the need for modifications in several
  significant areas

 OCIO continually identifies candidate changes to NPR 7120.7
  to advance the success of the Agency’s IT programs and
  projects



                                                                 5
Project Baselining and
             Rebaselining Background

 Currently NPR 7120.7 addresses baselining (at Key Decision
  Point (KDP)-C) but does not discuss changes to elements of
  the baseline that may occur during the project’s
  implementation
 As an Agency, we recognize the need to issue policy on
  rebaselining of IT projects to manage cost, schedule, and
  scope changes
 NASA has accepted Government Accountability Office
  (GAO) recommendation that we develop a rebaselining
  policy for IT projects
 OMB has issued policy direction (M-10-27) regarding
   development of agency IT investment baseline management
   policies
                                                               6
Project Baselining and
                  Rebaselining Definitions

• Baseline - an agreed-to set of requirements, cost, schedule, designs,
  documents, etc. that will have changes controlled through a formal
  approval and monitoring process as defined by NPR 7120.7
• Re-baseline - the process by which a project formally updates or
  modifies the project baseline as a result of any approved change to
  the project’s schedule, cost, or deliverable content
• Re-baseline may result from
     1. the baseline documented at KDP-C as defined in NPR 7120.7,
       or
     2. the current baseline that was subsequently approved via the
       rebaselining process.




                                                                          7
NPR 7120.7 IT Project Lifecycle




NASA decides at each KDP whether the project
should move to the next life-cycle phase       8
Project Rebaselining Steps


• Determining when a rebaseline is warranted for
  consideration

• Developing the proposed new baseline

• Validating the proposed new baseline

• Review and Approval by management of the proposed
  new baseline

• Documenting rebaselining decisions


                                                      9
Determining When a Rebaseline is
                Warranted for Consideration: OMB
                            Direction

 Acceptable reasons for rebaselining include:
  » Significant change in investment goals (scope, requirements, objectives)
    resulting from internal or external management decisions, or changes in
    funding level or availability of funds (e.g. extended continuing resolution), or
    contracting (including contractual protests)
  » In the case where an incremental or iterative system development and
    planning lifecycle has been chosen for the investment, progressive
    elaboration may be necessary when transitioning from one iteration or
    increment to the next, as scope and objectives evolve. Such rapid evolution
    inherent to iterative development shall be approved by the Agency CIO.
  » Current baseline is no longer useful as a management tool for realistic
    performance measurement as variances are so high that they lose meaning


          Issue: how/whether to specify in policy magnitude of
          variances that will trigger rebaselining

                                                                                10
Project Rebaselining Thresholds We
                     Are Considering

 Cost
  »If the project’s cost estimate at completion exceeds the
   current baseline by 10% or more (is this too low??)
 Schedule
  »If the project’s schedule estimate at completion exceeds
   the current baseline by 10% or more (is this too
   restrictive??)
  »If a KDP is forecast to slip by more than 45 days (is this too
   restrictive)

           Many of our IT projects are of relatively low cost
           and of relatively short duration!
                                                                11
Project Rebaselining Thresholds We
                 Are Considering
 Scope
  » If the project or the customer proposes to add or modify
    functional requirements that would result in changes
    that exceed the cost and schedule thresholds noted
    above, or
  » If the project or the customer proposes to defer or
    eliminate functional requirements determined by the
    customer to be significant, even if the current cost or
    schedule baselines are not affected




                                                          12
Project Rebaselining Thresholds We
                     Are Considering

 Program Managers
   » If a Program Manager imposes more stringent or additional
     rebaselining thresholds on a project
   » If a Program Manager deems it appropriate to reduce or remove the
     thresholds (waiver required)
 Agency IT Program Management Board (PMB)
   » If the IT PMB recommends to the NASA CIO thresholds that differ from
     those detailed in this document (and the CIO accepts the
     recommendation)


         The Agency IT PMB is the Governing Body that makes
         recommendations to the NASA CIO at each KDP whether a
         project should move forward to the next life cycle phase


                                                                     13
Standard Level 2
Work Breakdown Structure




                           14
Standard Level 2
                                 WBS Background
 Work Breakdown Structure (WBS) defined:
 (NASA WBS Handbook, January 2010)

  – A product-oriented hierarchical division of the hardware, software, services, and other work tasks
    that organizes, displays, and defines the products to be developed and/or produced and relates the
    elements of the work to be accomplished to each other and the end product(s) . The WBS should
    be accompanied by a text document referred to as a WBS Dictionary that describes the work content
    each element of the WBS in detail.

 The Standard Level 2 WBS policy will address:
  – NASA’s need, as an Agency, for a standard level 2 WBS for IT
  – Recommendations from GAO, “GAO Report 10-2; Information Technology; Agencies Need to
    Improve the Implementation and use of Earned Value Techniques to Help Manage Major System
    Acquisitions; October 2009”


 Good characteristics of a WBS (per GAO, and we agree):
  – Applies to the entire life cycle of the project.
  – Ensures that changes to the WBS be governed
  – Establishes a product-oriented WBS to allow a project to track cost and schedule by defined
    deliverables

                                                                                                  15
Standard Level 2 WBS
            For IT Projects: Business Rules

• Project name is WBS Level 1
• Title of each WBS Level 2 element can be modified to facilitate
  project-unique titles, but the content of each must remain the same
• Additional WBS elements may be added horizontally as long as the
  content does not fit into the content of any existing standard WBS
  element
• WBS Level 3 elements, Level 2 subordinate (children), are determined
  by the project
• Level 3 and lower elements may differ from project to project and must
  include only work that rolls up into the standard WBS Dictionary
  definition of the Level 2 element
• An inactive placeholder element (and inactive placeholder financial
  code) will be established if no work fits into a standard WBS element


                                                                     16
NPR 7120.5 Level 2 WBS




     Space Flight
       Projects
        WBS

                         17
NPR 7120.8 Level 2 WBS


  Research &
  Technology
Portfolio Project
      WBS




                     Technology
                    Development
                       Project
                        WBS
                                  18
NPR 7120.7 Level 2 WBS*




                           Information
                           Technology
                             Project
                               WBS

           * Courtesy of Kenneth Poole, MSFC

                                         19
Standard Level 2 WBS Benefits


 Facilitates planning and control of cost, schedule and technical
  content
 Unifies the technical and financial structures of a project
 Enables Project Manager to identify which components are
  causing cost and/or schedule overruns and mitigate the root
  cause(s) of the overrun
 Eliminates the need for Project Managers to create their own Level
  2 WBS
 Enables Earned Value Management for IT projects
 Improves financial reporting/tracking across projects


         We are considering extending the standard WBS to level 3
         but need more discussion within the Agency before doing so
                                                                       20
Criteria for Projects
to be Subject to NPR 7120.7




                              21
Criteria for Projects to be Subject to
                     NPR 7120.7

 Current criteria
  » New systems/capabilities: $500K or greater total
    development and implementation cost or affects more
    than one Center
  » Modification to or enhancement of existing IT systems
    or capabilities: $500K or greater total
    modification/enhancement cost, regardless of how
    many Centers are affected.
  » The NASA/ Center CIO deems that the NPR will apply
    (requires consultation with sponsoring organization)


                                                        22
Criteria for Projects to be Subject to
                      NPR 7120.7

 Issues with current criteria
   » Projects with modest budgets may have trouble meeting all the
     NPR requirements without submitting substantial waivers
   » Projects with short durations may have trouble accommodating all
     the required reviews without submitting substantial waivers
   » The Agency and Center IT PMBs (Governing Bodies overseeing
     projects) may not have bandwidth to conduct all the required
     reviews
 We plan to work with NPR 7120.7 stakeholders to come to
  agreement on whether the current criteria should be modified
 One possibility is to create tiers of requirements corresponding to
  project size/risk/importance/etc.


                                                                   23
I-Tools




          24
Summary


 Continual Improvement - the Agency OCIO continually
  identifies, solicits, and implements modifications to our
  policies to advance the success of the Agency’s IT
  programs and projects

 Alignment – the Agency OCIO strives to align IT policies
  and procedures with our Human Space Flight (NPR 7120.5)
  and Research and Technology (NPR 7120.8)
  program/project management policies to maintain
  consistency across NASA


                                                              25
Questions/Discussion?




                        26

Más contenido relacionado

La actualidad más candente

Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeffNASAPMC
 
Murphy.dar jean.jean
Murphy.dar jean.jeanMurphy.dar jean.jean
Murphy.dar jean.jeanNASAPMC
 
Harvey elliott
Harvey elliottHarvey elliott
Harvey elliottNASAPMC
 
Sandra smalley
Sandra smalleySandra smalley
Sandra smalleyNASAPMC
 
Esker.linda
Esker.lindaEsker.linda
Esker.lindaNASAPMC
 
Weaver.ed
Weaver.edWeaver.ed
Weaver.edNASAPMC
 
Linda maleki
Linda malekiLinda maleki
Linda malekiNASAPMC
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.garyNASAPMC
 
Backup darren elliott
Backup darren elliottBackup darren elliott
Backup darren elliottNASAPMC
 
Carmichael.kevin
Carmichael.kevinCarmichael.kevin
Carmichael.kevinNASAPMC
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreysNASAPMC
 
Woods.edwards.pm challenge bpr presentation 2012 v1
Woods.edwards.pm challenge bpr presentation 2012 v1Woods.edwards.pm challenge bpr presentation 2012 v1
Woods.edwards.pm challenge bpr presentation 2012 v1NASAPMC
 
Ken poole
Ken pooleKen poole
Ken pooleNASAPMC
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthewNASAPMC
 
Jerald kerby
Jerald kerbyJerald kerby
Jerald kerbyNASAPMC
 
Thomas.a.greathouse.r
Thomas.a.greathouse.rThomas.a.greathouse.r
Thomas.a.greathouse.rNASAPMC
 
Corcoran webster
Corcoran websterCorcoran webster
Corcoran websterNASAPMC
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.yNASAPMC
 
Healy edward
Healy edwardHealy edward
Healy edwardNASAPMC
 

La actualidad más candente (20)

Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
Murphy.dar jean.jean
Murphy.dar jean.jeanMurphy.dar jean.jean
Murphy.dar jean.jean
 
Harvey elliott
Harvey elliottHarvey elliott
Harvey elliott
 
Sandra smalley
Sandra smalleySandra smalley
Sandra smalley
 
Esker.linda
Esker.lindaEsker.linda
Esker.linda
 
Weaver.ed
Weaver.edWeaver.ed
Weaver.ed
 
Linda maleki
Linda malekiLinda maleki
Linda maleki
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Backup darren elliott
Backup darren elliottBackup darren elliott
Backup darren elliott
 
Carmichael.kevin
Carmichael.kevinCarmichael.kevin
Carmichael.kevin
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreys
 
Woods.edwards.pm challenge bpr presentation 2012 v1
Woods.edwards.pm challenge bpr presentation 2012 v1Woods.edwards.pm challenge bpr presentation 2012 v1
Woods.edwards.pm challenge bpr presentation 2012 v1
 
Ken poole
Ken pooleKen poole
Ken poole
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthew
 
Jerald kerby
Jerald kerbyJerald kerby
Jerald kerby
 
Thomas.a.greathouse.r
Thomas.a.greathouse.rThomas.a.greathouse.r
Thomas.a.greathouse.r
 
Corcoran webster
Corcoran websterCorcoran webster
Corcoran webster
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.y
 
Symons
SymonsSymons
Symons
 
Healy edward
Healy edwardHealy edward
Healy edward
 

Similar a Petze.lara

Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsenNASAPMC
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsenNASAPMC
 
Blythe.mike
Blythe.mikeBlythe.mike
Blythe.mikeNASAPMC
 
Vanessa.jeff
Vanessa.jeffVanessa.jeff
Vanessa.jeffNASAPMC
 
unit-vpart-2.ppt
unit-vpart-2.pptunit-vpart-2.ppt
unit-vpart-2.pptTejaTeja57
 
Capex opex
Capex opexCapex opex
Capex opexRaju_p1
 
Khan Project Scope Creep Presentationin Pdf
Khan   Project Scope Creep Presentationin PdfKhan   Project Scope Creep Presentationin Pdf
Khan Project Scope Creep Presentationin PdfZahidKhan007
 
Beyond the bca
Beyond the bcaBeyond the bca
Beyond the bcaRobb Dods
 
Software management disciplines
Software management disciplinesSoftware management disciplines
Software management disciplinesKuppusamy P
 
Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...
Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...
Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...Project Controls Expo
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.garyNASAPMC
 
Conveyor Belt Project Report
Conveyor Belt Project ReportConveyor Belt Project Report
Conveyor Belt Project ReportRISHABHSIINGH
 
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxVoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxjessiehampson
 
Building a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two DaysBuilding a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two DaysGlen Alleman
 
Project Management Presentation Template.pdf
Project Management Presentation Template.pdfProject Management Presentation Template.pdf
Project Management Presentation Template.pdfapoorvaguptaspn27
 
Presentation2_Integ and Scope.pdf
Presentation2_Integ and Scope.pdfPresentation2_Integ and Scope.pdf
Presentation2_Integ and Scope.pdfssuser465c6b1
 
Presentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectPresentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectSharad Srivastava
 

Similar a Petze.lara (20)

Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
 
Blythe.mike
Blythe.mikeBlythe.mike
Blythe.mike
 
Vanessa.jeff
Vanessa.jeffVanessa.jeff
Vanessa.jeff
 
unit-vpart-2.ppt
unit-vpart-2.pptunit-vpart-2.ppt
unit-vpart-2.ppt
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 
Pep
PepPep
Pep
 
Capex opex
Capex opexCapex opex
Capex opex
 
Khan Project Scope Creep Presentationin Pdf
Khan   Project Scope Creep Presentationin PdfKhan   Project Scope Creep Presentationin Pdf
Khan Project Scope Creep Presentationin Pdf
 
Beyond the bca
Beyond the bcaBeyond the bca
Beyond the bca
 
Software management disciplines
Software management disciplinesSoftware management disciplines
Software management disciplines
 
Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...
Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...
Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Conveyor Belt Project Report
Conveyor Belt Project ReportConveyor Belt Project Report
Conveyor Belt Project Report
 
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxVoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
 
Building a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two DaysBuilding a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two Days
 
Project Management Presentation Template.pdf
Project Management Presentation Template.pdfProject Management Presentation Template.pdf
Project Management Presentation Template.pdf
 
Ch05
Ch05Ch05
Ch05
 
Presentation2_Integ and Scope.pdf
Presentation2_Integ and Scope.pdfPresentation2_Integ and Scope.pdf
Presentation2_Integ and Scope.pdf
 
Presentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectPresentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics Project
 

Más de NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski johnNASAPMC
 
Yew manson
Yew mansonYew manson
Yew mansonNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joeNASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuartNASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahmNASAPMC
 
Snow lee
Snow leeSnow lee
Snow leeNASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krageNASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marcoNASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mikeNASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karleneNASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Paradis william
Paradis williamParadis william
Paradis williamNASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe williamNASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralfNASAPMC
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerryNASAPMC
 

Más de NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerry
 

Último

20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdfMintel Group
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 

Último (20)

20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 

Petze.lara

  • 1. NPR 7120.7 Enhancements and Agency IT Governance Impacts Lara Petze February 10, 2010
  • 2. Agenda • Background • NPR 7120.7* Modifications Under Consideration –Project baselining and rebaselining –Standard Level 2 Work Breakdown Structure (WBS) –Criteria for projects to be subject to NPR 7120.7 • I-Tools • Summary * NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Management Requirements 2
  • 3. Project Project Baselining And Rebaselining Baselining And Rebaselining 3
  • 4. Background  NPR 7120.7 identifies four types of IT and institutional infrastructure investments: – Information Technology (IT) – Construction of Facilities (CoF) – Environmental Compliance and Restoration (ECR) – Other Mission Support Investments (OMSI)  This briefing addresses IT investments only  The updates that we are discussing today are in draft only, and must be reviewed via the Agency’s policy approval process 4
  • 5. Background  NPR 7120.7, Information Technology and Institutional Infrastructure Program and Project Management Requirements, was issued in November 2008  New requirements and Agency experience with using NPR 7120.7 has resulted in the need for modifications in several significant areas  OCIO continually identifies candidate changes to NPR 7120.7 to advance the success of the Agency’s IT programs and projects 5
  • 6. Project Baselining and Rebaselining Background  Currently NPR 7120.7 addresses baselining (at Key Decision Point (KDP)-C) but does not discuss changes to elements of the baseline that may occur during the project’s implementation  As an Agency, we recognize the need to issue policy on rebaselining of IT projects to manage cost, schedule, and scope changes  NASA has accepted Government Accountability Office (GAO) recommendation that we develop a rebaselining policy for IT projects  OMB has issued policy direction (M-10-27) regarding development of agency IT investment baseline management policies 6
  • 7. Project Baselining and Rebaselining Definitions • Baseline - an agreed-to set of requirements, cost, schedule, designs, documents, etc. that will have changes controlled through a formal approval and monitoring process as defined by NPR 7120.7 • Re-baseline - the process by which a project formally updates or modifies the project baseline as a result of any approved change to the project’s schedule, cost, or deliverable content • Re-baseline may result from 1. the baseline documented at KDP-C as defined in NPR 7120.7, or 2. the current baseline that was subsequently approved via the rebaselining process. 7
  • 8. NPR 7120.7 IT Project Lifecycle NASA decides at each KDP whether the project should move to the next life-cycle phase 8
  • 9. Project Rebaselining Steps • Determining when a rebaseline is warranted for consideration • Developing the proposed new baseline • Validating the proposed new baseline • Review and Approval by management of the proposed new baseline • Documenting rebaselining decisions 9
  • 10. Determining When a Rebaseline is Warranted for Consideration: OMB Direction  Acceptable reasons for rebaselining include: » Significant change in investment goals (scope, requirements, objectives) resulting from internal or external management decisions, or changes in funding level or availability of funds (e.g. extended continuing resolution), or contracting (including contractual protests) » In the case where an incremental or iterative system development and planning lifecycle has been chosen for the investment, progressive elaboration may be necessary when transitioning from one iteration or increment to the next, as scope and objectives evolve. Such rapid evolution inherent to iterative development shall be approved by the Agency CIO. » Current baseline is no longer useful as a management tool for realistic performance measurement as variances are so high that they lose meaning Issue: how/whether to specify in policy magnitude of variances that will trigger rebaselining 10
  • 11. Project Rebaselining Thresholds We Are Considering  Cost »If the project’s cost estimate at completion exceeds the current baseline by 10% or more (is this too low??)  Schedule »If the project’s schedule estimate at completion exceeds the current baseline by 10% or more (is this too restrictive??) »If a KDP is forecast to slip by more than 45 days (is this too restrictive) Many of our IT projects are of relatively low cost and of relatively short duration! 11
  • 12. Project Rebaselining Thresholds We Are Considering  Scope » If the project or the customer proposes to add or modify functional requirements that would result in changes that exceed the cost and schedule thresholds noted above, or » If the project or the customer proposes to defer or eliminate functional requirements determined by the customer to be significant, even if the current cost or schedule baselines are not affected 12
  • 13. Project Rebaselining Thresholds We Are Considering  Program Managers » If a Program Manager imposes more stringent or additional rebaselining thresholds on a project » If a Program Manager deems it appropriate to reduce or remove the thresholds (waiver required)  Agency IT Program Management Board (PMB) » If the IT PMB recommends to the NASA CIO thresholds that differ from those detailed in this document (and the CIO accepts the recommendation) The Agency IT PMB is the Governing Body that makes recommendations to the NASA CIO at each KDP whether a project should move forward to the next life cycle phase 13
  • 14. Standard Level 2 Work Breakdown Structure 14
  • 15. Standard Level 2 WBS Background  Work Breakdown Structure (WBS) defined: (NASA WBS Handbook, January 2010) – A product-oriented hierarchical division of the hardware, software, services, and other work tasks that organizes, displays, and defines the products to be developed and/or produced and relates the elements of the work to be accomplished to each other and the end product(s) . The WBS should be accompanied by a text document referred to as a WBS Dictionary that describes the work content each element of the WBS in detail.  The Standard Level 2 WBS policy will address: – NASA’s need, as an Agency, for a standard level 2 WBS for IT – Recommendations from GAO, “GAO Report 10-2; Information Technology; Agencies Need to Improve the Implementation and use of Earned Value Techniques to Help Manage Major System Acquisitions; October 2009”  Good characteristics of a WBS (per GAO, and we agree): – Applies to the entire life cycle of the project. – Ensures that changes to the WBS be governed – Establishes a product-oriented WBS to allow a project to track cost and schedule by defined deliverables 15
  • 16. Standard Level 2 WBS For IT Projects: Business Rules • Project name is WBS Level 1 • Title of each WBS Level 2 element can be modified to facilitate project-unique titles, but the content of each must remain the same • Additional WBS elements may be added horizontally as long as the content does not fit into the content of any existing standard WBS element • WBS Level 3 elements, Level 2 subordinate (children), are determined by the project • Level 3 and lower elements may differ from project to project and must include only work that rolls up into the standard WBS Dictionary definition of the Level 2 element • An inactive placeholder element (and inactive placeholder financial code) will be established if no work fits into a standard WBS element 16
  • 17. NPR 7120.5 Level 2 WBS Space Flight Projects WBS 17
  • 18. NPR 7120.8 Level 2 WBS Research & Technology Portfolio Project WBS Technology Development Project WBS 18
  • 19. NPR 7120.7 Level 2 WBS* Information Technology Project WBS * Courtesy of Kenneth Poole, MSFC 19
  • 20. Standard Level 2 WBS Benefits  Facilitates planning and control of cost, schedule and technical content  Unifies the technical and financial structures of a project  Enables Project Manager to identify which components are causing cost and/or schedule overruns and mitigate the root cause(s) of the overrun  Eliminates the need for Project Managers to create their own Level 2 WBS  Enables Earned Value Management for IT projects  Improves financial reporting/tracking across projects We are considering extending the standard WBS to level 3 but need more discussion within the Agency before doing so 20
  • 21. Criteria for Projects to be Subject to NPR 7120.7 21
  • 22. Criteria for Projects to be Subject to NPR 7120.7  Current criteria » New systems/capabilities: $500K or greater total development and implementation cost or affects more than one Center » Modification to or enhancement of existing IT systems or capabilities: $500K or greater total modification/enhancement cost, regardless of how many Centers are affected. » The NASA/ Center CIO deems that the NPR will apply (requires consultation with sponsoring organization) 22
  • 23. Criteria for Projects to be Subject to NPR 7120.7  Issues with current criteria » Projects with modest budgets may have trouble meeting all the NPR requirements without submitting substantial waivers » Projects with short durations may have trouble accommodating all the required reviews without submitting substantial waivers » The Agency and Center IT PMBs (Governing Bodies overseeing projects) may not have bandwidth to conduct all the required reviews  We plan to work with NPR 7120.7 stakeholders to come to agreement on whether the current criteria should be modified  One possibility is to create tiers of requirements corresponding to project size/risk/importance/etc. 23
  • 24. I-Tools 24
  • 25. Summary  Continual Improvement - the Agency OCIO continually identifies, solicits, and implements modifications to our policies to advance the success of the Agency’s IT programs and projects  Alignment – the Agency OCIO strives to align IT policies and procedures with our Human Space Flight (NPR 7120.5) and Research and Technology (NPR 7120.8) program/project management policies to maintain consistency across NASA 25