This document contains the resume of Nagendra Mudarakola summarizing his work experience and skills. He has over 6 years of experience working in various roles such as a screw press machine operator, telemarketing agent, and design engineer. His skills include 3D modeling in Solidworks, Pro-E, and AutoCAD. He has experience designing mechanical components and creating schematics, drawings, and blueprints. The document also lists 8 projects he has worked on involving the design of wind turbines, valves, pumps, motors, and piping systems.
1. NAGENDRA MUDARAKOLA
Mudara.ngndr714@gmail.com,
Mobile: +917382563738
Experience Summary:
Worked in GODREJ Palm oil Industry as a Screw Press Machine Operator under
contractor for 6 Months.
Worked in R.K.SKYSHOP Pvt. Ltd as a Telemarketing Agent for 3 months in Chennai.
Worked in PARAMESU Biotech pvt. Ltd as an Operator for 6 months.
Presently Working as Mechanical Design Engineer in SUN KPO Systems LLP since
March, 2015.
Key Skill Sets:
Designing ability.
Product development.
Conceptual Design in 3D modelling.
R&D
TECHNICAL SKILLS:
3D modelling and Drafting in Solid works
2D and 3D modelling in Pro-E
2D and 3D modelling in Auto-Cad
Mostly familiar with Solid works of Modelling, Assembling, Weldments, Sheet Metal
and Drawing.
Achievements:
March 2015 to present Sun KPO Engineering Solutions, Secunderabad, Telangana
Senior Design Engineer:
Specialized in mechanical components, creating schematic, angle and
orthographic views using SolidWorks
Create detailed designs, blueprints and drawings using technical outlines for
new products.
Review and revise designs and initiate modifications to adjust for operating
deficiencies.
Ensure all created materials align with company policies and drafting
practices.
Guided the fresher’s to learn tool quickly.
March 2014 to 2015 Godrej Agrovet Ltd, R.P.Skyshop and Paramesu Biotech,
Andhra Pradesh and Chennai
Fruit Press operator, Telemarketing Agent and Decanter operator:
Worked as Palm fruit Press machine operator in Godrej Agrovet Ltd, which is
involved in the main process station that have to press and crush the palm
fruits those are received from the sterilization station.
Worked as Telemarketing agent in R.P Sky shop Tele buy Ltd. Which is
involved in customer relationship management through tele calls for selling
the products of the company.
Worked as Decanter operator which is for separating the gluten as solids and
water as liquids in Maize industry i.e. Paramesu Biotech Pvt Ltd.
2. Projects Summary
PROJECT#1 TUBULAR WIND TOWER_90M_2.5MW
COMPANY Goldwind Global
ROLE Design Engineer
DURATION 25/11/2015 TO PRESENT
DESCRIPTION Goldwind is a leading wind tower manufacturers in international
level which is based on Beijing. The project is from them is
“Tubular Wind Tower 80M” Re-Modelling and Re-drawing which is
internals of tower layout has changed and eliminated Service lift.
TOOLS USED Solid works
TEAM SIZE 4
RESPONSIBILITIES Requirement analysis
3D Modelling
Cost Effectiveness
Assembling in manufacturing sequence
Quality Assurance
Time Management
PROJECT#2 GTS LATTICE WIND TOWER 1_98M (GTS1)
COMPANY Global Tower Solutions (GTS)
ROLE Design Engineer
DURATION 10/07/2015 TO PRESENT
DESCRIPTION GTS wind tower project is a conceptual design project and from top
view it looks like top of the Petronas tower. Here in this main thig is
to reduce the manufacturing time and material cost. To reduce the
followed things, working on the different bracing system in the
lattice structure.
TOOLS USED Solid works
TEAM SIZE 1
RESPONSIBILITIES Requirement analysis
Part Modelling
Cost Effective Modelling
Assembling
Quality Assurance
Time Management
3. Project#3 GTS Lattice Wind Tower 2 (GTS2)
Company Global Tower Solutions (GTS)
Role Design Engineer
Duration 10/07/2015 TO PRESENT
Description GTS wind tower project 2 is a conceptual wind turbine which is 22M
tapered octagon tower with the plates on eight sides
Tools Used Solid works
Team Size 1
Responsibilities Requirement analysis
Part Modelling
Cost Effectiveness
Assembling in manufacturing sequence
Quality Assurance
Time Management
PROJECT#4 MULTI-PORT BALL VALVE
COMPANY Flo-Tite
ROLE Design Engineer
DURATION 2 Days
DESCRIPTION One Piece Ball/Stem Trunnion - Supported Type
3 Seat Design Maintains Proper Ball Position
Actuator Mounting Pad
Anti-Static Grounding Device
Open And Closed Locking Device for Positional Safety
Lockout
TOOLS USED Solid works
TEAM SIZE 1
RESPONSIBILITIES Requirement analysis
Part Modelling
Assembling
Quality Assurance
Time Management
4. PROJECT#6 APT CATWALK PLATFORM
COMPANY Automatic Processing Technologies
ROLE Design Engineer
DURATION 1 Day
DESCRIPTION APT’s Equipment Access Catwalks are designed to fit around new
or existing equipment.
TOOLS USED Solid works
TEAM SIZE 1
RESPONSIBILITIES Requirement analysis
Part Modelling
Assembling
Quality Assurance
Time Management
PROJECT#5 LOBE PUMP
COMPANY Unibloc
ROLE Design Engineer
DURATION 2 Days
DESCRIPTION The UNIBLOC-PD rotary lobe pump has set the industry standard
for high performance sanitary pumps, with the fully machined
gearbox at its core, the UNIBLOC-PD’s compact design offers a
solid foundation for reliability and durability in the field.
TOOLS USED Solid works
TEAM SIZE 1
RESPONSIBILITIES Requirement analysis
Part Modelling
Assembling
Quality Assurance
Time Management
5. PROJECT#7 BRUSHLESS DC STEP MOTOR
COMPANY FullingMotorUSA
ROLE Design Engineer
DURATION 2 Days
DESCRIPTION A brushless DC motor (BLDC) is a synchronous electric motor
which is powered by direct-current electricity (DC) and which has
an electronically controlled commutation system, instead of a
mechanical commutation system based on brushes. In such
motors, current and torque, voltage and rpm are linearly related.
TOOLS USED Solid works
TEAM SIZE 1
RESPONSIBILITIES Requirement analysis
Part Modelling
Assembling
Quality Assurance
Time Management
PROJECT#6 GEORG FISCHER PIPING SYSTEMS
COMPANY George Fischer
ROLE Design Engineer
DURATION 28 Days
DESCRIPTION Made the BOM’s or quotations as per the customer quotation
format for the following plans:
Phantom Carriage
Iron Triangle Brewery Flow loop
Canoga Park
Henniker
Dare devil
TOOLS USED Solid works, M.S.Office
TEAM SIZE 1
RESPONSIBILITIES Requirement analysis
Parts Counting
Accuracy of counting
Quality Assurance
Time Management
PROJECT#8 GEORG FISCHER PIPING SYSTEMS
COMPANY George Fischer
ROLE Design Engineer
DURATION 28 Days
DESCRIPTION Made the BOM’s or quotations as per the customer quotation
format for the following plans:
Phantom Carriage
Iron Triangle Brewery Flow loop
Canoga Park
Henniker
Dare devil
TOOLS USED Solid works, M.S.Office
TEAM SIZE 1
RESPONSIBILITIES Requirement analysis
Parts Counting
Accuracy of counting
Quality Assurance
Time Management