Introduction

• In today’s ever-changing world, the only thing that doesn’t
  change is ‘change’ itself. In a world increasingly driven by the
  three Cs: Customer, Competition and Change,
• companies are on the lookout for new solutions for their
  business problems[4]. Recently, some of the more successful
  business corporations in the world seem to have hit upon an
  incredible solution: Business Process Reengineering (BPR).
• Some of the recent headlines in the popular press read,
  “Wal-Mart reduces restocking time from six weeks
• to thirty-six hours.”” Hewlett Packard’s assembly time for
  server computers touches new low- four minutes.”
• The reason behind these success stories: Business Process
  Reengineering!
What is reengineering?
• “Reengineering is the fundamental rethinking
  and radical redesign of business processes to
  achieve dramatic improvements in critical,
  contemporary measures of performance such
  as cost, quality, service and speed”.
• BPR advocates that enterprises go back to the
  basics and reexamine their very roots. It
  doesn’t believe in small improvements. Rather
  it aims at total reinvention.
• BPR focuses on processes and not on tasks,
  jobs or people.
What to reengineer? :
• “A business process is a series of steps
  designed to produce a product or a service. It
  includes all the activities that deliver
  particular      results    for     a     given
  Customer(external or internal)”.
• Talking about the importance of processes just
  as companies have organization charts, they
  should also have what are called process maps
  to give a picture of how work flows through
  the company.
Why Reengineer?
• Historical ‘reality’ for organizations:
   – High level of demand: organizations are order takers
   – Management (and IT!) focus – efficiency and control
     of operations
• Modern ‘reality’ since 1990s:
   –   Hyper-competiveness
   –   Globalization
   –   Very demanding customers
   –   Management and IT focus: Innovation,
       responsiveness/speed, quality and service.
Ford Motor Company
• Accounts Payable function
• 500 people
• Most work on mistakes between


                          Purchase
                          Orders

              Receiving
                                     Invoices
              Documents
Ford (cont)
Ford (cont)
BPR Principles
• Organize around outcomes, not tasks.
• Have those who use the output of the process perform the
  process.
• Subsume information-processing work into the real work
  that produces the information.
• Treat geographically dispersed resources as though they
  were centralized.
• Link parallel activities instead of integrating their results.
• Put decision points where the work is performed and build
  controls into the process.
• Capture information once and at the source.
Process of BPR
• Activity #1: Prepare for Reengineering:
• “If you fail to plan, you plan to fail”. Planning and
  Preparation are vital factors for any activity or event
  to be successful, and reengineering is no exception.
  Before attempting reengineering, the question ‘Is BPR
  necessary?’ should be asked?
• There should be a significant need for the process to
  be reengineered.
• A cross-functional team is established with a game
  plan for the process of reengineering.
• Another important factor to be considered is to
  understand the expectations of your customers and
  where your existing process falls short of meeting
  those requirements.
• Having identified the customer driven objectives, the
  mission or vision statement is formulated.
Activity #2: Map and Analyze As-Is Process
• Before the reengineering team can proceed to redesign
  the process, they should understand the existing
  process.
• The important aspect of BPR (what makes BPR, BPR) is
  that the improvement should provide dramatic results.
• A large manufacturer spent six million dollars over a
  period of one year in a bid to develop a parts-tracking
  system and was all set to go online. Only then did he
  realize that he had totally overlooked a small piece of
  information – ‘the mode of transmission of information
  between the scheduling staff and the shop floor was
  through a phone call.’
Activity #2: Map and Analyze As-Is Process
• The main objective of this phase is to identify
  disconnects (anything that prevents the process
  from achieving desired results and in particular
  information transfer between organizations or
  people) and value adding processes.
• This is initiated by first creation and documentation
  of Activity and Process models.
• Then, the amount of time that each activity takes
  and the cost that each activity requires in terms of
  resources is calculated through simulation and
  activity based costing(ABC).
Activity #3: Design To-Be process
• The objective of this phase is to produce one or
  more alternatives to the current situation, which
  satisfy the strategic goals of the enterprise.
• The first step in this phase is benchmarking.
  “Benchmarking is the comparing of both the
  performance of the organization’s processes and
  the way those processes are conducted with those
  relevant peer organizations to obtain ideas for
  improvement”
• Having identified the potential improvements we
  perform simulation and ABC to analyze factors like
  the time and cost involved.
Activity #3: Design To-Be process
• The several To-Be models that are finally arrived at
  are validated. By performing Trade off Analysis the
  best possible To-Be scenarios are selected for
  implementation.
     Activity #4:Implement Reengineered Process:

•The implementation stage is where reengineering
efforts meet the most resistance and hence it is by far
the most difficult one.
•The question that confronts us would be,’ If BPR
promises such breath taking results then why wasn’t
it adopted much earlier?’
Activity #4:Implement Reengineered Process:
•requirements for the construction of the To-Be
components can be added and the result organized
into a Work Breakdown Structure (WBS).
•The benefit here is that we can now define the causal
and time sequential relationships between the
activities planned.
•Using prototyping and simulation techniques, the
transition plan is validated and it’s pilot versions are
designed and demonstrated.
• Training programs for the workers are initiated and
the plan is executed in full scale.
Activity #5: Improve Process Continuously:
• A process cannot be reengineered overnight.
• very vital part in the success of every reengineering
effort lies in improving the reengineered process
continuously.
• Two things have to be monitored – the progress of
action and the results.
• The progress of action is measured by seeing how
much more informed the people feel, how much more
commitment the management shows and how well the
change teams are accepted in the broader perspective of
the organization.
•As for monitoring the results, the monitoring should
include such measures as employee attitudes, customer
perceptions, supplier responsiveness etc
New Life Insurance Policy Application Process at
                                  Mutual Benefits Life Before Reengineering*

          Department A
             Step 1
                                                                       Department A
                                                                          Step 2
                                                                                           ....
  Issuance
  Application                     Mutual Benefits Life Before Reengineering*


                                                                       Department E
                                         Issuance
                                                                          Step 19
                                         Policy




• 30 steps, 5 departments, 19 persons
• Issuance application processing cycle time:           24 hours minimum;
  average 22 days
• only 17 minutes in actually processing the application


*Source: Adapted from Rethinking the Corporate Workplace: Case Manager at Mutual Benefit
                    Life, Harvard Business School case 9-492-015, 1991.
The New Life Insurance Policy Application Process
                           Handled by Case Managers




                                                                          Mainframe



                                   Physician
Underwriter




                                                                        LAN
              Case Manager                                              Server
                                                      PC
                                                      Workstation


                                               •   application processing cycle time: 4 hours
                                                   minimum; 2-5 days average
                                               •   Application handling capacity double
                                               •   Cut 100 field office positions
Enabling IT to Consider
•   Client/server technology
•   Groupware and collaboration technologies
•   Mobile computing (wireless LAN, pen-based computing, GPS, iPhone)
•   Data capturing technology (scanner/barcode reader/RFID)
•   Telephony: Integration of computer and telephone systems; VoIP;
    Unified communications
•   Web services and Service-Oriented Architecture (SOA)
•   Imaging technology, work flow management systems, Business
    Process Management (BPM)
•   Decision support systems, Data warehouse, Business intelligence,
    Data mining, Digital dashboard
•   ERP, CRM, SCM
•   Electronic Data Interchange (EDI), Electronic Commerce, WWW, and
    Internet
IT Enabling Effects
      Dimensions & Type                                          Examples                                           IT Enabling Effects

  Organization Entity
  • Interorganizational                         Order from a supplier                                   Lower transaction costs
                                                                                                        Eliminate intermediaries

  • Interfunctional                             Develop a new product                                   Work across geography
                                                                                                        Greater concurrency

  • Interpersonal                               Approve a bank loan                                     Integrate role and task


  Objects                                       Manufacture a product
  • Physical                                                                                            Increase outcome flexibility
                                                                                                        Control process

  • Informational                               Prepare a proposal
                                                                                                        Routinize complex decision

                                                Fill a customer order
  Activities
  • Operational                                                                                         Reduce time and costs
                                                Develop a budget                                        Increase output quality

  • Managerial                                                                                          Improve analysis
                                                                                                        Increase participation
Adapted from: Davenport, T. H. and Short, J. E., "The New Industrial Engineering: Information Technology and Business Process Redesign," Sloan Management
Review, Summer 1990, p. 17.
The Reengineering Diamond
Customers &                                              Competitors
                          Values and
Suppliers                   Beliefs


              Enlighten                        Foster




                          Customers                   Management &
         Business
       Processes &             &                      Measurement
        Functions         Info. Tech.                   Systems




               Entail                        Demand


                          Jobs , Skills, &
                          Organizational
  Culture                   Structures                        Markets
Conclusion:

• An intense customer focus, superior process
  design and a strong and motivated leadership
  are vital ingredients to the recipe for the
  success of any business corporation.
  Reengineering is the key that every
  organization should possess to attain these
  prerequisites to success.

Más contenido relacionado

La actualidad más candente

Business Process Re-Engineering
Business Process Re-Engineering Business Process Re-Engineering
Business Process Re-Engineering Dilawar Abbas
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process ReengineeringDAVIS THOMAS
 
Bpr 03 Process Re Design
Bpr 03 Process Re DesignBpr 03 Process Re Design
Bpr 03 Process Re Designmsq2004
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in TimeMusfiqur Rahman
 
Business Process Re-engineering (BPR)
Business Process Re-engineering (BPR)Business Process Re-engineering (BPR)
Business Process Re-engineering (BPR)Parth Shukla
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process ReengineeringDAVIS THOMAS
 
Quality circle
Quality circleQuality circle
Quality circleAshwin Dev
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineeringManisha Awan
 
organisational development ppt
organisational development pptorganisational development ppt
organisational development pptkohlisudeep18
 
Manufacturing systems
Manufacturing systemsManufacturing systems
Manufacturing systemsDavid Jaison
 
Facility location & steps on location selection
Facility location & steps on location selectionFacility location & steps on location selection
Facility location & steps on location selectionemmanuelpjoy1992
 
BPR- An Introduction
BPR- An IntroductionBPR- An Introduction
BPR- An IntroductionVipen Mahajan
 
Organizational development interventions
Organizational development interventionsOrganizational development interventions
Organizational development interventionsDebbie Nell Geronimo
 
Business process reengineering module 2
Business process reengineering module 2Business process reengineering module 2
Business process reengineering module 2POOJA UDAYAN
 
Bpr 01 Introduction
Bpr 01 IntroductionBpr 01 Introduction
Bpr 01 Introductionmsq2004
 

La actualidad más candente (20)

Business Process Re-Engineering
Business Process Re-Engineering Business Process Re-Engineering
Business Process Re-Engineering
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineering
 
Bpr 03 Process Re Design
Bpr 03 Process Re DesignBpr 03 Process Re Design
Bpr 03 Process Re Design
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in Time
 
Business Process Re-engineering (BPR)
Business Process Re-engineering (BPR)Business Process Re-engineering (BPR)
Business Process Re-engineering (BPR)
 
4 business process reengineering
4 business process reengineering4 business process reengineering
4 business process reengineering
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineering
 
Mazda Bpr Short
Mazda Bpr ShortMazda Bpr Short
Mazda Bpr Short
 
CAPACITY PLANNING
CAPACITY PLANNINGCAPACITY PLANNING
CAPACITY PLANNING
 
Quality circle
Quality circleQuality circle
Quality circle
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
organisational development ppt
organisational development pptorganisational development ppt
organisational development ppt
 
Manufacturing systems
Manufacturing systemsManufacturing systems
Manufacturing systems
 
Facility location & steps on location selection
Facility location & steps on location selectionFacility location & steps on location selection
Facility location & steps on location selection
 
BPR- An Introduction
BPR- An IntroductionBPR- An Introduction
BPR- An Introduction
 
Organizational development interventions
Organizational development interventionsOrganizational development interventions
Organizational development interventions
 
Business process reengineering module 2
Business process reengineering module 2Business process reengineering module 2
Business process reengineering module 2
 
Kaizen
KaizenKaizen
Kaizen
 
Organizational change-model
Organizational change-modelOrganizational change-model
Organizational change-model
 
Bpr 01 Introduction
Bpr 01 IntroductionBpr 01 Introduction
Bpr 01 Introduction
 

Destacado

Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineeringtheairliner
 
إعادة هندسة العمليات الإدارية
إعادة هندسة العمليات الإداريةإعادة هندسة العمليات الإدارية
إعادة هندسة العمليات الإداريةAbdullrahman Tayshoori
 
Concurrent engineering
Concurrent engineeringConcurrent engineering
Concurrent engineeringHome
 
Taco Bell
Taco BellTaco Bell
Taco Bellmsq2004
 
Planning the marketing for 300 bedded corporate hospital
Planning the marketing for 300 bedded corporate hospitalPlanning the marketing for 300 bedded corporate hospital
Planning the marketing for 300 bedded corporate hospital Dr.Priyanka Phonde
 
ALL ABOUT MARKETING by Aditi Walia
ALL ABOUT MARKETING by Aditi WaliaALL ABOUT MARKETING by Aditi Walia
ALL ABOUT MARKETING by Aditi WaliaAditi Walia
 
Business process Re-engineering of Mahindra & mahindra
Business process Re-engineering of Mahindra & mahindra  Business process Re-engineering of Mahindra & mahindra
Business process Re-engineering of Mahindra & mahindra Sanket Kulkarni
 
Mahindra & Mahindra
Mahindra & MahindraMahindra & Mahindra
Mahindra & Mahindraivank30
 
Quality Function Deployment
Quality Function DeploymentQuality Function Deployment
Quality Function Deploymentguy_davis
 
Process engineer performance appraisal
Process engineer performance appraisalProcess engineer performance appraisal
Process engineer performance appraisaltaylorshannon964
 
Quality function deployment
Quality function deploymentQuality function deployment
Quality function deploymentPreeti Mishra
 
Relational algebra in dbms
Relational algebra in dbmsRelational algebra in dbms
Relational algebra in dbmsshekhar1991
 
Relational Algebra-Database Systems
Relational Algebra-Database SystemsRelational Algebra-Database Systems
Relational Algebra-Database Systemsjakodongo
 
Architecture of-dbms-and-data-independence
Architecture of-dbms-and-data-independenceArchitecture of-dbms-and-data-independence
Architecture of-dbms-and-data-independenceAnuj Modi
 

Destacado (20)

Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineering
 
إعادة هندسة العمليات الإدارية
إعادة هندسة العمليات الإداريةإعادة هندسة العمليات الإدارية
إعادة هندسة العمليات الإدارية
 
MBNQA
MBNQAMBNQA
MBNQA
 
Concurrent engineering
Concurrent engineeringConcurrent engineering
Concurrent engineering
 
Taco Bell
Taco BellTaco Bell
Taco Bell
 
Planning the marketing for 300 bedded corporate hospital
Planning the marketing for 300 bedded corporate hospitalPlanning the marketing for 300 bedded corporate hospital
Planning the marketing for 300 bedded corporate hospital
 
ALL ABOUT MARKETING by Aditi Walia
ALL ABOUT MARKETING by Aditi WaliaALL ABOUT MARKETING by Aditi Walia
ALL ABOUT MARKETING by Aditi Walia
 
Business process Re-engineering of Mahindra & mahindra
Business process Re-engineering of Mahindra & mahindra  Business process Re-engineering of Mahindra & mahindra
Business process Re-engineering of Mahindra & mahindra
 
Mahindra & Mahindra
Mahindra & MahindraMahindra & Mahindra
Mahindra & Mahindra
 
kaizen (mba bf)
kaizen (mba bf)kaizen (mba bf)
kaizen (mba bf)
 
Quality Function Deployment
Quality Function DeploymentQuality Function Deployment
Quality Function Deployment
 
Process engineer performance appraisal
Process engineer performance appraisalProcess engineer performance appraisal
Process engineer performance appraisal
 
M&M Bpr Final
M&M Bpr FinalM&M Bpr Final
M&M Bpr Final
 
Quality function deployment
Quality function deploymentQuality function deployment
Quality function deployment
 
Kaizen sqc
Kaizen sqcKaizen sqc
Kaizen sqc
 
House of quality
House  of  qualityHouse  of  quality
House of quality
 
Dbms architecture
Dbms architectureDbms architecture
Dbms architecture
 
Relational algebra in dbms
Relational algebra in dbmsRelational algebra in dbms
Relational algebra in dbms
 
Relational Algebra-Database Systems
Relational Algebra-Database SystemsRelational Algebra-Database Systems
Relational Algebra-Database Systems
 
Architecture of-dbms-and-data-independence
Architecture of-dbms-and-data-independenceArchitecture of-dbms-and-data-independence
Architecture of-dbms-and-data-independence
 

Similar a Business process reengineering

Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement BprRoy Antony Arnold G
 
Business process re- engineering
Business process re- engineeringBusiness process re- engineering
Business process re- engineeringAshutosh Sharma
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process ReengineeringShillu Blue
 
Enterprise resource planning, business process re engineering, Total Producti...
Enterprise resource planning, business process re engineering, Total Producti...Enterprise resource planning, business process re engineering, Total Producti...
Enterprise resource planning, business process re engineering, Total Producti...Rajesh Singh
 
Business Process Reengineering | Case studies
Business Process Reengineering | Case studiesBusiness Process Reengineering | Case studies
Business Process Reengineering | Case studiesSumit Sanyal
 
Strategic Change - Revolution
Strategic Change - RevolutionStrategic Change - Revolution
Strategic Change - Revolutionemmabutler14
 
ERPAL + ERP Solution, Case Study
ERPAL + ERP Solution, Case StudyERPAL + ERP Solution, Case Study
ERPAL + ERP Solution, Case StudyAniket Maithani
 
Business Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIABusiness Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIAAditi Walia
 
Cmmi agile kulpa 2004meas cmmi[1]
Cmmi  agile kulpa 2004meas cmmi[1]Cmmi  agile kulpa 2004meas cmmi[1]
Cmmi agile kulpa 2004meas cmmi[1]JULIO GONZALEZ SANZ
 
BPM (Business Process Management) Introduction
BPM (Business Process Management) IntroductionBPM (Business Process Management) Introduction
BPM (Business Process Management) IntroductionIntegrify
 
HR Software - Find Your Match
HR Software - Find Your MatchHR Software - Find Your Match
HR Software - Find Your MatchCascadeHR
 
Reacing Strategic Edge
Reacing Strategic EdgeReacing Strategic Edge
Reacing Strategic EdgePrashant Mehta
 
Business Process Re engineering
Business Process Re engineeringBusiness Process Re engineering
Business Process Re engineeringAnkur Verma
 
CRM Implementations and Upgrades
CRM Implementations and UpgradesCRM Implementations and Upgrades
CRM Implementations and UpgradesPeter Ware PMP
 
Business Process Re-engineering
Business Process Re-engineeringBusiness Process Re-engineering
Business Process Re-engineeringVyomus Consulting
 

Similar a Business process reengineering (20)

BPR ppt.pptx
BPR ppt.pptxBPR ppt.pptx
BPR ppt.pptx
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement Bpr
 
Unit1 introduction bpr
Unit1 introduction bprUnit1 introduction bpr
Unit1 introduction bpr
 
Business process re- engineering
Business process re- engineeringBusiness process re- engineering
Business process re- engineering
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineering
 
ERP ppt.ppt
ERP ppt.pptERP ppt.ppt
ERP ppt.ppt
 
Enterprise resource planning, business process re engineering, Total Producti...
Enterprise resource planning, business process re engineering, Total Producti...Enterprise resource planning, business process re engineering, Total Producti...
Enterprise resource planning, business process re engineering, Total Producti...
 
Business Process Reengineering | Case studies
Business Process Reengineering | Case studiesBusiness Process Reengineering | Case studies
Business Process Reengineering | Case studies
 
Strategic Change - Revolution
Strategic Change - RevolutionStrategic Change - Revolution
Strategic Change - Revolution
 
ERPAL + ERP Solution, Case Study
ERPAL + ERP Solution, Case StudyERPAL + ERP Solution, Case Study
ERPAL + ERP Solution, Case Study
 
Business Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIABusiness Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIA
 
Cmmi agile kulpa 2004meas cmmi[1]
Cmmi  agile kulpa 2004meas cmmi[1]Cmmi  agile kulpa 2004meas cmmi[1]
Cmmi agile kulpa 2004meas cmmi[1]
 
Erp
Erp Erp
Erp
 
BPM (Business Process Management) Introduction
BPM (Business Process Management) IntroductionBPM (Business Process Management) Introduction
BPM (Business Process Management) Introduction
 
HR Software - Find Your Match
HR Software - Find Your MatchHR Software - Find Your Match
HR Software - Find Your Match
 
20959.pptx
20959.pptx20959.pptx
20959.pptx
 
Reacing Strategic Edge
Reacing Strategic EdgeReacing Strategic Edge
Reacing Strategic Edge
 
Business Process Re engineering
Business Process Re engineeringBusiness Process Re engineering
Business Process Re engineering
 
CRM Implementations and Upgrades
CRM Implementations and UpgradesCRM Implementations and Upgrades
CRM Implementations and Upgrades
 
Business Process Re-engineering
Business Process Re-engineeringBusiness Process Re-engineering
Business Process Re-engineering
 

Último

Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Availablepr788182
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...yulianti213969
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableCuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Availablepr788182
 
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDINGPuri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDINGpriyakumari801827
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxDitasDelaCruz
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxCynthia Clay
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAITim Wilson
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...meghakumariji156
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Falcon Invoice Discounting
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...ssuserf63bd7
 

Último (20)

Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableCuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDINGPuri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 

Business process reengineering

  • 2. Introduction • In today’s ever-changing world, the only thing that doesn’t change is ‘change’ itself. In a world increasingly driven by the three Cs: Customer, Competition and Change, • companies are on the lookout for new solutions for their business problems[4]. Recently, some of the more successful business corporations in the world seem to have hit upon an incredible solution: Business Process Reengineering (BPR). • Some of the recent headlines in the popular press read, “Wal-Mart reduces restocking time from six weeks • to thirty-six hours.”” Hewlett Packard’s assembly time for server computers touches new low- four minutes.” • The reason behind these success stories: Business Process Reengineering!
  • 3. What is reengineering? • “Reengineering is the fundamental rethinking and radical redesign of business processes to achieve dramatic improvements in critical, contemporary measures of performance such as cost, quality, service and speed”. • BPR advocates that enterprises go back to the basics and reexamine their very roots. It doesn’t believe in small improvements. Rather it aims at total reinvention. • BPR focuses on processes and not on tasks, jobs or people.
  • 4. What to reengineer? : • “A business process is a series of steps designed to produce a product or a service. It includes all the activities that deliver particular results for a given Customer(external or internal)”. • Talking about the importance of processes just as companies have organization charts, they should also have what are called process maps to give a picture of how work flows through the company.
  • 5. Why Reengineer? • Historical ‘reality’ for organizations: – High level of demand: organizations are order takers – Management (and IT!) focus – efficiency and control of operations • Modern ‘reality’ since 1990s: – Hyper-competiveness – Globalization – Very demanding customers – Management and IT focus: Innovation, responsiveness/speed, quality and service.
  • 6. Ford Motor Company • Accounts Payable function • 500 people • Most work on mistakes between Purchase Orders Receiving Invoices Documents
  • 9. BPR Principles • Organize around outcomes, not tasks. • Have those who use the output of the process perform the process. • Subsume information-processing work into the real work that produces the information. • Treat geographically dispersed resources as though they were centralized. • Link parallel activities instead of integrating their results. • Put decision points where the work is performed and build controls into the process. • Capture information once and at the source.
  • 11. • Activity #1: Prepare for Reengineering: • “If you fail to plan, you plan to fail”. Planning and Preparation are vital factors for any activity or event to be successful, and reengineering is no exception. Before attempting reengineering, the question ‘Is BPR necessary?’ should be asked? • There should be a significant need for the process to be reengineered. • A cross-functional team is established with a game plan for the process of reengineering. • Another important factor to be considered is to understand the expectations of your customers and where your existing process falls short of meeting those requirements. • Having identified the customer driven objectives, the mission or vision statement is formulated.
  • 12. Activity #2: Map and Analyze As-Is Process • Before the reengineering team can proceed to redesign the process, they should understand the existing process. • The important aspect of BPR (what makes BPR, BPR) is that the improvement should provide dramatic results. • A large manufacturer spent six million dollars over a period of one year in a bid to develop a parts-tracking system and was all set to go online. Only then did he realize that he had totally overlooked a small piece of information – ‘the mode of transmission of information between the scheduling staff and the shop floor was through a phone call.’
  • 13. Activity #2: Map and Analyze As-Is Process • The main objective of this phase is to identify disconnects (anything that prevents the process from achieving desired results and in particular information transfer between organizations or people) and value adding processes. • This is initiated by first creation and documentation of Activity and Process models. • Then, the amount of time that each activity takes and the cost that each activity requires in terms of resources is calculated through simulation and activity based costing(ABC).
  • 14. Activity #3: Design To-Be process • The objective of this phase is to produce one or more alternatives to the current situation, which satisfy the strategic goals of the enterprise. • The first step in this phase is benchmarking. “Benchmarking is the comparing of both the performance of the organization’s processes and the way those processes are conducted with those relevant peer organizations to obtain ideas for improvement” • Having identified the potential improvements we perform simulation and ABC to analyze factors like the time and cost involved.
  • 15. Activity #3: Design To-Be process • The several To-Be models that are finally arrived at are validated. By performing Trade off Analysis the best possible To-Be scenarios are selected for implementation. Activity #4:Implement Reengineered Process: •The implementation stage is where reengineering efforts meet the most resistance and hence it is by far the most difficult one. •The question that confronts us would be,’ If BPR promises such breath taking results then why wasn’t it adopted much earlier?’
  • 16. Activity #4:Implement Reengineered Process: •requirements for the construction of the To-Be components can be added and the result organized into a Work Breakdown Structure (WBS). •The benefit here is that we can now define the causal and time sequential relationships between the activities planned. •Using prototyping and simulation techniques, the transition plan is validated and it’s pilot versions are designed and demonstrated. • Training programs for the workers are initiated and the plan is executed in full scale.
  • 17. Activity #5: Improve Process Continuously: • A process cannot be reengineered overnight. • very vital part in the success of every reengineering effort lies in improving the reengineered process continuously. • Two things have to be monitored – the progress of action and the results. • The progress of action is measured by seeing how much more informed the people feel, how much more commitment the management shows and how well the change teams are accepted in the broader perspective of the organization. •As for monitoring the results, the monitoring should include such measures as employee attitudes, customer perceptions, supplier responsiveness etc
  • 18. New Life Insurance Policy Application Process at Mutual Benefits Life Before Reengineering* Department A Step 1 Department A Step 2 .... Issuance Application Mutual Benefits Life Before Reengineering* Department E Issuance Step 19 Policy • 30 steps, 5 departments, 19 persons • Issuance application processing cycle time: 24 hours minimum; average 22 days • only 17 minutes in actually processing the application *Source: Adapted from Rethinking the Corporate Workplace: Case Manager at Mutual Benefit Life, Harvard Business School case 9-492-015, 1991.
  • 19. The New Life Insurance Policy Application Process Handled by Case Managers Mainframe Physician Underwriter LAN Case Manager Server PC Workstation • application processing cycle time: 4 hours minimum; 2-5 days average • Application handling capacity double • Cut 100 field office positions
  • 20. Enabling IT to Consider • Client/server technology • Groupware and collaboration technologies • Mobile computing (wireless LAN, pen-based computing, GPS, iPhone) • Data capturing technology (scanner/barcode reader/RFID) • Telephony: Integration of computer and telephone systems; VoIP; Unified communications • Web services and Service-Oriented Architecture (SOA) • Imaging technology, work flow management systems, Business Process Management (BPM) • Decision support systems, Data warehouse, Business intelligence, Data mining, Digital dashboard • ERP, CRM, SCM • Electronic Data Interchange (EDI), Electronic Commerce, WWW, and Internet
  • 21. IT Enabling Effects Dimensions & Type Examples IT Enabling Effects Organization Entity • Interorganizational Order from a supplier Lower transaction costs Eliminate intermediaries • Interfunctional Develop a new product Work across geography Greater concurrency • Interpersonal Approve a bank loan Integrate role and task Objects Manufacture a product • Physical Increase outcome flexibility Control process • Informational Prepare a proposal Routinize complex decision Fill a customer order Activities • Operational Reduce time and costs Develop a budget Increase output quality • Managerial Improve analysis Increase participation Adapted from: Davenport, T. H. and Short, J. E., "The New Industrial Engineering: Information Technology and Business Process Redesign," Sloan Management Review, Summer 1990, p. 17.
  • 22. The Reengineering Diamond Customers & Competitors Values and Suppliers Beliefs Enlighten Foster Customers Management & Business Processes & & Measurement Functions Info. Tech. Systems Entail Demand Jobs , Skills, & Organizational Culture Structures Markets
  • 23. Conclusion: • An intense customer focus, superior process design and a strong and motivated leadership are vital ingredients to the recipe for the success of any business corporation. Reengineering is the key that every organization should possess to attain these prerequisites to success.