Why "Testing of Circuit Breaker" is Necessary?
A Circuit Breaker should be capable of carrying, making, and
breaking under normal and abnormal conditions. In any power
system circuit breaker has to withstand power frequency over
voltages and transient over voltages due to switching and
lightning.
The performance of a circuit breaker under normal and abnormal
conditions can be verified by performing different type of tests
on circuit breakers. The main purpose of testing of circuit
breakers is to confirm if circuit breaker is able to work on
particular voltage and current ratings or not.
There are mainly two tests classified:
1) Type test
2) Routine Test
1) Type Tests:
The purpose of type tests is to prove design
features and the quality of circuit breaker. Type tests
are not conducted on each circuit breaker. This is
done to prove the capabilities and to confirm the
rated characteristics of the circuit breakers.
2)Routine Tests:
Routine test is performed before circuit
breaker dispatch to ensure the product.
This gives result about defects in
materials and construction of circuit
breaker. We can check quality of material
of circuit breaker by performing Routine
Test.
 Mechanical endurance tests
 Thermal tests
 Dielectric tests
 Measurement of resistance of the main circuits
 Short Circuit tests
In this test, the C.B.. is open and closed 500 times or
other value as agreed to between the purchaser and the
supplier.the test are carried out without current through
the main circuit of the C.B.Out of the total number of
tests, 10% should be closed-open operation,that is with
the tripping,mechanism energized by the closing of
main contacts.During the tests,occasional
lubrication,but no mechanical adjustments are
permissible.after the tests,all parts including contacts
should be in good condition and there should be no
permanent distortion and undue wear of the parts.
This test determines the maximum normal current that the
circuit breaker can carry without exceeding the maximum
allowable temperature rise.In this test the rated normal
current of normal frequency is passed through the current
carrying parts of circuit breaker.
Method are recognized by Indian standards for measuring
temperature rise of parts:-
1) Thermometer method
2) Thermocouple method
3) Self resistance method
1) Breaking capacity Test:-
• Sequence of performing this tests is as follows:-
 First of all,the master circuit breaker (MB)and the breaker under test
(TB)are closed.
 The s.c.current is passed by closing the make switch.
 The circuit breaker under test(TB) is opened to interrupt the s.c.current at
desired moment.
• The following measurements related to the breaking capacity
performance are taken from the oscillogram during the test:-
 Symmetrical breaking current
 Asymmetrical breaking current
 Amplitude factor
 Natural frequency of oscillations and RRRV(RATE OF RISE OF
RISTRIKING VOLTAGE)
Sequence of Performing this test :-
First of all,the master circuit breaker (MB)and the
make switch(MS) are closed.
Then,the short circuit current is initiated by closing
the test breaker (TB).
The rated short circuit making current i.e.the peak
value of the first major loop of the short circuit current
envelope is measured from the oscillorgram.
3(Short Time Withstand Current Capacity
In this test,the rated short-time withstand current is
applied to the circuit breaker
under test for the specified duration of the time.
The rated short time withstand current is equal to be
rated short circuit breaking current and standarad
value of rated duration of short circuit current is 1
second or 3 seconds.
The current is measured by taking an oscillograph of
the short circuit current wave.
After the test,there should be no mechanical or
insulation damage and any contact welding.
Routine Test Listed Below:-
1(Mechanical Operational test
2(One-Minute power frequency
voltage dry withstand test
3(Measurement of resistance of main
circuits
 This test should be made before temperature rise
test.The measurement of resistance is made by
measuring dc voltage drop or resistance across the
terminals of each pole of circuit breaker.The current
during the test shall have any convenient value
between 100 A and the rated current of the circuit
breaker.The d.c. resistance of main contact of each
pole of a circuit breaker is of the order of a few tens
of micro-ohms.
 Operational tests are made to ensure that the circuit breakers
comply with prescribed operating conditions within the specified
voltage and supply pressure limits of their opening and closing
devices.
 During routine test five opening and five closing operations should
carry out at
a. Minimum supply voltage and pressure
b. Maximum supply voltage and pressure
After the test,all parts should be in good condition and should not
undue wear.
 
The preliminary preparations of circuit breaker testing include
the following:
 Connect the equipment.
 Adjust the correct values of resistance and reactors to set
the required magnitude of short circuit.
 Connect and set the transformer to get desired test voltage.
 The contacts on sequence switch are adjusted to get
desired timings.
 Oscillographs are adjusted and calibrated.
• 1) Short Circuit generator:-
It is a specially designed generator having very low
leakage reactance to provide short power for testing c.b.
It is driven by 3-phse induction motor.A flywheel is
provided on shaft of generator to supply kinetic energy
during short circuit and helps in spped regulation.
• 2)Short Circuit Transformer:-
 It is connected between TB and power source.It is used
to allow for flexibility to test at different voltage levels and
also provide isolation between the power source and test
breaker.
It is designed to have low leakage reactance and to
withstand repeated short circuit.
It is used as a back up c.b. to interrupt the short circuit
current in event of c.b.under test(TB) fails to operate.It
has higher capacity than the circuit breaker under
test.After every test,it is also isolates the test circuit
breaker(TB) from the supply source.It is set to operate at
a predetermined time after the initiation of short circuit
4) Make Switch(MS):-
It is very high speed switch used for initiation of short
circuit test current at desired moment.Recently,SF6 gas
make switch are used in short circuit testing station.
5) Reactors(L):-
It is connected in series.It is used to limit or control the
magnitude of the short circuit or test current to its
required value.
6) Resistors and Capacitors (R and C):-
TRV shaping circuit(R and C) is connected across the
circuit breaker under test(TB).This circuit is used to control
transient recovery voltage(TRV).Capacitors are also used
for voltage measurement.
7) Measuring Equipments:-
 For the measurements of voltage,voltage
dividers are used and for cureent measurements
shunts or CTs are used in the short circuit testing
stations.
Photo Of Testing Of Circuit Breaker
Testing of c.b.(hk & hr) nihal

Más contenido relacionado

La actualidad más candente

Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenancekarikalan123
 
Lightning impulse test in precise
Lightning impulse test in  preciseLightning impulse test in  precise
Lightning impulse test in preciseMuthar Hussain
 
Lightning Arrester Working Principle & Types
Lightning Arrester Working Principle & TypesLightning Arrester Working Principle & Types
Lightning Arrester Working Principle & TypesPower System Operation
 
DC potentiometers
DC potentiometersDC potentiometers
DC potentiometerstadi1padma
 
Switchgear and protection 2
Switchgear and protection 2Switchgear and protection 2
Switchgear and protection 2Md Irshad Ahmad
 
circuit breakers ppt by gaurav
circuit breakers ppt by gauravcircuit breakers ppt by gaurav
circuit breakers ppt by gauravAnkit Vij
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenancePremanandDesai
 
Switchgear and protection 4
Switchgear and protection 4Switchgear and protection 4
Switchgear and protection 4Md Irshad Ahmad
 
Testing of circuit breakers
Testing of circuit breakersTesting of circuit breakers
Testing of circuit breakersKabilesh K
 
Circuit Breaker : Types
Circuit Breaker : TypesCircuit Breaker : Types
Circuit Breaker : TypesRidwanul Hoque
 
Electromagnetic Protection (PART III)
Electromagnetic Protection (PART III)Electromagnetic Protection (PART III)
Electromagnetic Protection (PART III)Dr. Rohit Babu
 
Seminar on circuit breaker
Seminar on circuit breakerSeminar on circuit breaker
Seminar on circuit breakerSaroj Sahoo
 
Impulse test for power transformers
Impulse test for power transformersImpulse test for power transformers
Impulse test for power transformersjibinjoy1988
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1Md Irshad Ahmad
 
High voltage testing of electrical transformer
High voltage testing of electrical transformerHigh voltage testing of electrical transformer
High voltage testing of electrical transformerPraveenKumar5880
 

La actualidad más candente (20)

Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenance
 
ppt
pptppt
ppt
 
Lightning impulse test in precise
Lightning impulse test in  preciseLightning impulse test in  precise
Lightning impulse test in precise
 
Lightning Arrester Working Principle & Types
Lightning Arrester Working Principle & TypesLightning Arrester Working Principle & Types
Lightning Arrester Working Principle & Types
 
DC potentiometers
DC potentiometersDC potentiometers
DC potentiometers
 
Switchgear and protection 2
Switchgear and protection 2Switchgear and protection 2
Switchgear and protection 2
 
circuit breakers ppt by gaurav
circuit breakers ppt by gauravcircuit breakers ppt by gaurav
circuit breakers ppt by gaurav
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenance
 
Switchgear and protection 4
Switchgear and protection 4Switchgear and protection 4
Switchgear and protection 4
 
circuit breaker
circuit breakercircuit breaker
circuit breaker
 
Testing of circuit breakers
Testing of circuit breakersTesting of circuit breakers
Testing of circuit breakers
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
Protection and Switchgear
 
Circuit Breaker : Types
Circuit Breaker : TypesCircuit Breaker : Types
Circuit Breaker : Types
 
Electromagnetic Protection (PART III)
Electromagnetic Protection (PART III)Electromagnetic Protection (PART III)
Electromagnetic Protection (PART III)
 
Seminar on circuit breaker
Seminar on circuit breakerSeminar on circuit breaker
Seminar on circuit breaker
 
Single Line Diagram.pptx
Single Line Diagram.pptxSingle Line Diagram.pptx
Single Line Diagram.pptx
 
Impulse test for power transformers
Impulse test for power transformersImpulse test for power transformers
Impulse test for power transformers
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
 
High voltage testing of electrical transformer
High voltage testing of electrical transformerHigh voltage testing of electrical transformer
High voltage testing of electrical transformer
 

Destacado

Digital testing of high voltage circuit breaker
Digital testing of high voltage circuit breakerDigital testing of high voltage circuit breaker
Digital testing of high voltage circuit breakerneeraj prasad
 
Er. rahul sharma circuit breaker
Er. rahul sharma circuit breakerEr. rahul sharma circuit breaker
Er. rahul sharma circuit breakerRahul Ruddra
 
digital testing of high voltage circuit breaker
digital testing of high voltage circuit breakerdigital testing of high voltage circuit breaker
digital testing of high voltage circuit breakerRenuka Verma
 
2.components in a substation breaker
2.components in a substation   breaker2.components in a substation   breaker
2.components in a substation breakerayyadurai SHANMUGAM
 
Circuit Breaker, Recloser and Tap-Changer Instrument Testing
Circuit Breaker, Recloser and Tap-Changer Instrument TestingCircuit Breaker, Recloser and Tap-Changer Instrument Testing
Circuit Breaker, Recloser and Tap-Changer Instrument Testinginfoweb12
 
Schering bridge
Schering bridge Schering bridge
Schering bridge mihir jain
 
TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR ...
TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR                   ...TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR                   ...
TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR ...Shivakumar Shivu
 
High voltage engineering
High voltage engineeringHigh voltage engineering
High voltage engineeringHari Kumar
 
Ppt maintenance cb(encrypted)
Ppt maintenance cb(encrypted)Ppt maintenance cb(encrypted)
Ppt maintenance cb(encrypted)Rohini Haridas
 
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...Prannay Kumar Giri
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsSumeet Ratnawat
 
Best transformer-test-procedures-en
Best transformer-test-procedures-enBest transformer-test-procedures-en
Best transformer-test-procedures-enSuresh Patil
 
Circuit breaker Maintenance By Mobile Agent Software Technology
Circuit breaker Maintenance By Mobile Agent Software TechnologyCircuit breaker Maintenance By Mobile Agent Software Technology
Circuit breaker Maintenance By Mobile Agent Software Technologysiddhartha muduli
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformervikasgupta1965
 

Destacado (20)

Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 
HV Circuit Breaker Testing
HV Circuit Breaker TestingHV Circuit Breaker Testing
HV Circuit Breaker Testing
 
Digital testing of high voltage circuit breaker
Digital testing of high voltage circuit breakerDigital testing of high voltage circuit breaker
Digital testing of high voltage circuit breaker
 
Er. rahul sharma circuit breaker
Er. rahul sharma circuit breakerEr. rahul sharma circuit breaker
Er. rahul sharma circuit breaker
 
digital testing of high voltage circuit breaker
digital testing of high voltage circuit breakerdigital testing of high voltage circuit breaker
digital testing of high voltage circuit breaker
 
2.components in a substation breaker
2.components in a substation   breaker2.components in a substation   breaker
2.components in a substation breaker
 
final yr project-1
final yr project-1final yr project-1
final yr project-1
 
Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 
1+1 venky
1+1 venky1+1 venky
1+1 venky
 
Circuit Breaker, Recloser and Tap-Changer Instrument Testing
Circuit Breaker, Recloser and Tap-Changer Instrument TestingCircuit Breaker, Recloser and Tap-Changer Instrument Testing
Circuit Breaker, Recloser and Tap-Changer Instrument Testing
 
Schering bridge
Schering bridge Schering bridge
Schering bridge
 
Akt tl design01
Akt tl design01Akt tl design01
Akt tl design01
 
TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR ...
TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR                   ...TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR                   ...
TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR ...
 
High voltage engineering
High voltage engineeringHigh voltage engineering
High voltage engineering
 
Ppt maintenance cb(encrypted)
Ppt maintenance cb(encrypted)Ppt maintenance cb(encrypted)
Ppt maintenance cb(encrypted)
 
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation Equipments
 
Best transformer-test-procedures-en
Best transformer-test-procedures-enBest transformer-test-procedures-en
Best transformer-test-procedures-en
 
Circuit breaker Maintenance By Mobile Agent Software Technology
Circuit breaker Maintenance By Mobile Agent Software TechnologyCircuit breaker Maintenance By Mobile Agent Software Technology
Circuit breaker Maintenance By Mobile Agent Software Technology
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 

Similar a Testing of c.b.(hk & hr) nihal

Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushingNovia Putri
 
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...Ali Sepehri
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxRAJKIRANR3
 
AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100Ali Sepehri
 
switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxDrNiveditaSingh3
 
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...Ali Sepehri
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear johny renoald
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentationNadir Baloch
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSatish Pydimarla
 
Relay testing.............................
Relay testing.............................Relay testing.............................
Relay testing.............................hiiarindam
 
Electrical disturbances from conduction and coupling.pptx
Electrical disturbances from conduction and coupling.pptxElectrical disturbances from conduction and coupling.pptx
Electrical disturbances from conduction and coupling.pptxPritishPachhapure1
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHShankar Singh
 

Similar a Testing of c.b.(hk & hr) nihal (20)

Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushing
 
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
 
ET 5 LESSON 2 TEST EQUIPMENT.pptx
ET 5 LESSON 2 TEST EQUIPMENT.pptxET 5 LESSON 2 TEST EQUIPMENT.pptx
ET 5 LESSON 2 TEST EQUIPMENT.pptx
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptx
 
AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100
 
switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptx
 
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptx
 
Relay testing.............................
Relay testing.............................Relay testing.............................
Relay testing.............................
 
16950
1695016950
16950
 
Test Switch Operation, Specifications & Accesories
Test Switch Operation, Specifications & Accesories Test Switch Operation, Specifications & Accesories
Test Switch Operation, Specifications & Accesories
 
Test Switch Operation, Specification & Accessories
Test Switch Operation, Specification & AccessoriesTest Switch Operation, Specification & Accessories
Test Switch Operation, Specification & Accessories
 
Unit 1-2-b
Unit 1-2-bUnit 1-2-b
Unit 1-2-b
 
Electrical disturbances from conduction and coupling.pptx
Electrical disturbances from conduction and coupling.pptxElectrical disturbances from conduction and coupling.pptx
Electrical disturbances from conduction and coupling.pptx
 
Electrical testing
Electrical testingElectrical testing
Electrical testing
 
SEMA 2016 - Introduction to Transformer Rated Metering
SEMA 2016 -  Introduction to Transformer Rated MeteringSEMA 2016 -  Introduction to Transformer Rated Metering
SEMA 2016 - Introduction to Transformer Rated Metering
 
Meduim Voltage Switchgear.pptx
Meduim Voltage Switchgear.pptxMeduim Voltage Switchgear.pptx
Meduim Voltage Switchgear.pptx
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
 

Último

The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 

Último (20)

The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 

Testing of c.b.(hk & hr) nihal

  • 2. Why "Testing of Circuit Breaker" is Necessary? A Circuit Breaker should be capable of carrying, making, and breaking under normal and abnormal conditions. In any power system circuit breaker has to withstand power frequency over voltages and transient over voltages due to switching and lightning. The performance of a circuit breaker under normal and abnormal conditions can be verified by performing different type of tests on circuit breakers. The main purpose of testing of circuit breakers is to confirm if circuit breaker is able to work on particular voltage and current ratings or not.
  • 3. There are mainly two tests classified: 1) Type test 2) Routine Test 1) Type Tests: The purpose of type tests is to prove design features and the quality of circuit breaker. Type tests are not conducted on each circuit breaker. This is done to prove the capabilities and to confirm the rated characteristics of the circuit breakers.
  • 4. 2)Routine Tests: Routine test is performed before circuit breaker dispatch to ensure the product. This gives result about defects in materials and construction of circuit breaker. We can check quality of material of circuit breaker by performing Routine Test.
  • 5.  Mechanical endurance tests  Thermal tests  Dielectric tests  Measurement of resistance of the main circuits  Short Circuit tests
  • 6. In this test, the C.B.. is open and closed 500 times or other value as agreed to between the purchaser and the supplier.the test are carried out without current through the main circuit of the C.B.Out of the total number of tests, 10% should be closed-open operation,that is with the tripping,mechanism energized by the closing of main contacts.During the tests,occasional lubrication,but no mechanical adjustments are permissible.after the tests,all parts including contacts should be in good condition and there should be no permanent distortion and undue wear of the parts.
  • 7. This test determines the maximum normal current that the circuit breaker can carry without exceeding the maximum allowable temperature rise.In this test the rated normal current of normal frequency is passed through the current carrying parts of circuit breaker. Method are recognized by Indian standards for measuring temperature rise of parts:- 1) Thermometer method 2) Thermocouple method 3) Self resistance method
  • 8. 1) Breaking capacity Test:- • Sequence of performing this tests is as follows:-  First of all,the master circuit breaker (MB)and the breaker under test (TB)are closed.  The s.c.current is passed by closing the make switch.  The circuit breaker under test(TB) is opened to interrupt the s.c.current at desired moment. • The following measurements related to the breaking capacity performance are taken from the oscillogram during the test:-  Symmetrical breaking current  Asymmetrical breaking current  Amplitude factor  Natural frequency of oscillations and RRRV(RATE OF RISE OF RISTRIKING VOLTAGE)
  • 9. Sequence of Performing this test :- First of all,the master circuit breaker (MB)and the make switch(MS) are closed. Then,the short circuit current is initiated by closing the test breaker (TB). The rated short circuit making current i.e.the peak value of the first major loop of the short circuit current envelope is measured from the oscillorgram.
  • 10. 3(Short Time Withstand Current Capacity In this test,the rated short-time withstand current is applied to the circuit breaker under test for the specified duration of the time. The rated short time withstand current is equal to be rated short circuit breaking current and standarad value of rated duration of short circuit current is 1 second or 3 seconds. The current is measured by taking an oscillograph of the short circuit current wave. After the test,there should be no mechanical or insulation damage and any contact welding.
  • 11. Routine Test Listed Below:- 1(Mechanical Operational test 2(One-Minute power frequency voltage dry withstand test 3(Measurement of resistance of main circuits
  • 12.  This test should be made before temperature rise test.The measurement of resistance is made by measuring dc voltage drop or resistance across the terminals of each pole of circuit breaker.The current during the test shall have any convenient value between 100 A and the rated current of the circuit breaker.The d.c. resistance of main contact of each pole of a circuit breaker is of the order of a few tens of micro-ohms.
  • 13.  Operational tests are made to ensure that the circuit breakers comply with prescribed operating conditions within the specified voltage and supply pressure limits of their opening and closing devices.  During routine test five opening and five closing operations should carry out at a. Minimum supply voltage and pressure b. Maximum supply voltage and pressure After the test,all parts should be in good condition and should not undue wear.
  • 14.   The preliminary preparations of circuit breaker testing include the following:  Connect the equipment.  Adjust the correct values of resistance and reactors to set the required magnitude of short circuit.  Connect and set the transformer to get desired test voltage.  The contacts on sequence switch are adjusted to get desired timings.  Oscillographs are adjusted and calibrated.
  • 15. • 1) Short Circuit generator:- It is a specially designed generator having very low leakage reactance to provide short power for testing c.b. It is driven by 3-phse induction motor.A flywheel is provided on shaft of generator to supply kinetic energy during short circuit and helps in spped regulation. • 2)Short Circuit Transformer:-  It is connected between TB and power source.It is used to allow for flexibility to test at different voltage levels and also provide isolation between the power source and test breaker. It is designed to have low leakage reactance and to withstand repeated short circuit.
  • 16. It is used as a back up c.b. to interrupt the short circuit current in event of c.b.under test(TB) fails to operate.It has higher capacity than the circuit breaker under test.After every test,it is also isolates the test circuit breaker(TB) from the supply source.It is set to operate at a predetermined time after the initiation of short circuit 4) Make Switch(MS):- It is very high speed switch used for initiation of short circuit test current at desired moment.Recently,SF6 gas make switch are used in short circuit testing station. 5) Reactors(L):- It is connected in series.It is used to limit or control the magnitude of the short circuit or test current to its required value.
  • 17. 6) Resistors and Capacitors (R and C):- TRV shaping circuit(R and C) is connected across the circuit breaker under test(TB).This circuit is used to control transient recovery voltage(TRV).Capacitors are also used for voltage measurement. 7) Measuring Equipments:-  For the measurements of voltage,voltage dividers are used and for cureent measurements shunts or CTs are used in the short circuit testing stations.
  • 18. Photo Of Testing Of Circuit Breaker