Combined Company Presentation, October 2013
VMS OWNS 23.9% OF NAN

John Tumazos Very Independent Research
Metals & Mining Conference Oct. 16, 2013

North Shore Mining Group
Forward Looking Statements:

TSX-V : VMS

TSX-V : NAN

Some of the statements contained herein may be forward-looking statements
which involve known and unknown risks and uncertainties. Without limitation,
statements regarding potential mineralization and resources, exploration
results, and future plans and objectives of the Company are forward-looking
statements that involve various risks. The following are important factors that
could cause the Company’s actual results to differ materially from those
expressed or implied by such forward-looking statements: changes in the
world wide price of mineral commodities, general market conditions, risks
inherent in mineral exploration, risks associated with development,
construction and mining operations, the uncertainty of future profitability and
the uncertainty of access to additional capital. There can be no assurance that
forward-looking statements will prove to be accurate as actual results and
future events may differ materially from those anticipated in such statements.
VMS Ventures Inc. undertakes no obligation to update such forward-looking
statements if circumstances or management’s estimates or opinions should
change. The reader is cautioned not to place undue reliance on such forwardlooking statements.

2
Typical Exploration Stock Price Cycle
VMS
Oct.2007

NAN
Oct. 2013 ?

VMS
Oct. 2013 ?

3
VMS Ventures: Overview


Reed Copper Deposit discovered 2007



June 2010: Joint Venture signed with HudBay
Minerals (operator)(T.HBM); 70% HBM & 30% VMS.



Reed Copper Deposit Prefeasibility Mineral Reserves:
2.16M tonnes of 3.83% Cu, 0.48 g/t Au, 6.02 g/t Ag



Underground
development
underway
and
production to begin Q4 2013; cash flow in 2015



Well funded; over $6M in the treasury



Other assets :


Owns 23.9% of North American Nickel
(NAN.TSX.V)



Large 100% owned land package in the
Snow Lake-Flin Flon Greenstone Belt in
Manitoba, Canada; drilling planned for
winter 2013

www.vmsventures.com

CAPITAL STRUCTURE
(as at October, 2013)
Issued & Outstanding:
Warrants:
Options:
Fully Diluted:

129,730,899
163,333
8,692,500
138,586,732

4
Reed Copper Project

www.vmsventures.com

5
Reed Copper Project
VMS-HudBay Reed Project JV


VMS owns 30% of the project and is
financed to production



Borehole Pulse Electromagnetic targets
indicate the deposit remains open at
depth.



Environmental Act Licence received –
Milestone for full mine production – 1300 tpd



First production of 7000 tonnes completed in
September



4500 tonnes of ore milled during the month
of September



Full production to begin Q4 2013

Open Down Plunge

www.vmsventures.com

6
Reed Copper Project: Cash Flow Expected In 2015
 The high grade nature of the Reed Copper deposit gives the project strong leverage to
copper prices.
 The following table shows a copper price sensitivity analysis based on the operating parameters
set out in the Prefeasibility Study Published in May 2012:
PFS VMS Ventures

VMS Ventures Inc.

VMS Ventures Inc.

VMS Ventures Inc.

VMS Ventures Inc.

Cu = $3.25/lb USD

Cu = $3.00/lb USD

Cu = $3.30/lb USD

Cu = $3.50/lb USD

Cu = $4.00/lb USD

Prices and Exchange
Rate
Copper
(USS/lb)
Gold (US$/oz)
Silver (US$/oz)
US$/CDN$

$3.25

$3.00

$3.30

$3.50

$4.00

$1,500.00

$1,300.00

$1,300.00

$1,300.00

$1,300.00

$30.00

$22.00

$22.00

$22.00

$22.00

1

1

1

1

1

$43,228,000

$29,530,000

$44,278,000

$54,110,000

$78,691,000

Pre-tax
VMS Reed
Cash Flow

www.vmsventures.com

7
Assets and Opportunities
Why Own VMS
The Reed Copper Project


2015: Cash flow expected to commence.



Underground drill stations will explore for additional ore bodies and further define the size of the deposit.



Full production 2014.

$6M and cash flow coming = New Opportunities


We are actively seeking an advanced stage project and are continuously reviewing prospective projects. The
current business climate is favorable for high value acquisitions as companies struggle to raise money and
finance projects.

North American Nickel (VMS holds 23.9% of NAN Shares)


Exploring a camp scale property, Maniitsoq, S.W Greenland: The world’s next nickel sulphide camp?

www.vmsventures.com

8
North American Nickel: Overview


Acquired the (as big as Sudbury) Maniitsoq property
in Greenland in August, 2011; 100% owned.



High grade nickel sulphide mineralization (locally
over 5% nickel at Imiak Hilll) intersected in 2013
drilling



Over 100 conductive zones identified through
Helicopter EM (VTEM)



Large meteor impact structure



$8M invested to date; Cash position today $7.5M



VMS Ventures holds 23.9% of NAN shares



Sentient Fund holds 39.04% of NAN shares
CAPITAL STRUCTURE
(as at October, 2013)
Issued & Outstanding:
Warrants: ($0.21 - $1.00)
Options:
Fully Diluted:

www.northamericannickel.com

148,464,084
25,431,144
8,008,000
173,895,228

9
Nickel Supply/Demand: In Our Favor


The Nickel market is likely to face large deficits in 2nd half of this decade – only a doubling of NPI output could
balance it (difficult given Indonesian ore constraints combined with Chinese cost pressures) Nickel prices, as in
2005‐2007, will likely have to rise to force demand in line with available supply.


China is going to need 1+ MILLION tonnes more nickel annually during this decade and ROW will
also need more.



Supply response will be structurally insufficient as current projects under construction only
provide half this requirement (at best, as many are struggling) and “project cupboard” is largely
empty ‐ underpinned by 35+ years of underdevelopment.


Limited interest in new HPAL projects, no new high grade (>2%) FeNi projects in 30 years.



Few sulphide projects discovered/developed.

Courtesy of Royal Nickel
Presentation Jakarta, Sept. 2013
Website: www.royalnickel.com/presentations.php

www.northamericannickel.com

10
Size of the Prize: Some Context
“To date, core analysis (2012 assay data) suggests an admixture of 100 percent iron sulphide
(pyrrhotite - pyrite) - nickel sulphide (pentlandite) could carry 6 to 8% nickel - this is a guessing
game, but 2012 data provides some substance to this qualitative view:”

In Situ Metal Value: What is Nickel Worth in the Ground?

10Mt Deposit at 2% Ni (7lb) = $2.8B
15Mt Deposit at 1.2% Ni (7lb) = $2.5B
TSX-V : NAN

Maniitsoq Project
Sulphide Hosted Nickel Copper Cobalt & Precious Group Metals
Southwest Greenland
100% Owned

www.northamericannickel.com

12
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Location

Maniitsoq harbour looking east
towards the Maniitsoq project on the mainland


Located on the southwest coast of Greenland, which is
pack ice free year-round.



Maniitsoq’s mild climate allows for all year round mining
& shipping of concentrate.



Greenland is a democratic, pro-mining country with a
transparent regulatory system, competitive mining tax
regime and no land claims issues.

www.northamericannickel.com

13
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Property


Greenland’s capital, Nuuk, is 30 minutes by helicopter and
provides European standard coastal re-supply and logistics
facilities 4 to 6 hours shipping time to Maniitsoq coastline.



Maniitsoq is a greenfields nickel sulphide exploration project
with valuable by-products,



NAN owns 100% of Maniitsoq via two contiguous exclusive
mineral exploration licences covering 5,106 km2.



Maniitsoq has the scale and the potential metal endowment
to be the world’s next nickel sulphide province.

www.northamericannickel.com

14
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland

3D VIEW

Deposit Model


Mantle melting in response to a giant impact.



Hot ultramafic magma flows to surface through a
“conduit system” comprised of restricted conduits and
larger magma chambers.



Hot magma assimilates country rock (locally sulphidic)
resulting in sulphur saturation and production of a
sulphide liquid.



Ni+Cu+Co±PGE sulphide collects in zones of lower
velocity within the conduit system.



Continual magma flow upgrades the nickel tenor of
sulphide already deposited.



Magmatism eventually ceases and conduit system is
preserved as noritic rock.



Over time, uplift and erosion expose parts of the magma
conduit system and some of the Ni+Cu+Co±PGE
sulphides.

www.northamericannickel.com

J. Mungall, Ni Short Course Fig 4

15
Modified after Maier et al., 2001
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Project Geology
Maniitsoq Impact Structure


Recognized and documented by Garde et al., 2012*



Deeply eroded, deep-crustal remains of a giant impact that
struck a magmatic arc 3 Ga ago



Comprised of:


35 x 50 km core of crushed, mechanically mixed and
subsequently welded fragments of orthogneiss and
amphibolite known as the Finnefjeld Domain.



75 km wide annular melt zone variably affected by
crushing and melting.



150 km diameter zone of less damaged gneiss and
amphibolite.



Undeformed,
nickeliferous
noritic
intrusions,
interpreted to represent crustally contaminated melts
derived from the mantle in the wake of the impact occur
throughout the impact structure.

*Garde , A.A., McDonald, I., Dyck, B. & Keulen, N. 2012: Searching
for giant, ancient impact structures on Earth: the Meso-archaean
Maniitsoq structure, West Greenland. Earth and
Planetary Science Letters 137–138, 197–210.

www.northamericannickel.com

16
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Project Geology (Cont’d)
Nickeliferous Noritic Intrusions


Concentrated in a 75 x 15 km curvilinear belt
known as the Greenland Norite Belt.



Range in size from small dykes and plugs to
elongated bodies covering up to 8 km2. (Fossilik
intrusion, new discovery Sept. 26, 2013)



Xenoliths of crushed orthogneiss and fluidised
microbreccia indicate they post date impact.



Believed to
conduits.

represent

www.northamericannickel.com

open

ended

magma

17
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Norite Intrusions
Distinct Appearance

Rounded hills covered with brownish-grey,
often rusty, coarse gravel.

Multi-phase: compositions range from quartz
diorite,
through
norite,
to
lherzolite.
Gabbronorite is most common.

Magmatic and cumulus textures often well
preserved. Locally pyroxenes are partially or
completely replaced by hornblende.

Post Kinematic

Massive, little or no foliation except at margins.

Contacts often crosscut country rock foliation.

www.northamericannickel.com

18
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Sulphide
Mineralization


Consists of monoclinic pyrrhotite,
pentlandite, chalcopyrite and pyrite.



Often coarse-grained.



Likely
to
produce
concentrate.



Inclusion-bearing sulphide (i.e. solid
sulphide matrix with fragments of
host rock) is a common texture.



Disseminated, blebby, net texture
and vein sulphides are also
common.

www.northamericannickel.com

a

clean

19
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Historical Work


Kryolitselskabet Øresund, 1962 to 1973: extensive
mapping, prospecting defining the trend and shallow
diamond drilling (average hole length <55 m), no subsurface
geophysical modelling to orientate drilling but some success:
Imiak Hill: 9.85 m @ 2.67% Ni and 0.60% Cu



Cominco & Falconbridge, 1993 to 2000: Cominco flys
extensive fixed wing time domain EM unsuited to undulating
terrain and hampered by flight path
Falconbridge completes surface magnetic and EM surveys
plus extensive high quality re-analysis of historical core that
confirmed historical high-grade assays and establish
Maniitsoq nickel tenor.



Neither Cominco nor Falconbridge did any drilling.

www.northamericannickel.com

20
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Nickel Tenor

Ni vs. S for Historical GNB Drill Core

The Nickel Calculator




Falconbridge studied core from 119 drill
holes around the entire 75km Greenland
Norite Belt.



www.northamericannickel.com

Nickel tenor is the amount of nickel in
pure sulphide and it tends to be
consistent on a deposit scale.

The norite hosted sulphides have a
remarkably consistent nickel tenor of 6
to 8% Ni recalculated to 100% sulphide .

21
Maniitsoq Project
2011 / 2012 Advancements

www.northamericannickel.com

22
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Helicopter TDEM
New Technology in an Old Camp


Total of 5,746 line-kilometers of helicopter borne
SkyTEM / VTEM covering approximately 860km2
mainly focused on the Greenland Norite Belt (GNB)
but small survey also flown over the Pingo showing
(about 15 km to the northwest of the GNB).



Nominal flight line spacing of 200 to 100 meters.



102 conductive zones recognized to date.



Map shows total magnetic intensity reduced to pole
and electromagnetic anomaly picks over the GNB.
The resulting identified conductors are 3
dimensionally modeled, providing
low risk sub
surface drill targets that returned significant drill
intercepts



23
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
2012 Drill Program
1,551 METERS in 9 HOLES in 3 AREAS


Spotty Hill VTEM conductor P-55 tested intercepts:




Imiak Hill VTEM Conductor P-54 tested intercepts:




26.98 m at 0.98% Ni, 0.44% Cu and 0.04% Co
incl. 16.64 m at 1.36% Ni, 0.52% Cu and 0.05% Co

Fossilik II VTEM conductors P-58 & P-59 tested:


www.northamericannickel.com

123.94 m at 0.81% Ni, 0.21% Cu, 0.03% Co and 0.26 g/t PGM*
incl. 24.20 m at 1.75% Ni, 0.34% Cu, 0.06% Co and 0.52 g/t PGM*
incl. 8.20 m at 2.39% Ni, 0.21% Cu, 0.07% Co and 0.60 g/t PGM*

Anomalous mineralization and off hole BHEM conductors
(possible future drill target: see Sept. 26, 2013 results)

24
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Imiak Hill Longitudinal Section
2012




Confirmed nickel tenor calculation is working.



www.northamericannickel.com

NAN’s 2012 drill holes intersected Zones 10, 20
and 30.

Mineralization starts at surface.

25
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
2012 QEMSCAN Mineralogical Study
To identify and quantify nickel and copper-bearing minerals in
three high-grade samples from Imiak Hill and Spotty Hill and to
determine the liberation and association characteristics of nickel
and copper sulphides in the samples. The study was performed
by SGS Canada Inc.

HIGHLIGHTS:

Nickel


All three samples show high potential nickel
recovery. Mineralogically limiting grade-recovery
curves indicate maximum potential nickel grades of
35% at recoveries of 84 to 87%.



Pentlandite is the main nickel-bearing mineral and
contains 95.5 to 96.3% of all the nickel in the
samples. Silicate hosted nickel comprises less than
1% of all the nickel.



Pentlandite P80 grain sizes range from 53 to 65 μm.



Total potentially floatable pentlandite ranges from
96.3 to 97.6%.

Copper
Sample

Zone

Hole #

From
(m)

To (m)

Length
(m)

L163163

Imiak Hill

MQ-12-001

15.39

16.00

0.61

L163164

Imiak Hill

MQ-12-001

16.00

16.94

L163593

Spotty Hill

MQ-12-005

119.41

120.57

www.northamericannickel.com

Ni

(%)

Cu (%)

Co (%)

4.35

0.14

0.10

0.94

3.28

1.69

3.50

0.20

Entirely hosted by chalcopyrite.



Chalcopyrite P80 grain sizes range from 30 to 40 μm.



Mineralogically limiting grade-recovery curves indicate
maximum potential copper grades of 34% at
recoveries of 52 to 77%.

Total potentially floatable chalcopyrite ranges from
87.1 to 95.4%.

0.14

1.16





Samples selected by NAN that were used in the study (assays by ActLabs)

0.11

26
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Nickel Deportment

Pentlandite is the main nickelbearing mineral and contains 95.5 to
96.3% of all the nickel in the
samples.

Legend

Pyrrhotite hosts 2.71 to 4.03% of
the nickel

Mass (% Ni)

Silicates host < 1% of the nickel.

Elemental Deportment (Mass % Ni)

Sample

www.northamericannickel.com

27
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland

Total potentially floatable pentlandite
ranges from 96.3 to 97.6%.
Prediction of Flotation Characteristics

www.northamericannickel.com

Mass (% Pn)

Pentlandite Associations &
Predicted Liberation Characteristics
Maniitsoq Project
2013 Advancements / Assays Pending

www.northamericannickel.com

29
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
2013 Drill Program
Results released to date; Assays Pending


25 holes totaling 4,266 meters completed.



Four significant intersections at Imiak Hill (August
23 and September 4 news releases).



New zone of near solid to solid sulphides
intersected at Imiak North (September 12 news
release).



Fossilik: Potential tonnage added, 9km from Imiak
Hill (Sept. 26, 2013). Spotty Hill – Assays Pending.



Recognition of the Imiak Hill Conduit Complex



Imiak North



www.northamericannickel.com

Imiak Hill

Spotty Hill

30
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Imiak Hill Conduit Complex (IHCC)


12 km2 area at north end
of the Greenland Norite
Belt



Three mineralized norites
within a 2 km radius



Imiak North





Imiak Hill
Spotty Hill

25 km from nearest tide
water at Kangia Fjord

www.northamericannickel.com

31
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Imiak Hill Conduit Complex: 3 Mineralized Intrusions

www.northamericannickel.com

32
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Imiak Hill – 3D View


From east to west the zones are provisionally
named 10, 20 and 30.



Zones 10 and 30 are open at depth.



Bore hole electromagnetic (BHEM) survey results
suggest possible additional zone(s) east of Zone
10.



Near solid to solid sulphide mineralization.



Open at depth

33
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Imiak Hill Longitudinal Section
2013: Oct. 10, 2013 News
NAN’s 2013 drilling has intersected Zones 10 and 30 at
depth. Deepest intersection is 185m vertically below
surface.
Zone 30 sulphide mineralization is increasing in intensity
with depth.



MQ-13-019: 8.68m (5.58m)* @ 1.53% Ni, 0.43% Cu, 0.06% Co



MQ-13-024: 14.90m (8.33m)* @ 2.67% Ni, 0.39% Cu, 0.09% Co



MQ-13-026: 25.51m (11.94m)* @ 3.25% Ni, 0.48% Cu, 0.11% Co
Incl. 18.62m (8.70m) @ 4.31% Ni, 0.62% Cu, 0.14% Co



MQ-13-028: 24.75 m (11.08m)* 35-40% sulphides (ASSAYS
PENDING)



BHEM response is also increasing with depth.



10.33m (5.94m) @ 1.10% Ni, 0.38% Cu





MQ-13-023 (Zone 10)

Open at depth.

MQ-13-019 (Zone 30)
8.68m (5.58m) @ 1.53% Ni, 0.43% Cu

MQ-13-024 (Zone 30)
14.90m (8.33m) @ 2.67% Ni, 0.39% Cu

MQ-13-026 (Zone 30)
25.51m (11.94m) @ 3.25% Ni, 0.48% Cu

MQ-13-028 (Zone 30)
24.75m (11.08m) @ 35-40% sulphide
ASSAYS PENDING

*Estimated true width is shown in brackets

www.northamericannickel.com

34
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
IMIAK HILL DIAMOND DRILL HOLE MQ-13-026
156.70 TO 175.32 Meters
(18.62 meters)





www.northamericannickel.com

Intersection is hosted in noritic
rock.
Textures, such as inclusionbearing massive and semimassive sulphide, are similar
to those seen in 2012 holes
MQ-12-001 and 002.

35
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Imiak North Discovery Announced Sept. 12, 2013 – Assays Pending
30-40% Sulphides / 9.99 m

www.northamericannickel.com

36
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Imiak North – Borehole EM (BHEM) Results: Strong sulphide zones can be
difficult to hit with the first hole


Strong “in-hole” type response coincident with 3040% sulphide mineralization in hole MQ-13-029.



Maxwell modeling of the response indicates
conductor associated with the mineralization
plunges steeply to the northeast.



Mineralization is open down plunge.



MQ-13-021
passed
under
the
plunging
mineralization and MQ-13-027 passed over the
top.



Note broad zones of disseminated mineralization
in holes MQ-13-027 and 029.

37
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Spotty Hill Drilling
2013 ADDITIONAL DRILLING:
MQ-13-022
Collared 53 m southeast of MQ-12-005.
Originally drilled to 191 m and subsequently
deepened to 290 m.
Assays pending.

123.94 m @ 0.81% Ni, 0.21% Cu, 0.03% Co, 0.26 g/t PGM
Incl. 24.20 m @ 1.75% Ni, 0.34% Cu, 0.06% Co, 0.52 g/t PGM
Incl. 8.20 m @ 2.39% Ni, 0.21% Cu, 0.07% Co, 0.60 g/t PGM

2012 DISCOVERY:
123.94 m of high grade sulphides in hole MQ-12-005.
119 m of anomalous mineralization in MQ-12-009.

Significant 2012 Drill intersections from
Spotty Hill

www.northamericannickel.com

38
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Fossilik Area: Additional Tonnage Potential for IHCC


Within 10 km of the IHCC



New discovery: MQ-13-018



Two historical occurrences with
grades up to 2.24% Ni and 0.63%
Cu plus a new discovery in hole
MQ-13-018

Hole MQ-13-018
3 zones of disseminated mineralization:
32.19m @ 0.59% Ni, 0.18% Cu, 0.21 g/t TPM*
Incl. 4.53m @ 1.06% Ni, 0.23% Cu, 0.33 g/t TPM*



26.00m @ 0.24% Ni, 0.11% Cu, 0.16 g/t TPM*
Incl. 9.00m @ 0.42% Ni, 0.15% Cu, 0.27 g/t TPM*





8.71m @ 0.26% Ni, 0.15% Cu, 0.12 g/t TPM*

*TPM = total precious metals (Pt+Pd+Au)

www.northamericannickel.com

39
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
Summary


NAN’s exclusive mineral exploration licences cover virtually all of the Greenland Norite Belt and Maniitsoq
Impact Structure and all significant associated nickel sulphide occurrences.



Four noritic intrusions comprising the Imiak Hill Conduit Complex (IHCC) with significant sulphide
mineralization identified to date:

Imiak Hill - near solid to solid sulphides – high grade nickel mineralization – assays pending

Imiak North – disseminated and near solid to solid sulphides - assays pending

Spotty Hill – strong disseminated sulphides – assays pending



Additional mineralized norite within 10 km of the IHCC

Fossilik – strong disseminated suphides



The mineralization in all four norites are open at depth.



High priority regional targets.

www.northamericannickel.com

40
Maniitsoq Ni-Cu-Co-PGM Project
South West Greenland
What's Next?


Targeted surface geophysical surveys to develop deep targets at the Imiak Hill Conduit Complex. Techniques
being considered include:




Large loop pulse EM or Magnetotellurics? or SQUID?

Focused drilling at the Imiak Hill Conduit Complex.


Expand near solid to solid sulphide zones at Imiak Hill.



Test down plunge of near solid to solid sulphide mineralization at Imiak North.



Define extent of strong disseminated sulphide mineralization at Spotty Hill, Imiak North and Fossilik.



Test deep targets.



Drill test priority regional target zones across the belt.



Additional helicopter geophysical surveys to explore norite and other ultramafic bodies within the project area.

www.northamericannickel.com

41
Why Buy NAN?:
World’s Next Nickel Camp
Investor Risk Mitigation: These “boxes” are already ticked




Greenland is a secure political jurisdiction supported by pro-mining government;
Significant historic exploration data and drill core analyzed and interpreted by NAN
Maniitsoq’s geology is exemplary for district scale nickel potential:












Abundance of Ni-Cu sulphide occurrences at surface & in drilling;
High Nickel tenor – consistent across 7KM belt
Major, long lived structures; and
Large-scale mafic igneous event associated with meteorite impact
QEMSCAN testing suggests good recoveries expected

Modern helicopter “terrain hugging” surveys optimal for Maniitsoq’s topography and mineralization
immediate success >100 EM anomalies
Access to ice free tide water, 12 month of the year: Moderate climate
Low cost power potential, (hydro electricity generation) and near by access to deep water shipping
Management has a discovery track record;
NAN has a strategic investor: The Sentient Group; owns 39.04% (VMS Owns 27.5%)
QUJANAQ / TAK
NORTH AMERICAN NICKEL INC.
TSX V: NAN

FOR MORE INFORMATION
PLEASE VISIT
www.northamericannickel.com
43
VMS/NAN Management
Rick Mark, M.Ed (Admin) CEO & Chairman VMS & NAN: Rick has over 25 years experience in the public market
place. He is also CEO & Chairman of Harvest Gold Corporation (HVG-TSX.V), a December 2005 "spin off" from VMS,
and is the President and CEO of Pancontinental Uranium Corp. (PUC-TSX.V).
Neil Richardson P. Geo. COO, VMS & NAN: Neil has a long history of mineral exploration and mining experience
with HudBay Minerals and others. As the COO of both companies, Neil is responsible for developing and implementing
exploration programs .
John Pattison, P. Geo., B.Sc. Chief Geologist VMS and NAN: John worked with Falconbridge Limited and
associated companies for 19 years managing base metal, PGE and gold exploration projects throughout Canada and
southern Africa. He is the lead project geologist for the Maniitsoq, Greenland nickel project.
Mark Fedikow, HBSc., M.Sc., Ph.D., P.Eng., P. Geo., C.P.G. : President & Director NAN, VP Exploration VMS: Mark
has 35 years of industry and government experience including Chief Geologist of the Mineral Deposits Section in
Manitoba. He is a recipient of the Canadian national award for outstanding geoscientific achievement.
John Roozendaal B.Sc, President of VMS, Director of NAN: John was the founding director of VMS Ventures Inc.
He has 20 years of Mineral Exploration experience and was directly involved in the Reed Copper discovery.

www.vmsventures.com

44
Independent Directors & Advisory Boards
Independent Directors
Gilbert Clark, Director, NAN: Mr. Clark is a European based Geologist with more than 13 years of industry experience; principally in mining
and international resource developments. He is currently an Investment Advisor with The Sentient Group, an independent private equity
investment firm specializing in the global resources industry.
Don Whalen, Director & Audit Committee Chair, VMS: Don was Executive Chairman and Director of High River Gold Mines. Before
joining High River, he held numerous marketing, technical and management positions over a 29 year career with IBM Canada Ltd.
Jim Clucas, Director & Audit Committee Member, NAN: Jim was Chief Financial Officer of Inco’s Canadian operations and has been
involved in the development of several mineral deposits, including the Snow Lake Mine (High River Gold Mines), Montana Tunnels (Pegasus
Mining) and the Fenix Project in Guatemala. He was the founder of International Nickel Ventures Inc. which acquired and developed the Santa
Fe/Ipora Nickel Laterite deposit in Brazil. Jim is currently President and CEO of Search Minerals.

Advisory Board
Mr. Alex Balogh: Alex is the former Chairman and CEO of Falconbridge Ltd., Deputy Chairman of Noranda Inc. and CEO of Noranda
Minerals Inc. He has served as Chairman and Director for various mining organizations, sits on The Sentient Council and is a current member
of the Advisory Board of Hatch Associates. Mr. Balogh is a metallurgical engineer and has more than 40 years of experience in the mining and
metallurgical industry.
Dr. Tony Naldrett: Tony is an internationally recognized expert in the field of nickel sulphide mineralization and was Professor of
Geology at the University of Toronto from 1967 to 1998. He has authored or co-authored over 240 refereed papers and 8 books and has
supervised 15 M.Sc. and 16 Ph.D. students and 15 Postdoctoral Fellows with focus on magmatic nickel, copper and platinum-group element
sulphide deposits, worldwide.
Dr. James M. Patterson , P.Geo., Ph.D. , Technical Advisor: James is the former Geological Consultant, Vice President Exploration
and VP & Executive Consultant with FNX Mining Company Inc. He was instrumental in the revival and building of the company from a
market capitalization of $20 million to $2.5 billion. Dr. Patterson has over 40 years experience in mineral exploration globally. Dr. Patterson
received his Ph.D. Mining Geology from the University of London, England, Diploma of Imperial College from Imperial College, London,
England, BA (Honours) in Natural Sciences – Geology from Trinity College, University of Dublin, Ireland, and has over 25 publications on
mineral exploration.

www.vmsventures.com

45

Más contenido relacionado

La actualidad más candente

Lion One Metals Presenation Oct 2018
Lion One Metals Presenation Oct 2018 Lion One Metals Presenation Oct 2018
Lion One Metals Presenation Oct 2018 Joe Gray
 
Agm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdfAgm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdfaldridgeminerals
 
Lion One Metals Presentation Dec 2017
Lion One Metals Presentation Dec 2017Lion One Metals Presentation Dec 2017
Lion One Metals Presentation Dec 2017Joe Gray
 
Lion One Metals August 2018 Presentation
Lion One Metals August 2018 PresentationLion One Metals August 2018 Presentation
Lion One Metals August 2018 PresentationJoe Gray
 
Lion One Metals Presentation Oct 2018
Lion One Metals Presentation Oct 2018Lion One Metals Presentation Oct 2018
Lion One Metals Presentation Oct 2018Joe Gray
 
Lion One Metals Presentation Jan 2019
Lion One Metals Presentation Jan 2019Lion One Metals Presentation Jan 2019
Lion One Metals Presentation Jan 2019Joe Gray
 
Lion One Presentation - January 2017
Lion One Presentation  - January 2017Lion One Presentation  - January 2017
Lion One Presentation - January 2017LionOneMetals
 
Lion One Presentation - December 2016
Lion One Presentation  - December 2016Lion One Presentation  - December 2016
Lion One Presentation - December 2016LionOneMetals
 
Lion One Presentation March 2018
Lion One Presentation March 2018Lion One Presentation March 2018
Lion One Presentation March 2018Joe Gray
 
Lion One Corporate Presentation May 2018
Lion One Corporate Presentation May 2018Lion One Corporate Presentation May 2018
Lion One Corporate Presentation May 2018Joe Gray
 
Sept. 2013 Champion Corporate Presentation - English
Sept. 2013 Champion Corporate Presentation - EnglishSept. 2013 Champion Corporate Presentation - English
Sept. 2013 Champion Corporate Presentation - EnglishChampionMines
 
Lion One Metals Presentation Jan 2018
Lion One Metals Presentation Jan 2018Lion One Metals Presentation Jan 2018
Lion One Metals Presentation Jan 2018Joe Gray
 
Lion One Metals Dec 2018 Presentation
Lion One Metals Dec 2018 PresentationLion One Metals Dec 2018 Presentation
Lion One Metals Dec 2018 PresentationJoe Gray
 
Lio ppt mar 2018
Lio ppt mar 2018Lio ppt mar 2018
Lio ppt mar 2018Joe Gray
 
Corporate presentation nan only june 2014 final
Corporate presentation nan only june 2014 finalCorporate presentation nan only june 2014 final
Corporate presentation nan only june 2014 finalNorthAmericanNickel
 
Gfg resources transaction presentation final
Gfg resources transaction presentation   finalGfg resources transaction presentation   final
Gfg resources transaction presentation finalGFG Resources Inc.
 
Sami f al rushaid's presentation slides from the 2010 World National Oil Comp...
Sami f al rushaid's presentation slides from the 2010 World National Oil Comp...Sami f al rushaid's presentation slides from the 2010 World National Oil Comp...
Sami f al rushaid's presentation slides from the 2010 World National Oil Comp...oilandgas
 
Lion One Presenation April 2016
Lion One Presenation April 2016Lion One Presenation April 2016
Lion One Presenation April 2016Lion One Metals
 

La actualidad más candente (20)

Lion One Metals Presenation Oct 2018
Lion One Metals Presenation Oct 2018 Lion One Metals Presenation Oct 2018
Lion One Metals Presenation Oct 2018
 
Agm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdfAgm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdf
 
Lion One Metals Presentation Dec 2017
Lion One Metals Presentation Dec 2017Lion One Metals Presentation Dec 2017
Lion One Metals Presentation Dec 2017
 
Lion One Metals August 2018 Presentation
Lion One Metals August 2018 PresentationLion One Metals August 2018 Presentation
Lion One Metals August 2018 Presentation
 
Lion One Metals Presentation Oct 2018
Lion One Metals Presentation Oct 2018Lion One Metals Presentation Oct 2018
Lion One Metals Presentation Oct 2018
 
Lion One Metals Presentation Jan 2019
Lion One Metals Presentation Jan 2019Lion One Metals Presentation Jan 2019
Lion One Metals Presentation Jan 2019
 
Lion One Presentation - January 2017
Lion One Presentation  - January 2017Lion One Presentation  - January 2017
Lion One Presentation - January 2017
 
Lion One Presentation - December 2016
Lion One Presentation  - December 2016Lion One Presentation  - December 2016
Lion One Presentation - December 2016
 
Syh corp presenation
Syh corp presenationSyh corp presenation
Syh corp presenation
 
Lion One Presentation March 2018
Lion One Presentation March 2018Lion One Presentation March 2018
Lion One Presentation March 2018
 
Lion One Corporate Presentation May 2018
Lion One Corporate Presentation May 2018Lion One Corporate Presentation May 2018
Lion One Corporate Presentation May 2018
 
Sept. 2013 Champion Corporate Presentation - English
Sept. 2013 Champion Corporate Presentation - EnglishSept. 2013 Champion Corporate Presentation - English
Sept. 2013 Champion Corporate Presentation - English
 
Lion One Metals Presentation Jan 2018
Lion One Metals Presentation Jan 2018Lion One Metals Presentation Jan 2018
Lion One Metals Presentation Jan 2018
 
Lion One Metals Dec 2018 Presentation
Lion One Metals Dec 2018 PresentationLion One Metals Dec 2018 Presentation
Lion One Metals Dec 2018 Presentation
 
Lio ppt mar 2018
Lio ppt mar 2018Lio ppt mar 2018
Lio ppt mar 2018
 
Corporate presentation nan only june 2014 final
Corporate presentation nan only june 2014 finalCorporate presentation nan only june 2014 final
Corporate presentation nan only june 2014 final
 
Gfg resources transaction presentation final
Gfg resources transaction presentation   finalGfg resources transaction presentation   final
Gfg resources transaction presentation final
 
Sami f al rushaid's presentation slides from the 2010 World National Oil Comp...
Sami f al rushaid's presentation slides from the 2010 World National Oil Comp...Sami f al rushaid's presentation slides from the 2010 World National Oil Comp...
Sami f al rushaid's presentation slides from the 2010 World National Oil Comp...
 
Rare earths: not so rare but sought after
Rare earths: not so rare but sought afterRare earths: not so rare but sought after
Rare earths: not so rare but sought after
 
Lion One Presenation April 2016
Lion One Presenation April 2016Lion One Presenation April 2016
Lion One Presenation April 2016
 

Similar a New york 2013 final

Corporate Presentation July 2014
Corporate Presentation July 2014Corporate Presentation July 2014
Corporate Presentation July 2014NorthAmericanNickel
 
Corporate Presentation August 2014
Corporate Presentation August 2014Corporate Presentation August 2014
Corporate Presentation August 2014NorthAmericanNickel
 
John tumazos corporate presentation nan april 2014
John tumazos corporate presentation nan april 2014John tumazos corporate presentation nan april 2014
John tumazos corporate presentation nan april 2014NorthAmericanNickel
 
VMS Ventures - Investor Presentation - September 2010
VMS Ventures - Investor Presentation - September 2010VMS Ventures - Investor Presentation - September 2010
VMS Ventures - Investor Presentation - September 2010VMS Ventures
 
Corporate presentation may 15 website
Corporate presentation may 15 websiteCorporate presentation may 15 website
Corporate presentation may 15 websiteNorthAmericanNickel
 
Corporate Presentation April 2015
Corporate Presentation April 2015Corporate Presentation April 2015
Corporate Presentation April 2015NorthAmericanNickel
 
Corporate presentation november 2014 final website
Corporate presentation november 2014 final   websiteCorporate presentation november 2014 final   website
Corporate presentation november 2014 final websiteNorthAmericanNickel
 
Corporate presentation september 2014 final
Corporate presentation september 2014 finalCorporate presentation september 2014 final
Corporate presentation september 2014 finalNorthAmericanNickel
 
Corporate presentation november 2014 final website
Corporate presentation november 2014 final   websiteCorporate presentation november 2014 final   website
Corporate presentation november 2014 final websiteNorthAmericanNickel
 
Corporate Presentation November 2014
Corporate Presentation November 2014Corporate Presentation November 2014
Corporate Presentation November 2014NorthAmericanNickel
 
Corporate Presentation October 2014
Corporate Presentation October 2014Corporate Presentation October 2014
Corporate Presentation October 2014NorthAmericanNickel
 
Manitobas Next Copper Mine
Manitobas Next Copper MineManitobas Next Copper Mine
Manitobas Next Copper MineVMS Ventures
 
North American Nickel Maniitsoq June 2013 Corporate Presentation
North American Nickel Maniitsoq June 2013 Corporate PresentationNorth American Nickel Maniitsoq June 2013 Corporate Presentation
North American Nickel Maniitsoq June 2013 Corporate Presentationruptajac
 
Minotaur Exploration | ASX:MEP | RIS2014 Broken Hill Investor Presentation
Minotaur Exploration | ASX:MEP | RIS2014 Broken Hill Investor PresentationMinotaur Exploration | ASX:MEP | RIS2014 Broken Hill Investor Presentation
Minotaur Exploration | ASX:MEP | RIS2014 Broken Hill Investor PresentationSymposium
 
Fortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor PresentationFortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor PresentationCompany Spotlight
 
Ximen Mining reveals striking drill core observations ahead of assays
Ximen Mining reveals striking drill core observations ahead of assaysXimen Mining reveals striking drill core observations ahead of assays
Ximen Mining reveals striking drill core observations ahead of assaysStephan Bogner
 
Cambridge House Vancouver Resource Investment Conference
Cambridge House Vancouver Resource Investment ConferenceCambridge House Vancouver Resource Investment Conference
Cambridge House Vancouver Resource Investment ConferenceVMS Ventures
 
Vms nan combo for astrologers fund feb 2013
Vms nan combo for astrologers fund feb 2013Vms nan combo for astrologers fund feb 2013
Vms nan combo for astrologers fund feb 2013VMS Ventures
 

Similar a New york 2013 final (20)

Corporate Presentation July 2014
Corporate Presentation July 2014Corporate Presentation July 2014
Corporate Presentation July 2014
 
Corporate Presentation August 2014
Corporate Presentation August 2014Corporate Presentation August 2014
Corporate Presentation August 2014
 
John tumazos corporate presentation nan april 2014
John tumazos corporate presentation nan april 2014John tumazos corporate presentation nan april 2014
John tumazos corporate presentation nan april 2014
 
Nan maniitsoq sept 5 2013
Nan maniitsoq sept 5 2013Nan maniitsoq sept 5 2013
Nan maniitsoq sept 5 2013
 
Nan maniitsoq sept 5 2013
Nan maniitsoq sept 5 2013Nan maniitsoq sept 5 2013
Nan maniitsoq sept 5 2013
 
VMS Ventures - Investor Presentation - September 2010
VMS Ventures - Investor Presentation - September 2010VMS Ventures - Investor Presentation - September 2010
VMS Ventures - Investor Presentation - September 2010
 
Corporate presentation may 15 website
Corporate presentation may 15 websiteCorporate presentation may 15 website
Corporate presentation may 15 website
 
Corporate Presentation April 2015
Corporate Presentation April 2015Corporate Presentation April 2015
Corporate Presentation April 2015
 
Corporate presentation november 2014 final website
Corporate presentation november 2014 final   websiteCorporate presentation november 2014 final   website
Corporate presentation november 2014 final website
 
Corporate presentation september 2014 final
Corporate presentation september 2014 finalCorporate presentation september 2014 final
Corporate presentation september 2014 final
 
Corporate presentation november 2014 final website
Corporate presentation november 2014 final   websiteCorporate presentation november 2014 final   website
Corporate presentation november 2014 final website
 
Corporate Presentation November 2014
Corporate Presentation November 2014Corporate Presentation November 2014
Corporate Presentation November 2014
 
Corporate Presentation October 2014
Corporate Presentation October 2014Corporate Presentation October 2014
Corporate Presentation October 2014
 
Manitobas Next Copper Mine
Manitobas Next Copper MineManitobas Next Copper Mine
Manitobas Next Copper Mine
 
North American Nickel Maniitsoq June 2013 Corporate Presentation
North American Nickel Maniitsoq June 2013 Corporate PresentationNorth American Nickel Maniitsoq June 2013 Corporate Presentation
North American Nickel Maniitsoq June 2013 Corporate Presentation
 
Minotaur Exploration | ASX:MEP | RIS2014 Broken Hill Investor Presentation
Minotaur Exploration | ASX:MEP | RIS2014 Broken Hill Investor PresentationMinotaur Exploration | ASX:MEP | RIS2014 Broken Hill Investor Presentation
Minotaur Exploration | ASX:MEP | RIS2014 Broken Hill Investor Presentation
 
Fortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor PresentationFortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor Presentation
 
Ximen Mining reveals striking drill core observations ahead of assays
Ximen Mining reveals striking drill core observations ahead of assaysXimen Mining reveals striking drill core observations ahead of assays
Ximen Mining reveals striking drill core observations ahead of assays
 
Cambridge House Vancouver Resource Investment Conference
Cambridge House Vancouver Resource Investment ConferenceCambridge House Vancouver Resource Investment Conference
Cambridge House Vancouver Resource Investment Conference
 
Vms nan combo for astrologers fund feb 2013
Vms nan combo for astrologers fund feb 2013Vms nan combo for astrologers fund feb 2013
Vms nan combo for astrologers fund feb 2013
 

Más de NorthAmericanNickel

Nan june 2017_corporate_deck_marketing_final_-_website
Nan june 2017_corporate_deck_marketing_final_-_websiteNan june 2017_corporate_deck_marketing_final_-_website
Nan june 2017_corporate_deck_marketing_final_-_websiteNorthAmericanNickel
 
Nan april 2017 corporate deck prospectus marketing 6 apr-2017 final
Nan april 2017 corporate deck prospectus marketing 6 apr-2017 finalNan april 2017 corporate deck prospectus marketing 6 apr-2017 final
Nan april 2017 corporate deck prospectus marketing 6 apr-2017 finalNorthAmericanNickel
 
Nan corporate presenation_november_2016
Nan corporate presenation_november_2016Nan corporate presenation_november_2016
Nan corporate presenation_november_2016NorthAmericanNickel
 
Nan mines and money mining oct. corporate
Nan mines and money mining oct. corporateNan mines and money mining oct. corporate
Nan mines and money mining oct. corporateNorthAmericanNickel
 
Corporate presentation april 2016
Corporate presentation april 2016Corporate presentation april 2016
Corporate presentation april 2016NorthAmericanNickel
 
Corporate presentation website january 2016
Corporate presentation   website january 2016Corporate presentation   website january 2016
Corporate presentation website january 2016NorthAmericanNickel
 
2015 December Corporate Presentation Mines and Money
2015 December Corporate Presentation Mines and Money 2015 December Corporate Presentation Mines and Money
2015 December Corporate Presentation Mines and Money NorthAmericanNickel
 
Nan corporate presentation october 2015 final
Nan corporate presentation october 2015 finalNan corporate presentation october 2015 final
Nan corporate presentation october 2015 finalNorthAmericanNickel
 
Nan corporate presentation september 2015 final
Nan corporate presentation september 2015 finalNan corporate presentation september 2015 final
Nan corporate presentation september 2015 finalNorthAmericanNickel
 
Corporate Presentation July 2015
Corporate Presentation July 2015Corporate Presentation July 2015
Corporate Presentation July 2015NorthAmericanNickel
 
Corporate Presentation June 2015
Corporate Presentation June 2015Corporate Presentation June 2015
Corporate Presentation June 2015NorthAmericanNickel
 
Corporate presentation march 2015 full version
Corporate presentation march 2015 full versionCorporate presentation march 2015 full version
Corporate presentation march 2015 full versionNorthAmericanNickel
 
Corporate presentation january 2015 short version final
Corporate presentation january 2015 short version finalCorporate presentation january 2015 short version final
Corporate presentation january 2015 short version finalNorthAmericanNickel
 
Corporate Presentation January 2015
Corporate Presentation January 2015Corporate Presentation January 2015
Corporate Presentation January 2015NorthAmericanNickel
 
Corporate presentation december 2014
Corporate presentation december 2014Corporate presentation december 2014
Corporate presentation december 2014NorthAmericanNickel
 
Corporate Presentation December 2014
Corporate Presentation December 2014Corporate Presentation December 2014
Corporate Presentation December 2014NorthAmericanNickel
 
Corporate Presentation December 2014
Corporate Presentation December 2014Corporate Presentation December 2014
Corporate Presentation December 2014NorthAmericanNickel
 
Corporate presentation December 2014
Corporate presentation December 2014Corporate presentation December 2014
Corporate presentation December 2014NorthAmericanNickel
 
Corporate Presentation November 2014
Corporate Presentation November 2014Corporate Presentation November 2014
Corporate Presentation November 2014NorthAmericanNickel
 

Más de NorthAmericanNickel (20)

Nan june 2017_corporate_deck_marketing_final_-_website
Nan june 2017_corporate_deck_marketing_final_-_websiteNan june 2017_corporate_deck_marketing_final_-_website
Nan june 2017_corporate_deck_marketing_final_-_website
 
Nan april 2017 corporate deck prospectus marketing 6 apr-2017 final
Nan april 2017 corporate deck prospectus marketing 6 apr-2017 finalNan april 2017 corporate deck prospectus marketing 6 apr-2017 final
Nan april 2017 corporate deck prospectus marketing 6 apr-2017 final
 
Nan march 2017_corporate_final
Nan march 2017_corporate_finalNan march 2017_corporate_final
Nan march 2017_corporate_final
 
Nan corporate presenation_november_2016
Nan corporate presenation_november_2016Nan corporate presenation_november_2016
Nan corporate presenation_november_2016
 
Nan mines and money mining oct. corporate
Nan mines and money mining oct. corporateNan mines and money mining oct. corporate
Nan mines and money mining oct. corporate
 
Corporate presentation april 2016
Corporate presentation april 2016Corporate presentation april 2016
Corporate presentation april 2016
 
Corporate presentation website january 2016
Corporate presentation   website january 2016Corporate presentation   website january 2016
Corporate presentation website january 2016
 
2015 December Corporate Presentation Mines and Money
2015 December Corporate Presentation Mines and Money 2015 December Corporate Presentation Mines and Money
2015 December Corporate Presentation Mines and Money
 
Nan corporate presentation october 2015 final
Nan corporate presentation october 2015 finalNan corporate presentation october 2015 final
Nan corporate presentation october 2015 final
 
Nan corporate presentation september 2015 final
Nan corporate presentation september 2015 finalNan corporate presentation september 2015 final
Nan corporate presentation september 2015 final
 
Corporate Presentation July 2015
Corporate Presentation July 2015Corporate Presentation July 2015
Corporate Presentation July 2015
 
Corporate Presentation June 2015
Corporate Presentation June 2015Corporate Presentation June 2015
Corporate Presentation June 2015
 
Corporate presentation march 2015 full version
Corporate presentation march 2015 full versionCorporate presentation march 2015 full version
Corporate presentation march 2015 full version
 
Corporate presentation january 2015 short version final
Corporate presentation january 2015 short version finalCorporate presentation january 2015 short version final
Corporate presentation january 2015 short version final
 
Corporate Presentation January 2015
Corporate Presentation January 2015Corporate Presentation January 2015
Corporate Presentation January 2015
 
Corporate presentation december 2014
Corporate presentation december 2014Corporate presentation december 2014
Corporate presentation december 2014
 
Corporate Presentation December 2014
Corporate Presentation December 2014Corporate Presentation December 2014
Corporate Presentation December 2014
 
Corporate Presentation December 2014
Corporate Presentation December 2014Corporate Presentation December 2014
Corporate Presentation December 2014
 
Corporate presentation December 2014
Corporate presentation December 2014Corporate presentation December 2014
Corporate presentation December 2014
 
Corporate Presentation November 2014
Corporate Presentation November 2014Corporate Presentation November 2014
Corporate Presentation November 2014
 

Último

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 

Último (20)

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 

New york 2013 final

  • 1. Combined Company Presentation, October 2013 VMS OWNS 23.9% OF NAN John Tumazos Very Independent Research Metals & Mining Conference Oct. 16, 2013 North Shore Mining Group
  • 2. Forward Looking Statements: TSX-V : VMS TSX-V : NAN Some of the statements contained herein may be forward-looking statements which involve known and unknown risks and uncertainties. Without limitation, statements regarding potential mineralization and resources, exploration results, and future plans and objectives of the Company are forward-looking statements that involve various risks. The following are important factors that could cause the Company’s actual results to differ materially from those expressed or implied by such forward-looking statements: changes in the world wide price of mineral commodities, general market conditions, risks inherent in mineral exploration, risks associated with development, construction and mining operations, the uncertainty of future profitability and the uncertainty of access to additional capital. There can be no assurance that forward-looking statements will prove to be accurate as actual results and future events may differ materially from those anticipated in such statements. VMS Ventures Inc. undertakes no obligation to update such forward-looking statements if circumstances or management’s estimates or opinions should change. The reader is cautioned not to place undue reliance on such forwardlooking statements. 2
  • 3. Typical Exploration Stock Price Cycle VMS Oct.2007 NAN Oct. 2013 ? VMS Oct. 2013 ? 3
  • 4. VMS Ventures: Overview  Reed Copper Deposit discovered 2007  June 2010: Joint Venture signed with HudBay Minerals (operator)(T.HBM); 70% HBM & 30% VMS.  Reed Copper Deposit Prefeasibility Mineral Reserves: 2.16M tonnes of 3.83% Cu, 0.48 g/t Au, 6.02 g/t Ag  Underground development underway and production to begin Q4 2013; cash flow in 2015  Well funded; over $6M in the treasury  Other assets :  Owns 23.9% of North American Nickel (NAN.TSX.V)  Large 100% owned land package in the Snow Lake-Flin Flon Greenstone Belt in Manitoba, Canada; drilling planned for winter 2013 www.vmsventures.com CAPITAL STRUCTURE (as at October, 2013) Issued & Outstanding: Warrants: Options: Fully Diluted: 129,730,899 163,333 8,692,500 138,586,732 4
  • 6. Reed Copper Project VMS-HudBay Reed Project JV  VMS owns 30% of the project and is financed to production  Borehole Pulse Electromagnetic targets indicate the deposit remains open at depth.  Environmental Act Licence received – Milestone for full mine production – 1300 tpd  First production of 7000 tonnes completed in September  4500 tonnes of ore milled during the month of September  Full production to begin Q4 2013 Open Down Plunge www.vmsventures.com 6
  • 7. Reed Copper Project: Cash Flow Expected In 2015  The high grade nature of the Reed Copper deposit gives the project strong leverage to copper prices.  The following table shows a copper price sensitivity analysis based on the operating parameters set out in the Prefeasibility Study Published in May 2012: PFS VMS Ventures VMS Ventures Inc. VMS Ventures Inc. VMS Ventures Inc. VMS Ventures Inc. Cu = $3.25/lb USD Cu = $3.00/lb USD Cu = $3.30/lb USD Cu = $3.50/lb USD Cu = $4.00/lb USD Prices and Exchange Rate Copper (USS/lb) Gold (US$/oz) Silver (US$/oz) US$/CDN$ $3.25 $3.00 $3.30 $3.50 $4.00 $1,500.00 $1,300.00 $1,300.00 $1,300.00 $1,300.00 $30.00 $22.00 $22.00 $22.00 $22.00 1 1 1 1 1 $43,228,000 $29,530,000 $44,278,000 $54,110,000 $78,691,000 Pre-tax VMS Reed Cash Flow www.vmsventures.com 7
  • 8. Assets and Opportunities Why Own VMS The Reed Copper Project  2015: Cash flow expected to commence.  Underground drill stations will explore for additional ore bodies and further define the size of the deposit.  Full production 2014. $6M and cash flow coming = New Opportunities  We are actively seeking an advanced stage project and are continuously reviewing prospective projects. The current business climate is favorable for high value acquisitions as companies struggle to raise money and finance projects. North American Nickel (VMS holds 23.9% of NAN Shares)  Exploring a camp scale property, Maniitsoq, S.W Greenland: The world’s next nickel sulphide camp? www.vmsventures.com 8
  • 9. North American Nickel: Overview  Acquired the (as big as Sudbury) Maniitsoq property in Greenland in August, 2011; 100% owned.  High grade nickel sulphide mineralization (locally over 5% nickel at Imiak Hilll) intersected in 2013 drilling  Over 100 conductive zones identified through Helicopter EM (VTEM)  Large meteor impact structure  $8M invested to date; Cash position today $7.5M  VMS Ventures holds 23.9% of NAN shares  Sentient Fund holds 39.04% of NAN shares CAPITAL STRUCTURE (as at October, 2013) Issued & Outstanding: Warrants: ($0.21 - $1.00) Options: Fully Diluted: www.northamericannickel.com 148,464,084 25,431,144 8,008,000 173,895,228 9
  • 10. Nickel Supply/Demand: In Our Favor  The Nickel market is likely to face large deficits in 2nd half of this decade – only a doubling of NPI output could balance it (difficult given Indonesian ore constraints combined with Chinese cost pressures) Nickel prices, as in 2005‐2007, will likely have to rise to force demand in line with available supply.  China is going to need 1+ MILLION tonnes more nickel annually during this decade and ROW will also need more.  Supply response will be structurally insufficient as current projects under construction only provide half this requirement (at best, as many are struggling) and “project cupboard” is largely empty ‐ underpinned by 35+ years of underdevelopment.  Limited interest in new HPAL projects, no new high grade (>2%) FeNi projects in 30 years.  Few sulphide projects discovered/developed. Courtesy of Royal Nickel Presentation Jakarta, Sept. 2013 Website: www.royalnickel.com/presentations.php www.northamericannickel.com 10
  • 11. Size of the Prize: Some Context “To date, core analysis (2012 assay data) suggests an admixture of 100 percent iron sulphide (pyrrhotite - pyrite) - nickel sulphide (pentlandite) could carry 6 to 8% nickel - this is a guessing game, but 2012 data provides some substance to this qualitative view:” In Situ Metal Value: What is Nickel Worth in the Ground? 10Mt Deposit at 2% Ni (7lb) = $2.8B 15Mt Deposit at 1.2% Ni (7lb) = $2.5B
  • 12. TSX-V : NAN Maniitsoq Project Sulphide Hosted Nickel Copper Cobalt & Precious Group Metals Southwest Greenland 100% Owned www.northamericannickel.com 12
  • 13. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Location Maniitsoq harbour looking east towards the Maniitsoq project on the mainland  Located on the southwest coast of Greenland, which is pack ice free year-round.  Maniitsoq’s mild climate allows for all year round mining & shipping of concentrate.  Greenland is a democratic, pro-mining country with a transparent regulatory system, competitive mining tax regime and no land claims issues. www.northamericannickel.com 13
  • 14. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Property  Greenland’s capital, Nuuk, is 30 minutes by helicopter and provides European standard coastal re-supply and logistics facilities 4 to 6 hours shipping time to Maniitsoq coastline.  Maniitsoq is a greenfields nickel sulphide exploration project with valuable by-products,  NAN owns 100% of Maniitsoq via two contiguous exclusive mineral exploration licences covering 5,106 km2.  Maniitsoq has the scale and the potential metal endowment to be the world’s next nickel sulphide province. www.northamericannickel.com 14
  • 15. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland 3D VIEW Deposit Model  Mantle melting in response to a giant impact.  Hot ultramafic magma flows to surface through a “conduit system” comprised of restricted conduits and larger magma chambers.  Hot magma assimilates country rock (locally sulphidic) resulting in sulphur saturation and production of a sulphide liquid.  Ni+Cu+Co±PGE sulphide collects in zones of lower velocity within the conduit system.  Continual magma flow upgrades the nickel tenor of sulphide already deposited.  Magmatism eventually ceases and conduit system is preserved as noritic rock.  Over time, uplift and erosion expose parts of the magma conduit system and some of the Ni+Cu+Co±PGE sulphides. www.northamericannickel.com J. Mungall, Ni Short Course Fig 4 15 Modified after Maier et al., 2001
  • 16. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Project Geology Maniitsoq Impact Structure  Recognized and documented by Garde et al., 2012*  Deeply eroded, deep-crustal remains of a giant impact that struck a magmatic arc 3 Ga ago  Comprised of:  35 x 50 km core of crushed, mechanically mixed and subsequently welded fragments of orthogneiss and amphibolite known as the Finnefjeld Domain.  75 km wide annular melt zone variably affected by crushing and melting.  150 km diameter zone of less damaged gneiss and amphibolite.  Undeformed, nickeliferous noritic intrusions, interpreted to represent crustally contaminated melts derived from the mantle in the wake of the impact occur throughout the impact structure. *Garde , A.A., McDonald, I., Dyck, B. & Keulen, N. 2012: Searching for giant, ancient impact structures on Earth: the Meso-archaean Maniitsoq structure, West Greenland. Earth and Planetary Science Letters 137–138, 197–210. www.northamericannickel.com 16
  • 17. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Project Geology (Cont’d) Nickeliferous Noritic Intrusions  Concentrated in a 75 x 15 km curvilinear belt known as the Greenland Norite Belt.  Range in size from small dykes and plugs to elongated bodies covering up to 8 km2. (Fossilik intrusion, new discovery Sept. 26, 2013)  Xenoliths of crushed orthogneiss and fluidised microbreccia indicate they post date impact.  Believed to conduits. represent www.northamericannickel.com open ended magma 17
  • 18. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Norite Intrusions Distinct Appearance  Rounded hills covered with brownish-grey, often rusty, coarse gravel.  Multi-phase: compositions range from quartz diorite, through norite, to lherzolite. Gabbronorite is most common.  Magmatic and cumulus textures often well preserved. Locally pyroxenes are partially or completely replaced by hornblende. Post Kinematic  Massive, little or no foliation except at margins.  Contacts often crosscut country rock foliation. www.northamericannickel.com 18
  • 19. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Sulphide Mineralization  Consists of monoclinic pyrrhotite, pentlandite, chalcopyrite and pyrite.  Often coarse-grained.  Likely to produce concentrate.  Inclusion-bearing sulphide (i.e. solid sulphide matrix with fragments of host rock) is a common texture.  Disseminated, blebby, net texture and vein sulphides are also common. www.northamericannickel.com a clean 19
  • 20. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Historical Work  Kryolitselskabet Øresund, 1962 to 1973: extensive mapping, prospecting defining the trend and shallow diamond drilling (average hole length <55 m), no subsurface geophysical modelling to orientate drilling but some success: Imiak Hill: 9.85 m @ 2.67% Ni and 0.60% Cu  Cominco & Falconbridge, 1993 to 2000: Cominco flys extensive fixed wing time domain EM unsuited to undulating terrain and hampered by flight path Falconbridge completes surface magnetic and EM surveys plus extensive high quality re-analysis of historical core that confirmed historical high-grade assays and establish Maniitsoq nickel tenor.  Neither Cominco nor Falconbridge did any drilling. www.northamericannickel.com 20
  • 21. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Nickel Tenor Ni vs. S for Historical GNB Drill Core The Nickel Calculator   Falconbridge studied core from 119 drill holes around the entire 75km Greenland Norite Belt.  www.northamericannickel.com Nickel tenor is the amount of nickel in pure sulphide and it tends to be consistent on a deposit scale. The norite hosted sulphides have a remarkably consistent nickel tenor of 6 to 8% Ni recalculated to 100% sulphide . 21
  • 22. Maniitsoq Project 2011 / 2012 Advancements www.northamericannickel.com 22
  • 23. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Helicopter TDEM New Technology in an Old Camp  Total of 5,746 line-kilometers of helicopter borne SkyTEM / VTEM covering approximately 860km2 mainly focused on the Greenland Norite Belt (GNB) but small survey also flown over the Pingo showing (about 15 km to the northwest of the GNB).  Nominal flight line spacing of 200 to 100 meters.  102 conductive zones recognized to date.  Map shows total magnetic intensity reduced to pole and electromagnetic anomaly picks over the GNB. The resulting identified conductors are 3 dimensionally modeled, providing low risk sub surface drill targets that returned significant drill intercepts  23
  • 24. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland 2012 Drill Program 1,551 METERS in 9 HOLES in 3 AREAS  Spotty Hill VTEM conductor P-55 tested intercepts:   Imiak Hill VTEM Conductor P-54 tested intercepts:   26.98 m at 0.98% Ni, 0.44% Cu and 0.04% Co incl. 16.64 m at 1.36% Ni, 0.52% Cu and 0.05% Co Fossilik II VTEM conductors P-58 & P-59 tested:  www.northamericannickel.com 123.94 m at 0.81% Ni, 0.21% Cu, 0.03% Co and 0.26 g/t PGM* incl. 24.20 m at 1.75% Ni, 0.34% Cu, 0.06% Co and 0.52 g/t PGM* incl. 8.20 m at 2.39% Ni, 0.21% Cu, 0.07% Co and 0.60 g/t PGM* Anomalous mineralization and off hole BHEM conductors (possible future drill target: see Sept. 26, 2013 results) 24
  • 25. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Imiak Hill Longitudinal Section 2012   Confirmed nickel tenor calculation is working.  www.northamericannickel.com NAN’s 2012 drill holes intersected Zones 10, 20 and 30. Mineralization starts at surface. 25
  • 26. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland 2012 QEMSCAN Mineralogical Study To identify and quantify nickel and copper-bearing minerals in three high-grade samples from Imiak Hill and Spotty Hill and to determine the liberation and association characteristics of nickel and copper sulphides in the samples. The study was performed by SGS Canada Inc. HIGHLIGHTS: Nickel  All three samples show high potential nickel recovery. Mineralogically limiting grade-recovery curves indicate maximum potential nickel grades of 35% at recoveries of 84 to 87%.  Pentlandite is the main nickel-bearing mineral and contains 95.5 to 96.3% of all the nickel in the samples. Silicate hosted nickel comprises less than 1% of all the nickel.  Pentlandite P80 grain sizes range from 53 to 65 μm.  Total potentially floatable pentlandite ranges from 96.3 to 97.6%. Copper Sample Zone Hole # From (m) To (m) Length (m) L163163 Imiak Hill MQ-12-001 15.39 16.00 0.61 L163164 Imiak Hill MQ-12-001 16.00 16.94 L163593 Spotty Hill MQ-12-005 119.41 120.57 www.northamericannickel.com Ni (%) Cu (%) Co (%) 4.35 0.14 0.10 0.94 3.28 1.69 3.50 0.20 Entirely hosted by chalcopyrite.  Chalcopyrite P80 grain sizes range from 30 to 40 μm.  Mineralogically limiting grade-recovery curves indicate maximum potential copper grades of 34% at recoveries of 52 to 77%. Total potentially floatable chalcopyrite ranges from 87.1 to 95.4%. 0.14 1.16   Samples selected by NAN that were used in the study (assays by ActLabs) 0.11 26
  • 27. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Nickel Deportment Pentlandite is the main nickelbearing mineral and contains 95.5 to 96.3% of all the nickel in the samples. Legend Pyrrhotite hosts 2.71 to 4.03% of the nickel Mass (% Ni) Silicates host < 1% of the nickel. Elemental Deportment (Mass % Ni) Sample www.northamericannickel.com 27
  • 28. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Total potentially floatable pentlandite ranges from 96.3 to 97.6%. Prediction of Flotation Characteristics www.northamericannickel.com Mass (% Pn) Pentlandite Associations & Predicted Liberation Characteristics
  • 29. Maniitsoq Project 2013 Advancements / Assays Pending www.northamericannickel.com 29
  • 30. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland 2013 Drill Program Results released to date; Assays Pending  25 holes totaling 4,266 meters completed.  Four significant intersections at Imiak Hill (August 23 and September 4 news releases).  New zone of near solid to solid sulphides intersected at Imiak North (September 12 news release).  Fossilik: Potential tonnage added, 9km from Imiak Hill (Sept. 26, 2013). Spotty Hill – Assays Pending.  Recognition of the Imiak Hill Conduit Complex   Imiak North  www.northamericannickel.com Imiak Hill Spotty Hill 30
  • 31. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Imiak Hill Conduit Complex (IHCC)  12 km2 area at north end of the Greenland Norite Belt  Three mineralized norites within a 2 km radius   Imiak North   Imiak Hill Spotty Hill 25 km from nearest tide water at Kangia Fjord www.northamericannickel.com 31
  • 32. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Imiak Hill Conduit Complex: 3 Mineralized Intrusions www.northamericannickel.com 32
  • 33. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Imiak Hill – 3D View  From east to west the zones are provisionally named 10, 20 and 30.  Zones 10 and 30 are open at depth.  Bore hole electromagnetic (BHEM) survey results suggest possible additional zone(s) east of Zone 10.  Near solid to solid sulphide mineralization.  Open at depth 33
  • 34. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Imiak Hill Longitudinal Section 2013: Oct. 10, 2013 News NAN’s 2013 drilling has intersected Zones 10 and 30 at depth. Deepest intersection is 185m vertically below surface. Zone 30 sulphide mineralization is increasing in intensity with depth.  MQ-13-019: 8.68m (5.58m)* @ 1.53% Ni, 0.43% Cu, 0.06% Co  MQ-13-024: 14.90m (8.33m)* @ 2.67% Ni, 0.39% Cu, 0.09% Co  MQ-13-026: 25.51m (11.94m)* @ 3.25% Ni, 0.48% Cu, 0.11% Co Incl. 18.62m (8.70m) @ 4.31% Ni, 0.62% Cu, 0.14% Co  MQ-13-028: 24.75 m (11.08m)* 35-40% sulphides (ASSAYS PENDING)  BHEM response is also increasing with depth.  10.33m (5.94m) @ 1.10% Ni, 0.38% Cu   MQ-13-023 (Zone 10) Open at depth. MQ-13-019 (Zone 30) 8.68m (5.58m) @ 1.53% Ni, 0.43% Cu MQ-13-024 (Zone 30) 14.90m (8.33m) @ 2.67% Ni, 0.39% Cu MQ-13-026 (Zone 30) 25.51m (11.94m) @ 3.25% Ni, 0.48% Cu MQ-13-028 (Zone 30) 24.75m (11.08m) @ 35-40% sulphide ASSAYS PENDING *Estimated true width is shown in brackets www.northamericannickel.com 34
  • 35. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland IMIAK HILL DIAMOND DRILL HOLE MQ-13-026 156.70 TO 175.32 Meters (18.62 meters)   www.northamericannickel.com Intersection is hosted in noritic rock. Textures, such as inclusionbearing massive and semimassive sulphide, are similar to those seen in 2012 holes MQ-12-001 and 002. 35
  • 36. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Imiak North Discovery Announced Sept. 12, 2013 – Assays Pending 30-40% Sulphides / 9.99 m www.northamericannickel.com 36
  • 37. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Imiak North – Borehole EM (BHEM) Results: Strong sulphide zones can be difficult to hit with the first hole  Strong “in-hole” type response coincident with 3040% sulphide mineralization in hole MQ-13-029.  Maxwell modeling of the response indicates conductor associated with the mineralization plunges steeply to the northeast.  Mineralization is open down plunge.  MQ-13-021 passed under the plunging mineralization and MQ-13-027 passed over the top.  Note broad zones of disseminated mineralization in holes MQ-13-027 and 029. 37
  • 38. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Spotty Hill Drilling 2013 ADDITIONAL DRILLING: MQ-13-022 Collared 53 m southeast of MQ-12-005. Originally drilled to 191 m and subsequently deepened to 290 m. Assays pending. 123.94 m @ 0.81% Ni, 0.21% Cu, 0.03% Co, 0.26 g/t PGM Incl. 24.20 m @ 1.75% Ni, 0.34% Cu, 0.06% Co, 0.52 g/t PGM Incl. 8.20 m @ 2.39% Ni, 0.21% Cu, 0.07% Co, 0.60 g/t PGM 2012 DISCOVERY: 123.94 m of high grade sulphides in hole MQ-12-005. 119 m of anomalous mineralization in MQ-12-009. Significant 2012 Drill intersections from Spotty Hill www.northamericannickel.com 38
  • 39. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Fossilik Area: Additional Tonnage Potential for IHCC  Within 10 km of the IHCC  New discovery: MQ-13-018  Two historical occurrences with grades up to 2.24% Ni and 0.63% Cu plus a new discovery in hole MQ-13-018 Hole MQ-13-018 3 zones of disseminated mineralization: 32.19m @ 0.59% Ni, 0.18% Cu, 0.21 g/t TPM* Incl. 4.53m @ 1.06% Ni, 0.23% Cu, 0.33 g/t TPM*  26.00m @ 0.24% Ni, 0.11% Cu, 0.16 g/t TPM* Incl. 9.00m @ 0.42% Ni, 0.15% Cu, 0.27 g/t TPM*   8.71m @ 0.26% Ni, 0.15% Cu, 0.12 g/t TPM* *TPM = total precious metals (Pt+Pd+Au) www.northamericannickel.com 39
  • 40. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland Summary  NAN’s exclusive mineral exploration licences cover virtually all of the Greenland Norite Belt and Maniitsoq Impact Structure and all significant associated nickel sulphide occurrences.  Four noritic intrusions comprising the Imiak Hill Conduit Complex (IHCC) with significant sulphide mineralization identified to date:  Imiak Hill - near solid to solid sulphides – high grade nickel mineralization – assays pending  Imiak North – disseminated and near solid to solid sulphides - assays pending  Spotty Hill – strong disseminated sulphides – assays pending  Additional mineralized norite within 10 km of the IHCC  Fossilik – strong disseminated suphides  The mineralization in all four norites are open at depth.  High priority regional targets. www.northamericannickel.com 40
  • 41. Maniitsoq Ni-Cu-Co-PGM Project South West Greenland What's Next?  Targeted surface geophysical surveys to develop deep targets at the Imiak Hill Conduit Complex. Techniques being considered include:   Large loop pulse EM or Magnetotellurics? or SQUID? Focused drilling at the Imiak Hill Conduit Complex.  Expand near solid to solid sulphide zones at Imiak Hill.  Test down plunge of near solid to solid sulphide mineralization at Imiak North.  Define extent of strong disseminated sulphide mineralization at Spotty Hill, Imiak North and Fossilik.  Test deep targets.  Drill test priority regional target zones across the belt.  Additional helicopter geophysical surveys to explore norite and other ultramafic bodies within the project area. www.northamericannickel.com 41
  • 42. Why Buy NAN?: World’s Next Nickel Camp Investor Risk Mitigation: These “boxes” are already ticked    Greenland is a secure political jurisdiction supported by pro-mining government; Significant historic exploration data and drill core analyzed and interpreted by NAN Maniitsoq’s geology is exemplary for district scale nickel potential:           Abundance of Ni-Cu sulphide occurrences at surface & in drilling; High Nickel tenor – consistent across 7KM belt Major, long lived structures; and Large-scale mafic igneous event associated with meteorite impact QEMSCAN testing suggests good recoveries expected Modern helicopter “terrain hugging” surveys optimal for Maniitsoq’s topography and mineralization immediate success >100 EM anomalies Access to ice free tide water, 12 month of the year: Moderate climate Low cost power potential, (hydro electricity generation) and near by access to deep water shipping Management has a discovery track record; NAN has a strategic investor: The Sentient Group; owns 39.04% (VMS Owns 27.5%)
  • 43. QUJANAQ / TAK NORTH AMERICAN NICKEL INC. TSX V: NAN FOR MORE INFORMATION PLEASE VISIT www.northamericannickel.com 43
  • 44. VMS/NAN Management Rick Mark, M.Ed (Admin) CEO & Chairman VMS & NAN: Rick has over 25 years experience in the public market place. He is also CEO & Chairman of Harvest Gold Corporation (HVG-TSX.V), a December 2005 "spin off" from VMS, and is the President and CEO of Pancontinental Uranium Corp. (PUC-TSX.V). Neil Richardson P. Geo. COO, VMS & NAN: Neil has a long history of mineral exploration and mining experience with HudBay Minerals and others. As the COO of both companies, Neil is responsible for developing and implementing exploration programs . John Pattison, P. Geo., B.Sc. Chief Geologist VMS and NAN: John worked with Falconbridge Limited and associated companies for 19 years managing base metal, PGE and gold exploration projects throughout Canada and southern Africa. He is the lead project geologist for the Maniitsoq, Greenland nickel project. Mark Fedikow, HBSc., M.Sc., Ph.D., P.Eng., P. Geo., C.P.G. : President & Director NAN, VP Exploration VMS: Mark has 35 years of industry and government experience including Chief Geologist of the Mineral Deposits Section in Manitoba. He is a recipient of the Canadian national award for outstanding geoscientific achievement. John Roozendaal B.Sc, President of VMS, Director of NAN: John was the founding director of VMS Ventures Inc. He has 20 years of Mineral Exploration experience and was directly involved in the Reed Copper discovery. www.vmsventures.com 44
  • 45. Independent Directors & Advisory Boards Independent Directors Gilbert Clark, Director, NAN: Mr. Clark is a European based Geologist with more than 13 years of industry experience; principally in mining and international resource developments. He is currently an Investment Advisor with The Sentient Group, an independent private equity investment firm specializing in the global resources industry. Don Whalen, Director & Audit Committee Chair, VMS: Don was Executive Chairman and Director of High River Gold Mines. Before joining High River, he held numerous marketing, technical and management positions over a 29 year career with IBM Canada Ltd. Jim Clucas, Director & Audit Committee Member, NAN: Jim was Chief Financial Officer of Inco’s Canadian operations and has been involved in the development of several mineral deposits, including the Snow Lake Mine (High River Gold Mines), Montana Tunnels (Pegasus Mining) and the Fenix Project in Guatemala. He was the founder of International Nickel Ventures Inc. which acquired and developed the Santa Fe/Ipora Nickel Laterite deposit in Brazil. Jim is currently President and CEO of Search Minerals. Advisory Board Mr. Alex Balogh: Alex is the former Chairman and CEO of Falconbridge Ltd., Deputy Chairman of Noranda Inc. and CEO of Noranda Minerals Inc. He has served as Chairman and Director for various mining organizations, sits on The Sentient Council and is a current member of the Advisory Board of Hatch Associates. Mr. Balogh is a metallurgical engineer and has more than 40 years of experience in the mining and metallurgical industry. Dr. Tony Naldrett: Tony is an internationally recognized expert in the field of nickel sulphide mineralization and was Professor of Geology at the University of Toronto from 1967 to 1998. He has authored or co-authored over 240 refereed papers and 8 books and has supervised 15 M.Sc. and 16 Ph.D. students and 15 Postdoctoral Fellows with focus on magmatic nickel, copper and platinum-group element sulphide deposits, worldwide. Dr. James M. Patterson , P.Geo., Ph.D. , Technical Advisor: James is the former Geological Consultant, Vice President Exploration and VP & Executive Consultant with FNX Mining Company Inc. He was instrumental in the revival and building of the company from a market capitalization of $20 million to $2.5 billion. Dr. Patterson has over 40 years experience in mineral exploration globally. Dr. Patterson received his Ph.D. Mining Geology from the University of London, England, Diploma of Imperial College from Imperial College, London, England, BA (Honours) in Natural Sciences – Geology from Trinity College, University of Dublin, Ireland, and has over 25 publications on mineral exploration. www.vmsventures.com 45