1. Created date: 10 June 2012
Last updated: 7 Sep 2012
Create by Traitet Th.
2. OBJECTIVES OF THIS DOCUMENT
- To complete dissertation within timescale
- To manage and control software development project
- To manage and control producing portfolio
- To identify issues and countermeasures of implementation
- To use it for communication with my supervisor
2
3. DETAILED PLAN OF DISSERTATION ā THE FIRST PLAN
Start Meeting #2 Summit formal letter Draft system analysis First prototype of Final prototype of Finish
Project with supervisor to chosen restaurant and design e-menu system e-menu system Project
1 June 19 June at 3.30pm by 31 May documents by 17 Aug by 5 Sep 10 Sep
by 22 July
Draft literature Contact Gathering System System Coding, testing and Develop final
review restaurant requirements analysis design interview prototype
9-17 June 18-30 June 1-8 July 10-15 July 16-22July 23 July ā 17 Aug 18 Aug ā 5 Sep
3.5 MONTHS
Contact for SHU Receive Final analysis
Project Plan Web services feedback from and design
9-17 June Server stakeholders document
18-30 June 7-17 Aug 18-22Aug
Draft artifact and
document of Finalize artifact and document of
dissertation dissertation 18 Aug ā 9 Sep
16 July ā 10 Aug
Draft Literature Summarise List Submit overarching Receive comment Hand-in
Review of requirements documentation from supervisor dissertation
18 Jun by 8 July 10 Sep
10 Aug 16 Aug
Doc Date 17 June 2012
3
4. DETAILED PLAN OF DISSERTATION ā LAST UPDATED PLAN
Start Meeting #2 Meeting #3 Draft system analysis First prototype of Final prototype of Finish
Project with supervisor with supervisor and design e-menu system e-menu system Project
1 June 19 June at 3.30pm 3 July at 1pm documents by 17 Aug by 5 Sep 10 Sep
by 22 July
Today 3 Sep
12
Draft literature Contact Gathering System System Coding, testing and Develop final
review restaurant requirements analysis design interview prototype
9-17 June 18-30 June 1-8 July 10-15 July 16-22July 23 July ā 17 Aug 18 Aug ā 5 Sep
3.5 MONTHS
Contact for SHU Receive Final analysis Early Presented
Delayed for 12 days the first & final
Project Plan Web services feedback from and design
But the final prototype is prototype
9-17 June Server stakeholders document
almost finished. on 20 Jul & 10
18-30 June 7-17 Aug 18-22Aug
Aug
Gathering Draft artifact and
requirements document of Finalise artifact and document of
in advance dissertation dissertation 18 Aug ā 9 Sep
on 20, 29 June 16 July ā 10 Aug
Draft Literature Summit formal letter Summarise List Submit overarching Receive advice Hand-in
Review to chosen restaurant of requirements documentation from supervisor dissertation
18 Jun by 31 May by 8 July 10 Sep
9 Aug 14 Aug
(Meeting #4 at 1pm)
Schedule
1. Present the first prototype at restaurant on 20 July 2012 (Finished)
2. Present the final prototype at restaurant & interview on 10 August 2012 (Finished)
3. Meeting#5 with my supervisor on 4 September
Issue
1. Delay of making artifact document because of development issues. However, process of coding
can be finished by 17 August 2012 4
5. ACTION PLAN OF āPREPARATION STAGEā
IN JUNE 2012
Jun-12
No Description Due-date Measurement
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Plan
1 Project Start Date 01-Jun-12 Actual
Result
Plan Draft literature review
2 Draft literature review 18-Jun-12 Actual Draft literature review
Result
Plan Contact restaurant & web services server
Contact restaurant &
3 30-Jun-12 Actual Contact restaurant & web services server
web services server
Result
Activities
1. Prepared draft literature review and dissertation document format between 9 ā 17 June (Finished)
2. Sent e-mail to request using .NET and SQL Server provided by the university on 16 June (Finished, available until 28 Feb
2013)
3. Meeting with supervisor on 19 June at 3.30pm (Finished) 5
4. Meeting with the restaurant owner on 20 June at 1pm (Finished)
6. ACTION PLAN OF āSYSTEM ANALYSIS & DESIGN STAGEā
BETWEEN JULY AND AUGUST
Jul-12 Aug-12
Measur
No Description Due-date
ement 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1
Plan Gathering Req. Receive Feedback
Gather
8-Jul-12 Gathering Req. Gathering Req.
4 requirements Actual
16-Aug-12
and feedbacks
Result
Plan System Analysis
Iterative Process Final
Analyse system Analysis
and create 15-Jul-12
5 Actual Analyse system and create document artifacts
documents & 23-Aug-12
artifact
Result
Plan Iterative Process
System Design Final Design
Design system
and create 22-Jul-12
6 Actual Design system and create document artifacts
documents & 23-Aug-12
artifact
Result
Need to finalize the artifact after getting feedback from a presentation of
the first prototype.
Activities
1. Present the first prototype on 20 July 2012 by using website & some user interfaces on iPad (Finished on time)
2. Present the final prototype on 10 Sep 2012 by using video presentation, website and application on iPad (Finished on time)
Issues
1. Developing on iPad by was really slow because I was not familiar with the objective-c language. Therefore, the first prototype was
mainly presented on .NET website. However, I could take advantage from creating .NET website because it could test web
services developed before implementing on iPad. 6
7. ACTION PLAN OF āIMPLMENTATION AND DOCUMENTATION STAGEā
BETWEEN JULY AND SEPTERMBER
Jul-12 Aug-12 Sep-12
Measure
No Description Due-date
ment 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 1 2 3 4 5 6 7 8 9 1
6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 0
Plan Develop the first prototype: Develop, test the application Develop the final prototype and interview
Implement e-
menu (Coding, 17-Jul-12 Actual Frist
Develop the final prototype and interview
7 Prototype
testing and 5-Sep-12
interview) Result
Plan Create document & artifacts for dissertation Finalise document & artifacts for dissertation
Create
documents & 10-Aug-12
8 Actual Create document & artifacts for dissertation Final document & artifacts for dissertation
artefacts for 10-Sep-12
dissertation
Result
Having more time to focus documentation because
Plan prototype and interview was already finished on 10 Aug
Submit 2012
9 overarching 10-Aug-12 Actual
documentation Insufficient information & needed to focus carefully
Result on marking criteria and portfolio templates
Plan
Receive
10 comment back 16-Aug-12 Actual
from supervisor
Result
Plan
Hand-in
11 10-Sep-12 Actual
dissertation
Result
Activities
1. Present the final prototype & interview between 6-10 Aug 2012 (Finished on 10 Aug 2012)
Issues
1. Delay of making documents because of developing issues. However, process of coding can be finished early by 17 Aug 2012.
7
8. SUMMARY OF ACTIVITIES AT THE CASE STUDY RESTAURANT
Activities: Discussion, presentation, getting feedback and interviews
No Date Time Activities
1 29-Jun-12 14.00 - 16.00 Discussing and observing with the restaurant manager#1
2 06-Jul-12 14.00 - 17.00 Discussing and observing with the restaurant manager and waiting staffs#2
3 12-Jul-12 18.00 - 23.00 Discussing and observing with the restaurant manager and waiting staffs#3
14.00-16.30 Presenting the first prototype and getting feedback from restaurant manager
4 20-Jul-12
18.00 - 23.00 Observation by working as a waiter at the restaurant
15.00-16.00 Presenting the final prototype
5 10-Aug Interviewing the restaurant manager, waiting staffs and chefs
16.30 - 23.30
Final observing with the restaurant manager, waiting staffs and chefs#4
Main activities: Discussion, presentation, demonstration, getting feedback and group interviews
Observation & Observation by 8
Discussion Working as a waiter Presentation ā Demonstration -
Interviews
Editor's Notes
Additional meeting to discuss and get more information from waiting staff on 17 Aug 2012 (18.00 ā 21.00) and 24 Aug 2012 (16.30 ā 18.00)All pictures were obtained the permission from the restaurant staff and manager.