SlideShare una empresa de Scribd logo
1 de 47
Perspectives on Maintenance and Asset Management in industry Do Company Boards understand the risks? Do insurers compensate the Company Boards for taking risks? Are current underwriting practices supporting mediocrity?  Is there a better way?
About me – Steve Turner In 1977Joined RAAF at 17...  Bachelor of Engineering (Aero) RMIT Worked in maintenance and reliability with the RAAF including an exchange officer post with the UK Ministry of Defence on a reliability think tank post. Left RAAF in1989  3 Years with GMH purchasing department running production improvement programs with its suppliers Graduated with MBA from Monash in 1993 (part time studies) 3 years with Price Waterhouse (now PWC) as a senior consultant
About me – Steve Turner Started OMCS International in 1996 Grown to be a highly respected consulting business in the area of asset management. Works in all sectors where physical assets generate the revenue.  Most of our business is in  Oil and Gas,  Chemicals and   Mining. Have been working with the power industry in Europe – focus on Nuclear Power stations.
The agenda Lessons learnt The ESSO Longford Disaster The BP Texas Disaster The sad response by industry Maintenance strategy explained What we typically find wrong Summary  Discussion
The Longford Disaster - 1998
The Longford Disaster On 25 September 1998, at the Longford Gas Plant in Victoria, Australia, a gas absorber burst, releasing a large cloud of hydrocarbon vapours.  Seconds later, it exploded.  Two staff were killed and 4 million people were deprived of gas for about two weeks
A few graphic snaps
A few graphic snaps – GP09 Heat Exchanger
Some of the findings – Royal commission and Hopkins What would normally be considered abnormal was normalized - Hopkins Vital shut down and control mechanisms had not been working for 10 days– Other indicators were not seen as critical Engineering staff had been cut or moved to the city This led to lack of control of decision making on site The plant personnel were driven by production targets It was common practice to run the operation in the “red zone”.
John Boshier - Chief Executive OfficerInstitution of Engineers, Australia It has been 3 years since the Esso Longford gas plant exploded in September 1998.  This passage of time has allowed Australia’s major hazard facilities to review the disaster and implement changes to ensure that such a tragedy does not re-occur. Unfortunately, according to the author of this report, the industry and the engineering profession have not learnt as much as they might have from the tragedy.  Far more could be done to apply the lessons from Longford at facilities around Australia.
Reference to the report http://www.engineersaustralia.org.au/shadomx/apps/fms/fmsdownload.cfm?file_uuid=199C7EF9-9642-91DD-6B9D-9E1CAEB72F31&siteName=ieaust
The BP Texas City Disaster - 2006
BP Texas City Refinery Explosion March 2005 John Mogford BP - Senior Group Vice President, Safety & Operations Paper delivered at Center for Chemical Process Safety,  2nd Global Congress on Process Safety, Orlando, Florida 24 April 2006
Reference to the Report www.bp.com/genericarticle.do?categoryId=98&contentId=7017238
BP Texas City Refinery Explosion It’s not an easy story to tell. BP doesn’t come out of it well.  And it’s a complicated tale involving many factors that go well beyond the process of operating a refinery safely –  BP’s empowerment ethos,  the behaviour of individuals in leadership and  the clarity of our standards to name a few. ....
BP Texas City Refinery Explosion This was a preventable incident, as I will explain.  It should be seen as a process failure, a cultural failure and a management failure.  Our investigations have revealed significant deficiencies in the work and safety culture at Texas City.  The question, of course, is why these deficiencies developed – and why weren’t they sufficiently identified and addressed before the explosion.
What I have learnt recently We have been in touch with BP Texas City and have had long phone conversations. I am told, they have spent $18 M USD in the last few years on consultants writing maintenance procedures and maintenance programs. They seem to have gone overboard since they simply don’t have the staff to complete the work. The real problem is they seem to have swung the pendulum too far the other way.
My impressions based on decades of consulting
My impressions of asset management in hazardous facilities... The process of asset management in hazardous plants is appalling in almost every case. This low level is considered satisfactory. The leaders of business do not understand the implications. There is a fundamental lack of knowledge about the subject: The aviation industry figured it out in the seventies but few organisations outside of aviation are anywhere close to where they should be.
What I observe The problems found by the Longford Royal Commissions are endemic in industry and there is not much motivation to change.  The concepts of maintenance analysis are not difficult to apply yet most organisations are in complete disarray. Maintenance engineers have not had much impact: In the past, they have not articulated their needs well, and have not been good at getting improvements happening. Many are still in that situation.
What I suspect I suspect Company Boards don’t want to listen because they:  See maintenance as an uncontrollable drain on cash which, in the past, no one has been able to manage properly, Feel that improvements in the area of reliability and maintenance may provide high returns, but prefer to take shorter term cost reduction strategies. Base decisions on bad experiences; they don’t have confidence in reliability improvement programs.
Some evidence showing how poor things are in general
Analysis of a vendor supplied maintenance program
Analysis of PM program for Reciprocating Compressors at a Refinery
Turbine and mainline pump in Saudi – Before and after labour hours per year
A deep water drilling company maintenance program before and after
The problem The fundamentals of asset integrity and reliability relate directly to the preventive and predictive maintenance programs deployed by asset managers. In over a decade of providing review programs in all industries, the common thread is that almost all companies  have gaps in their programs  while at the same time the over-service in others. The result is that few companies have control over the condition of their assets.
28 How organisations get into trouble - the vicious cycle of reactive maintenanceTM.
The Birth of industrial Plant.. a Common Scenario  Maintenance not involved in the design. Poor maintainability. Lack of condition monitoring considerations: Inspection facilities. Sample points. Gauges and alarms. Inadequate maintenance facilities. Design not functionally capable. etc FMECA is not seen by maintenance.
The Birth of industrial Plant..  cont The project runs over budget and the design capability is reduced.  There is little margin between what the plant can achieve and what is expected of it. The maintenance tradesmen arrive too late for adequate training and preparation.  Commissioning is done in a rush and often not fully completed.
After Commissioning …. The project is handed over without a maintenance program The tradesmen write one… Little input from operations No consistent method No audit trail of rationale Generally risk averse - over-servicing Page  6
The Infancy days… Failures happen and useless tasks are added. Operations has no buy in for the maintenance plan and there is a reluctance to cooperate. Not all the PM Program is achieved and this becomes the culture of the organisation. Temporary repairs creep in and get out of control Consultants arrive and cut heads
The Vicious Circle of Reactive MaintenanceTM Backlog grows PM is missed Standards Drop More preventable failures Morale Declines   Resources taken by Breakdowns Head / Budget Reduction Temporary Repairs More repeat work
Maintenance Philosophy Explained   Principles of Maintenance Analysis for Evident Failure Modes
Almost all assets fail in some way at some time The mechanisms of failure are referred to as failure modes.  Maintenance personnel are interested in to characteristics regarding failure  modes: The pattern: Wear out Random Infant Mortality  Rate of deterioration Sudden Gradual
Age Studies (Nowlan and Heap) show that intrusive maintenance needs to be avoided.. C: Gradual     5% D: Almost Random    7% A: Bath Tub    4% E:  Random 14% B: Wear Out    2% Conditional Probability of Failure F: Infant Mortality  68% Age or Life Source:  United Airlines 1978
Step 6…. RCM Task Selection Sequence Hidden Evident Operational Loss Hazard Repair Only Condition Monitoring Condition Monitoring Condition Monitoring Condition Monitoring Scheduled Restoration Scheduled Restoration Scheduled Restoration Scheduled Restoration Scheduled Discard Scheduled Discard Scheduled Discard Scheduled Discard Failure Finding Modification Modification or No PM Modification or No PM
The frequency of On-Condition tasks must be less than the  P-F Interval.  Resistance  to Failure P-F Interval (months) Potential Failure Functional        Failure Check at 1 monthly intervals Age Option 1..Monitor Condition (Condition Monitoring)
Option 2…Fixed time replacement  Safe Life The frequency of fixed time replacement must be before safe of economic life.
Maintenance Options for Evident Failure Modes… Age Related Failure Pattern Fixed Time Replacement only Random Gradual Sudden Rate of Deterioration
Maintenance Options for Evident Failure Modes… Condition Based Replacement only Age Related Failure Pattern Random Gradual Sudden Rate of Deterioration
Maintenance Options for Evident Failure Modes… Age Related Failure Pattern Fixed Time Replacement or Condition Based Replacement Random Gradual Sudden Rate of Deterioration
Maintenance Options for Evident Failure Modes… Failure will always be a breakdown Age Related Failure Pattern Random Gradual Sudden Rate of Deterioration
Maintenance Options for Evident Failure Modes… Age Related Failure Pattern Random Gradual Sudden Rate of Deterioration
Start measuring plant metrics Expected Failure Inherent Capability Loss Planned Maintenance Maintenance Capability Loss Unexpected Failure Inherent Performance Level Available Time TotalTime
A typical example …… Inherent Capability
Perspectives on Maintenance and Asset Management in industry Do Company Boards understand the risks? Do insurers compensate the Company Boards for taking risks? Are current underwriting practices supporting mediocrity?  Is there a better way?

Más contenido relacionado

La actualidad más candente

Procedure Based Maintenance White Paper
Procedure Based Maintenance White PaperProcedure Based Maintenance White Paper
Procedure Based Maintenance White PaperRicky Smith CMRP, CMRT
 
Reliability Presentation
Reliability PresentationReliability Presentation
Reliability Presentationematzan
 
JR Dickens - IWCS 2007
JR Dickens - IWCS 2007JR Dickens - IWCS 2007
JR Dickens - IWCS 2007jrd9234
 
FRACAS, Failure Reporting Analysis, Corrective Action System
FRACAS, Failure Reporting Analysis, Corrective Action SystemFRACAS, Failure Reporting Analysis, Corrective Action System
FRACAS, Failure Reporting Analysis, Corrective Action SystemRicky Smith CMRP, CMRT
 
Advanced Maintenance And Reliability (Maintenance and Reliability Best Pract...
Advanced Maintenance And Reliability  (Maintenance and Reliability Best Pract...Advanced Maintenance And Reliability  (Maintenance and Reliability Best Pract...
Advanced Maintenance And Reliability (Maintenance and Reliability Best Pract...Ricky Smith CMRP, CMRT
 
Asset Reliability Begins With Your Operators
Asset Reliability Begins With Your OperatorsAsset Reliability Begins With Your Operators
Asset Reliability Begins With Your OperatorsRicky Smith CMRP, CMRT
 
MasterCommanderMay15Final copy
MasterCommanderMay15Final copyMasterCommanderMay15Final copy
MasterCommanderMay15Final copyMichael Timpane
 
10 Things an Operations Supervisor can do Today to Improve Reliability
10 Things an Operations Supervisor can do Today to Improve Reliability10 Things an Operations Supervisor can do Today to Improve Reliability
10 Things an Operations Supervisor can do Today to Improve ReliabilityRicky Smith CMRP, CMRT
 
Risk Management - Business Continuity Planning and Management
Risk Management  - Business Continuity Planning and ManagementRisk Management  - Business Continuity Planning and Management
Risk Management - Business Continuity Planning and ManagementCody Shive
 
Business Continuity - Business Risk & Management
Business Continuity - Business Risk & ManagementBusiness Continuity - Business Risk & Management
Business Continuity - Business Risk & ManagementAndrew Styles
 
Building Operational Excellence in Petroleum Refining Training Course
Building Operational Excellence  in Petroleum Refining  Training CourseBuilding Operational Excellence  in Petroleum Refining  Training Course
Building Operational Excellence in Petroleum Refining Training CourseKarl Kolmetz
 
Contingency%20planning%20lecture%205
Contingency%20planning%20lecture%205Contingency%20planning%20lecture%205
Contingency%20planning%20lecture%205Magdalena Anna Fas
 
3 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-32937903 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-3293790Jose Quintero
 
Disaster Recovery Plan / Enterprise Continuity Plan
Disaster Recovery Plan / Enterprise Continuity PlanDisaster Recovery Plan / Enterprise Continuity Plan
Disaster Recovery Plan / Enterprise Continuity PlanMarcelo Silva
 

La actualidad más candente (20)

Why RCM Doesn't Work?
Why RCM Doesn't Work?Why RCM Doesn't Work?
Why RCM Doesn't Work?
 
Procedure Based Maintenance White Paper
Procedure Based Maintenance White PaperProcedure Based Maintenance White Paper
Procedure Based Maintenance White Paper
 
Maximo Overview
Maximo OverviewMaximo Overview
Maximo Overview
 
Doing Too Much PM Report
Doing Too Much PM ReportDoing Too Much PM Report
Doing Too Much PM Report
 
Reliability Presentation
Reliability PresentationReliability Presentation
Reliability Presentation
 
JR Dickens - IWCS 2007
JR Dickens - IWCS 2007JR Dickens - IWCS 2007
JR Dickens - IWCS 2007
 
FRACAS, Failure Reporting Analysis, Corrective Action System
FRACAS, Failure Reporting Analysis, Corrective Action SystemFRACAS, Failure Reporting Analysis, Corrective Action System
FRACAS, Failure Reporting Analysis, Corrective Action System
 
Advanced Maintenance And Reliability (Maintenance and Reliability Best Pract...
Advanced Maintenance And Reliability  (Maintenance and Reliability Best Pract...Advanced Maintenance And Reliability  (Maintenance and Reliability Best Pract...
Advanced Maintenance And Reliability (Maintenance and Reliability Best Pract...
 
The key to improving your availability is fracas
The key to improving your availability is fracasThe key to improving your availability is fracas
The key to improving your availability is fracas
 
Asset Reliability Begins With Your Operators
Asset Reliability Begins With Your OperatorsAsset Reliability Begins With Your Operators
Asset Reliability Begins With Your Operators
 
MasterCommanderMay15Final copy
MasterCommanderMay15Final copyMasterCommanderMay15Final copy
MasterCommanderMay15Final copy
 
10 Things an Operations Supervisor can do Today to Improve Reliability
10 Things an Operations Supervisor can do Today to Improve Reliability10 Things an Operations Supervisor can do Today to Improve Reliability
10 Things an Operations Supervisor can do Today to Improve Reliability
 
Risk Management - Business Continuity Planning and Management
Risk Management  - Business Continuity Planning and ManagementRisk Management  - Business Continuity Planning and Management
Risk Management - Business Continuity Planning and Management
 
Business Continuity - Business Risk & Management
Business Continuity - Business Risk & ManagementBusiness Continuity - Business Risk & Management
Business Continuity - Business Risk & Management
 
Preventive Maintenance
Preventive MaintenancePreventive Maintenance
Preventive Maintenance
 
Building Operational Excellence in Petroleum Refining Training Course
Building Operational Excellence  in Petroleum Refining  Training CourseBuilding Operational Excellence  in Petroleum Refining  Training Course
Building Operational Excellence in Petroleum Refining Training Course
 
Contingency%20planning%20lecture%205
Contingency%20planning%20lecture%205Contingency%20planning%20lecture%205
Contingency%20planning%20lecture%205
 
3 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-32937903 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-3293790
 
Disaster Recovery Plan / Enterprise Continuity Plan
Disaster Recovery Plan / Enterprise Continuity PlanDisaster Recovery Plan / Enterprise Continuity Plan
Disaster Recovery Plan / Enterprise Continuity Plan
 
Tpm training
Tpm trainingTpm training
Tpm training
 

Destacado

Presentationfor Forum
Presentationfor ForumPresentationfor Forum
Presentationfor ForumSteve Turner
 
Mergers And Acquistion Financing Power Point
Mergers And Acquistion Financing Power PointMergers And Acquistion Financing Power Point
Mergers And Acquistion Financing Power Pointdloughran
 
Mis in banking
Mis in bankingMis in banking
Mis in bankingEh'Med
 
Conglomerate presentation & cnn
Conglomerate presentation & cnnConglomerate presentation & cnn
Conglomerate presentation & cnnDara Corporates
 
Merger and Acquisitions -HP and Compac
Merger and Acquisitions -HP and CompacMerger and Acquisitions -HP and Compac
Merger and Acquisitions -HP and CompacAugustin Bangalore
 
Legal Procedure for mergers
Legal Procedure for mergersLegal Procedure for mergers
Legal Procedure for mergersAnand Marda
 
Financial services marketing
Financial services marketingFinancial services marketing
Financial services marketingMayank Saxena
 
Sebi role and_functions
Sebi role and_functionsSebi role and_functions
Sebi role and_functionsDonda Ankit
 
Mergers and acquisitions
Mergers and acquisitionsMergers and acquisitions
Mergers and acquisitionsPradeep Yuvaraj
 

Destacado (17)

Presentationfor Forum
Presentationfor ForumPresentationfor Forum
Presentationfor Forum
 
Bbi ppt
Bbi pptBbi ppt
Bbi ppt
 
Mergers And Acquistion Financing Power Point
Mergers And Acquistion Financing Power PointMergers And Acquistion Financing Power Point
Mergers And Acquistion Financing Power Point
 
5 amfi point
5 amfi  point5 amfi  point
5 amfi point
 
Ma
MaMa
Ma
 
Mis in banking
Mis in bankingMis in banking
Mis in banking
 
Conglomerate presentation & cnn
Conglomerate presentation & cnnConglomerate presentation & cnn
Conglomerate presentation & cnn
 
Legal structure of businesses
Legal structure of businessesLegal structure of businesses
Legal structure of businesses
 
Legal Business Structures 101
Legal Business Structures 101Legal Business Structures 101
Legal Business Structures 101
 
Sebi & Mutual Funds
Sebi & Mutual FundsSebi & Mutual Funds
Sebi & Mutual Funds
 
Merger and Acquisitions -HP and Compac
Merger and Acquisitions -HP and CompacMerger and Acquisitions -HP and Compac
Merger and Acquisitions -HP and Compac
 
Legal Procedure for mergers
Legal Procedure for mergersLegal Procedure for mergers
Legal Procedure for mergers
 
Development of financial Institution
Development of financial InstitutionDevelopment of financial Institution
Development of financial Institution
 
Financial services marketing
Financial services marketingFinancial services marketing
Financial services marketing
 
Merger ppt
Merger pptMerger ppt
Merger ppt
 
Sebi role and_functions
Sebi role and_functionsSebi role and_functions
Sebi role and_functions
 
Mergers and acquisitions
Mergers and acquisitionsMergers and acquisitions
Mergers and acquisitions
 

Similar a Perspectiveson Asset Management

Bosch Rexroth - British Manufacturing maintenance report - Final
Bosch Rexroth - British Manufacturing maintenance report - FinalBosch Rexroth - British Manufacturing maintenance report - Final
Bosch Rexroth - British Manufacturing maintenance report - FinalTom Leatherbarrow
 
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...Cairn India Limited
 
Optimizing Petroleum Refining FCC Unit Operations Training
Optimizing Petroleum Refining FCC Unit Operations TrainingOptimizing Petroleum Refining FCC Unit Operations Training
Optimizing Petroleum Refining FCC Unit Operations TrainingKarl Kolmetz
 
Optimizing Petroleum Refining Unit Operations Training
Optimizing Petroleum Refining Unit Operations TrainingOptimizing Petroleum Refining Unit Operations Training
Optimizing Petroleum Refining Unit Operations TrainingKarl Kolmetz
 
Optimizing Petroleum Refining Unit Operations Training Course
Optimizing Petroleum Refining Unit Operations Training CourseOptimizing Petroleum Refining Unit Operations Training Course
Optimizing Petroleum Refining Unit Operations Training CourseKarl Kolmetz
 
Reliability-Centered Maintenance's Role in Asset Performance Management
Reliability-Centered Maintenance's Role in Asset Performance ManagementReliability-Centered Maintenance's Role in Asset Performance Management
Reliability-Centered Maintenance's Role in Asset Performance ManagementUSC Consulting Group
 
Evolution of maintenance_practices
Evolution of maintenance_practicesEvolution of maintenance_practices
Evolution of maintenance_practicesDanny Khudu
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance managementStudy Stuff
 
The challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceThe challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceMANUEL PACINI
 
Why RCM Doesn't Work Report - Digital Version
Why RCM Doesn't Work Report - Digital VersionWhy RCM Doesn't Work Report - Digital Version
Why RCM Doesn't Work Report - Digital VersionRicky Smith CMRP, CMRT
 
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....SOLVED SMU MBA ASSIGNMENTS AVAILABLE....
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....Naveen Kumar
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputGaurav Singh Rajput
 
Proactive Maintenance: EMAL’s Strategic Solution for Cost Competitiveness
Proactive Maintenance: EMAL’s Strategic Solution for Cost CompetitivenessProactive Maintenance: EMAL’s Strategic Solution for Cost Competitiveness
Proactive Maintenance: EMAL’s Strategic Solution for Cost Competitivenessalcircle.com
 
TCG Svcs Pres 2011
TCG Svcs Pres 2011TCG Svcs Pres 2011
TCG Svcs Pres 2011mcourton
 
Om0015 – maintenance management
Om0015 – maintenance managementOm0015 – maintenance management
Om0015 – maintenance managementsmumbahelp
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance managementsmumbahelp
 
Operations Excellence in the Management of Ageing Assets
Operations Excellence in the Management of Ageing AssetsOperations Excellence in the Management of Ageing Assets
Operations Excellence in the Management of Ageing AssetsAdvisian
 
Om 0015 maintenance management
Om 0015   maintenance managementOm 0015   maintenance management
Om 0015 maintenance managementsmumbahelp
 

Similar a Perspectiveson Asset Management (20)

Bosch Rexroth - British Manufacturing maintenance report - Final
Bosch Rexroth - British Manufacturing maintenance report - FinalBosch Rexroth - British Manufacturing maintenance report - Final
Bosch Rexroth - British Manufacturing maintenance report - Final
 
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
 
Optimizing Petroleum Refining FCC Unit Operations Training
Optimizing Petroleum Refining FCC Unit Operations TrainingOptimizing Petroleum Refining FCC Unit Operations Training
Optimizing Petroleum Refining FCC Unit Operations Training
 
Optimizing Petroleum Refining Unit Operations Training
Optimizing Petroleum Refining Unit Operations TrainingOptimizing Petroleum Refining Unit Operations Training
Optimizing Petroleum Refining Unit Operations Training
 
Optimizing Petroleum Refining Unit Operations Training Course
Optimizing Petroleum Refining Unit Operations Training CourseOptimizing Petroleum Refining Unit Operations Training Course
Optimizing Petroleum Refining Unit Operations Training Course
 
Reliability-Centered Maintenance's Role in Asset Performance Management
Reliability-Centered Maintenance's Role in Asset Performance ManagementReliability-Centered Maintenance's Role in Asset Performance Management
Reliability-Centered Maintenance's Role in Asset Performance Management
 
Evolution of maintenance_practices
Evolution of maintenance_practicesEvolution of maintenance_practices
Evolution of maintenance_practices
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance management
 
The challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceThe challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenance
 
Procedure Based Maintenance
Procedure Based MaintenanceProcedure Based Maintenance
Procedure Based Maintenance
 
Why RCM Doesn't Work Report - Digital Version
Why RCM Doesn't Work Report - Digital VersionWhy RCM Doesn't Work Report - Digital Version
Why RCM Doesn't Work Report - Digital Version
 
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....SOLVED SMU MBA ASSIGNMENTS AVAILABLE....
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh Rajput
 
Proactive Maintenance: EMAL’s Strategic Solution for Cost Competitiveness
Proactive Maintenance: EMAL’s Strategic Solution for Cost CompetitivenessProactive Maintenance: EMAL’s Strategic Solution for Cost Competitiveness
Proactive Maintenance: EMAL’s Strategic Solution for Cost Competitiveness
 
TCG Svcs Pres 2011
TCG Svcs Pres 2011TCG Svcs Pres 2011
TCG Svcs Pres 2011
 
Om0015 – maintenance management
Om0015 – maintenance managementOm0015 – maintenance management
Om0015 – maintenance management
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance management
 
Operations Excellence in the Management of Ageing Assets
Operations Excellence in the Management of Ageing AssetsOperations Excellence in the Management of Ageing Assets
Operations Excellence in the Management of Ageing Assets
 
Om 0015 maintenance management
Om 0015   maintenance managementOm 0015   maintenance management
Om 0015 maintenance management
 
ilm completed
ilm completedilm completed
ilm completed
 

Último

Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 

Último (20)

Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 

Perspectiveson Asset Management

  • 1. Perspectives on Maintenance and Asset Management in industry Do Company Boards understand the risks? Do insurers compensate the Company Boards for taking risks? Are current underwriting practices supporting mediocrity? Is there a better way?
  • 2. About me – Steve Turner In 1977Joined RAAF at 17... Bachelor of Engineering (Aero) RMIT Worked in maintenance and reliability with the RAAF including an exchange officer post with the UK Ministry of Defence on a reliability think tank post. Left RAAF in1989 3 Years with GMH purchasing department running production improvement programs with its suppliers Graduated with MBA from Monash in 1993 (part time studies) 3 years with Price Waterhouse (now PWC) as a senior consultant
  • 3. About me – Steve Turner Started OMCS International in 1996 Grown to be a highly respected consulting business in the area of asset management. Works in all sectors where physical assets generate the revenue. Most of our business is in Oil and Gas, Chemicals and Mining. Have been working with the power industry in Europe – focus on Nuclear Power stations.
  • 4. The agenda Lessons learnt The ESSO Longford Disaster The BP Texas Disaster The sad response by industry Maintenance strategy explained What we typically find wrong Summary Discussion
  • 6. The Longford Disaster On 25 September 1998, at the Longford Gas Plant in Victoria, Australia, a gas absorber burst, releasing a large cloud of hydrocarbon vapours. Seconds later, it exploded. Two staff were killed and 4 million people were deprived of gas for about two weeks
  • 8. A few graphic snaps – GP09 Heat Exchanger
  • 9. Some of the findings – Royal commission and Hopkins What would normally be considered abnormal was normalized - Hopkins Vital shut down and control mechanisms had not been working for 10 days– Other indicators were not seen as critical Engineering staff had been cut or moved to the city This led to lack of control of decision making on site The plant personnel were driven by production targets It was common practice to run the operation in the “red zone”.
  • 10. John Boshier - Chief Executive OfficerInstitution of Engineers, Australia It has been 3 years since the Esso Longford gas plant exploded in September 1998. This passage of time has allowed Australia’s major hazard facilities to review the disaster and implement changes to ensure that such a tragedy does not re-occur. Unfortunately, according to the author of this report, the industry and the engineering profession have not learnt as much as they might have from the tragedy. Far more could be done to apply the lessons from Longford at facilities around Australia.
  • 11. Reference to the report http://www.engineersaustralia.org.au/shadomx/apps/fms/fmsdownload.cfm?file_uuid=199C7EF9-9642-91DD-6B9D-9E1CAEB72F31&siteName=ieaust
  • 12. The BP Texas City Disaster - 2006
  • 13. BP Texas City Refinery Explosion March 2005 John Mogford BP - Senior Group Vice President, Safety & Operations Paper delivered at Center for Chemical Process Safety, 2nd Global Congress on Process Safety, Orlando, Florida 24 April 2006
  • 14. Reference to the Report www.bp.com/genericarticle.do?categoryId=98&contentId=7017238
  • 15. BP Texas City Refinery Explosion It’s not an easy story to tell. BP doesn’t come out of it well. And it’s a complicated tale involving many factors that go well beyond the process of operating a refinery safely – BP’s empowerment ethos, the behaviour of individuals in leadership and the clarity of our standards to name a few. ....
  • 16. BP Texas City Refinery Explosion This was a preventable incident, as I will explain. It should be seen as a process failure, a cultural failure and a management failure. Our investigations have revealed significant deficiencies in the work and safety culture at Texas City. The question, of course, is why these deficiencies developed – and why weren’t they sufficiently identified and addressed before the explosion.
  • 17. What I have learnt recently We have been in touch with BP Texas City and have had long phone conversations. I am told, they have spent $18 M USD in the last few years on consultants writing maintenance procedures and maintenance programs. They seem to have gone overboard since they simply don’t have the staff to complete the work. The real problem is they seem to have swung the pendulum too far the other way.
  • 18. My impressions based on decades of consulting
  • 19. My impressions of asset management in hazardous facilities... The process of asset management in hazardous plants is appalling in almost every case. This low level is considered satisfactory. The leaders of business do not understand the implications. There is a fundamental lack of knowledge about the subject: The aviation industry figured it out in the seventies but few organisations outside of aviation are anywhere close to where they should be.
  • 20. What I observe The problems found by the Longford Royal Commissions are endemic in industry and there is not much motivation to change. The concepts of maintenance analysis are not difficult to apply yet most organisations are in complete disarray. Maintenance engineers have not had much impact: In the past, they have not articulated their needs well, and have not been good at getting improvements happening. Many are still in that situation.
  • 21. What I suspect I suspect Company Boards don’t want to listen because they: See maintenance as an uncontrollable drain on cash which, in the past, no one has been able to manage properly, Feel that improvements in the area of reliability and maintenance may provide high returns, but prefer to take shorter term cost reduction strategies. Base decisions on bad experiences; they don’t have confidence in reliability improvement programs.
  • 22. Some evidence showing how poor things are in general
  • 23. Analysis of a vendor supplied maintenance program
  • 24. Analysis of PM program for Reciprocating Compressors at a Refinery
  • 25. Turbine and mainline pump in Saudi – Before and after labour hours per year
  • 26. A deep water drilling company maintenance program before and after
  • 27. The problem The fundamentals of asset integrity and reliability relate directly to the preventive and predictive maintenance programs deployed by asset managers. In over a decade of providing review programs in all industries, the common thread is that almost all companies have gaps in their programs while at the same time the over-service in others. The result is that few companies have control over the condition of their assets.
  • 28. 28 How organisations get into trouble - the vicious cycle of reactive maintenanceTM.
  • 29. The Birth of industrial Plant.. a Common Scenario Maintenance not involved in the design. Poor maintainability. Lack of condition monitoring considerations: Inspection facilities. Sample points. Gauges and alarms. Inadequate maintenance facilities. Design not functionally capable. etc FMECA is not seen by maintenance.
  • 30. The Birth of industrial Plant.. cont The project runs over budget and the design capability is reduced. There is little margin between what the plant can achieve and what is expected of it. The maintenance tradesmen arrive too late for adequate training and preparation. Commissioning is done in a rush and often not fully completed.
  • 31. After Commissioning …. The project is handed over without a maintenance program The tradesmen write one… Little input from operations No consistent method No audit trail of rationale Generally risk averse - over-servicing Page 6
  • 32. The Infancy days… Failures happen and useless tasks are added. Operations has no buy in for the maintenance plan and there is a reluctance to cooperate. Not all the PM Program is achieved and this becomes the culture of the organisation. Temporary repairs creep in and get out of control Consultants arrive and cut heads
  • 33. The Vicious Circle of Reactive MaintenanceTM Backlog grows PM is missed Standards Drop More preventable failures Morale Declines Resources taken by Breakdowns Head / Budget Reduction Temporary Repairs More repeat work
  • 34. Maintenance Philosophy Explained Principles of Maintenance Analysis for Evident Failure Modes
  • 35. Almost all assets fail in some way at some time The mechanisms of failure are referred to as failure modes. Maintenance personnel are interested in to characteristics regarding failure modes: The pattern: Wear out Random Infant Mortality Rate of deterioration Sudden Gradual
  • 36. Age Studies (Nowlan and Heap) show that intrusive maintenance needs to be avoided.. C: Gradual 5% D: Almost Random 7% A: Bath Tub 4% E: Random 14% B: Wear Out 2% Conditional Probability of Failure F: Infant Mortality 68% Age or Life Source: United Airlines 1978
  • 37. Step 6…. RCM Task Selection Sequence Hidden Evident Operational Loss Hazard Repair Only Condition Monitoring Condition Monitoring Condition Monitoring Condition Monitoring Scheduled Restoration Scheduled Restoration Scheduled Restoration Scheduled Restoration Scheduled Discard Scheduled Discard Scheduled Discard Scheduled Discard Failure Finding Modification Modification or No PM Modification or No PM
  • 38. The frequency of On-Condition tasks must be less than the P-F Interval. Resistance to Failure P-F Interval (months) Potential Failure Functional Failure Check at 1 monthly intervals Age Option 1..Monitor Condition (Condition Monitoring)
  • 39. Option 2…Fixed time replacement Safe Life The frequency of fixed time replacement must be before safe of economic life.
  • 40. Maintenance Options for Evident Failure Modes… Age Related Failure Pattern Fixed Time Replacement only Random Gradual Sudden Rate of Deterioration
  • 41. Maintenance Options for Evident Failure Modes… Condition Based Replacement only Age Related Failure Pattern Random Gradual Sudden Rate of Deterioration
  • 42. Maintenance Options for Evident Failure Modes… Age Related Failure Pattern Fixed Time Replacement or Condition Based Replacement Random Gradual Sudden Rate of Deterioration
  • 43. Maintenance Options for Evident Failure Modes… Failure will always be a breakdown Age Related Failure Pattern Random Gradual Sudden Rate of Deterioration
  • 44. Maintenance Options for Evident Failure Modes… Age Related Failure Pattern Random Gradual Sudden Rate of Deterioration
  • 45. Start measuring plant metrics Expected Failure Inherent Capability Loss Planned Maintenance Maintenance Capability Loss Unexpected Failure Inherent Performance Level Available Time TotalTime
  • 46. A typical example …… Inherent Capability
  • 47. Perspectives on Maintenance and Asset Management in industry Do Company Boards understand the risks? Do insurers compensate the Company Boards for taking risks? Are current underwriting practices supporting mediocrity? Is there a better way?