1. PERLA RAVI THEJA
+919738421266
EXECUTIVE SUMMARY
• Working as Quality Associate (Using QTP/UFT) at Ariba An SAP Company in Bangalore from November 2015 – Worked
as Senior Software Test Engineer in Arvind Internet Limited from April 2015 – Worked as SAP Automation Test
Consultant (Using QTP/UFT, HP-QC and SAP-TAO), in Cognizant from June 2012 - Worked as Intern, in Data-center I/O
R&D at VMware Software India Pvt. Ltd Bangalore for 10 months.
• Five years of IT experience in automating critical applications for reputed clients such as Southern California Edison,
Staples, Nike, Unilever and Arvind, which includes 11 months internship at VMware Pvt Ltd, R&D, Banglore.
• Specialties: Script Automation Development, Regression and Functional testing, Defect Analysis and Resolution,
Implementation, Support.
• Strong analytical skills, proven by years of successful system implementation-driven process redesign
• Worked on automating different modules in SAP ECC and SAP HR (Web Portal).
• Flexible, creative thinker, Diligent and quality focused.
• Worked on a variety of frameworks, including Data driven, Keyword driven and Hybrid.
• Has knowledge on SAN, NAS, Addressing modes both LBA and CHS using C language.
• Configured iSCSI Initiators, targets and Storage, Multi-path configuration to targets, NMP, Raw device Mapping,
spanning and Booting from iSCSI and SAN.
• Developed simulated partition utility for ESX a cloud OS which prevents data corruption.
Skills & Certifications
• I am Currently working at Ariba on Designing Test Automation Frame Work using QTP.
• I had completed QTP (CCP Certification) and developed functional knowledge on SAP-MM.
• I worked on and learnt about HP-QC/ALM (Test Management Tool) and also of how to deal with Creation of Business
Components, Test folders and Tests in Test Plan Module, Test Sets in Test lab Module, and Defects in Defects Module.
• I worked on and learnt about HP-QTP/UFT (Functional Automation Testing Tool), of how to creating, running and
analyzing Automated Tests by Data-Driven Testing using Descriptive Programming, Parameters, Object repositories.
• I worked in VB-Script Scripting language used by QTP/UFT. (Usage of Operators, Conditional Statements, Looping
Statements, various In-Built functions, Creation of Functions and Sub-Routines).
• I worked and learnt about SAP-TAO (SAP Test Acceleration and Optimization) which streamlines the creation and
maintenance of ERP business process testing using Run Time Libraries.
• I experienced relationship in usage among HP-QC/ALM, QTP/UFT, and SAP-TAO.
Education
2016: Completed Ph.D. in area of Cloud Computing under the curriculum of Vellore Institute of Technology, Vellore.
2012: M.Tech Computer Science & Engineering under the curriculum of Vellore Institute of Technology, Vellore.
2010: B.Tech Computer Science & Engineering under the course curriculum of G.Pulla Reddy Engineering College, Kurnool.
Professional Experience
VMware Software India Pvt. Ltd : Sep 9th
2011 to May 12th 2012.
Cognizant Technology Solutions : June 28th
2012 to Apr 08th
2015
Arvind Internet Limited : Apr 09th
2015 to Nov 20th
2015.
Ariba An SAP Company : Nov 22nd
2015 to Present
Projects Worked on Till Date
1 | P a g e
2. Cloud Integartion Nov 22nd
2015 to Till Date
Role: Quality ASSOCIATE
Employer: Ariba An SAP Company
Project Description: Develop Test Automation Frame Work using QTP/UFT Scripts and also to develop new Scripts, for flow
between Ariba Products and SAP ECC.
Project Responsibilities:
• Developing, Executing and maintaining the tests according to the sequence of steps in the Test Scripts.
• Validate and verify all test results against the expected results
• Report progress, issues, and risks to the Test manager
• Execute and complete required test phases
Multi Brand Outlet(MBO) Apr 09th
2015 to Nov 20th
2015
Role: Senior Software Test Engineer
Employer: Arvind Internet Limited
Project Description: A Multi Brand Outlet by name MBO is going to be launched, I meant for testing through Automation, at
all phases like UI testing.
Project Responsibilities:
• Developing, Executing and maintaining the tests.
• Validate and verify all test results against the expected results
• Report progress, issues, and risks to the Test manager
• Execute and complete required test phases
U2K2-UnileverU2K2Platform Sep 22nd
2014 to Apr 08th
2015
Role: BI-ASSOCIATE
Employer: Cognizant Technology Solutions
Project Description: Client need to do regression testing, maintain core QTP/UFT Scripts and also to develop new Scripts,
Cognizant was engaged to test all modules associated with SAP.
Project Responsibilities:
• Developing, Executing and maintaining the tests according to the sequence of steps in the Test Scripts.
• Validate and verify all test results against the expected results
• Report progress, issues, and risks to the Test manager
• Execute and complete required test phases
Nike-SAP-Functional-Testing Jun 6 th
2014 to Sep 22nd
,2014
Role : BI-ASSOCIATE
Employer: Cognizant Technology Solutions
Project Description: Client need to do regression testing and Cognizant was engaged to test all modules associated with
SAP.
Project Responsibilities:
• Developing, Executing and maintaining the tests according to the sequence of steps in the Test Scripts.
• Validate and verify all test results against the expected results
• Report progress, issues, and risks to the Test manager
• Execute and complete required test phases
Nike-SAP-Testing-T&M Apr 21st
2014 to Jun 5th
2014
Role: BI-ASSOCIATE
Employer: Cognizant Technology Solutions
Project Description: Client needs to do Automation testing and develop Portal and SAP-ECC Scripts for HR-Module, So
Cognizant was engaged to develop Portal and SAP-ECC for HR module.
Project Responsibilities:
• I am the solo person to handle the complete project from end-to-end.
2 | P a g e
3. • Developing the tests according to the sequence of steps in the Test Scripts.
• Validate and verify all test results from portal against the expected results in sap.
• Report progress, issues, and risks to the Test manager.
• Developing, Executing and completing required test phases.
Nike SAP Functional Testing Dec 12th
2013 to Apr 20th
2014
Role: BI-ASSOCIATE
Employer: Cognizant Technology Solutions
Project Description: Client need to do regression testing and Cognizant was engaged to test all modules associated with
SAP.
Project Responsibilities:
• Developing, Executing and maintaining the tests according to the sequence of steps in the Test Scripts.
• Validate and verify all test results against the expected results.
• Report progress, issues, and risks to the Test manager.
• Execute and complete required test phases.
Nike - SAP Functional T&M Nov 8th
2013 to Dec 8th
2014
Role: BI-ASSOCIATE
Employer: Cognizant Technology Solutions
Project Description: Client need to do regression testing and Cognizant was engaged to test all modules associated with
SAP.
Project Responsibilities:
• Executing and maintaining the tests according to the sequence of steps in the Test Scripts.
• Validate and verify all test results against the expected results.
• Report progress, issues, and risks to the Test manager.
• Execute and complete required test phases.
Staples Jun 25th
2013 to Oct 16th
2013
Role: BI-ASSOCIATE
Employer: Cognizant Technology Solutions
Project Description: Client had upgraded SAP, and Cognizant was engaged to test all MM module associated with SAP.
Project Responsibilities:
• Developing and executing the tests according to the sequence of steps in the Test Scripts for PTP.
• Validate and verify all test results against the expected results.
• Report progress, issues, and risks to the Test manager.
• Execute and complete required test phases.
Unilever Sirius Platform May 10th
2013 to Jun 7th
2013
Role: BI-ASSOCIATE
Employer: Cognizant Technology Solutions
Project Description: Client had upgraded SAP, and Cognizant was engaged to test all MM module associated with SAP.
Project Responsibilities:
• Developing and executing the tests according to the sequence of steps in the Test Scripts for PTP.
• Validate and verify all test results against the expected results.
• Report progress, issues, and risks to the Test manager.
• Execute and complete required test phases.
SCE_SAP_UPGRADE Oct 29th
2013 to Apr 27th
2013
Role: BI-ASSOCIATE
Employer: Cognizant Technology Solutions
Project Description: Client had recently upgraded SAP, and Cognizant was engaged to test all sub modules associated with
SAP.
Project Responsibilities:
3 | P a g e
4. • Developing and executing the tests according to the sequence of steps in the Test Scripts for PTP.
• Validate and verify all test results against the expected results.
• Report progress, issues, and risks to the Test manager.
• Execute and complete required test phases.
VMware Software India Pvt. Ltd, India Sep 5th
2011 to May 21st 2012
Role: Intern
Employer: VMware Software India Pvt. Ltd, India
Project Description: Each operating-system has its own partition utility; we need to develop a simulated parted Utility which
simulates partition-table for cloud operating system. We can develop a partition table on raw disk without its
corresponding operating system existence on the disk. It analyzes the partition table and able to customize it, also helps in
testing the capabilities of native partition utility, whether it can be able to recognize disk -label and its partition table and
avoids data corruption.
Used: C (Programming Language) in ESX and UNIX (Operating Systems).
Project Responsibilities:
• Develop simulated partition-table for cloud operating system.
• Analyzing various partition tables and simulate them using C.
• Report progress, issues, and risks to the Mentor.
Personal Details:
Mobile: +91 9738421266
Email : ravithejaperla9048@gmail.com
PASSPORT: H5779028
4 | P a g e