Cycle Time
Normal Time
 Allowance




    SERVICE OPERATION
      MANAGEMENT
Time Studies
 The classical approach to time studies was
  developed by Frederick W. Taylor in 1911, and is
  the accepted procedure for production analysis.
 A time study, also termed a stopwatch time study,
  is an analysis of a worker`s performance against
  a time standard.
 Time studies are normally performed on short
  repetitive production types of tasks.
How is a time study performed?
There are several basic steps which must be
  followed in any time study:
1. Define the job to be analyzed.
2. Break the job into discrete tasks.
3. Measure the actual time required for each task.
4. Develop a statistically significant sample size of
    the task work cycles to be measured.
Cycle Time
 Operator Cycle Time
  • total time required for a worker to
    complete one cycle of an operation

 Machine Cycle Time
  • total time for a machine to finish one
     complete cycle
 • includes loading and unloading
Normal Time
 Normal time = (average element time) x
 (Performance rating / 100)

 The normal time for a particular employee is rated
 against the average job element time
Allowance
 This may take into consideration personal factors
  as well as unavoidable constraints encountered in
  the work situation.
 Allowances include all unavoidable delays, but
  rule out avoidable delays.
 An allowance factor represents time lost due to
  personal factors, shift adjustments, improper
  equipment, fatigue, and related issues.
Standard Time
 When calculating the standard time, three
 different types of time are actually utilized.
   Actual time is the time a particular employee
    actually takes to perform a particular job operation.
   Normal time is the time needed to complete an
    operation by an employee working at 100%
    efficiency having no delays.
   Standard time is the time needed to complete an
    operation by an employee working at 100%
    efficiency with unavoidable delays:
 Standard time = normal time + allowance time
 Standard time = normal time / (1 - allowance
 fraction)

 Allowances are generally applied to total cycle
 time as some percentage of it, but sometimes
 these are given separately for machine time as
 some % and for manual effort time some other %.

More Related Content

What's hot

Method Study
Method StudyMethod Study
Method Study
ajithsrc
 
Principles of Motion Economy
Principles of Motion EconomyPrinciples of Motion Economy
Principles of Motion Economy
Joseph Konnully
 

What's hot (20)

Line balancing
Line balancingLine balancing
Line balancing
 
Work Study
Work StudyWork Study
Work Study
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Work study
Work studyWork study
Work study
 
Line balancing
Line balancingLine balancing
Line balancing
 
Work study
Work studyWork study
Work study
 
79971255 assembly-line-balancing
79971255 assembly-line-balancing79971255 assembly-line-balancing
79971255 assembly-line-balancing
 
Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
 
Work measurement
Work measurementWork measurement
Work measurement
 
Method Study
Method StudyMethod Study
Method Study
 
assembly line balancing
assembly line balancingassembly line balancing
assembly line balancing
 
Ranked Positional Weight Method | Management
Ranked Positional Weight Method | ManagementRanked Positional Weight Method | Management
Ranked Positional Weight Method | Management
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
 
Recording techniques in method study
Recording techniques in method studyRecording techniques in method study
Recording techniques in method study
 
Principles of Motion Economy
Principles of Motion EconomyPrinciples of Motion Economy
Principles of Motion Economy
 
Motion And Time Study
Motion And Time StudyMotion And Time Study
Motion And Time Study
 
Production and Operation Management
Production and Operation ManagementProduction and Operation Management
Production and Operation Management
 
Lecture 2 process charts work study
Lecture 2 process charts work studyLecture 2 process charts work study
Lecture 2 process charts work study
 
Assembly Line Balancing -Example
Assembly Line Balancing -ExampleAssembly Line Balancing -Example
Assembly Line Balancing -Example
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 

Similar to cycle time, normal time and standard allowance

7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
Akash Bakshi
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
sai precious
 
Effect of time and motion study
Effect of time and motion studyEffect of time and motion study
Effect of time and motion study
Ankur Shukla
 

Similar to cycle time, normal time and standard allowance (20)

Work study Training Manual
Work study Training ManualWork study Training Manual
Work study Training Manual
 
Unit 3 problems
Unit 3 problemsUnit 3 problems
Unit 3 problems
 
Good work measurement
Good work measurementGood work measurement
Good work measurement
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
 
work-measurement.pptx
work-measurement.pptxwork-measurement.pptx
work-measurement.pptx
 
Work measurement ppt @ bec doms
Work measurement ppt @ bec domsWork measurement ppt @ bec doms
Work measurement ppt @ bec doms
 
4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx
 
presentation group 5.pptx
presentation group 5.pptxpresentation group 5.pptx
presentation group 5.pptx
 
III. WORK MEASUREMENT in Work Study and Measurement
III. WORK MEASUREMENT in Work Study and MeasurementIII. WORK MEASUREMENT in Work Study and Measurement
III. WORK MEASUREMENT in Work Study and Measurement
 
Fst gp ppt
Fst gp pptFst gp ppt
Fst gp ppt
 
Work measurement
Work measurementWork measurement
Work measurement
 
work-measurement-ppt.pptx
work-measurement-ppt.pptxwork-measurement-ppt.pptx
work-measurement-ppt.pptx
 
Work Measurement
Work MeasurementWork Measurement
Work Measurement
 
Work measurement
Work measurementWork measurement
Work measurement
 
Time and motion study
Time and motion study Time and motion study
Time and motion study
 
UNIT 4 LABOUR.pptx
UNIT 4 LABOUR.pptxUNIT 4 LABOUR.pptx
UNIT 4 LABOUR.pptx
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
Effect of time and motion study
Effect of time and motion studyEffect of time and motion study
Effect of time and motion study
 
Effect of time and motion study
Effect of time and motion studyEffect of time and motion study
Effect of time and motion study
 

Recently uploaded

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Recently uploaded (20)

Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 

cycle time, normal time and standard allowance

  • 1. Cycle Time Normal Time Allowance SERVICE OPERATION MANAGEMENT
  • 2. Time Studies  The classical approach to time studies was developed by Frederick W. Taylor in 1911, and is the accepted procedure for production analysis.  A time study, also termed a stopwatch time study, is an analysis of a worker`s performance against a time standard.  Time studies are normally performed on short repetitive production types of tasks.
  • 3. How is a time study performed? There are several basic steps which must be followed in any time study: 1. Define the job to be analyzed. 2. Break the job into discrete tasks. 3. Measure the actual time required for each task. 4. Develop a statistically significant sample size of the task work cycles to be measured.
  • 4. Cycle Time  Operator Cycle Time • total time required for a worker to complete one cycle of an operation  Machine Cycle Time • total time for a machine to finish one complete cycle • includes loading and unloading
  • 5. Normal Time  Normal time = (average element time) x (Performance rating / 100)  The normal time for a particular employee is rated against the average job element time
  • 6. Allowance  This may take into consideration personal factors as well as unavoidable constraints encountered in the work situation.  Allowances include all unavoidable delays, but rule out avoidable delays.  An allowance factor represents time lost due to personal factors, shift adjustments, improper equipment, fatigue, and related issues.
  • 7. Standard Time  When calculating the standard time, three different types of time are actually utilized.  Actual time is the time a particular employee actually takes to perform a particular job operation.  Normal time is the time needed to complete an operation by an employee working at 100% efficiency having no delays.  Standard time is the time needed to complete an operation by an employee working at 100% efficiency with unavoidable delays: