-:About NTPC:•
•
•
•
•
•
•
•
•

NTPC, the largest power Company in India, was setup in 1975 to accelerate
power development in the country.
Dr.Arup Roy choudhary is chairman & MD since 1/09/2010.
NTPC has installed capacity of 41,684 MW.
NTPC ranked 300th in the ‘2013, Forbes Global 2000’ ranking of the World’s
biggest companies.
NTPC plans to become a 128,000 MW company by 2032.
It has 16 coal based power stations (23,395 MW)
7 gas based power stations (3,955 MW)
4 power stations in Joint Ventures (1,794 MW).
NTPC has been awarded NO-1,best workplace in india among large
organization and the best psu for the year 2010.
-:NTPC, DADRI:TOTAL CAPACITY OF DADRI POWER PLANT :(A) THERMAL
I:- 04X210 MW = 840 MW
II:- 02X490 MW = 980 MW
TOTAL
= 1820 MW
B)

GAS

(C) SOLAR

= 817 MW
= 05MW

GRAND TOTAL = 2642 MW
PMI Revision 00

October 14, 2013

5
Diagram of a typical coal-fired thermal power station
-:Generation of Electricity:•
•

•
•
•

Prime mover coupled to
Alternator
Prime mover is driven by energy
obtained from various sources
such as
burning of fuel
pressure of water
Force of wind etc.
Fig. Fundamental of generation of Electricity
-:Thermal Power Plant:•

A generating station which converts heat energy of coal combustion
into electrical energy is known as a steam power station.

•

Steam is produced in the boiler by utilizing the heat of coal
combustion. The steam is then expanded in the steam turbine and is
condensed in a condenser to be fed into the boiler again. The steam
turbine drives the alternator which converts mechanical energy of the
turbine into electrical energy.
-:Basic Power Plant Cycle:-
-:WORKING OF STEAM POWER PLANT:Coal is burnt in a boiler ,which converts water into
steam.
• The steam is expanded in a turbine used to drive
alternator.
• The steam expanded is condensed in a condenser to
be feed into the boiler again.
• The entire arrangement of steam power plant can be
divided into.
•

a. fuel and ash plant.
b. air and fuel gas plant.
c. feed water and steam plant.
d. cooling water plant.
-:Main and Auxiliary Equipments:1. Coal handling plant
2. Stoker
3. Pulverizer
4.Boiler
5.Superheater
6.Eonomiser & Air preheater
7.Reheater
8.Deaerator
9.Condenser
10.Primary air fan
11.Turbine(prime mover)
12.Draft fan & chimney
13.Electo-static precipitator
14.Cooling tower
15.Ash handling plant
16.Electrical equipment
a. Generator
b. Transformers
c. Switch yard
-:Coal handling plant:-

•The

function of coal handling plant is automatic feeding of coal to the boiler
furnace.
• A thermal power plant burns enormous amounts of coal.
•A 200MW plant may require around 2000 tons of coal daily
Coal conveyor : This is a belt type of arrangement. With this coal is transported from
coal storage place in power plant to the place near by boiler.  

Stoker : The coal which is brought near by boiler has to put in boiler furnace for
combustion. This stoker is a mechanical device for feeding coal to a furnace.

Pulverizer : The coal is put in the boiler after pulverization. For this pulverizer is used. A
pulverizer is a device for grinding coal for combustion in a furnace in a power plant. A
pulverizer is a device for grinding coal for combustion in a furnace in a power plant.
Pulverizing mills are further classified as:
1.Contact mill
2.Ball mill
3.Impact mill
-:Boiler:A boiler is closed vessel in which water is converted into steam by
utilising the heat of coal combustion.
Steam boilers are broadly classified into following two types:base on the
relative position of water and gases.
(a) Water tube boilers (b) Fire tube boilers
In a water tube boiler, water flows
through the tubes and the hot gases of
combustion flow over these tubes.
Water-tube boilers are used for highpressure boilers
Examples: cochron, Lancashire,
locomotive boiler.
In a fire tube boiler, the hot products of combustion pass through the
tubes surrounded by water.

• The heated water then rises into the steam drum. Here, saturated steam is
drawn off the top of the drum. The steam will reenter the furnace in
through a superheater in order to become superheated. Superheated
steam is used in driving turbines. Since water droplets can severely
damage turbine blades, steam is superheated to 730°F (390°C) or higher
in order to ensure that there is no water entrained in the steam.
-:Super heater:•

A device which removes last traces of moisture.

•
•

It helps in reduction in requirement of steam quantity.
steam being dry reduces the mechanical resistance of
turbine.
No corrosion at the turbine blades.

•
-:Economizer and Air Pre-heater:•

An economizer is a heat transfer device used for heating the feed water with
the help of hot flue gases before leaving the chimney.

•

It helps in improving the efficiency of the power plant.

•

Air preheater is a device which utilizes the waste heat of the flue gases leaving
the economizer to heat the air to be supplied to the boiler.
-:Reheater :Some of the heat of superheated
steam is used to rotate the turbine
where it loses some of its energy.
The steam after reheating is used
to rotate the second steam turbine
where the heat is converted to
mechanical
energy.
This
mechanical energy is used to run
the alternator, which is coupled to
turbine , there by generating
electrical energy.
-:DEAERATOR:•A steam generating boiler requires that the boiler feed water should be devoid
of air and other dissolved gases, particularly corrosive ones.
• In order to avoid corrosion of the metal, power station uses a Deaerator, for
the removal of air and other dissolved gases from the boiler feed water.
•A deaerator has a vertical, domed deaeration section mounted on top of a
horizontal cylindrical vessel which serves as a deaerated boiler feed water
storage tank.
-:Condenser:Which condenses the steam at the exhaust of turbine.
•It

creates a very low pressure at the exhaust of turbine, this
helps in converting heat energy of steam into mechanical
energy in the prime mover.
•The

condensed steam can be used as feed water to the
boiler.
•Classification of condenser
1.Jet condensers or contact condensers,
2. Surface condensers
Primary Air Fan:•

Air to blow the coal from the mill
to the boiler, called the primary
air, is supplied by a large fan
driven by a variable speed motor

•

When mixed with a stream of air
the powdered coal behaves more
like a gas than a solid

•

Primary air does two jobs –
heating the coal powder and
secondly lifting it into the furnace
through pipelines
-:Prime Mover (i.e. Turbine):A steam turbine is a mechanical device that extracts thermal energy from
pressurized steam, and converts it into mechanical energy.
The steam turbine is a form of heat engine that derives much of its
improvement in thermodynamic efficiency from the use of multiple stages in
the expansion of the steam, which results in a closer approach to the ideal
reversible expansion process.
About 86% of all electric generation in the world is by use of steam turbines.

BOILER

GENERATOR
STEAM TURBINE
-:Cooling Towers:Remove heat from the
water discharged from the
condenser so that the water
can be discharged to the
river or re circulated and
reused.
• Air can be circulated in the
cooling towers through
natural draft and
mechanical draft.
• Type of cooling tower
1. Wet cooling tower
2. Dry cooling tower
•
Induced Draught (ID) Fan

Chimney
•

•

Two induced draught fans draw
gases out of the boiler

•

The gas has already passed
through the air heaters and
precipitators before it has
reached these fans

•

The heat from the flue gases or
smoke is used in the air heaters
to heat up the primary and
secondary air

The chimney is 275 meters' high
and 50,000 tonnes of reinforced
concrete were used to make it

•

It consists of flues each of which
serve typically two or three boilers
(two units)
-:Electro-Static Precipitator:-

Top View of ESP Schematic Diagram



Side view of ESP Schematic Diagram

It is a device which removes dust or other finely divided particles from flue gases by
charging the particles inductively with an electric field, then attracting them to highly
charged collector plates. Also known as precipitator. The process depends on two
steps. In the first step the suspension passes through an electric discharge (corona
discharge) area where ionization of the gas occurs. The ions produced collide with
the suspended particles and confer on them an electric charge. The charged particles
drift toward an electrode of opposite sign and are deposited on the electrode where
their electric charge is neutralized. The phenomenon would be more correctly
designated as electrode position from the gas phase
-:COAL TRANSPORTATION SYATEM:



Source of coal = Piparwar Mines North Karanpur (Jharkhand)
Location = Near Ranchi
Means of transportation-Railway



Rout of ply=kalari-gawaroad,seonnogarmughalsarai,Allahabad,Kanpur,Aligarh,dadri-plant unloading area.



Distance = 1124 Km from kholori to dadri with electrified trak from
seonnogar.



Type of coal = F-grade (Washed),E grade(Raw)



C.V(calorific value)=3600-3800 kcal/kg.



Coal requirement = 13,000 MT/Day(04 rakes)



Type of wagon= 1.BOBR(bogy open rapid discharge)
= 2.Box-N(min 2 door on each said)
ASH HANDLING PLANT
The percentage of ash in coal is 5% in good quality coal & about 40% in poor
quality coal.
• Power plants generally use poor quality of coal , thus amount of ash produced
by it is quite large.
• A modern 1000MW plant produces about 4800 tons of ash daily.
• The stations use some conveyor arrangement to carry ash to dump sites.
•
-:Electrical Equipments:Alternator
An alternator is coupled to a steam turbine and converts mechanical
energy of the turbine into electrical energy.
It may be hydrogen or air cooled.
The necessary excitation is provided by means of main and pilot exciters
directly coupled to the alternator shaft.
Transformers
(a) main step-transformers, which steps-up generated voltage transmission
of power
(b) station transformers, general purpose
(c) auxiliary transformers, which supply to individual unit-auxiliaries.
Control Room and Switchyard :
The control room monitors the overall operation of the plant. It is
provided with controls for real and reactive power flow. It is provided
with safety relays and switchgears.
-:Coal Ash can be used in:•
•
•
•
•
•

Construction of embankments and fills
Construction of road in sub-base
Manufacture of cement
Manufacture of bricks/blocks
Filling as flowable fill material
Agriculture as soil amendment/source of
essential plant nutrients
-:TRIPICAL DIAGRAM OP THERMAL POWER PLANT:-
Efficiency of Thermal Power Station or Plant
The overall efficiency of a thermal power station or plant varies from 20% to 26% and
it depends upon plant capacity.
Emam training

More Related Content

What's hot

Steam power plant
Steam power plant Steam power plant
Steam power plant msrao1
 
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportUtkarsh Chaubey
 
THERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORT
THERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORTTHERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORT
THERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORTPrasant Kumar
 
Thermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit HingeThermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit Hingeamit307
 
Power plant Engineering ppt
Power plant Engineering ppt Power plant Engineering ppt
Power plant Engineering ppt Prabhat Kumar
 
Pollution due to power generation (1)
Pollution due to power  generation (1)Pollution due to power  generation (1)
Pollution due to power generation (1)Sumit Nagar
 
Coal based thermal power plant
Coal based thermal power plant Coal based thermal power plant
Coal based thermal power plant Eklavya Sharma
 
thermal power plant PTTP Parichha
thermal power plant PTTP Parichhathermal power plant PTTP Parichha
thermal power plant PTTP ParichhaGagandeep Maan
 
Steam power plants
Steam power plantsSteam power plants
Steam power plantsRahul Rathod
 
Power Plant Familiarization
Power Plant FamiliarizationPower Plant Familiarization
Power Plant FamiliarizationAanand Kumar
 
Ppt on ntpc dadri created vikas gujjar(IET lko)
Ppt on ntpc dadri created vikas gujjar(IET lko)Ppt on ntpc dadri created vikas gujjar(IET lko)
Ppt on ntpc dadri created vikas gujjar(IET lko)Vikas Gurjer
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Shubham Thakur
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantVivek Pathak
 
SUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONSUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONAMIT KUMAR
 
Coal Fired Thermal Power Plants
Coal Fired Thermal Power Plants Coal Fired Thermal Power Plants
Coal Fired Thermal Power Plants Arnab Nandi
 

What's hot (20)

Steam power plant
Steam power plant Steam power plant
Steam power plant
 
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
 
THERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORT
THERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORTTHERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORT
THERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORT
 
Thermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit HingeThermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit Hinge
 
Power plant Engineering ppt
Power plant Engineering ppt Power plant Engineering ppt
Power plant Engineering ppt
 
Pollution due to power generation (1)
Pollution due to power  generation (1)Pollution due to power  generation (1)
Pollution due to power generation (1)
 
Coal based thermal power plant
Coal based thermal power plant Coal based thermal power plant
Coal based thermal power plant
 
thermal power plant PTTP Parichha
thermal power plant PTTP Parichhathermal power plant PTTP Parichha
thermal power plant PTTP Parichha
 
Power plant
Power plantPower plant
Power plant
 
Ntpc report harsh
Ntpc report  harshNtpc report  harsh
Ntpc report harsh
 
Power plant, Power Station and types of power plant
Power plant, Power Station and types of power plantPower plant, Power Station and types of power plant
Power plant, Power Station and types of power plant
 
Steam power plants
Steam power plantsSteam power plants
Steam power plants
 
Power Plant Familiarization
Power Plant FamiliarizationPower Plant Familiarization
Power Plant Familiarization
 
Ppt on ntpc dadri created vikas gujjar(IET lko)
Ppt on ntpc dadri created vikas gujjar(IET lko)Ppt on ntpc dadri created vikas gujjar(IET lko)
Ppt on ntpc dadri created vikas gujjar(IET lko)
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
SUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONSUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTION
 
Power plant
Power plantPower plant
Power plant
 
Paras ppt
Paras pptParas ppt
Paras ppt
 
Coal Fired Thermal Power Plants
Coal Fired Thermal Power Plants Coal Fired Thermal Power Plants
Coal Fired Thermal Power Plants
 

Similar to Emam training

Similar to Emam training (20)

Ntpc2 111125042448-phpapp02
Ntpc2 111125042448-phpapp02Ntpc2 111125042448-phpapp02
Ntpc2 111125042448-phpapp02
 
Ntpc dadri ppt
Ntpc dadri pptNtpc dadri ppt
Ntpc dadri ppt
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
 
Mtps ppt
Mtps pptMtps ppt
Mtps ppt
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Ntpc2
Ntpc2Ntpc2
Ntpc2
 
thermal and nuclear power plant
 thermal and nuclear power plant thermal and nuclear power plant
thermal and nuclear power plant
 
compalete file 2023 (AutoRecovered).docx
compalete file 2023 (AutoRecovered).docxcompalete file 2023 (AutoRecovered).docx
compalete file 2023 (AutoRecovered).docx
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
Harsh ntpc
Harsh ntpcHarsh ntpc
Harsh ntpc
 
Bandel training
Bandel trainingBandel training
Bandel training
 
KTPS
KTPSKTPS
KTPS
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal Power Plant (Bathinda) PPT
Thermal Power Plant (Bathinda) PPTThermal Power Plant (Bathinda) PPT
Thermal Power Plant (Bathinda) PPT
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
 
Project Report on “WORKING MODEL OF POWER GRID/SMART GRID
Project Report on “WORKING MODEL OF POWER GRID/SMART GRIDProject Report on “WORKING MODEL OF POWER GRID/SMART GRID
Project Report on “WORKING MODEL OF POWER GRID/SMART GRID
 
Bokaro Thermal Power Plant
Bokaro Thermal Power PlantBokaro Thermal Power Plant
Bokaro Thermal Power Plant
 
Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02
 

More from Dubai Electricity and Water Authority | DEWA | Official-Page (7)

Delivery challan.
Delivery challan.Delivery challan.
Delivery challan.
 
Fabrication and determination of critical thickness of spherical objects
Fabrication and determination of critical      thickness of spherical objectsFabrication and determination of critical      thickness of spherical objects
Fabrication and determination of critical thickness of spherical objects
 
Application for refund of security
Application for refund of securityApplication for refund of security
Application for refund of security
 
bhushan steel ppt
bhushan steel pptbhushan steel ppt
bhushan steel ppt
 
Alttc report
Alttc report Alttc report
Alttc report
 
Report ON NTPC DADRI .BY ....EMAM
Report ON NTPC DADRI  .BY ....EMAMReport ON NTPC DADRI  .BY ....EMAM
Report ON NTPC DADRI .BY ....EMAM
 
ppt of ntpc dadri by emam raza khan
ppt of ntpc dadri by emam raza khan  ppt of ntpc dadri by emam raza khan
ppt of ntpc dadri by emam raza khan
 

Recently uploaded

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 

Recently uploaded (20)

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 

Emam training

  • 1. -:A SUMMER TRAINIG EXPERIENCE: IN -:NATIONAL THERMAL POWER PLANT{DADRI}:-  PRESENTED BY: EMAM RAZA  ROLL.NO-1002940032  M.E STUDENT OF KIET(GZB) UNDER THE GUIDANCE OF:- MR. R.K SHINHA DGM, EE Department of power plant (DADRI)
  • 2. -:About NTPC:• • • • • • • • • NTPC, the largest power Company in India, was setup in 1975 to accelerate power development in the country. Dr.Arup Roy choudhary is chairman & MD since 1/09/2010. NTPC has installed capacity of 41,684 MW. NTPC ranked 300th in the ‘2013, Forbes Global 2000’ ranking of the World’s biggest companies. NTPC plans to become a 128,000 MW company by 2032. It has 16 coal based power stations (23,395 MW) 7 gas based power stations (3,955 MW) 4 power stations in Joint Ventures (1,794 MW). NTPC has been awarded NO-1,best workplace in india among large organization and the best psu for the year 2010.
  • 3.
  • 4. -:NTPC, DADRI:TOTAL CAPACITY OF DADRI POWER PLANT :(A) THERMAL I:- 04X210 MW = 840 MW II:- 02X490 MW = 980 MW TOTAL = 1820 MW B) GAS (C) SOLAR = 817 MW = 05MW GRAND TOTAL = 2642 MW
  • 6. Diagram of a typical coal-fired thermal power station
  • 7. -:Generation of Electricity:• • • • • Prime mover coupled to Alternator Prime mover is driven by energy obtained from various sources such as burning of fuel pressure of water Force of wind etc. Fig. Fundamental of generation of Electricity
  • 8. -:Thermal Power Plant:• A generating station which converts heat energy of coal combustion into electrical energy is known as a steam power station. • Steam is produced in the boiler by utilizing the heat of coal combustion. The steam is then expanded in the steam turbine and is condensed in a condenser to be fed into the boiler again. The steam turbine drives the alternator which converts mechanical energy of the turbine into electrical energy.
  • 10. -:WORKING OF STEAM POWER PLANT:Coal is burnt in a boiler ,which converts water into steam. • The steam is expanded in a turbine used to drive alternator. • The steam expanded is condensed in a condenser to be feed into the boiler again. • The entire arrangement of steam power plant can be divided into. • a. fuel and ash plant. b. air and fuel gas plant. c. feed water and steam plant. d. cooling water plant.
  • 11. -:Main and Auxiliary Equipments:1. Coal handling plant 2. Stoker 3. Pulverizer 4.Boiler 5.Superheater 6.Eonomiser & Air preheater 7.Reheater 8.Deaerator 9.Condenser 10.Primary air fan 11.Turbine(prime mover) 12.Draft fan & chimney 13.Electo-static precipitator 14.Cooling tower 15.Ash handling plant 16.Electrical equipment a. Generator b. Transformers c. Switch yard
  • 12. -:Coal handling plant:- •The function of coal handling plant is automatic feeding of coal to the boiler furnace. • A thermal power plant burns enormous amounts of coal. •A 200MW plant may require around 2000 tons of coal daily
  • 13. Coal conveyor : This is a belt type of arrangement. With this coal is transported from coal storage place in power plant to the place near by boiler.   Stoker : The coal which is brought near by boiler has to put in boiler furnace for combustion. This stoker is a mechanical device for feeding coal to a furnace. Pulverizer : The coal is put in the boiler after pulverization. For this pulverizer is used. A pulverizer is a device for grinding coal for combustion in a furnace in a power plant. A pulverizer is a device for grinding coal for combustion in a furnace in a power plant. Pulverizing mills are further classified as: 1.Contact mill 2.Ball mill 3.Impact mill
  • 14. -:Boiler:A boiler is closed vessel in which water is converted into steam by utilising the heat of coal combustion. Steam boilers are broadly classified into following two types:base on the relative position of water and gases. (a) Water tube boilers (b) Fire tube boilers In a water tube boiler, water flows through the tubes and the hot gases of combustion flow over these tubes. Water-tube boilers are used for highpressure boilers Examples: cochron, Lancashire, locomotive boiler.
  • 15. In a fire tube boiler, the hot products of combustion pass through the tubes surrounded by water. • The heated water then rises into the steam drum. Here, saturated steam is drawn off the top of the drum. The steam will reenter the furnace in through a superheater in order to become superheated. Superheated steam is used in driving turbines. Since water droplets can severely damage turbine blades, steam is superheated to 730°F (390°C) or higher in order to ensure that there is no water entrained in the steam.
  • 16. -:Super heater:• A device which removes last traces of moisture. • • It helps in reduction in requirement of steam quantity. steam being dry reduces the mechanical resistance of turbine. No corrosion at the turbine blades. •
  • 17. -:Economizer and Air Pre-heater:• An economizer is a heat transfer device used for heating the feed water with the help of hot flue gases before leaving the chimney. • It helps in improving the efficiency of the power plant. • Air preheater is a device which utilizes the waste heat of the flue gases leaving the economizer to heat the air to be supplied to the boiler.
  • 18. -:Reheater :Some of the heat of superheated steam is used to rotate the turbine where it loses some of its energy. The steam after reheating is used to rotate the second steam turbine where the heat is converted to mechanical energy. This mechanical energy is used to run the alternator, which is coupled to turbine , there by generating electrical energy.
  • 19. -:DEAERATOR:•A steam generating boiler requires that the boiler feed water should be devoid of air and other dissolved gases, particularly corrosive ones. • In order to avoid corrosion of the metal, power station uses a Deaerator, for the removal of air and other dissolved gases from the boiler feed water. •A deaerator has a vertical, domed deaeration section mounted on top of a horizontal cylindrical vessel which serves as a deaerated boiler feed water storage tank.
  • 20. -:Condenser:Which condenses the steam at the exhaust of turbine. •It creates a very low pressure at the exhaust of turbine, this helps in converting heat energy of steam into mechanical energy in the prime mover. •The condensed steam can be used as feed water to the boiler. •Classification of condenser 1.Jet condensers or contact condensers, 2. Surface condensers
  • 21. Primary Air Fan:• Air to blow the coal from the mill to the boiler, called the primary air, is supplied by a large fan driven by a variable speed motor • When mixed with a stream of air the powdered coal behaves more like a gas than a solid • Primary air does two jobs – heating the coal powder and secondly lifting it into the furnace through pipelines
  • 22. -:Prime Mover (i.e. Turbine):A steam turbine is a mechanical device that extracts thermal energy from pressurized steam, and converts it into mechanical energy. The steam turbine is a form of heat engine that derives much of its improvement in thermodynamic efficiency from the use of multiple stages in the expansion of the steam, which results in a closer approach to the ideal reversible expansion process. About 86% of all electric generation in the world is by use of steam turbines. BOILER GENERATOR STEAM TURBINE
  • 23. -:Cooling Towers:Remove heat from the water discharged from the condenser so that the water can be discharged to the river or re circulated and reused. • Air can be circulated in the cooling towers through natural draft and mechanical draft. • Type of cooling tower 1. Wet cooling tower 2. Dry cooling tower •
  • 24. Induced Draught (ID) Fan Chimney • • Two induced draught fans draw gases out of the boiler • The gas has already passed through the air heaters and precipitators before it has reached these fans • The heat from the flue gases or smoke is used in the air heaters to heat up the primary and secondary air The chimney is 275 meters' high and 50,000 tonnes of reinforced concrete were used to make it • It consists of flues each of which serve typically two or three boilers (two units)
  • 25. -:Electro-Static Precipitator:- Top View of ESP Schematic Diagram  Side view of ESP Schematic Diagram It is a device which removes dust or other finely divided particles from flue gases by charging the particles inductively with an electric field, then attracting them to highly charged collector plates. Also known as precipitator. The process depends on two steps. In the first step the suspension passes through an electric discharge (corona discharge) area where ionization of the gas occurs. The ions produced collide with the suspended particles and confer on them an electric charge. The charged particles drift toward an electrode of opposite sign and are deposited on the electrode where their electric charge is neutralized. The phenomenon would be more correctly designated as electrode position from the gas phase
  • 26.
  • 27. -:COAL TRANSPORTATION SYATEM:   Source of coal = Piparwar Mines North Karanpur (Jharkhand) Location = Near Ranchi Means of transportation-Railway  Rout of ply=kalari-gawaroad,seonnogarmughalsarai,Allahabad,Kanpur,Aligarh,dadri-plant unloading area.  Distance = 1124 Km from kholori to dadri with electrified trak from seonnogar.  Type of coal = F-grade (Washed),E grade(Raw)  C.V(calorific value)=3600-3800 kcal/kg.  Coal requirement = 13,000 MT/Day(04 rakes)  Type of wagon= 1.BOBR(bogy open rapid discharge) = 2.Box-N(min 2 door on each said)
  • 28. ASH HANDLING PLANT The percentage of ash in coal is 5% in good quality coal & about 40% in poor quality coal. • Power plants generally use poor quality of coal , thus amount of ash produced by it is quite large. • A modern 1000MW plant produces about 4800 tons of ash daily. • The stations use some conveyor arrangement to carry ash to dump sites. •
  • 29. -:Electrical Equipments:Alternator An alternator is coupled to a steam turbine and converts mechanical energy of the turbine into electrical energy. It may be hydrogen or air cooled. The necessary excitation is provided by means of main and pilot exciters directly coupled to the alternator shaft. Transformers (a) main step-transformers, which steps-up generated voltage transmission of power (b) station transformers, general purpose (c) auxiliary transformers, which supply to individual unit-auxiliaries. Control Room and Switchyard : The control room monitors the overall operation of the plant. It is provided with controls for real and reactive power flow. It is provided with safety relays and switchgears.
  • 30. -:Coal Ash can be used in:• • • • • • Construction of embankments and fills Construction of road in sub-base Manufacture of cement Manufacture of bricks/blocks Filling as flowable fill material Agriculture as soil amendment/source of essential plant nutrients
  • 31. -:TRIPICAL DIAGRAM OP THERMAL POWER PLANT:-
  • 32. Efficiency of Thermal Power Station or Plant The overall efficiency of a thermal power station or plant varies from 20% to 26% and it depends upon plant capacity.