info@prophecycoal.comUlaan Ovoo - The flagship of coal deposits in northern Mongolia
F: 604-642-2629
www.prophecycoal.com
TSX: PCY, OTCQX: PRPCF, Frankfurt: 1P2
Fulfilling Asia’s Energy Needs
Prophecy’s Ulaan Ovoo Mine April 2011
Why Invest in Prophecy Prophecy’s Ulaan Ovoo Mine
• Proxy for growth in Mongolia and China • High Quality Abundant Thermal Coal+
• Min AR 5,000 kcal/kg, Max 1% Sulphur, 10% Ash
• Strong demand for thermal coal and electricity • 20 year+ mine life
• Proven Reserve: 20 Mt; Resource: 208 Mt
• Top quartile low cost coal producer with 1.4b tonnes+ supply
• Low Cost Mining
• Commenced coal production, permitting power plant • Single seam, 50 meters thickness, strip ratio 2: 1
• Strong growth profile • Potential Sales to:
• Offshore markets (China, South Korea, & Japan)
Corporate Structure & Information • Domestic (Mongolia and Russia)
Symbol TSX: PCY, OTCQX: PRPCF, Frankfurt: 1P2
Ulaan Ovoo Seam Cross Section
Shares:
Issued and Outstanding 198,026,307
Fully Diluted 240,184,001
Market Capitalization $100M CAD
Cash* (no debt) $4M CAD
Investment Holdings $75M CAD
Avg. Daily Vol (TSXV: PCY) 700,000
*As at September 2011
+Ulaan Ovoo: 174 million tonnes of measured, 34 million tonnes of indicated, and 20
million tonnes of proven coal. Ulaan Ovoo’s resource numbers are from the Dec 2010, 43‐
101 Prefeasibility Study by Wardrop Engineering. Chandgana: 665 million tonnes of
measured and 545 million tonnes of indicated coal. Chandgana’s resource numbers are
from the September 2007, 43‐101 Technical Report by Behre Dolbear & Company (USA),
Inc. for Chandgana Tal and from the September 2010, 43‐101 Technical Report by Kravits
Geological Services, LLC for Chandgana Khavtgai.
2. Oct 2009
Ulaan Ovoo
Prophecy Coal Corp.
Redhill Energy Inc
T: +1.604.569.3661Street
2060-777 Hornby
F: +1.604.569.3617 1T7
Vancouver BC V 6Z
T: 604-642-2625
info@prophecycoal.comUlaan Ovoo - The flagship of coal deposits in northern Mongolia
F: 604-642-2629
www.prophecycoal.com
TSX: PCY, OTCQX: PRPCF, Frankfurt: 1P2
Think China, Think Mongolia, ThinkNeeds
Fulfilling Asia’s Energy Prophecy
Prophecy’s Chandgana Coal Field April 2011
Chandgana Power Plant Project Selendum
•Abundant low cost coal Russia
border
• Low Strip and Low Cost
Darkhan
• M&I resource 1.2 billion tonnes+ Erdenet - 80 MW
Choibalsan
- 100 MW
- 100 MW
Mongolia
•Large Scalable power plant 0M
W
330 MW 10
• Proposed Phase 1 : 600MW (Mongolian - 150 MW
Ulaanbaatar
Baganuur
370
MW Undurkhaan
consumption) 140 M
W
20
MW
• Proposed Phase 2 : 3,600MW (to China)
Chandgana - 20 MW
Bayanmunkh
havtgai Baruun - Urt
1,000km
•Timeline - 20 MW
Choir
• Permit application (Q2‐2011) - 40 MW
Bor Undur 400km
• Application Starts (Q2‐2013)
• Start up phase (Q2 2015) China Beijing
Mandalgobi
Directors and Advisors
Jivko Savov, Director
• Deputy CEO of En+ and
• Deputy Chairman of EurosibEnergo
Michael Deats, Director
• Ex‐Managing Director of BP Coal South Africa
Chandgana 600 ‐> 4,200 MW Transmission to Chuluunbaatar Baz, Director
Coal Mine Power Plant on site Mongolia, China • Chairman of Monnis Group Mongolia
Harald Batista , Advisor
Think China, Think Mongolia, Think Prophecy • Brother to Eike Batista (EBX Group)
Certain statements contained in this Presentation, including statements which may contain words such as "expects", "anticipates", "intends", "plans", "believes", "estimates", or similar
expressions, and statements related to matters which are not historical facts, are forward-looking information within the meaning of securities laws. Such forward-looking statements,
which reflect management’s expectations regarding Prophecy’s future growth, results of operations, performance, business prospects and opportunities are based on certain factors and
assumptions and involve known and unknown risks and uncertainties which may cause the actual results, performance, or achievements of the Company to be materially different from
any future results, performance, or achievements expressed or implied by such forward-looking statements. Forward-looking statements in this Presentation include, without limitation,
statements regarding the permitting, development and production of the Company’s Chandgana Power Plant, including approval of the license to build Chandgana Power Plant from the
Mongolian government and completion of a feasibility study by late 2011 and other information concerning possible or assumed future results of operations of Prophecy. Although
Prophecy has attempted to identify important risks and factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements,
there may be other factors and risks that cause actions, events or results not anticipated, estimated or intended. Accordingly, readers should not place any undue reliance on forward-
looking statements as such information may not be appropriate for other purposes. We disclaim any intention or obligation to update or revise any forward looking statements, whether
as a result of new information, future events or otherwise, except as required by law.