SlideShare una empresa de Scribd logo
1 de 39
Descargar para leer sin conexión
Implications of the New NBC Section 9.36
Moving Towards More Energy Efficient
Wood-Frame Building Enclosures
Graham Finch, MASc, P.Eng
Principal, Building Science Research Engineer
RDH Building Engineering Ltd.
Vancouver, BC
RCIC 2013 Edmonton – April 30, 2013
Presentation Outline
New Building Enclosure Energy Efficiency
Requirements Under New 2012 NBC Section 9.36
Highly Insulated Wood-frame Enclosure
Assemblies
Building Enclosure Design Guide for Highly-
Insulated Wood-frame Buildings
New Section 9.36 - Whole
Building Energy Efficiency
Requirements for Part 9 houses
Reference to NECB 2011 for
other buildings (Part 3)
Building Enclosure (Envelope),
HVAC, Hot-Water Components
Prescriptive, Trade-off and
Energy Modeling Paths for
Compliance
Effective R-values vs Nominal R-
values
New NBC Section 9.36 Energy Efficiency Requirements
2010 NBC Updated in December
2012 – New Section 9.36.
Energy Efficiency
Nominal R-values = Rated R-values of
insulation which do not include
impacts of how they are installed
For example R-20 batt insulation or R-
10 foam insulation
Effective R-values or Real R-values =
Calculated R-values of
assemblies/details which include
impacts of installation and thermal
bridges
For example nominal R-20 batts
within steel studs 16” o.c. becoming
~R-9 effective, or in wood studs ~R-15
Nominal vs Effective R-values
Thermal bridging occurs when a conductive
material (e.g. aluminum, steel, concrete, wood
etc.) provides a path for heat to flow around
insulation
The bypassing “bridging” of the less conductive
material significantly reduces its effectiveness as
an insulator
Examples:
Wood framing (studs, plates) in insulated wall
Steel framing in insulated wall
Conductive cladding attachments through insulation
(metal girts, clips, anchors, screws etc)
Concrete slab edge (balcony, exposed slab edge)
through a wall
Window frames and windows themselves
Thermal Bridging
Effective R-values account for thermal bridges
and represent actual heat flow through
enclosure assemblies and details
Heat flow finds the path of least resistance
Disproportionate amount of heat flow
occurs through thermal bridges
Often adding more/thicker insulation can’t
help
Required for almost all energy and building
code calculations
Energy code compliance has historically
focused on assembly R-values – however
more importance is being placed on details
and interfaces & thermal bridges
Airtightness also as important
Why Thermal Bridging is Important
Increased emphasis on continuous insulation, higher
effective R-values
Minimum R-value Tables for Above & Below Grade
Enclosures (Walls, Roofs, Floors) – dependent on whether
HRV present in house (minor tradeoff allowance)
Maximum U-value (minimum R-value) & Minimum Energy
Rating (ER) Tables for Windows, Doors, Skylights
Prescriptive airtightness requirements (no blower door yet)
HVAC duct sealing/insulation, minimum equipment
efficiency
Domestic Hot Water, minimum equipment efficiency
Energy modeling option & Trade-off options
New NBC Section 9.36 Energy Efficiency Requirements
New NBC/NECB Climate Zone Divisions
• >7000 HDD
• 6000 to 6999 HDD
• 5000 to 5999 HDD
• 4000 to 4999 HDD
• 3000 to 3999 HDD
• < 3000 HDD
Wall, Roof & Window Requirements for Alberta (NBC 9.36)
Climate
Zone
Wall - Above
Grade:
Minimum
R-value (IP)
Roof –
Flat/Cathedral
: Minimum R-
value (IP)
Roof –
Attic:
Minimum
R-value (IP)
Window:
Max. U-
value (IP) /
Min. ER
8 21.9 28.5 59.2 0.25 / 29
7B 21.9 28.5 59.2 0.25 / 29
7A 17.5 28.5 59.2 0.28 / 25
6 17.5 26.5 49.2 0.28 / 25
WithoutaHRV
Climate
Zone
Wall - Above
Grade:
Minimum
R-value (IP)
Roof –
Flat/Cathedral
: Minimum R-
value (IP)
Roof –
Attic:
Minimum
R-value (IP)
Window:
Max. U-
value (IP) /
Min. ER
8 17.5 28.5 59.2 0.25 / 29
7B 17.5 28.5 59.2 0.25 / 29
7A 16.9 28.5 49.2 0.28 / 25
6 16.9 26.5 49.2 0.28 / 25
WithaHRV
Wall, Roof & Windows (NECB 2011/ASHRAE 90.1-2010)
Climate
Zone
Wall – Above
Grade: Minimum
R-value (IP)
Roof – Flat or
Sloped: Minimum
R-value (IP)
Window:
Max. U-
value (IP)
8 31.0 40.0 0.28
7B 27.0 35.0 0.39
7A 27.0 35.0 0.39
6 23.0 31.0 0.39
NECB2011
ASHRAE90.1-2010–
ResidentialBuilding
Climate
Zone
Wall (Mass,
Wood, Steel):
Min R-value
Roof (Attic,
Cathedral/Flat)
: Min R-value
Window (Alum,
PVC/fiberglass)
: Max. U-value
8 19.2, 27.8, 27.0 47.6, 20.8 0.45, 0.35
7B 14.1, 19.6, 23.8 37.0, 20.8 0.45, 0.35
7A 14.1, 19.6, 23.8 37.0, 20.8 0.45, 0.35
6 12.5, 19.6, 15.6 37.0, 20.8 0.55, 0.35
*7A/7B combined
in ASHRAE 90.1
Some guidance (Table
A-9.36.2.6.(1)A
provided for
calculation of effective
R-values of some
assemblies (to help
transition from
nominal R-values)
Sufficient for most
wood-frame /ICF wall
assemblies
No provisions for
cladding attachment/
thermal bridging
Guidance: Effective R-values within NBC 9.36
Wall Assembly /
Insulation Rated R-
value
Effective Wall R-value **
Studs at 16”,
25% F.F.*
Studs at 24”,
22% F.F.*
2x4 w/ R-12 batts 10.7 -
2x4 w/ R-14 batts 11.5 -
2x6 w/ R-19 batts 15.5 16.1
2x6 w/ R-22 batts 16.6 17.4
2x6 w/ 2pcf sprayfoam
(R-5/in, R-27.5)
18.3 19.3
2x6 w/ 2pcf sprayfoam
(R-6/in, R-33)
18.6 19.8
*Studs at 16” o.c.=25% total Framing Factor (F.F.) and Studs at 24” o.c. =22% total framing factor. This
includes typical framing arrangements of studs, sill and top plates, window headers, corners, built-up
studs etc.
** All values calculated using three-dimensional thermal modeling calibrated to hot-box testing
Typical Wood-frame Wall Assemblies – Effective R-values
Effective R-value targets above
~R-17 essentially means that
standard practice of batt insulation
in 2x6 stud frame wall is inadequate
Shifts code minimum baseline wall
assembly to:
Insulated/Foam Sheathing
Sprayfoam?
Exterior/Split Rigid Insulation
Double/Deep Stud
Structurally Insulated Panels (SIPs)
Insulated Concrete Forms (ICFs)
Beyond 2x6 Framed Walls
Insulation Placement & Wall Design Considerations
Interior
Insulation
Exterior
Insulation
Split
Insulation
Getting to Higher R-values – Insulation Placement
Baseline
2x6 w/ R-22
batts = R-16
effective
Exterior Insulation – R-20 to R-40+ effective
• Constraints: cladding attachment, wall thickness
• Good for wood/steel/concrete
Deep/Double Stud– R-
20 to R-40+ effective
• Constraints wall
thickness
• Good for wood,
wasted for steel
Split Insulation–
R-20 to R-40+ effective
• Constraints: cladding
attachment
• Good for wood, palatable for
steel
Insulation outboard of structure and control layers (air/vapor/water)
Thermal mass at interior where useful
Excellent performance in all climate zones
Cladding Attachment biggest source of thermal loss/bridging
Not the panacea, can still mess it up
Exterior Insulated Walls
Steel Stud Concrete Heavy Timber (CLT)
Key Considerations:
Cladding Attachment
Wall Thickness
Heat Control: Exterior
Insulation
Air Control: Membrane on
exterior of structure
Vapor Control: Membrane on
exterior of structure
Water Control: Membrane on
exterior of structure (possibly
surface of insulation)
Exterior Insulation Assemblies
Many Possible Strategies – Wide Range of Performance
Cladding Attachment through Exterior Insulation
Minimizing Thermal Bridging through Exterior Insulation
Longer cladding
Fasteners directly
through rigid
insulation (up to 2”
for light claddings)
Long screws through
vertical strapping and rigid
insulation creates truss
(8”+) – short cladding
fasteners into vertical
strapping Rigid shear block type connection
through insulation, cladding to
vertical strapping
Key Considerations - Split Insulation Assemblies
Key Considerations:
Exterior insulation type
Cladding attachment
Sequencing & detailing
Heat Control: Exterior and stud space
Insulation
Air Control: House-wrap
adhered/sheet/liquid membrane on
sheathing, sealants/tapes etc. Often vapor
permeable
Vapor Control: Poly or VB paint at
interior, plywood/OSB sheathing
Water Control: Rainscreen cladding*,
WRB membrane, surface of insulation
Split Insulation Assemblies – Exterior Insulation Selection
Foam insulations (XPS, EPS, Polyiso, ccSPF) are vapor
impermeable
Is the vapor barrier on the wrong side?
Does your wall have two vapor barriers?
How much insulation should be put outside
of the sheathing? – More the better, but room?
Rigid mineral or glass fiber insulation are
vapor permeable which can address
these concerns
Vapor permeability of WRB and air-barrier also important
Risk is dependant on interior conditions (RH) and potential for
air-leakage, and on exterior conditions (rain/RH) and potential for
water leaks
Double 2x4/2x6 stud, Single Deep 2x10, 2x10, I-Joist etc…
Common wood-frame wall assembly in many passive houses
Lends itself well to pre-fabricated wall/roof assemblies
Interior service wall – greater control over interior airtightness
Higher risk for damage if sheathing gets wet (rainwater, air leakage,
vapor diffusion)
Double/Deep Stud Insulated
Key Considerations – Double Stud/Deep Stud
Key Considerations:
Air-sealing
Rainwater management/detailing
Heat Control: Double stud cavity fill
insulation(s)
Air Control: House-wrap/membrane on
sheathing, poly, airtight drywall on interior,
OSB/plywood at interior, tapes, sealants,
sprayfoam. Airtightness on both sides of cavity
recommended
Vapor Control: Poly, VB paint or
OSB/plywood at interior
Water Control: Rainscreen cladding*, WRB
at house-wrap/membrane, flashings etc.
Energy-Efficient Building Enclosure
Design Guide for Wood-frame
Multi-Unit Residential Buildings in
Marine to Cold Climates
Builds off of Previous Building
Enclosure Design Guides & CMHC
Best Practice Guides
Focus on durable and highly
insulated wood-frame assemblies
to meet current and upcoming
energy codes
Guidance for taller and alternate
wood-frame structures (ie post &
beam, CLT) up to 6 stories
Building Enclosure Design Guidance
Chapter 1: Introduction
Context
Chapter 2: Building and
Energy Codes across North
America
Canadian Building and Energy
Code Summaries & R-value
requirements
US Building and Energy Code
Summaries & R-value
requirements
Performance Rating Systems
& Green Building Programs
What is in the Guide?
Chapter 3: Moisture, Air and Thermal Control
Building as a System
Climate Zones
Interior Climate, HVAC Interaction
Critical Barriers
Control of Rainwater Penetration
Control of Air Flow
Controlling Condensation
Construction Moisture
Controlling Heat Flow and Insulation
Whole Building Energy Efficiency
Computer Simulation Considerations for Wood-frame Enclosures
What is in the Guide?
Chapter 4: Energy Efficient Wall and Roof Assemblies
Above Grade Wall Assemblies
• Split Insulated, Double Stud/Deep Stud, Exterior Insulated
• Infill Walls for Concrete Frame
Below Grade Wall Assemblies
• Interior and Exterior Insulated
Roof Assemblies
• Steep Slope & Low Slope
Chapter 5: Detailing
2D CAD (colored) and 3D build-sequences for various typical
enclosure details
Chapter 6: Further Reading & References
What is in the Guide?
Air Barrier Systems (Fundamentals,
Materials, Performance, testing)
Sealed Poly/Sheet Membranes
Airtight drywall
Sprayfoam
Sealed-Sheathing Approaches
› Unsupported sheet membranes
› Supported sheet membranes with
vertical strapping
› Sandwiched membranes behind
exterior insulation
› Self-Adhered and liquid applied
membranes
Air Flow Control – Air Barrier Strategies
Control of Heat Flow
Minimizing Conductive
Losses, Minimizing Air
Leakage
Placement of Insulation
within assemblies
Wood framing factors
Types of insulation,
R-values and typical uses
Thermal bridging and
effective R-values
Heat Flow Control & Insulation
Material selection &
guidance
Control Functions
Critical Barriers
Effective R-value Tables
Energy Efficient Walls – Split Insulated
Wood
framing
Nominal stud-
space
insulation
[R-value
(RSI)]
Exterior insulation
None
[R-value
(RSI)]
R-4
(1 inch)
[R-value
(RSI)]
R-8
(2 inches)
[R-value
(RSI)]
R-12
(3 inches)
[R-value
(RSI)]
R-16
(4 inches)
[R-value
(RSI)]
R-20
(5 inches)
[R-value
(RSI)]
R-24
(6 inches)
[R-value
(RSI)]
2x4 R-12
(2.1)
10.7
(1.9)
15.0
(2.6)
18.8
(3.3)
22.5
(4.0)
26.2
(4.6)
29.7
(5.2)
33.2
(5.8)
R-14
(2.5)
11.5
(2.0)
15.8
(2.8)
19.6
(3.4)
23.2
(4.1)
27.0
(4.8)
30.5
(5.4)
34.0
(6.0)
2x6 R-19
(3.3)
15.5
(2.7)
19.8
(3.5)
23.7
(4.2)
27.3
(4.8)
31.0
(5.5)
34.5
(6.1)
38.0
(6.7)
R-22
(3.9)
16.6
(2.9)
21.0
(3.7)
24.8
(4.4)
28.5
(5.0)
32.2
(5.7)
35.7
(6.3)
39.2
(6.9)
Material selection &
guidance
Control Functions
Critical Barriers
Effective R-value Tables
Energy Efficient Walls – Double Stud/Deep Stud
Wood
framing
Nominal fill
insulation
[R-value/inch
(RSI/cm)]
Gap width between stud walls
No gap
[R-value
(RSI)]
1-inch
[R-value
(RSI)]
2-inches
[R-value
(RSI)]
3-inches
[R-value
(RSI)]
4-inches
[R-value
(RSI)]
5-inches
[R-value
(RSI)]
6-inches
[R-value
(RSI)]
Double-
stud 2x4
R-3.4/inch
(0.24/cm)
19.1
(3.4)
22.9
(4.0)
26.5
(4.7)
30.0
(5.3)
33.4
(5.9)
36.9
(6.5)
40.3
(7.1)
R-4.0/inch
(0.28/cm)
20.5
(3.6)
25.1
(4.4)
29.4
(5.2)
33.4
(5.9)
37.4
(6.6)
41.5
(7.3)
45.4
(8.0)
Pitched-Roof, Exterior Insulated Assembly
Materials & Control
Functions
Critical Barriers
Effective R-values
Low-Slope Conventional Roof Assembly
Materials & Control
Functions
Critical Barriers
Effective R-values
(Accounting for
tapered insulation
packages)
2D CAD details (colored)
provided for typical details for
each wall assembly type (split
insulated, double stud, exterior
insulated) plus some for infill
walls
3D sequence details provided
for window interfacing (split
insulated, double stud, exterior
insulated)
Detailing
Detailing – Colored 2D Details
Detailing – Wall to Roof Interfaces
Detailing – 2D Window Details
Detailing – 3D Window Installation Sequences
Graham Finch, MASc, P.Eng
gfinch@rdhbe.com
604-873-1181
Building Enclosure Design Guide Available from
FP Innovations:
http://www.fpinnovations.ca/ResearchProgram/Advanced
BuildingSystem/designing-energy-efficient-building-
enclosures.pdf
Discussion

Más contenido relacionado

Similar a Moving Towards more Energy Efficient Wood-frame Building Enclosure

Building Enclosures For the Future - Building Tomorrows Buildings Today
Building Enclosures For the Future - Building Tomorrows Buildings TodayBuilding Enclosures For the Future - Building Tomorrows Buildings Today
Building Enclosures For the Future - Building Tomorrows Buildings TodayGraham Finch
 
Walls and Windows for Highly Insulated Buildings in the Pacific Northwest
Walls and Windows for Highly Insulated Buildings in the Pacific NorthwestWalls and Windows for Highly Insulated Buildings in the Pacific Northwest
Walls and Windows for Highly Insulated Buildings in the Pacific NorthwestRDH Building Science
 
Moving Towards More Energy Efficient Wood Frame Building Enclosures
Moving Towards More Energy Efficient Wood Frame Building EnclosuresMoving Towards More Energy Efficient Wood Frame Building Enclosures
Moving Towards More Energy Efficient Wood Frame Building EnclosuresRDH Building Science
 
Building Enclosures of the Future - Building Tomorrow's Buildings Today
Building Enclosures of the Future - Building Tomorrow's Buildings TodayBuilding Enclosures of the Future - Building Tomorrow's Buildings Today
Building Enclosures of the Future - Building Tomorrow's Buildings TodayRDH Building Science
 
Walls and Windows for Highly Insulated Buildings in the Pacific Northwest
Walls and Windows for Highly Insulated Buildings in the Pacific NorthwestWalls and Windows for Highly Insulated Buildings in the Pacific Northwest
Walls and Windows for Highly Insulated Buildings in the Pacific NorthwestRDH Building Science
 
Super Insulated Building Enclosures
 Super Insulated Building Enclosures Super Insulated Building Enclosures
Super Insulated Building EnclosuresRDH Building Science
 
Super Insulated Buildings Enclosures in the Pacific Northwest
Super Insulated Buildings Enclosures in the Pacific NorthwestSuper Insulated Buildings Enclosures in the Pacific Northwest
Super Insulated Buildings Enclosures in the Pacific NorthwestGraham Finch
 
Adoption and Compliance with Energy Codes - ASHRAE 90.1 and NECB
Adoption and Compliance with Energy Codes -  ASHRAE 90.1 and NECBAdoption and Compliance with Energy Codes -  ASHRAE 90.1 and NECB
Adoption and Compliance with Energy Codes - ASHRAE 90.1 and NECBRDH Building Science
 
NBEC 2014 - Balcony Thermal Bridging
NBEC 2014 -  Balcony Thermal BridgingNBEC 2014 -  Balcony Thermal Bridging
NBEC 2014 - Balcony Thermal BridgingRDH Building Science
 
Optimizing Concrete Thermal Bridges - Balcony and Slab Edge Thermal Breaks
Optimizing Concrete Thermal Bridges - Balcony and Slab Edge Thermal BreaksOptimizing Concrete Thermal Bridges - Balcony and Slab Edge Thermal Breaks
Optimizing Concrete Thermal Bridges - Balcony and Slab Edge Thermal BreaksGraham Finch
 
R-22 Walls and Insulating for the Future
R-22 Walls and Insulating for the FutureR-22 Walls and Insulating for the Future
R-22 Walls and Insulating for the FutureLorne Ricketts
 
Adoption and Compliance with Canadian Energy Codes - Lessons from BC
Adoption and Compliance with Canadian Energy Codes - Lessons from BCAdoption and Compliance with Canadian Energy Codes - Lessons from BC
Adoption and Compliance with Canadian Energy Codes - Lessons from BCGraham Finch
 
Benefits Ri Rb Ircc
Benefits Ri Rb IrccBenefits Ri Rb Ircc
Benefits Ri Rb Irccnx122
 
Tall Wood Building Enclosure Designs That Work
Tall Wood Building Enclosure Designs That WorkTall Wood Building Enclosure Designs That Work
Tall Wood Building Enclosure Designs That WorkGraham Finch
 
Thermal bridges in concrete construction solutions to address energy code co...
Thermal bridges in concrete construction  solutions to address energy code co...Thermal bridges in concrete construction  solutions to address energy code co...
Thermal bridges in concrete construction solutions to address energy code co...RDH Building Science
 
Super Insulated Building Enclosures (SEABEC 2013)
Super Insulated Building Enclosures (SEABEC 2013)Super Insulated Building Enclosures (SEABEC 2013)
Super Insulated Building Enclosures (SEABEC 2013)RDH Building Science
 
High Performance Walls - Solutions for Thermal Bridging
High Performance Walls - Solutions for Thermal BridgingHigh Performance Walls - Solutions for Thermal Bridging
High Performance Walls - Solutions for Thermal BridgingGraham Finch
 
Greenbuild 2013
Greenbuild 2013Greenbuild 2013
Greenbuild 2013nuform
 
Technical details of Energy Efficient HVAC System
Technical details of  Energy Efficient HVAC SystemTechnical details of  Energy Efficient HVAC System
Technical details of Energy Efficient HVAC Systemjayeshmahajan24
 
The Tradition and Science of Window Installations - Where are We Headed with ...
The Tradition and Science of Window Installations - Where are We Headed with ...The Tradition and Science of Window Installations - Where are We Headed with ...
The Tradition and Science of Window Installations - Where are We Headed with ...Graham Finch
 

Similar a Moving Towards more Energy Efficient Wood-frame Building Enclosure (20)

Building Enclosures For the Future - Building Tomorrows Buildings Today
Building Enclosures For the Future - Building Tomorrows Buildings TodayBuilding Enclosures For the Future - Building Tomorrows Buildings Today
Building Enclosures For the Future - Building Tomorrows Buildings Today
 
Walls and Windows for Highly Insulated Buildings in the Pacific Northwest
Walls and Windows for Highly Insulated Buildings in the Pacific NorthwestWalls and Windows for Highly Insulated Buildings in the Pacific Northwest
Walls and Windows for Highly Insulated Buildings in the Pacific Northwest
 
Moving Towards More Energy Efficient Wood Frame Building Enclosures
Moving Towards More Energy Efficient Wood Frame Building EnclosuresMoving Towards More Energy Efficient Wood Frame Building Enclosures
Moving Towards More Energy Efficient Wood Frame Building Enclosures
 
Building Enclosures of the Future - Building Tomorrow's Buildings Today
Building Enclosures of the Future - Building Tomorrow's Buildings TodayBuilding Enclosures of the Future - Building Tomorrow's Buildings Today
Building Enclosures of the Future - Building Tomorrow's Buildings Today
 
Walls and Windows for Highly Insulated Buildings in the Pacific Northwest
Walls and Windows for Highly Insulated Buildings in the Pacific NorthwestWalls and Windows for Highly Insulated Buildings in the Pacific Northwest
Walls and Windows for Highly Insulated Buildings in the Pacific Northwest
 
Super Insulated Building Enclosures
 Super Insulated Building Enclosures Super Insulated Building Enclosures
Super Insulated Building Enclosures
 
Super Insulated Buildings Enclosures in the Pacific Northwest
Super Insulated Buildings Enclosures in the Pacific NorthwestSuper Insulated Buildings Enclosures in the Pacific Northwest
Super Insulated Buildings Enclosures in the Pacific Northwest
 
Adoption and Compliance with Energy Codes - ASHRAE 90.1 and NECB
Adoption and Compliance with Energy Codes -  ASHRAE 90.1 and NECBAdoption and Compliance with Energy Codes -  ASHRAE 90.1 and NECB
Adoption and Compliance with Energy Codes - ASHRAE 90.1 and NECB
 
NBEC 2014 - Balcony Thermal Bridging
NBEC 2014 -  Balcony Thermal BridgingNBEC 2014 -  Balcony Thermal Bridging
NBEC 2014 - Balcony Thermal Bridging
 
Optimizing Concrete Thermal Bridges - Balcony and Slab Edge Thermal Breaks
Optimizing Concrete Thermal Bridges - Balcony and Slab Edge Thermal BreaksOptimizing Concrete Thermal Bridges - Balcony and Slab Edge Thermal Breaks
Optimizing Concrete Thermal Bridges - Balcony and Slab Edge Thermal Breaks
 
R-22 Walls and Insulating for the Future
R-22 Walls and Insulating for the FutureR-22 Walls and Insulating for the Future
R-22 Walls and Insulating for the Future
 
Adoption and Compliance with Canadian Energy Codes - Lessons from BC
Adoption and Compliance with Canadian Energy Codes - Lessons from BCAdoption and Compliance with Canadian Energy Codes - Lessons from BC
Adoption and Compliance with Canadian Energy Codes - Lessons from BC
 
Benefits Ri Rb Ircc
Benefits Ri Rb IrccBenefits Ri Rb Ircc
Benefits Ri Rb Ircc
 
Tall Wood Building Enclosure Designs That Work
Tall Wood Building Enclosure Designs That WorkTall Wood Building Enclosure Designs That Work
Tall Wood Building Enclosure Designs That Work
 
Thermal bridges in concrete construction solutions to address energy code co...
Thermal bridges in concrete construction  solutions to address energy code co...Thermal bridges in concrete construction  solutions to address energy code co...
Thermal bridges in concrete construction solutions to address energy code co...
 
Super Insulated Building Enclosures (SEABEC 2013)
Super Insulated Building Enclosures (SEABEC 2013)Super Insulated Building Enclosures (SEABEC 2013)
Super Insulated Building Enclosures (SEABEC 2013)
 
High Performance Walls - Solutions for Thermal Bridging
High Performance Walls - Solutions for Thermal BridgingHigh Performance Walls - Solutions for Thermal Bridging
High Performance Walls - Solutions for Thermal Bridging
 
Greenbuild 2013
Greenbuild 2013Greenbuild 2013
Greenbuild 2013
 
Technical details of Energy Efficient HVAC System
Technical details of  Energy Efficient HVAC SystemTechnical details of  Energy Efficient HVAC System
Technical details of Energy Efficient HVAC System
 
The Tradition and Science of Window Installations - Where are We Headed with ...
The Tradition and Science of Window Installations - Where are We Headed with ...The Tradition and Science of Window Installations - Where are We Headed with ...
The Tradition and Science of Window Installations - Where are We Headed with ...
 

Más de RDH Building Science

High-Rise Passive House Feasibility Study
High-Rise Passive House Feasibility StudyHigh-Rise Passive House Feasibility Study
High-Rise Passive House Feasibility StudyRDH Building Science
 
Window Sill Pan Flashings: Are Liquid Membranes Suitable?
Window Sill Pan Flashings: Are Liquid Membranes Suitable?Window Sill Pan Flashings: Are Liquid Membranes Suitable?
Window Sill Pan Flashings: Are Liquid Membranes Suitable?RDH Building Science
 
Impact of Heating and Cooling of Expanded Polystyrene and Wool Insulations on...
Impact of Heating and Cooling of Expanded Polystyrene and Wool Insulations on...Impact of Heating and Cooling of Expanded Polystyrene and Wool Insulations on...
Impact of Heating and Cooling of Expanded Polystyrene and Wool Insulations on...RDH Building Science
 
Challenges Related to Measuring and Reporting Temperature-Dependent Apparent ...
Challenges Related to Measuring and Reporting Temperature-Dependent Apparent ...Challenges Related to Measuring and Reporting Temperature-Dependent Apparent ...
Challenges Related to Measuring and Reporting Temperature-Dependent Apparent ...RDH Building Science
 
Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...
Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...
Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...RDH Building Science
 
State of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold Climates
State of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold ClimatesState of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold Climates
State of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold ClimatesRDH Building Science
 
Solutions to Address Osmosis and the Blistering of Liquid-Applied Waterproofi...
Solutions to Address Osmosis and the Blistering of Liquid-Applied Waterproofi...Solutions to Address Osmosis and the Blistering of Liquid-Applied Waterproofi...
Solutions to Address Osmosis and the Blistering of Liquid-Applied Waterproofi...RDH Building Science
 
Passive House Wall Assembly Performance - A Case Study
Passive House Wall Assembly Performance - A Case StudyPassive House Wall Assembly Performance - A Case Study
Passive House Wall Assembly Performance - A Case StudyRDH Building Science
 
Structural Testing of Screws Through Thick Insulation
Structural Testing of Screws Through Thick InsulationStructural Testing of Screws Through Thick Insulation
Structural Testing of Screws Through Thick InsulationRDH Building Science
 
Tall Wood Building Enclosures - A Race To the Top
Tall Wood Building Enclosures - A Race To the TopTall Wood Building Enclosures - A Race To the Top
Tall Wood Building Enclosures - A Race To the TopRDH Building Science
 
Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...
Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...
Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...RDH Building Science
 
Energy and Indoor Air Quality Impacts of DOAS Retrofits in Small Commercial B...
Energy and Indoor Air Quality Impacts of DOAS Retrofits in Small Commercial B...Energy and Indoor Air Quality Impacts of DOAS Retrofits in Small Commercial B...
Energy and Indoor Air Quality Impacts of DOAS Retrofits in Small Commercial B...RDH Building Science
 
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential BuildingsEnergy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential BuildingsRDH Building Science
 
Moisture Uptake Testing for CLT Floor Panels in a Tall Wood Building in Vanco...
Moisture Uptake Testing for CLT Floor Panels in a Tall Wood Building in Vanco...Moisture Uptake Testing for CLT Floor Panels in a Tall Wood Building in Vanco...
Moisture Uptake Testing for CLT Floor Panels in a Tall Wood Building in Vanco...RDH Building Science
 
Attaching Cladding with Long Screws
Attaching Cladding with Long ScrewsAttaching Cladding with Long Screws
Attaching Cladding with Long ScrewsRDH Building Science
 
Building the Future: Net Zero and Net Zero Ready
Building the Future: Net Zero and Net Zero ReadyBuilding the Future: Net Zero and Net Zero Ready
Building the Future: Net Zero and Net Zero ReadyRDH Building Science
 
Carbon Neutral Apartment Retrofits
Carbon Neutral Apartment RetrofitsCarbon Neutral Apartment Retrofits
Carbon Neutral Apartment RetrofitsRDH Building Science
 
Options for Retrofit Regulations at Time of Renovation
Options for Retrofit Regulations at Time of RenovationOptions for Retrofit Regulations at Time of Renovation
Options for Retrofit Regulations at Time of RenovationRDH Building Science
 
Post Occupancy Research at the North Park Passive House
Post Occupancy Research at the North Park Passive HousePost Occupancy Research at the North Park Passive House
Post Occupancy Research at the North Park Passive HouseRDH Building Science
 

Más de RDH Building Science (20)

High-Rise Passive House Feasibility Study
High-Rise Passive House Feasibility StudyHigh-Rise Passive House Feasibility Study
High-Rise Passive House Feasibility Study
 
Window Sill Pan Flashings: Are Liquid Membranes Suitable?
Window Sill Pan Flashings: Are Liquid Membranes Suitable?Window Sill Pan Flashings: Are Liquid Membranes Suitable?
Window Sill Pan Flashings: Are Liquid Membranes Suitable?
 
Impact of Heating and Cooling of Expanded Polystyrene and Wool Insulations on...
Impact of Heating and Cooling of Expanded Polystyrene and Wool Insulations on...Impact of Heating and Cooling of Expanded Polystyrene and Wool Insulations on...
Impact of Heating and Cooling of Expanded Polystyrene and Wool Insulations on...
 
Challenges Related to Measuring and Reporting Temperature-Dependent Apparent ...
Challenges Related to Measuring and Reporting Temperature-Dependent Apparent ...Challenges Related to Measuring and Reporting Temperature-Dependent Apparent ...
Challenges Related to Measuring and Reporting Temperature-Dependent Apparent ...
 
Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...
Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...
Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...
 
State of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold Climates
State of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold ClimatesState of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold Climates
State of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold Climates
 
Solutions to Address Osmosis and the Blistering of Liquid-Applied Waterproofi...
Solutions to Address Osmosis and the Blistering of Liquid-Applied Waterproofi...Solutions to Address Osmosis and the Blistering of Liquid-Applied Waterproofi...
Solutions to Address Osmosis and the Blistering of Liquid-Applied Waterproofi...
 
Passive House Wall Assembly Performance - A Case Study
Passive House Wall Assembly Performance - A Case StudyPassive House Wall Assembly Performance - A Case Study
Passive House Wall Assembly Performance - A Case Study
 
Structural Testing of Screws Through Thick Insulation
Structural Testing of Screws Through Thick InsulationStructural Testing of Screws Through Thick Insulation
Structural Testing of Screws Through Thick Insulation
 
Tall Wood Building Enclosures - A Race To the Top
Tall Wood Building Enclosures - A Race To the TopTall Wood Building Enclosures - A Race To the Top
Tall Wood Building Enclosures - A Race To the Top
 
Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...
Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...
Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...
 
Energy and Indoor Air Quality Impacts of DOAS Retrofits in Small Commercial B...
Energy and Indoor Air Quality Impacts of DOAS Retrofits in Small Commercial B...Energy and Indoor Air Quality Impacts of DOAS Retrofits in Small Commercial B...
Energy and Indoor Air Quality Impacts of DOAS Retrofits in Small Commercial B...
 
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential BuildingsEnergy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
 
Moisture Uptake Testing for CLT Floor Panels in a Tall Wood Building in Vanco...
Moisture Uptake Testing for CLT Floor Panels in a Tall Wood Building in Vanco...Moisture Uptake Testing for CLT Floor Panels in a Tall Wood Building in Vanco...
Moisture Uptake Testing for CLT Floor Panels in a Tall Wood Building in Vanco...
 
Attaching Cladding with Long Screws
Attaching Cladding with Long ScrewsAttaching Cladding with Long Screws
Attaching Cladding with Long Screws
 
Building the Future: Net Zero and Net Zero Ready
Building the Future: Net Zero and Net Zero ReadyBuilding the Future: Net Zero and Net Zero Ready
Building the Future: Net Zero and Net Zero Ready
 
Carbon Neutral Apartment Retrofits
Carbon Neutral Apartment RetrofitsCarbon Neutral Apartment Retrofits
Carbon Neutral Apartment Retrofits
 
Options for Retrofit Regulations at Time of Renovation
Options for Retrofit Regulations at Time of RenovationOptions for Retrofit Regulations at Time of Renovation
Options for Retrofit Regulations at Time of Renovation
 
Post Occupancy Research at the North Park Passive House
Post Occupancy Research at the North Park Passive HousePost Occupancy Research at the North Park Passive House
Post Occupancy Research at the North Park Passive House
 
Re-glazing of an All Glass Tower
Re-glazing of an All Glass TowerRe-glazing of an All Glass Tower
Re-glazing of an All Glass Tower
 

Último

Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 

Último (20)

Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 

Moving Towards more Energy Efficient Wood-frame Building Enclosure

  • 1. Implications of the New NBC Section 9.36 Moving Towards More Energy Efficient Wood-Frame Building Enclosures Graham Finch, MASc, P.Eng Principal, Building Science Research Engineer RDH Building Engineering Ltd. Vancouver, BC RCIC 2013 Edmonton – April 30, 2013
  • 2. Presentation Outline New Building Enclosure Energy Efficiency Requirements Under New 2012 NBC Section 9.36 Highly Insulated Wood-frame Enclosure Assemblies Building Enclosure Design Guide for Highly- Insulated Wood-frame Buildings
  • 3. New Section 9.36 - Whole Building Energy Efficiency Requirements for Part 9 houses Reference to NECB 2011 for other buildings (Part 3) Building Enclosure (Envelope), HVAC, Hot-Water Components Prescriptive, Trade-off and Energy Modeling Paths for Compliance Effective R-values vs Nominal R- values New NBC Section 9.36 Energy Efficiency Requirements 2010 NBC Updated in December 2012 – New Section 9.36. Energy Efficiency
  • 4. Nominal R-values = Rated R-values of insulation which do not include impacts of how they are installed For example R-20 batt insulation or R- 10 foam insulation Effective R-values or Real R-values = Calculated R-values of assemblies/details which include impacts of installation and thermal bridges For example nominal R-20 batts within steel studs 16” o.c. becoming ~R-9 effective, or in wood studs ~R-15 Nominal vs Effective R-values
  • 5. Thermal bridging occurs when a conductive material (e.g. aluminum, steel, concrete, wood etc.) provides a path for heat to flow around insulation The bypassing “bridging” of the less conductive material significantly reduces its effectiveness as an insulator Examples: Wood framing (studs, plates) in insulated wall Steel framing in insulated wall Conductive cladding attachments through insulation (metal girts, clips, anchors, screws etc) Concrete slab edge (balcony, exposed slab edge) through a wall Window frames and windows themselves Thermal Bridging
  • 6. Effective R-values account for thermal bridges and represent actual heat flow through enclosure assemblies and details Heat flow finds the path of least resistance Disproportionate amount of heat flow occurs through thermal bridges Often adding more/thicker insulation can’t help Required for almost all energy and building code calculations Energy code compliance has historically focused on assembly R-values – however more importance is being placed on details and interfaces & thermal bridges Airtightness also as important Why Thermal Bridging is Important
  • 7. Increased emphasis on continuous insulation, higher effective R-values Minimum R-value Tables for Above & Below Grade Enclosures (Walls, Roofs, Floors) – dependent on whether HRV present in house (minor tradeoff allowance) Maximum U-value (minimum R-value) & Minimum Energy Rating (ER) Tables for Windows, Doors, Skylights Prescriptive airtightness requirements (no blower door yet) HVAC duct sealing/insulation, minimum equipment efficiency Domestic Hot Water, minimum equipment efficiency Energy modeling option & Trade-off options New NBC Section 9.36 Energy Efficiency Requirements
  • 8. New NBC/NECB Climate Zone Divisions • >7000 HDD • 6000 to 6999 HDD • 5000 to 5999 HDD • 4000 to 4999 HDD • 3000 to 3999 HDD • < 3000 HDD
  • 9. Wall, Roof & Window Requirements for Alberta (NBC 9.36) Climate Zone Wall - Above Grade: Minimum R-value (IP) Roof – Flat/Cathedral : Minimum R- value (IP) Roof – Attic: Minimum R-value (IP) Window: Max. U- value (IP) / Min. ER 8 21.9 28.5 59.2 0.25 / 29 7B 21.9 28.5 59.2 0.25 / 29 7A 17.5 28.5 59.2 0.28 / 25 6 17.5 26.5 49.2 0.28 / 25 WithoutaHRV Climate Zone Wall - Above Grade: Minimum R-value (IP) Roof – Flat/Cathedral : Minimum R- value (IP) Roof – Attic: Minimum R-value (IP) Window: Max. U- value (IP) / Min. ER 8 17.5 28.5 59.2 0.25 / 29 7B 17.5 28.5 59.2 0.25 / 29 7A 16.9 28.5 49.2 0.28 / 25 6 16.9 26.5 49.2 0.28 / 25 WithaHRV
  • 10. Wall, Roof & Windows (NECB 2011/ASHRAE 90.1-2010) Climate Zone Wall – Above Grade: Minimum R-value (IP) Roof – Flat or Sloped: Minimum R-value (IP) Window: Max. U- value (IP) 8 31.0 40.0 0.28 7B 27.0 35.0 0.39 7A 27.0 35.0 0.39 6 23.0 31.0 0.39 NECB2011 ASHRAE90.1-2010– ResidentialBuilding Climate Zone Wall (Mass, Wood, Steel): Min R-value Roof (Attic, Cathedral/Flat) : Min R-value Window (Alum, PVC/fiberglass) : Max. U-value 8 19.2, 27.8, 27.0 47.6, 20.8 0.45, 0.35 7B 14.1, 19.6, 23.8 37.0, 20.8 0.45, 0.35 7A 14.1, 19.6, 23.8 37.0, 20.8 0.45, 0.35 6 12.5, 19.6, 15.6 37.0, 20.8 0.55, 0.35 *7A/7B combined in ASHRAE 90.1
  • 11. Some guidance (Table A-9.36.2.6.(1)A provided for calculation of effective R-values of some assemblies (to help transition from nominal R-values) Sufficient for most wood-frame /ICF wall assemblies No provisions for cladding attachment/ thermal bridging Guidance: Effective R-values within NBC 9.36
  • 12. Wall Assembly / Insulation Rated R- value Effective Wall R-value ** Studs at 16”, 25% F.F.* Studs at 24”, 22% F.F.* 2x4 w/ R-12 batts 10.7 - 2x4 w/ R-14 batts 11.5 - 2x6 w/ R-19 batts 15.5 16.1 2x6 w/ R-22 batts 16.6 17.4 2x6 w/ 2pcf sprayfoam (R-5/in, R-27.5) 18.3 19.3 2x6 w/ 2pcf sprayfoam (R-6/in, R-33) 18.6 19.8 *Studs at 16” o.c.=25% total Framing Factor (F.F.) and Studs at 24” o.c. =22% total framing factor. This includes typical framing arrangements of studs, sill and top plates, window headers, corners, built-up studs etc. ** All values calculated using three-dimensional thermal modeling calibrated to hot-box testing Typical Wood-frame Wall Assemblies – Effective R-values
  • 13. Effective R-value targets above ~R-17 essentially means that standard practice of batt insulation in 2x6 stud frame wall is inadequate Shifts code minimum baseline wall assembly to: Insulated/Foam Sheathing Sprayfoam? Exterior/Split Rigid Insulation Double/Deep Stud Structurally Insulated Panels (SIPs) Insulated Concrete Forms (ICFs) Beyond 2x6 Framed Walls
  • 14. Insulation Placement & Wall Design Considerations Interior Insulation Exterior Insulation Split Insulation
  • 15. Getting to Higher R-values – Insulation Placement Baseline 2x6 w/ R-22 batts = R-16 effective Exterior Insulation – R-20 to R-40+ effective • Constraints: cladding attachment, wall thickness • Good for wood/steel/concrete Deep/Double Stud– R- 20 to R-40+ effective • Constraints wall thickness • Good for wood, wasted for steel Split Insulation– R-20 to R-40+ effective • Constraints: cladding attachment • Good for wood, palatable for steel
  • 16. Insulation outboard of structure and control layers (air/vapor/water) Thermal mass at interior where useful Excellent performance in all climate zones Cladding Attachment biggest source of thermal loss/bridging Not the panacea, can still mess it up Exterior Insulated Walls Steel Stud Concrete Heavy Timber (CLT)
  • 17. Key Considerations: Cladding Attachment Wall Thickness Heat Control: Exterior Insulation Air Control: Membrane on exterior of structure Vapor Control: Membrane on exterior of structure Water Control: Membrane on exterior of structure (possibly surface of insulation) Exterior Insulation Assemblies
  • 18. Many Possible Strategies – Wide Range of Performance Cladding Attachment through Exterior Insulation
  • 19. Minimizing Thermal Bridging through Exterior Insulation Longer cladding Fasteners directly through rigid insulation (up to 2” for light claddings) Long screws through vertical strapping and rigid insulation creates truss (8”+) – short cladding fasteners into vertical strapping Rigid shear block type connection through insulation, cladding to vertical strapping
  • 20. Key Considerations - Split Insulation Assemblies Key Considerations: Exterior insulation type Cladding attachment Sequencing & detailing Heat Control: Exterior and stud space Insulation Air Control: House-wrap adhered/sheet/liquid membrane on sheathing, sealants/tapes etc. Often vapor permeable Vapor Control: Poly or VB paint at interior, plywood/OSB sheathing Water Control: Rainscreen cladding*, WRB membrane, surface of insulation
  • 21. Split Insulation Assemblies – Exterior Insulation Selection Foam insulations (XPS, EPS, Polyiso, ccSPF) are vapor impermeable Is the vapor barrier on the wrong side? Does your wall have two vapor barriers? How much insulation should be put outside of the sheathing? – More the better, but room? Rigid mineral or glass fiber insulation are vapor permeable which can address these concerns Vapor permeability of WRB and air-barrier also important Risk is dependant on interior conditions (RH) and potential for air-leakage, and on exterior conditions (rain/RH) and potential for water leaks
  • 22. Double 2x4/2x6 stud, Single Deep 2x10, 2x10, I-Joist etc… Common wood-frame wall assembly in many passive houses Lends itself well to pre-fabricated wall/roof assemblies Interior service wall – greater control over interior airtightness Higher risk for damage if sheathing gets wet (rainwater, air leakage, vapor diffusion) Double/Deep Stud Insulated
  • 23. Key Considerations – Double Stud/Deep Stud Key Considerations: Air-sealing Rainwater management/detailing Heat Control: Double stud cavity fill insulation(s) Air Control: House-wrap/membrane on sheathing, poly, airtight drywall on interior, OSB/plywood at interior, tapes, sealants, sprayfoam. Airtightness on both sides of cavity recommended Vapor Control: Poly, VB paint or OSB/plywood at interior Water Control: Rainscreen cladding*, WRB at house-wrap/membrane, flashings etc.
  • 24. Energy-Efficient Building Enclosure Design Guide for Wood-frame Multi-Unit Residential Buildings in Marine to Cold Climates Builds off of Previous Building Enclosure Design Guides & CMHC Best Practice Guides Focus on durable and highly insulated wood-frame assemblies to meet current and upcoming energy codes Guidance for taller and alternate wood-frame structures (ie post & beam, CLT) up to 6 stories Building Enclosure Design Guidance
  • 25. Chapter 1: Introduction Context Chapter 2: Building and Energy Codes across North America Canadian Building and Energy Code Summaries & R-value requirements US Building and Energy Code Summaries & R-value requirements Performance Rating Systems & Green Building Programs What is in the Guide?
  • 26. Chapter 3: Moisture, Air and Thermal Control Building as a System Climate Zones Interior Climate, HVAC Interaction Critical Barriers Control of Rainwater Penetration Control of Air Flow Controlling Condensation Construction Moisture Controlling Heat Flow and Insulation Whole Building Energy Efficiency Computer Simulation Considerations for Wood-frame Enclosures What is in the Guide?
  • 27. Chapter 4: Energy Efficient Wall and Roof Assemblies Above Grade Wall Assemblies • Split Insulated, Double Stud/Deep Stud, Exterior Insulated • Infill Walls for Concrete Frame Below Grade Wall Assemblies • Interior and Exterior Insulated Roof Assemblies • Steep Slope & Low Slope Chapter 5: Detailing 2D CAD (colored) and 3D build-sequences for various typical enclosure details Chapter 6: Further Reading & References What is in the Guide?
  • 28. Air Barrier Systems (Fundamentals, Materials, Performance, testing) Sealed Poly/Sheet Membranes Airtight drywall Sprayfoam Sealed-Sheathing Approaches › Unsupported sheet membranes › Supported sheet membranes with vertical strapping › Sandwiched membranes behind exterior insulation › Self-Adhered and liquid applied membranes Air Flow Control – Air Barrier Strategies
  • 29. Control of Heat Flow Minimizing Conductive Losses, Minimizing Air Leakage Placement of Insulation within assemblies Wood framing factors Types of insulation, R-values and typical uses Thermal bridging and effective R-values Heat Flow Control & Insulation
  • 30. Material selection & guidance Control Functions Critical Barriers Effective R-value Tables Energy Efficient Walls – Split Insulated Wood framing Nominal stud- space insulation [R-value (RSI)] Exterior insulation None [R-value (RSI)] R-4 (1 inch) [R-value (RSI)] R-8 (2 inches) [R-value (RSI)] R-12 (3 inches) [R-value (RSI)] R-16 (4 inches) [R-value (RSI)] R-20 (5 inches) [R-value (RSI)] R-24 (6 inches) [R-value (RSI)] 2x4 R-12 (2.1) 10.7 (1.9) 15.0 (2.6) 18.8 (3.3) 22.5 (4.0) 26.2 (4.6) 29.7 (5.2) 33.2 (5.8) R-14 (2.5) 11.5 (2.0) 15.8 (2.8) 19.6 (3.4) 23.2 (4.1) 27.0 (4.8) 30.5 (5.4) 34.0 (6.0) 2x6 R-19 (3.3) 15.5 (2.7) 19.8 (3.5) 23.7 (4.2) 27.3 (4.8) 31.0 (5.5) 34.5 (6.1) 38.0 (6.7) R-22 (3.9) 16.6 (2.9) 21.0 (3.7) 24.8 (4.4) 28.5 (5.0) 32.2 (5.7) 35.7 (6.3) 39.2 (6.9)
  • 31. Material selection & guidance Control Functions Critical Barriers Effective R-value Tables Energy Efficient Walls – Double Stud/Deep Stud Wood framing Nominal fill insulation [R-value/inch (RSI/cm)] Gap width between stud walls No gap [R-value (RSI)] 1-inch [R-value (RSI)] 2-inches [R-value (RSI)] 3-inches [R-value (RSI)] 4-inches [R-value (RSI)] 5-inches [R-value (RSI)] 6-inches [R-value (RSI)] Double- stud 2x4 R-3.4/inch (0.24/cm) 19.1 (3.4) 22.9 (4.0) 26.5 (4.7) 30.0 (5.3) 33.4 (5.9) 36.9 (6.5) 40.3 (7.1) R-4.0/inch (0.28/cm) 20.5 (3.6) 25.1 (4.4) 29.4 (5.2) 33.4 (5.9) 37.4 (6.6) 41.5 (7.3) 45.4 (8.0)
  • 32. Pitched-Roof, Exterior Insulated Assembly Materials & Control Functions Critical Barriers Effective R-values
  • 33. Low-Slope Conventional Roof Assembly Materials & Control Functions Critical Barriers Effective R-values (Accounting for tapered insulation packages)
  • 34. 2D CAD details (colored) provided for typical details for each wall assembly type (split insulated, double stud, exterior insulated) plus some for infill walls 3D sequence details provided for window interfacing (split insulated, double stud, exterior insulated) Detailing
  • 35. Detailing – Colored 2D Details
  • 36. Detailing – Wall to Roof Interfaces
  • 37. Detailing – 2D Window Details
  • 38. Detailing – 3D Window Installation Sequences
  • 39. Graham Finch, MASc, P.Eng gfinch@rdhbe.com 604-873-1181 Building Enclosure Design Guide Available from FP Innovations: http://www.fpinnovations.ca/ResearchProgram/Advanced BuildingSystem/designing-energy-efficient-building- enclosures.pdf Discussion