NDL FUEL STATION OPERATION OM
Objective:-
To operate the fuel station very efficiently .the fuel selling to in-house usage and
commercial purpose.
The following Certificates& License Needed to Run the Fuel Station.
1. NEMC-National Environment Management Council.
(Regent Estate /plot no.29/30. Post box-63154 /Dar es salaam,
Tanzania/071368930/+255 22 2774852)
2. To appoint an Environment Consultant for getting the NEMC certificate.
(Lilianjohn -754046117 / Lilianjohnuk@yahoo.com)
3. After to Contact the EWURA –(Energy and Water Utilities Regulatory Authority) to
get the certificates.
(6th
Floor, Harbor View towers, Samora Avenue, Po box-72175 ,Dar es salaam,
Tanzania/ +255 22 2123850/2323853/2123854/ info@ewura.go.tz) Shabani -
0782110075)
4. After contact the Fire Fighting Protection department and get the Fire protection
certificates.
5. After to Contact the QOSHA and get the Certificate.
6. To Contact the Weight and mature Department and make the calibration of
Underground tank & Fuel filling Machines.
7. Tin certificate needed from to run the business.
8. Certificate of Incorporation for new company started (NDL)
9. Mwanza Municipal Business license. To run the Fuel station Business.
10. To change the Current Owner Name to NDL Name All Related Documents.
The following Things Needed to install & Run the Fuel Station.
1. MINIMUM STANDARD REQUIREMENTS OF A PETROL FILLING STATION
A petrol filling station should have at least:
• One underground storage tank for each petroleum product sold at the station
with a minimum capacity of 5 m
3
• One digital dispensing pump (two-way) for each petroleum product sold at the
station. All dispensing pumps should be covered.
• One service bay / One wash bay / One generation / Offices / One wastewater
drainage system / two Fuel Tanker Vehicles.
• Fire fighting equipments
2. UNDERGROUND STORAGE TANKS (UST)
It is required that petroleum storage tanks and filling stations be licensed and regulated
to conform with minimum standards that meet basic safety, health, operational and
environmental protection.
3. CONSTRUCTION
• An environmental impact assessment shall be done before construction of UST,
filling stations and storage tanks is permitted.
• UST to be located so that delivery trucks do not unduly block forecourt traffic.
• UST shall as a minimum requirement be single walled of rolled carbon steel plates
welded together.
• All storage tanks at retail dispensing sites shall be placed underground.
• The tank shall have a protective coating. As a minimum requirement, the tank shall
be painted with a primer, and then coated with epoxy, coal tar epoxy or similar
bituminous coating. Where the water table is high, additional protective coating
measures must be undertaken.
• A site soil analysis should be done to determine the type of soil, density, resistively
bearing pressure and depth of water table.
• Where aggressive soils have been encouraged and where the water table is high,
cathodic protection should be used for single steel walled tanks. Otherwise,
secondary contained tanks, i.e., a double-walled steel tank, double walled
fiberglass or jacketed steel tanks (with high density polythene or fiberglass
outer wall) should be used.
• Suitable sand shall be used for both bedding and backfilling of steel tanks.
• Installed tank and pipe work shall be hydrostatically tested.
• UST location to allow trucks to reach all fill pipes using normal hose length.
• UST location to provide a forecourt gradient that allows complete drainage of
delivery truck compartments.
• UST location to allow minimum maneuvering of truck before and after delivery
including ability to exit in forward direction.
• UST shall be installed to avoid traffic load and should be sufficiently protected from
traffic by using barriers.
• Placement of UST under canopy should be avoided.
4. ENVIRONMENTAL PROTECTION MEASURES
• Environmental impact assessment shall be done before licensing and construction
of any GFT.
• Periodic environmental audits shall be performed regularly on already existing
tanks.
• Employees and public health protection measures must be assured. These must
include insurance coverage for the staff and third party.
• Product testing/update laboratories is a prerequisite for establishment and
operation of GFT.
• Approved drawings of a bulk storage depot/tanks shall indicate at minimum but
not limited to the
Following:
• Nature and quantities of the products to be stored
• Distance between tanks
• Distance between storage and adjoining property
• Lighting arrangements
• Certification by a registered engineer
• Floating/screen roof shall be installed on the GFT and regularly
checked to safeguard against unnecessary evaporation losses
5. FIRE FIGHTING PROTECTION
• In addition to measures mentioned UST, fire water storage and
supply shall be sufficient to give at least 6 hours of cooling water
cover in case of fire.
• Fire foam system shall provide protection to fire vulnerable areas
(tanks loading rack, etc.).
• Water system shall be installed around GFT to ensure safeness in case of fire
outbreak.
6. CALIBRATION AND MAINTENANCE OF EQUIPMENTS
• GFT must be calibrated in accordance with recommended standards.
• All calibration equipments must be proved and certified by competent
firms/individuals within a recognized period of time, for instance 5 years for GFT
and meters every 6 months.
7. WASTEWATER MANAGEMENT
• The forecourt should be designed with drain channels to capture all wastewater
from the forecourt, wash bays and service bays.
• The wash water shall be directed to a suitably designed three chamber oil
interceptor to separate oil before the effluent is permitted to flow in public storm
water system.
• Effluent going into the public waterways should be monitored regularly and
records maintained to ensure that it does not exceed the required limits.
8. VAPOUR VENTS
• UST should be fitted with appropriately sized vapour vents.
• Vents should terminate in open air in such a position that flammable vapours will
not accumulate or travel to unsafe place.
9. FIRE FIGHTING
• A fire master certificate should be issued for any new retail dispensing or
storage facility.
• An appropriate inventory of fire extinguishers, at least two of 9 kgs of
chemical powder, should be available at the site and the extinguishers
shall be tested every six months.
• No smoking and no cell phone usage signs shall be significantly displayed
in the forecourt.
10. FILL PIPES
• All direct fill pipes should be of the same diameter as the outlet of the fuel delivery
truck
• Each tank should have its own fill pipe and the size of the fill pipe should
correspond to the size of delivery truck outlets.
• At the fill point the pipe shall determine with a tight fill adapter and a lockable fill
cap.
• A spill containment device such as a stump should be fitted at the fill point to
prevent spill soaking directly into backfill and contaminate the ground.
• Fill Point Sea caps should remain securely locked at all times to prevent
unauthorized tampering with the products.
• Periodic environmental audits shall be performed as directed by EWURA
Management Authority.
11. LICENSING PROCEDURES
• All GFT, UST and filling stations must be licensed to operate. Any modification or
alteration on the existing GFT, UST and filling stations must be licensed.
• Licensing procedure. The following are licensing procedures:
• An application must be received and registered by the relevant authorities.
• Plans and drawings will be checked for site location, site size, structures and traffic
flow.
• Applications will then be reviewed and approved by EWURA for environmental
compliance.
• Then relevant organization will give the final approval and these are:
• Local/Municipal Authority
• EWURA
• To keep records in a standard form so that at any time data can be obtained.
• To have “permis d’exploitation” and a trade license.
12. PLANNING CRITERIA FOR LOCATION OF PETROL FILLING STATIONS
• Stations should be located within a growth center or an urban area except in
circumstances where it can be shown through appropriate studies that the need
exists otherwise.
• Stations should be located at a minimum of 100 m from any public institution such
as schools, churches, public libraries, auditoriums, hospitals, public playgrounds,
etc. However, other small and medium commercial activities may be located within
the specified limits.
• Distance between one petrol station and another: 150 m
• Area of land to be developed should be sufficient to allow maneuvering of vehicles
within its cartilage but should not be less than 1100 m
2
with a minimum frontage of
9 m on the primary street.
• Filling Stations will not be allowed in any area where the traffic situation is such
that it will cause obstructions in entering or leaving a station or on tight curves
where visibility is not adequate.
• Vehicular access/egress/crossover should be reasonably safe with adequate
approach distances especially where main roads and intersections are involved.
• Wherever possible, stations should be erected on level rather than sloping site to
prevent rolling or discarded materials such as cans, drums, etc.
• When sited in shopping centers, stations should be located in an isolated area of
the development as long as planning criteria are met, example, and setback.
• Environmental impact on streams, lakes, ponds, aquifer, etc., will be taken into
consideration. An Environmental Impact Assessment must be required from the
applicant.
• Buildings are to be located a minimum of 12 m from road property boundaries to
provide adequate area for maneuvering of vehicles in the service area.
• Canopies and supports over pumps and service equipment when located less than
6 m from interior residential lot lines or building or structure should be constructed
of noncombustible material.
• Petrol pumps shall be located a minimum 30 m from any residential building.
• No fuel pumps or other mechanical equipment shall be installed so as to permit
servicing of motor vehicles standing in a public street or highway.
• All service areas should be paved to avoid dust nuisance.
• Exterior design of the building should be compatible with adjacent development
and should be such that it is not detrimental to property values in the area.
• Urban Stretches:
a. Intersection with any category of road (irrespective of carriageway width) 100m.
b. Undivided carriageway 300m
c. Divided carriageway 100m if not on same side of carriage way; 300m if on same
side of carriage way
d. Minimum plot size of fuel station shall be…… 35m x 35m
e. Maximum building coverage……. 60%
f. Minimum landscaping…………….10%
• Where the site adjoins the side or rear boundary of a residential lot, a solid wall 3
m in height should be constructed and maintained along that lot boundary.
• A raised curb of at least 12 cm in height should be erected along street property
lines except for driveway openings so as to prevent operation of vehicles on
sidewalks, and to define entrance/exit points.
• Signs should be in accordance with the Advertisement Regulations and should be
located so as not to reflect the sun into the face of motorists and should be large
enough so that they can be seen from a reasonable distance at a reasonable speed.
• Each tank shall be vented to the atmosphere outside of buildings by means of an
independent vent pipe which should not be less than 3.6 m in height or 0.6 m
above the top of the nearest adjacent building.
• All volatile flammable liquid storage tanks shall be installed below ground in
compliance with the requirements of the Ministry of Trade and Industry.
• Integral containers of adequate design and capacity should be provided for solid
waste, such as discarded cans, bottles, etc.
• Proper facilities for storage and disposal of used and waste oil and gas must be
provided.
• Waste water from the washing of motor vehicles et cetera and sewage disposal
should be to the satisfaction of the EWURA.
• Notice of intent to construct and operate a Petrol Filling Station should be posted
on the site to enable adjacent owners within a specified radius to object if they so
desire.
• Fuel should be stored in double-walled containers/tanks to minimize leakage and
prevent contamination of ground water.
• A minimum distance of 10 m should be maintained between UST and dispensing
pumps.
• UST should be installed at a minimum distance of 10 m from front plot boundaries.
• All vehicles should not be allowed within 2 m from the outer edge of the UST.
• Normally no access to or egress from a filling station shall be closer than 45 m to
any road intersection or 75 m from the intersection of two main roads.
13. Routine Works in FILLING STATIONS
1. Pumps (Using Cash / Value Preset Pad -. Quantity Delivers as per
Totalizer).
2. UST- (Under Storages Tank) Calibration & Capacities.
3. Totalizer Meter readings (Manual Meter & Electronics).
4. Seals Checking(weight & Measures seals,Gapco’s Seals,TTseals)
5. Forecourt Supervising.
6. House Keeping
7. Dipping
8. Daily Sales Cash Collection
9. Pumps Sales Recording
10. Changing Shifts
11. Fire Extinguisher uses
12. Calibrations Chart (Reading by Using mm /Cm)
13. Decantation(how to check stick measurements, seals, dipping TT
dip hole, ust first dipping& second dipping, & how to ensure TT
shortages by using Mathematical /Physical pours methods).
14. Density checking (by using the Measuring Cylinder & Hydrometer
Reading).
15. Temperature checking.
16. Pump Attendants Responsibilities.
17. Daily stock take
18. Daily stock sheet control
19. Weekly report
20. Monthly report
21. Product delivery Register
22. Monthly Stock Loss & Gain
23. Maintains the other records.
24. Management By & Large.
Whatever possible I was collected the most of the information. Still I am
working on it. Other information we will discuss in the Joint meeting
(Shivakumar/Philemon/Praveen).
Regards
Raghuraman
Model Fuel Station:-
Petro Africa Fuel station:- Nyamhongolo
NDL FUEL STATION OPERATION
NDL FUEL STATION OPERATION

Más contenido relacionado

La actualidad más candente

Fire safety officer kpi
Fire safety officer kpiFire safety officer kpi
Fire safety officer kpi
jomxasri
 
Fire Fighting PPT
Fire Fighting PPTFire Fighting PPT
Fire Fighting PPT
SELVAN J
 

La actualidad más candente (20)

LNG
LNGLNG
LNG
 
Fire Protection Systems Unit-I
Fire Protection Systems Unit-IFire Protection Systems Unit-I
Fire Protection Systems Unit-I
 
Fire pumps
Fire pumpsFire pumps
Fire pumps
 
Dana shrisivanesh
Dana  shrisivaneshDana  shrisivanesh
Dana shrisivanesh
 
Fire protection system...
Fire protection system...Fire protection system...
Fire protection system...
 
Fire safety officer kpi
Fire safety officer kpiFire safety officer kpi
Fire safety officer kpi
 
CRR-Training Power-Points
CRR-Training Power-PointsCRR-Training Power-Points
CRR-Training Power-Points
 
Life Safety Code: NFPA 101, IFC 2015 & OSHA Subpart E
Life Safety Code: NFPA 101, IFC 2015 & OSHA Subpart E Life Safety Code: NFPA 101, IFC 2015 & OSHA Subpart E
Life Safety Code: NFPA 101, IFC 2015 & OSHA Subpart E
 
power point presentation on conversion of Diesel engine into CNG engine
power point presentation on conversion of Diesel engine into CNG enginepower point presentation on conversion of Diesel engine into CNG engine
power point presentation on conversion of Diesel engine into CNG engine
 
HCCI engine
HCCI engineHCCI engine
HCCI engine
 
Fire Safety and Building Materials
Fire Safety and Building MaterialsFire Safety and Building Materials
Fire Safety and Building Materials
 
Emission Free Coke Oven Doors
Emission Free Coke Oven Doors Emission Free Coke Oven Doors
Emission Free Coke Oven Doors
 
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19
 
Elevator Codes in India -- IS 14665 at a glance
Elevator Codes in India --  IS  14665    at a glance Elevator Codes in India --  IS  14665    at a glance
Elevator Codes in India -- IS 14665 at a glance
 
hydrogen fuel cell vehicle ppt
hydrogen fuel cell vehicle ppthydrogen fuel cell vehicle ppt
hydrogen fuel cell vehicle ppt
 
Fire Fighting PPT
Fire Fighting PPTFire Fighting PPT
Fire Fighting PPT
 
Safety tips for lpg tank installation
Safety tips for lpg tank installationSafety tips for lpg tank installation
Safety tips for lpg tank installation
 
Basic fire safety
Basic fire safetyBasic fire safety
Basic fire safety
 
Business Plan for Car Care
Business Plan for Car CareBusiness Plan for Car Care
Business Plan for Car Care
 
Fire fighting system in buildings
Fire fighting system  in buildingsFire fighting system  in buildings
Fire fighting system in buildings
 

Destacado

Feasibility report
Feasibility reportFeasibility report
Feasibility report
ali habib
 

Destacado (13)

Airbond Out Door Air Coolers for petrol station
Airbond Out Door Air Coolers for  petrol stationAirbond Out Door Air Coolers for  petrol station
Airbond Out Door Air Coolers for petrol station
 
Nafta Starter Kit
Nafta Starter KitNafta Starter Kit
Nafta Starter Kit
 
Integrated Business Solution
Integrated Business SolutionIntegrated Business Solution
Integrated Business Solution
 
Brochure tank en
Brochure tank enBrochure tank en
Brochure tank en
 
Petrol station
Petrol stationPetrol station
Petrol station
 
Feasibility report
Feasibility reportFeasibility report
Feasibility report
 
Petrol station safety
Petrol station safetyPetrol station safety
Petrol station safety
 
Solar petrol station
Solar petrol stationSolar petrol station
Solar petrol station
 
project on safety and prevention measures in petrol pumps of indianoil corpo...
project on safety and prevention measures in petrol pumps of indianoil  corpo...project on safety and prevention measures in petrol pumps of indianoil  corpo...
project on safety and prevention measures in petrol pumps of indianoil corpo...
 
Construction of CNG station project final report.
Construction of CNG station project final report.Construction of CNG station project final report.
Construction of CNG station project final report.
 
Customer service training for mobil filling station attendants(1)
Customer service training for mobil filling station attendants(1)Customer service training for mobil filling station attendants(1)
Customer service training for mobil filling station attendants(1)
 
Insurance Vs Islamic Insurance(takaful)
Insurance Vs Islamic Insurance(takaful)Insurance Vs Islamic Insurance(takaful)
Insurance Vs Islamic Insurance(takaful)
 
Fuel Station Promotion Marketing
Fuel Station Promotion MarketingFuel Station Promotion Marketing
Fuel Station Promotion Marketing
 

Similar a NDL FUEL STATION OPERATION

Presentation chapter 5
Presentation chapter 5Presentation chapter 5
Presentation chapter 5
Paulo P
 
New Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 USNew Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 US
Kristopher Vardell
 
helios-17077226655664443335555443300 (2).pdf
helios-17077226655664443335555443300 (2).pdfhelios-17077226655664443335555443300 (2).pdf
helios-17077226655664443335555443300 (2).pdf
Agoyi1
 
Technical specifications for Phase 1 Wastewater Network tank interceptors
Technical specifications for Phase 1 Wastewater Network tank interceptorsTechnical specifications for Phase 1 Wastewater Network tank interceptors
Technical specifications for Phase 1 Wastewater Network tank interceptors
Laith Abdel Nabi
 
Coal handling-guidelines
Coal handling-guidelinesCoal handling-guidelines
Coal handling-guidelines
Boudina Oussama
 

Similar a NDL FUEL STATION OPERATION (20)

Operations Management at Petrol retail outlet
Operations Management at Petrol retail outletOperations Management at Petrol retail outlet
Operations Management at Petrol retail outlet
 
Presentation chapter 5
Presentation chapter 5Presentation chapter 5
Presentation chapter 5
 
Presentation chapter 5
Presentation chapter 5Presentation chapter 5
Presentation chapter 5
 
provision for landscape and solid waste management bye laws
provision for landscape and solid waste management bye lawsprovision for landscape and solid waste management bye laws
provision for landscape and solid waste management bye laws
 
Secure landfilling.pptx
Secure landfilling.pptxSecure landfilling.pptx
Secure landfilling.pptx
 
343312365 mt-ppt
343312365 mt-ppt343312365 mt-ppt
343312365 mt-ppt
 
Enhancing existing tank cleaning practice and weighting future duabi marcusev...
Enhancing existing tank cleaning practice and weighting future duabi marcusev...Enhancing existing tank cleaning practice and weighting future duabi marcusev...
Enhancing existing tank cleaning practice and weighting future duabi marcusev...
 
Enhancing existing tank cleaning practice and weighting future duabi marcusev...
Enhancing existing tank cleaning practice and weighting future duabi marcusev...Enhancing existing tank cleaning practice and weighting future duabi marcusev...
Enhancing existing tank cleaning practice and weighting future duabi marcusev...
 
Operation & maintenance aspects of a Water treatment plant.
Operation & maintenance aspects of a Water treatment plant.Operation & maintenance aspects of a Water treatment plant.
Operation & maintenance aspects of a Water treatment plant.
 
OISD STD-150
OISD STD-150OISD STD-150
OISD STD-150
 
Husam CV updated (1)
Husam CV updated (1)Husam CV updated (1)
Husam CV updated (1)
 
Boiler recommissioning procedure after capital overhaul
Boiler recommissioning procedure after capital overhaul Boiler recommissioning procedure after capital overhaul
Boiler recommissioning procedure after capital overhaul
 
Petroleum drilling fundamentals
Petroleum drilling fundamentalsPetroleum drilling fundamentals
Petroleum drilling fundamentals
 
New Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 USNew Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 US
 
PRESENT-AMTS-SRK
PRESENT-AMTS-SRKPRESENT-AMTS-SRK
PRESENT-AMTS-SRK
 
helios-17077226655664443335555443300 (2).pdf
helios-17077226655664443335555443300 (2).pdfhelios-17077226655664443335555443300 (2).pdf
helios-17077226655664443335555443300 (2).pdf
 
Petrol Pump : Standards and Case Study
Petrol Pump : Standards and Case StudyPetrol Pump : Standards and Case Study
Petrol Pump : Standards and Case Study
 
Motor launch
Motor launchMotor launch
Motor launch
 
Technical specifications for Phase 1 Wastewater Network tank interceptors
Technical specifications for Phase 1 Wastewater Network tank interceptorsTechnical specifications for Phase 1 Wastewater Network tank interceptors
Technical specifications for Phase 1 Wastewater Network tank interceptors
 
Coal handling-guidelines
Coal handling-guidelinesCoal handling-guidelines
Coal handling-guidelines
 

NDL FUEL STATION OPERATION

  • 1. NDL FUEL STATION OPERATION OM Objective:- To operate the fuel station very efficiently .the fuel selling to in-house usage and commercial purpose. The following Certificates& License Needed to Run the Fuel Station. 1. NEMC-National Environment Management Council. (Regent Estate /plot no.29/30. Post box-63154 /Dar es salaam, Tanzania/071368930/+255 22 2774852) 2. To appoint an Environment Consultant for getting the NEMC certificate. (Lilianjohn -754046117 / Lilianjohnuk@yahoo.com) 3. After to Contact the EWURA –(Energy and Water Utilities Regulatory Authority) to get the certificates. (6th Floor, Harbor View towers, Samora Avenue, Po box-72175 ,Dar es salaam, Tanzania/ +255 22 2123850/2323853/2123854/ info@ewura.go.tz) Shabani - 0782110075)
  • 2. 4. After contact the Fire Fighting Protection department and get the Fire protection certificates. 5. After to Contact the QOSHA and get the Certificate. 6. To Contact the Weight and mature Department and make the calibration of Underground tank & Fuel filling Machines. 7. Tin certificate needed from to run the business. 8. Certificate of Incorporation for new company started (NDL) 9. Mwanza Municipal Business license. To run the Fuel station Business. 10. To change the Current Owner Name to NDL Name All Related Documents. The following Things Needed to install & Run the Fuel Station. 1. MINIMUM STANDARD REQUIREMENTS OF A PETROL FILLING STATION A petrol filling station should have at least: • One underground storage tank for each petroleum product sold at the station with a minimum capacity of 5 m 3 • One digital dispensing pump (two-way) for each petroleum product sold at the station. All dispensing pumps should be covered. • One service bay / One wash bay / One generation / Offices / One wastewater drainage system / two Fuel Tanker Vehicles. • Fire fighting equipments 2. UNDERGROUND STORAGE TANKS (UST) It is required that petroleum storage tanks and filling stations be licensed and regulated to conform with minimum standards that meet basic safety, health, operational and environmental protection. 3. CONSTRUCTION
  • 3. • An environmental impact assessment shall be done before construction of UST, filling stations and storage tanks is permitted. • UST to be located so that delivery trucks do not unduly block forecourt traffic. • UST shall as a minimum requirement be single walled of rolled carbon steel plates welded together. • All storage tanks at retail dispensing sites shall be placed underground. • The tank shall have a protective coating. As a minimum requirement, the tank shall be painted with a primer, and then coated with epoxy, coal tar epoxy or similar bituminous coating. Where the water table is high, additional protective coating measures must be undertaken. • A site soil analysis should be done to determine the type of soil, density, resistively bearing pressure and depth of water table. • Where aggressive soils have been encouraged and where the water table is high, cathodic protection should be used for single steel walled tanks. Otherwise, secondary contained tanks, i.e., a double-walled steel tank, double walled fiberglass or jacketed steel tanks (with high density polythene or fiberglass outer wall) should be used. • Suitable sand shall be used for both bedding and backfilling of steel tanks. • Installed tank and pipe work shall be hydrostatically tested. • UST location to allow trucks to reach all fill pipes using normal hose length. • UST location to provide a forecourt gradient that allows complete drainage of delivery truck compartments. • UST location to allow minimum maneuvering of truck before and after delivery including ability to exit in forward direction. • UST shall be installed to avoid traffic load and should be sufficiently protected from traffic by using barriers. • Placement of UST under canopy should be avoided.
  • 4. 4. ENVIRONMENTAL PROTECTION MEASURES • Environmental impact assessment shall be done before licensing and construction of any GFT. • Periodic environmental audits shall be performed regularly on already existing tanks. • Employees and public health protection measures must be assured. These must include insurance coverage for the staff and third party. • Product testing/update laboratories is a prerequisite for establishment and operation of GFT. • Approved drawings of a bulk storage depot/tanks shall indicate at minimum but not limited to the Following: • Nature and quantities of the products to be stored • Distance between tanks • Distance between storage and adjoining property • Lighting arrangements • Certification by a registered engineer • Floating/screen roof shall be installed on the GFT and regularly checked to safeguard against unnecessary evaporation losses 5. FIRE FIGHTING PROTECTION • In addition to measures mentioned UST, fire water storage and supply shall be sufficient to give at least 6 hours of cooling water cover in case of fire. • Fire foam system shall provide protection to fire vulnerable areas (tanks loading rack, etc.). • Water system shall be installed around GFT to ensure safeness in case of fire outbreak.
  • 5. 6. CALIBRATION AND MAINTENANCE OF EQUIPMENTS • GFT must be calibrated in accordance with recommended standards. • All calibration equipments must be proved and certified by competent firms/individuals within a recognized period of time, for instance 5 years for GFT and meters every 6 months. 7. WASTEWATER MANAGEMENT • The forecourt should be designed with drain channels to capture all wastewater from the forecourt, wash bays and service bays. • The wash water shall be directed to a suitably designed three chamber oil interceptor to separate oil before the effluent is permitted to flow in public storm water system. • Effluent going into the public waterways should be monitored regularly and records maintained to ensure that it does not exceed the required limits. 8. VAPOUR VENTS • UST should be fitted with appropriately sized vapour vents. • Vents should terminate in open air in such a position that flammable vapours will not accumulate or travel to unsafe place. 9. FIRE FIGHTING • A fire master certificate should be issued for any new retail dispensing or storage facility. • An appropriate inventory of fire extinguishers, at least two of 9 kgs of chemical powder, should be available at the site and the extinguishers shall be tested every six months. • No smoking and no cell phone usage signs shall be significantly displayed in the forecourt.
  • 6. 10. FILL PIPES • All direct fill pipes should be of the same diameter as the outlet of the fuel delivery truck • Each tank should have its own fill pipe and the size of the fill pipe should correspond to the size of delivery truck outlets. • At the fill point the pipe shall determine with a tight fill adapter and a lockable fill cap. • A spill containment device such as a stump should be fitted at the fill point to prevent spill soaking directly into backfill and contaminate the ground. • Fill Point Sea caps should remain securely locked at all times to prevent unauthorized tampering with the products. • Periodic environmental audits shall be performed as directed by EWURA Management Authority. 11. LICENSING PROCEDURES • All GFT, UST and filling stations must be licensed to operate. Any modification or alteration on the existing GFT, UST and filling stations must be licensed. • Licensing procedure. The following are licensing procedures: • An application must be received and registered by the relevant authorities. • Plans and drawings will be checked for site location, site size, structures and traffic flow. • Applications will then be reviewed and approved by EWURA for environmental compliance. • Then relevant organization will give the final approval and these are: • Local/Municipal Authority • EWURA • To keep records in a standard form so that at any time data can be obtained. • To have “permis d’exploitation” and a trade license.
  • 7. 12. PLANNING CRITERIA FOR LOCATION OF PETROL FILLING STATIONS • Stations should be located within a growth center or an urban area except in circumstances where it can be shown through appropriate studies that the need exists otherwise. • Stations should be located at a minimum of 100 m from any public institution such as schools, churches, public libraries, auditoriums, hospitals, public playgrounds, etc. However, other small and medium commercial activities may be located within the specified limits. • Distance between one petrol station and another: 150 m • Area of land to be developed should be sufficient to allow maneuvering of vehicles within its cartilage but should not be less than 1100 m 2 with a minimum frontage of 9 m on the primary street. • Filling Stations will not be allowed in any area where the traffic situation is such that it will cause obstructions in entering or leaving a station or on tight curves where visibility is not adequate. • Vehicular access/egress/crossover should be reasonably safe with adequate approach distances especially where main roads and intersections are involved. • Wherever possible, stations should be erected on level rather than sloping site to prevent rolling or discarded materials such as cans, drums, etc. • When sited in shopping centers, stations should be located in an isolated area of the development as long as planning criteria are met, example, and setback. • Environmental impact on streams, lakes, ponds, aquifer, etc., will be taken into consideration. An Environmental Impact Assessment must be required from the applicant. • Buildings are to be located a minimum of 12 m from road property boundaries to provide adequate area for maneuvering of vehicles in the service area. • Canopies and supports over pumps and service equipment when located less than 6 m from interior residential lot lines or building or structure should be constructed of noncombustible material. • Petrol pumps shall be located a minimum 30 m from any residential building.
  • 8. • No fuel pumps or other mechanical equipment shall be installed so as to permit servicing of motor vehicles standing in a public street or highway. • All service areas should be paved to avoid dust nuisance. • Exterior design of the building should be compatible with adjacent development and should be such that it is not detrimental to property values in the area. • Urban Stretches: a. Intersection with any category of road (irrespective of carriageway width) 100m. b. Undivided carriageway 300m c. Divided carriageway 100m if not on same side of carriage way; 300m if on same side of carriage way d. Minimum plot size of fuel station shall be…… 35m x 35m e. Maximum building coverage……. 60% f. Minimum landscaping…………….10% • Where the site adjoins the side or rear boundary of a residential lot, a solid wall 3 m in height should be constructed and maintained along that lot boundary. • A raised curb of at least 12 cm in height should be erected along street property lines except for driveway openings so as to prevent operation of vehicles on sidewalks, and to define entrance/exit points. • Signs should be in accordance with the Advertisement Regulations and should be located so as not to reflect the sun into the face of motorists and should be large enough so that they can be seen from a reasonable distance at a reasonable speed. • Each tank shall be vented to the atmosphere outside of buildings by means of an independent vent pipe which should not be less than 3.6 m in height or 0.6 m above the top of the nearest adjacent building. • All volatile flammable liquid storage tanks shall be installed below ground in compliance with the requirements of the Ministry of Trade and Industry. • Integral containers of adequate design and capacity should be provided for solid waste, such as discarded cans, bottles, etc. • Proper facilities for storage and disposal of used and waste oil and gas must be provided. • Waste water from the washing of motor vehicles et cetera and sewage disposal
  • 9. should be to the satisfaction of the EWURA. • Notice of intent to construct and operate a Petrol Filling Station should be posted on the site to enable adjacent owners within a specified radius to object if they so desire. • Fuel should be stored in double-walled containers/tanks to minimize leakage and prevent contamination of ground water. • A minimum distance of 10 m should be maintained between UST and dispensing pumps. • UST should be installed at a minimum distance of 10 m from front plot boundaries. • All vehicles should not be allowed within 2 m from the outer edge of the UST. • Normally no access to or egress from a filling station shall be closer than 45 m to any road intersection or 75 m from the intersection of two main roads. 13. Routine Works in FILLING STATIONS 1. Pumps (Using Cash / Value Preset Pad -. Quantity Delivers as per Totalizer). 2. UST- (Under Storages Tank) Calibration & Capacities.
  • 10. 3. Totalizer Meter readings (Manual Meter & Electronics). 4. Seals Checking(weight & Measures seals,Gapco’s Seals,TTseals)
  • 11.
  • 12. 5. Forecourt Supervising. 6. House Keeping 7. Dipping
  • 13. 8. Daily Sales Cash Collection 9. Pumps Sales Recording 10. Changing Shifts 11. Fire Extinguisher uses 12. Calibrations Chart (Reading by Using mm /Cm) 13. Decantation(how to check stick measurements, seals, dipping TT dip hole, ust first dipping& second dipping, & how to ensure TT shortages by using Mathematical /Physical pours methods). 14. Density checking (by using the Measuring Cylinder & Hydrometer Reading). 15. Temperature checking. 16. Pump Attendants Responsibilities. 17. Daily stock take 18. Daily stock sheet control 19. Weekly report 20. Monthly report 21. Product delivery Register 22. Monthly Stock Loss & Gain 23. Maintains the other records. 24. Management By & Large. Whatever possible I was collected the most of the information. Still I am working on it. Other information we will discuss in the Joint meeting (Shivakumar/Philemon/Praveen). Regards Raghuraman
  • 14. Model Fuel Station:- Petro Africa Fuel station:- Nyamhongolo