Overview of Lower Ninth Ward Rebuilding Plan




―In this present crisis, government is not the solution to our problem; government is the problem.
From time to time we've been tempted to believe that society has become too complex to be
managed by self-rule, that government by an elite group is superior to government for, by, and of
the people. Well, if no one among us is capable of governing himself, then who among us has the
capacity to govern someone else? All of us together, in and out of government, must bear the
burden. The solutions we seek must be equitable, with no one group singled out to pay a higher
price.‖ (Ronald Reagan, Jan 20, 1981)
Lower 9th Ward >>
Valley Before Filling (start)
Valley After Filling Began – 10/27/00
Landfill In-Progress (10 days
Landfill Complete With Topsoil
N
  The red crosses are the points that were surveyed. Both sides of the road were surveyed, and then a bit at the
top of the landfill. The corners (lowest elevations) are points surveyed to show the difference in height from the
paved road to the top.

  Next slides show different views.
N




GPS mapping ensures precision & accuracy in post-
landfill surveying
N




Note that elevation change (landfill buildup) ranged
from 10 to 25 ft.
Mass Grading (post-
excavation/landfill)
Drainage Channels – Function
                Table
                                                                       Q1 = A1 V1
   Area (surface) = Top
    width * length
   Volume = Cross
    sectional area *
    length
                           m21
   Outflow can be             1
    withdrawal, spillway
                                 m11                        m21
    discharge or outflow              1                1
    at the downstream        Q2 = A2 V2
    end of a reach
   Drainage Flow =               Depth  Area      Volume         Outflow
                                    0.0   0.0         0.0           0.0
    Cross sectional area *
                                   0.08 10.81       0.86           2.12
    velocity                       0.80 11.36        8.84          98.09
                                    1.20   11.68    13.45         192.51
Digital Elevation Model with 1 m resolution
               aerial photo
Note: 2007 technology facilitates tremendous
                 accuracy
Utilities are the Veins and Arteries of our Cities



  Communications
  Gas
  Oil/Petroleum
  Sewage
  Road drainage
  Power
  Steam
  Water
  District heating
  Street lighting
  Traffic control
Methodology
                       Improved            Improved
    Making
                         surface          Sub surface         Doing
  the best of             based              based             things
   what we               survey              survey          differently
     have              techniques          techniques

                    Development of a
   User need
                      multi-system        Mapping tool       Smart pipe
  requirements
                      location tool                          technology
Data collection &                        Through wall
   Exchange          Improving GPR          in pipe             Asset
   standards                             visualization         tagging
  Best practice     New technologies                       Novel approaches
   for existing      for buried asset   Keyhole access      to underground
  technologies           location                            infrastructure
                                        Asset avoidance
 Real costs of                           for directional
 buried assets                               drilling

     Better
   regulation
FRAMEWORK FOR COST-OPTIMIZED
                ASSET MANAGEMENT SYSTEM
             Degradation                                                        Specific
             Attack Models      Risk-based Analysis Framework                 Applications/
         (Materials & Products)                                                  Clients

                                                Financial-                       Water &
                Plastics                                                       Sewer Systems
                                                economic
                                                data
Degradation   Cement-based
                             Service                         Risk-based        Roads, Bridges
Attack          materials    Life                            Cost-optimized     & Transport
Mechanisms                   Performance                     Asset
and
Influencing
                Timber
                             Evaluation &
                             Prediction
                                                  ...        Management
                                                             Strategy
                                                                                 Utility Line
                                                                                 Structures
Agents                       (Need
                             performance                                          Buildings
                 Metals      criteria, models




                                                                                  ...
                             & data)

              Composites     Inspection & condition
                                                                                    Etc.
                             assessment/monitoring
Urban Water Systems of the Future
                                                                                                    Decentralized
 Decentralized systems and                                                                          wastewater
 many different technologies                                                                       Ptreatment plant
                                                                                                     P



                                                                                           Aquifer storage and
                                                                                           recovery (ASR)
                                                                    H2O

                                                                           Rainwater tank

                                                            Bottled water supply
                 AAA rated taps

     AAA rated shower                                                                         Infiltration trench
                                                                             Grass swale
              Eco-efficient toilet            Car washing on
                                              pervious surfaces

   Front-loading clothes         On-site non-standard                   Stormwater pond, Porous pavement
   washing machine               fire sprinkler system                  wetland, retention
                       Xeroscape                                        pond
                                               Incentives (non-price)
Prospect New Town, CO -
                                       STEP 2A - ―THE SOLAR COMMUNITY‖




Solar Village        Prospect developers are currently planning a "Solar
                     Village" for inclusion in the development. Partly inspired
                     by CU's 2002 Solar Decathlon project, the Solar Village
                     will include housing and small commercial enterprises.
                     Plans for CU's 2005 Solar Decathlon BioS(h)IP to be
                     placed in Prospect New Town near the Solar Village are
                     in motion. Following the 2005 Solar Decathlon
                     competition, the CU Home will be displayed on the
                     Boulder campus for six months before moving
                     permanently to Prospect.




                       A shot of Prospect New Town's Incorrigible Circle Park.
                       Prospect, located in Longmont, is the proposed
                       location for the CU Solar Decathlon Home following
                       the national competition.
                                                        Credit: Prospect New Town
Army Hawaii Family         STEP 2A - ―THE SOLAR COMMUNITY‖



        Housing               Army Hawaii Family Housing is the largest
                              privatization project awarded by the
                              Army, serving more than 20,000
                              residents. At completion the project will
                              include 7,894 homes at seven different
                              installations and 19 separate sites on the
                              island. The construction and renovation of
                              these homes will be completed by 2015.
                              Actus Lend Lease will continue to own,
                              operate and manage the project through
                              at least 2055.

                              Families living in these neighborhoods will
                              enjoy an environmentally-friendly, master-
                              planned community that seamlessly
                              integrates residents, homes, amenities
                              and services. Several Community Centers
                              will be completed during the initial
                              development period, each one serving as
                              the town center for individual villages.

                              Army Hawaii Family Housing believes in
                              protecting the environment and doing
                              what we can to reduce energy costs and
Mary Schmidtke, executive     conserve resources. Upon completion,
                              Army Hawaii Family Housing will be the
assistant at Actus Lend       world's largest solar powered community.
Lease, displays solar         Recycling trees and construction material
                              is also on the forefront of this project.
panels that will be part of   Rather than having waste end up in
                              landfills, Actus Lend Lease is reusing
the Army energy network       demolition waste in asphalt and other
                              building materials.
BedZed                                 STEP 2A - ―THE SOLAR COMMUNITY‖


BedZED, the Beddington Zero Energy
Development, is an environmentally-friendly,
energy-efficient mix of housing and work
space in Beddington, Sutton. BedZED will
only use energy from renewable sources
generated on site. It is the first large-scale
‗carbon neutral‘ community - i.e. the first not
to add to the amount of carbon dioxide in
the atmosphere. BedZED shows how
housing can be built without degrading the
environment.       BedZED turns a former
sewage works into a community of 100
properties for sale and rent, a childcare
facility and plenty of green space, including
private gardens.

The BedZED urban system reconciles high
density three storey city blocks with high
residential    and     workspace     amenity.
Workspace is placed in the shade zones of
south facing housing terraces, with
skygardens created on the workspace roofs,
enabling all flats to have outdoor garden
areas, with good access to sunlight, at the
same time as providing well daylit workspace
without problematic summer overheating.
The combination of superinsulation, a wind
driven ventilation system incorporating heat
recovery, and passive solar gain stored
within each flat by thermally massive floors
and walls - reduces the need for both
electricity and heat to the point where a 130
kw wood fuelled chp station can meet the
energy requirements for a community of
around 240 residents and 200 workers.
Hybrid Living
                   STEP 2C – ―PLUG-IN VEHICLES—ONE WAY FLOW OF ELECTRICITY‖

                Lithium Energy System: Our advanced Lithium battery technology is

   Home
                implemented into the house design and system infrastructure. The wind
                turbines and PV panels will charge the proprietary lithium battery system
                that in turn will provide for all of the electrical requirements of the
                home. Including the charging of our electric vehicles.
Dongtan, China                                                              STEP 3 – ―THE RENEWABLE ENERGY COMMUNITY‖




                                                       THE FUTURE


          NOW

British engineering firm, Arup, is working as a strategic partner with Shanghai
Industrial Investment Corporation (SIIC) on the integrated masterplanning for the
world‘s first sustainable city.

At three quarters the size of Manhattan and located on the third largest island in
China at the mouth of the Yangtse river, Dongtan will be developed on 630
hectares of land as a sustainable city to attract a range of commercial and leisure
investments.

Ecologically sensitive design will be a key element of the masterplan. The site is
mostly agricultural land adjacent to a huge wetland of global importance. This will
be a significant opportunity to apply our integrated sustainability and urban
planning expertise to the benefit of the eco-city

SIIC’s vision is to create a development with low energy consumption
that is as close to being carbon neutral as possible. This urban centre,
where people will be able to live and work in a high-quality
environment, could be the template for sustainability in city planning,
not only in China but elsewhere in the world.


                                                                        http://www.dongtan.biz/english/gywm/default.php
Renewable Communities for Today and Tomorrow




              Is It Time?
Renewable Energy
MCAGCC Twenty-nine Palms, CA
$16M Cogeneration plant (7.2MW)
 for electric power and heating --
 key advantage of providing
 improved energy security for
 remote activity.




  Photovoltaic Array   Wave Energy Technology      Wind Turbines
 MCAGCC 29 Palms, CA        MCB Hawaii          Guantanamo Bay, Cuba
Interesting Thoughts




Unless we change direction, we       Today‘s problems cannot be solved
are likely to end up where we are    if we still think the way we thought
going.             Chinese Proverb   when we created them.        Einstein
Project Management




Timeline for implementing strategy for
bringing back the Lower 9th Ward
Management

Must have good interpersonal skills

Possess knowledge leading to control

Adequate balance of administration

Earn respect; effectively utilize authority
Project Management Life Cycle
           Phases

Defining

Planning

Executing

Controlling

Closing
Aspects
Scope

Develop plan

Launch

Monitor / Control

Close
Deming’s 14 points
1. Constancy Of Purpose
2. The New Philosophy
3. Cease Dependence On Inspection
4. End “Lowest Tender” Contracts
5. Improve Every Process
6. Institute Training On The Job
7. Institute Leadership
8. Drive Out Fear
9. Break Down Barriers
10.Eliminate Exhortations /Slogans
11.Eliminate Arbitrary Numerical Targets
12.Permit Pride Of Workmanship
13. Education
14.Top Management Commitment
Project Team
 Residents and government happy with results

 All entities committed & supportive

 Necessary resources available

 Manage changes effectively

 Schedule realistic

 Feedback to cognizant authorities prompt and
  adequate
Project Life Cycle
Thank you for your time
    and attention!

Más contenido relacionado

Destacado

Pandillas, grupos juvenilesj
Pandillas, grupos juvenilesjPandillas, grupos juvenilesj
Pandillas, grupos juvenilesjsweetflor16
 
Pandillas, grupos juvenilesj
Pandillas, grupos juvenilesjPandillas, grupos juvenilesj
Pandillas, grupos juvenilesjsweetflor16
 
Proposal to Restore the Lower 9th Ward
Proposal to Restore the Lower 9th WardProposal to Restore the Lower 9th Ward
Proposal to Restore the Lower 9th WardCBV Enterprises
 
今まで読んだおすすめの小説のアピール 発表者:小林勝
今まで読んだおすすめの小説のアピール 発表者:小林勝今まで読んだおすすめの小説のアピール 発表者:小林勝
今まで読んだおすすめの小説のアピール 発表者:小林勝mourikousuke
 
Pandillas, grupos juvenilesj
Pandillas, grupos juvenilesjPandillas, grupos juvenilesj
Pandillas, grupos juvenilesjsweetflor16
 
Aia studio 111 folio anna harford
Aia studio 111 folio   anna harfordAia studio 111 folio   anna harford
Aia studio 111 folio anna harfordannakinskywalkr
 
Proposal to Rebuild New Orleans_Post Katrina
Proposal to Rebuild New Orleans_Post KatrinaProposal to Rebuild New Orleans_Post Katrina
Proposal to Rebuild New Orleans_Post KatrinaCBV Enterprises
 
Pandillas, grupos juvenilesj
Pandillas, grupos juvenilesjPandillas, grupos juvenilesj
Pandillas, grupos juvenilesjsweetflor16
 
Pandillas, grupos juvenilesj
Pandillas, grupos juvenilesjPandillas, grupos juvenilesj
Pandillas, grupos juvenilesjsweetflor16
 
クラウドコンピューティングについて 杉本 一晃
クラウドコンピューティングについて 杉本 一晃クラウドコンピューティングについて 杉本 一晃
クラウドコンピューティングについて 杉本 一晃mourikousuke
 
2012年度LTの詳細
2012年度LTの詳細2012年度LTの詳細
2012年度LTの詳細mourikousuke
 
FX(Foreign Exchange) 毛利 考佑
FX(Foreign Exchange)  毛利 考佑FX(Foreign Exchange)  毛利 考佑
FX(Foreign Exchange) 毛利 考佑mourikousuke
 
Pandillas, grupos juvenilesj
Pandillas, grupos juvenilesjPandillas, grupos juvenilesj
Pandillas, grupos juvenilesjsweetflor16
 
CG入門 分部雅也
CG入門 分部雅也CG入門 分部雅也
CG入門 分部雅也mourikousuke
 

Destacado (16)

Pandillas, grupos juvenilesj
Pandillas, grupos juvenilesjPandillas, grupos juvenilesj
Pandillas, grupos juvenilesj
 
Pandillas, grupos juvenilesj
Pandillas, grupos juvenilesjPandillas, grupos juvenilesj
Pandillas, grupos juvenilesj
 
Proposal to Restore the Lower 9th Ward
Proposal to Restore the Lower 9th WardProposal to Restore the Lower 9th Ward
Proposal to Restore the Lower 9th Ward
 
今まで読んだおすすめの小説のアピール 発表者:小林勝
今まで読んだおすすめの小説のアピール 発表者:小林勝今まで読んだおすすめの小説のアピール 発表者:小林勝
今まで読んだおすすめの小説のアピール 発表者:小林勝
 
Pandillas, grupos juvenilesj
Pandillas, grupos juvenilesjPandillas, grupos juvenilesj
Pandillas, grupos juvenilesj
 
Aia studio 111 folio anna harford
Aia studio 111 folio   anna harfordAia studio 111 folio   anna harford
Aia studio 111 folio anna harford
 
Proposal to Rebuild New Orleans_Post Katrina
Proposal to Rebuild New Orleans_Post KatrinaProposal to Rebuild New Orleans_Post Katrina
Proposal to Rebuild New Orleans_Post Katrina
 
Pandillas, grupos juvenilesj
Pandillas, grupos juvenilesjPandillas, grupos juvenilesj
Pandillas, grupos juvenilesj
 
Pandillas, grupos juvenilesj
Pandillas, grupos juvenilesjPandillas, grupos juvenilesj
Pandillas, grupos juvenilesj
 
クラウドコンピューティングについて 杉本 一晃
クラウドコンピューティングについて 杉本 一晃クラウドコンピューティングについて 杉本 一晃
クラウドコンピューティングについて 杉本 一晃
 
2012年度LTの詳細
2012年度LTの詳細2012年度LTの詳細
2012年度LTの詳細
 
FX(Foreign Exchange) 毛利 考佑
FX(Foreign Exchange)  毛利 考佑FX(Foreign Exchange)  毛利 考佑
FX(Foreign Exchange) 毛利 考佑
 
Pandillas, grupos juvenilesj
Pandillas, grupos juvenilesjPandillas, grupos juvenilesj
Pandillas, grupos juvenilesj
 
Git 实战
Git 实战Git 实战
Git 实战
 
End note x6
End note x6End note x6
End note x6
 
CG入門 分部雅也
CG入門 分部雅也CG入門 分部雅也
CG入門 分部雅也
 

Similar a Nola lower 9-2007

AWWA/WEF Student Chapter Presentation
AWWA/WEF Student Chapter PresentationAWWA/WEF Student Chapter Presentation
AWWA/WEF Student Chapter PresentationZachary Collins
 
Technical Services at ICI
Technical Services at ICITechnical Services at ICI
Technical Services at ICImigo007
 
Artelia Industrial Services Asian Region
Artelia Industrial Services   Asian RegionArtelia Industrial Services   Asian Region
Artelia Industrial Services Asian Regionlequereanne
 
Trinitygroup final cfd_88888.pptx
Trinitygroup final cfd_88888.pptxTrinitygroup final cfd_88888.pptx
Trinitygroup final cfd_88888.pptxSelvamlak
 
Dr shirish naik - Decentralized wastewater treatment systems
Dr shirish naik - Decentralized wastewater treatment systemsDr shirish naik - Decentralized wastewater treatment systems
Dr shirish naik - Decentralized wastewater treatment systemspromediakw
 
Aster Company Profile
Aster Company ProfileAster Company Profile
Aster Company Profilecostanzoaster
 
Company profile Aster s.r.l. - asteringegneria
Company profile Aster s.r.l. - asteringegneriaCompany profile Aster s.r.l. - asteringegneria
Company profile Aster s.r.l. - asteringegneriaAster s.r.l. - Engineering
 
Scalable Computing Labs (SCL).
Scalable Computing Labs (SCL).Scalable Computing Labs (SCL).
Scalable Computing Labs (SCL).Mindtree Ltd.
 
Element Blue IOC Express Program
Element Blue IOC Express ProgramElement Blue IOC Express Program
Element Blue IOC Express ProgramSteven Gerhardt
 
General Services Sheet
General Services SheetGeneral Services Sheet
General Services Sheetronguerin
 
Cfd presentation customer version
Cfd presentation customer versionCfd presentation customer version
Cfd presentation customer versionMarty Hayman
 
Enabling the next generation airport at DXB
Enabling the next generation airport at DXBEnabling the next generation airport at DXB
Enabling the next generation airport at DXBAmor Group
 
Eq2 Presentation Property Brief
Eq2  Presentation   Property  BriefEq2  Presentation   Property  Brief
Eq2 Presentation Property Briefgueste7a71b
 
Urban Systems Collaborative Seminar | Jurij Paraszczak, An it view of smarter...
Urban Systems Collaborative Seminar | Jurij Paraszczak, An it view of smarter...Urban Systems Collaborative Seminar | Jurij Paraszczak, An it view of smarter...
Urban Systems Collaborative Seminar | Jurij Paraszczak, An it view of smarter...urbansystemssymposium
 
Tracy - Urban Subwatershed Stormwater Retrofit Analysis
Tracy - Urban Subwatershed Stormwater Retrofit AnalysisTracy - Urban Subwatershed Stormwater Retrofit Analysis
Tracy - Urban Subwatershed Stormwater Retrofit AnalysisEnvironmental Initiative
 
Network Based Kernel Density Estimator for Urban Dynamics Analysis
Network Based Kernel Density Estimator for Urban Dynamics AnalysisNetwork Based Kernel Density Estimator for Urban Dynamics Analysis
Network Based Kernel Density Estimator for Urban Dynamics AnalysisNicolas Lachance-Bernard
 
PCTY 2012, IBM Smarter Buildings v. Claire Penny
PCTY 2012, IBM Smarter Buildings v. Claire PennyPCTY 2012, IBM Smarter Buildings v. Claire Penny
PCTY 2012, IBM Smarter Buildings v. Claire PennyIBM Danmark
 

Similar a Nola lower 9-2007 (20)

AWWA/WEF Student Chapter Presentation
AWWA/WEF Student Chapter PresentationAWWA/WEF Student Chapter Presentation
AWWA/WEF Student Chapter Presentation
 
Technical Services at ICI
Technical Services at ICITechnical Services at ICI
Technical Services at ICI
 
Artelia Industrial Services Asian Region
Artelia Industrial Services   Asian RegionArtelia Industrial Services   Asian Region
Artelia Industrial Services Asian Region
 
Trinitygroup final cfd_88888.pptx
Trinitygroup final cfd_88888.pptxTrinitygroup final cfd_88888.pptx
Trinitygroup final cfd_88888.pptx
 
Dr shirish naik - Decentralized wastewater treatment systems
Dr shirish naik - Decentralized wastewater treatment systemsDr shirish naik - Decentralized wastewater treatment systems
Dr shirish naik - Decentralized wastewater treatment systems
 
Aster Company Profile
Aster Company ProfileAster Company Profile
Aster Company Profile
 
Company profile Aster s.r.l. - asteringegneria
Company profile Aster s.r.l. - asteringegneriaCompany profile Aster s.r.l. - asteringegneria
Company profile Aster s.r.l. - asteringegneria
 
Scalable Computing Labs (SCL).
Scalable Computing Labs (SCL).Scalable Computing Labs (SCL).
Scalable Computing Labs (SCL).
 
Integrating biophysical and socioeconomic model outputs
Integrating biophysical and socioeconomic model outputs Integrating biophysical and socioeconomic model outputs
Integrating biophysical and socioeconomic model outputs
 
Element Blue IOC Express Program
Element Blue IOC Express ProgramElement Blue IOC Express Program
Element Blue IOC Express Program
 
Sgcp12 faulkner-cal
Sgcp12 faulkner-calSgcp12 faulkner-cal
Sgcp12 faulkner-cal
 
General Services Sheet
General Services SheetGeneral Services Sheet
General Services Sheet
 
Cfd presentation customer version
Cfd presentation customer versionCfd presentation customer version
Cfd presentation customer version
 
Enabling the next generation airport at DXB
Enabling the next generation airport at DXBEnabling the next generation airport at DXB
Enabling the next generation airport at DXB
 
Eq2 Presentation Property Brief
Eq2  Presentation   Property  BriefEq2  Presentation   Property  Brief
Eq2 Presentation Property Brief
 
Presentazione Pierluigi Cau, 24-05-2012
Presentazione Pierluigi Cau, 24-05-2012Presentazione Pierluigi Cau, 24-05-2012
Presentazione Pierluigi Cau, 24-05-2012
 
Urban Systems Collaborative Seminar | Jurij Paraszczak, An it view of smarter...
Urban Systems Collaborative Seminar | Jurij Paraszczak, An it view of smarter...Urban Systems Collaborative Seminar | Jurij Paraszczak, An it view of smarter...
Urban Systems Collaborative Seminar | Jurij Paraszczak, An it view of smarter...
 
Tracy - Urban Subwatershed Stormwater Retrofit Analysis
Tracy - Urban Subwatershed Stormwater Retrofit AnalysisTracy - Urban Subwatershed Stormwater Retrofit Analysis
Tracy - Urban Subwatershed Stormwater Retrofit Analysis
 
Network Based Kernel Density Estimator for Urban Dynamics Analysis
Network Based Kernel Density Estimator for Urban Dynamics AnalysisNetwork Based Kernel Density Estimator for Urban Dynamics Analysis
Network Based Kernel Density Estimator for Urban Dynamics Analysis
 
PCTY 2012, IBM Smarter Buildings v. Claire Penny
PCTY 2012, IBM Smarter Buildings v. Claire PennyPCTY 2012, IBM Smarter Buildings v. Claire Penny
PCTY 2012, IBM Smarter Buildings v. Claire Penny
 

Nola lower 9-2007

  • 1. Overview of Lower Ninth Ward Rebuilding Plan ―In this present crisis, government is not the solution to our problem; government is the problem. From time to time we've been tempted to believe that society has become too complex to be managed by self-rule, that government by an elite group is superior to government for, by, and of the people. Well, if no one among us is capable of governing himself, then who among us has the capacity to govern someone else? All of us together, in and out of government, must bear the burden. The solutions we seek must be equitable, with no one group singled out to pay a higher price.‖ (Ronald Reagan, Jan 20, 1981)
  • 4. Valley After Filling Began – 10/27/00 Landfill In-Progress (10 days
  • 6. N The red crosses are the points that were surveyed. Both sides of the road were surveyed, and then a bit at the top of the landfill. The corners (lowest elevations) are points surveyed to show the difference in height from the paved road to the top. Next slides show different views.
  • 7. N GPS mapping ensures precision & accuracy in post- landfill surveying
  • 8. N Note that elevation change (landfill buildup) ranged from 10 to 25 ft.
  • 10. Drainage Channels – Function Table Q1 = A1 V1  Area (surface) = Top width * length  Volume = Cross sectional area * length m21  Outflow can be 1 withdrawal, spillway m11 m21 discharge or outflow 1 1 at the downstream Q2 = A2 V2 end of a reach  Drainage Flow = Depth Area Volume Outflow 0.0 0.0 0.0 0.0 Cross sectional area * 0.08 10.81 0.86 2.12 velocity 0.80 11.36 8.84 98.09 1.20 11.68 13.45 192.51
  • 11. Digital Elevation Model with 1 m resolution aerial photo Note: 2007 technology facilitates tremendous accuracy
  • 12. Utilities are the Veins and Arteries of our Cities Communications Gas Oil/Petroleum Sewage Road drainage Power Steam Water District heating Street lighting Traffic control
  • 13. Methodology Improved Improved Making surface Sub surface Doing the best of based based things what we survey survey differently have techniques techniques Development of a User need multi-system Mapping tool Smart pipe requirements location tool technology Data collection & Through wall Exchange Improving GPR in pipe Asset standards visualization tagging Best practice New technologies Novel approaches for existing for buried asset Keyhole access to underground technologies location infrastructure Asset avoidance Real costs of for directional buried assets drilling Better regulation
  • 14. FRAMEWORK FOR COST-OPTIMIZED ASSET MANAGEMENT SYSTEM Degradation Specific Attack Models Risk-based Analysis Framework Applications/ (Materials & Products) Clients Financial- Water & Plastics Sewer Systems economic data Degradation Cement-based Service Risk-based Roads, Bridges Attack materials Life Cost-optimized & Transport Mechanisms Performance Asset and Influencing Timber Evaluation & Prediction ... Management Strategy Utility Line Structures Agents (Need performance Buildings Metals criteria, models ... & data) Composites Inspection & condition Etc. assessment/monitoring
  • 15. Urban Water Systems of the Future Decentralized Decentralized systems and wastewater many different technologies Ptreatment plant P Aquifer storage and recovery (ASR) H2O Rainwater tank Bottled water supply AAA rated taps AAA rated shower Infiltration trench Grass swale Eco-efficient toilet Car washing on pervious surfaces Front-loading clothes On-site non-standard Stormwater pond, Porous pavement washing machine fire sprinkler system wetland, retention Xeroscape pond Incentives (non-price)
  • 16. Prospect New Town, CO - STEP 2A - ―THE SOLAR COMMUNITY‖ Solar Village Prospect developers are currently planning a "Solar Village" for inclusion in the development. Partly inspired by CU's 2002 Solar Decathlon project, the Solar Village will include housing and small commercial enterprises. Plans for CU's 2005 Solar Decathlon BioS(h)IP to be placed in Prospect New Town near the Solar Village are in motion. Following the 2005 Solar Decathlon competition, the CU Home will be displayed on the Boulder campus for six months before moving permanently to Prospect. A shot of Prospect New Town's Incorrigible Circle Park. Prospect, located in Longmont, is the proposed location for the CU Solar Decathlon Home following the national competition. Credit: Prospect New Town
  • 17. Army Hawaii Family STEP 2A - ―THE SOLAR COMMUNITY‖ Housing Army Hawaii Family Housing is the largest privatization project awarded by the Army, serving more than 20,000 residents. At completion the project will include 7,894 homes at seven different installations and 19 separate sites on the island. The construction and renovation of these homes will be completed by 2015. Actus Lend Lease will continue to own, operate and manage the project through at least 2055. Families living in these neighborhoods will enjoy an environmentally-friendly, master- planned community that seamlessly integrates residents, homes, amenities and services. Several Community Centers will be completed during the initial development period, each one serving as the town center for individual villages. Army Hawaii Family Housing believes in protecting the environment and doing what we can to reduce energy costs and Mary Schmidtke, executive conserve resources. Upon completion, Army Hawaii Family Housing will be the assistant at Actus Lend world's largest solar powered community. Lease, displays solar Recycling trees and construction material is also on the forefront of this project. panels that will be part of Rather than having waste end up in landfills, Actus Lend Lease is reusing the Army energy network demolition waste in asphalt and other building materials.
  • 18. BedZed STEP 2A - ―THE SOLAR COMMUNITY‖ BedZED, the Beddington Zero Energy Development, is an environmentally-friendly, energy-efficient mix of housing and work space in Beddington, Sutton. BedZED will only use energy from renewable sources generated on site. It is the first large-scale ‗carbon neutral‘ community - i.e. the first not to add to the amount of carbon dioxide in the atmosphere. BedZED shows how housing can be built without degrading the environment. BedZED turns a former sewage works into a community of 100 properties for sale and rent, a childcare facility and plenty of green space, including private gardens. The BedZED urban system reconciles high density three storey city blocks with high residential and workspace amenity. Workspace is placed in the shade zones of south facing housing terraces, with skygardens created on the workspace roofs, enabling all flats to have outdoor garden areas, with good access to sunlight, at the same time as providing well daylit workspace without problematic summer overheating. The combination of superinsulation, a wind driven ventilation system incorporating heat recovery, and passive solar gain stored within each flat by thermally massive floors and walls - reduces the need for both electricity and heat to the point where a 130 kw wood fuelled chp station can meet the energy requirements for a community of around 240 residents and 200 workers.
  • 19. Hybrid Living STEP 2C – ―PLUG-IN VEHICLES—ONE WAY FLOW OF ELECTRICITY‖ Lithium Energy System: Our advanced Lithium battery technology is Home implemented into the house design and system infrastructure. The wind turbines and PV panels will charge the proprietary lithium battery system that in turn will provide for all of the electrical requirements of the home. Including the charging of our electric vehicles.
  • 20. Dongtan, China STEP 3 – ―THE RENEWABLE ENERGY COMMUNITY‖ THE FUTURE NOW British engineering firm, Arup, is working as a strategic partner with Shanghai Industrial Investment Corporation (SIIC) on the integrated masterplanning for the world‘s first sustainable city. At three quarters the size of Manhattan and located on the third largest island in China at the mouth of the Yangtse river, Dongtan will be developed on 630 hectares of land as a sustainable city to attract a range of commercial and leisure investments. Ecologically sensitive design will be a key element of the masterplan. The site is mostly agricultural land adjacent to a huge wetland of global importance. This will be a significant opportunity to apply our integrated sustainability and urban planning expertise to the benefit of the eco-city SIIC’s vision is to create a development with low energy consumption that is as close to being carbon neutral as possible. This urban centre, where people will be able to live and work in a high-quality environment, could be the template for sustainability in city planning, not only in China but elsewhere in the world. http://www.dongtan.biz/english/gywm/default.php
  • 21. Renewable Communities for Today and Tomorrow Is It Time?
  • 22. Renewable Energy MCAGCC Twenty-nine Palms, CA $16M Cogeneration plant (7.2MW) for electric power and heating -- key advantage of providing improved energy security for remote activity. Photovoltaic Array Wave Energy Technology Wind Turbines MCAGCC 29 Palms, CA MCB Hawaii Guantanamo Bay, Cuba
  • 23. Interesting Thoughts Unless we change direction, we Today‘s problems cannot be solved are likely to end up where we are if we still think the way we thought going. Chinese Proverb when we created them. Einstein
  • 24. Project Management Timeline for implementing strategy for bringing back the Lower 9th Ward
  • 25. Management Must have good interpersonal skills Possess knowledge leading to control Adequate balance of administration Earn respect; effectively utilize authority
  • 26. Project Management Life Cycle Phases Defining Planning Executing Controlling Closing
  • 28. Deming’s 14 points 1. Constancy Of Purpose 2. The New Philosophy 3. Cease Dependence On Inspection 4. End “Lowest Tender” Contracts 5. Improve Every Process 6. Institute Training On The Job 7. Institute Leadership 8. Drive Out Fear 9. Break Down Barriers 10.Eliminate Exhortations /Slogans 11.Eliminate Arbitrary Numerical Targets 12.Permit Pride Of Workmanship 13. Education 14.Top Management Commitment
  • 29. Project Team Residents and government happy with results All entities committed & supportive Necessary resources available Manage changes effectively Schedule realistic Feedback to cognizant authorities prompt and adequate
  • 31. Thank you for your time and attention!