Training for local DRC representatives
Learning by doing towards the
establishment of robust cap setting and
allocation for National ETS
全国碳交易能力建设培训会
Supporting the Design and
Implementation of Emissions Trading
Systems in China - 中欧碳交易能力建设项目
Beijing, 25th – 26th April 2015
北京,2015年4月25-26日
This project/programme is funded by the European Union under the Service Contract No. : DCI-ASIE/2013/334-592.
Project implemented by: ICF International together with Sinocarbon, SQ Consult and Ecofys
Allocation design choices: the EU ETS history on allowance allocation
如何设计配额分配: EU ETS 配额分配历史
25 April 2015
2015年4月25日
Overview and structure
概览和提纲
Overall context 总体背景情况
NAP 1 and 2: allocation and cap setting in a decentralised system
国家层面配额分配计划一期和二期:非集中体系下的配额分配和总量设定
Allocation approaches: lessons learnt 配额分配方法:我们的教训
Call for harmonisation 对统一的需求
Overall context 总体背景情况
Kyoto-Protocol 京都议定书
EU commitment 欧盟的承诺
Burden sharing to achieve 8% reduction to 1990 各成员国分担减排量,在1990年基础上减8%
State of play highlights need to act 国家要案强调必须行动起来
Idea of emissions trading gains ground 排放交易的想法获得支持
EU ETS Directive adopted in October 2003
EU ETS指令于2003年10月颁布
Phase 1: 2005 – 2007 (trial phase) 第一阶段:2005至2007(测试阶段)
Phase 2: 2008 – 2012 (Kyoto phase) 第二阶段:2008至2012(京都议定书阶段)
NAP 1 and 2: Process (1)
国家配额分配一期和二期:流程(1)
EU ETS Directive EU ETS指令
legally binding on the objectives 目标具有法律约束性
but Member States were free to decide how to achieve these objectives 但成员国可自行决定如何达到目标
Relevant provisions of Directive 指令中的相关条款
National Allocation Plan (Art 9) 国家配额分配计划 (第九章)
Allocation provision 配额分配条款
Annex 3 criteria to ensure 附录三 保障条件
Compliance with Kyoto track 遵循京都议定书方针
Technical abatement potential to be exploited 利用技术减排潜力
Compliance with Community legislation 符合共同体立法
NAP 1 and 2: Process (2)
国家配额分配一期和二期:流程(1)
COM guidance COM指南
to assist Member States in drawing up the NAP 协助成员国设立国家配额分配计划
To support COM assessment of NAP 支持COM评估国家配额分配计划
Setting out criteria including whether mandatory or optional 设定强制或可选条件
Guidance represents the understanding and interpretation of the Commission, but is not
binding on Member States 指南中陈述了对欧盟委员会政策的理解和解读,但对成员国没有强制性
NAP to be submitted to COM for approval 国家配额分配计划需提交COM予以批准
Great level of discretion for Member States with respect to cap setting and allocation 成员
国在总量设定和配额分配方面有相当大的自行决定权
EU ETS cap under NAPs 国家配额分配计划下的EU ETS总量
Composition of cap made up of Member States amount of allowances determined by the NAP 各成员国的国家配额分配计划中配额
的总量组成了欧盟层面的总量
Special feature of NAP 1 国家配额分配计划一期的特性
Scope definition 设定范围
BAU projections 照常运营情景的预测
No reliable emissions data 没有可靠的排放数据
On average more allowances than emissions 平均来说配额多于排放量
Special feature of NAP 2国家配额分配计划二期的特性
Some clarification on scope, but non binding and not harmonised 澄清范围,但不是强制性的,并且没有统一
More stringent cap 更紧缩的总量
Still heavy process with many uncertainties 鉴于很多不确定性流程依旧繁重
Comparison of Second Period caps with first period caps 二期总量和一期总量的对比
0
1000
2000
3000
EU15 EU10 EU25 EU12 EU27
1st period cap 2005 emissions 2nd period cap
一期总量 2005年排放量 二期总量
Allocation to incumbents in NAP 1&2 国家配额分配计划一期和二期中对的配额分配
Allocation mainly based on historical emissions (grandfathering) 配额分配主要基于历史排放数据(祖父法)
Different base periods 不同的基准阶段
Different approaches 不同的方法
Benchmarking only in few countries, even if increased in NAP2 二期中标杆法有上升,但也只在部分国家被采用
Very different benchmarks 差异较大的标杆
Matter of distortion/fairness 有真实性或公平性的顾虑
Auctioning very limited, but also increased in NAP2 二期中拍卖有所增长,但还是非常有限
Further examples for not harmonised treatment 更多的关于不统一对待的案例
Early action 早期行动
Some Member States rewarded early action, some did not 一些成员国对早期行动给予了回馈,一些没有
CHP 热电联用
Wide range of measures to counterbalance disadvantages relative to conventional energy installations
改进传统能源设施有非常多样的措施
Some MS dropped compliance factor 一些成员国弃用了合规系数
Double benchmarks 双重标杆
Earmarking reserve 特定用途的配额预留
Process-related emissions 流程相关的排放
Some MS give special treatment 一些成员国提供了特殊的政策
Special consideration in cap calculation 在计算总量时采用了特殊的考虑
Example: base periods for grandfathering 案例: 祖父法的基准情景
Use of benchmarks in Phase 1 and 2 in Member States 一期和二期成员国对标杆的使用
0
10
20
30
PG new PG incumbent Industry new Industry
incumbent
Phase 1 Phase 2
Source: Ecofys/IFSI 2009
一期 二期
NAP 1 and 2: allocation: new entrants
国家配额分配计划一期和二期对新进产能的配额分配
All Member States established new entrants reserve 所有的成员国都为新进产能预留了配额
Different sizes 不同的规模
Free allocation to new entrants in accordance with national rules 根据国家规定新进产能获得免费配额
Fuel specific benchmarks provide wrong signals 燃料相关的标杆发出了错误的信号
Similar problems with closure rules 关停相关的政策有类似的问题
Less efficient plants may run longer than lifetime 效率较低的工厂运营的时间可能长于额定寿命
Negative effects from non-harmonised rules for new entrants 未统一的政策对新进产能产生了消极的影响
0
10
20
30
Power new Power inc Industry new Industry inc
Phase 1 Phase 2
Number of Member States using benchmarks in Phase 1&2
一期和二期成员国使用标杆的数量
一期 二期
Issues with allocation methods NAP 1 and 2
国家配额分配计划一期和二期方法的问题
Grandfathering 祖父法
Base period 基准期
Reference: installation – sector – economy 参考:设施-行业-经济体
Special rules: e.g. early action 特殊政策:例如早期行动
Free allocation benchmarks 免费配额标杆
Which benchmarks? 哪一个标杆?
BAT, average or other reference? 最佳可行技术,平均还是其他的参考值?
If activity data, which period? 若采用活动数据,采用哪一个时间段的?
Auctioning 拍卖
Competitiveness? 竞争力
Higher costs? 更高的成本?
Environmental effectiveness and cost efficiency
环境有效性和成本有效性
Environmental effectiveness not jeopardised, as long as overall amount of allowances does
not change 只要配额总量没有发生变化,环境有效性就没有被损害
No updating 没有更新
No ex-post allocation 没有事后分配
Cost efficiency 成本有效性
Price signal is crucial 价格信号非常关键
Least cost approach also requires right signals from allocation, if non-perfect
markets prevail 如果没有成熟市场,最小成本法同样需要来自配额分配的正确信号,
Call for harmonisation from Member States 成员国要求统一性
During 2005 to 2007, call for „harmonisation“ of EU ETS was rapidly increasing
2005至2007,来自成员国的要求EU ETS统一性的呼声剧增
It concerned all essential elements of EU ETS, in particular cap setting, allocation, scope and new
entrants
EU ETS所有的关键要素都有涉及,特别是总量设定、配额分配、覆盖范围和新进产能
Strong role of EU regulator necessary and acknowledged by Member States and European
Parliament
成员国和欧盟议会都同意增强欧盟层面立法的必要性
Result: fully harmonised EU ETS as from 2013 with key decisions taken at EU level
成果:欧盟层面作出关键决策,自2013年起EU ETS将完全统一
Thank you
for your attention!
谢谢!
Further information available from:
更多信息请访问:
http://ec.europa.eu/clima/policies/ets/index_en.htm
Functioning of the EU ETS: underlying economics EU ETS的功能:经济学原理
0
5
10
15
20
25
Sell Buy
Investment/abatement costs
CO2 price
Profit from
abatement Purchase is
cheaper than
abatement
Principles of emission trading 排放交易的原则
Electricity sector: how do windfall profits occur? 电力行业:暴利的获得
Windfall profits are profits which are not due to own
action, but occur due to new circumstances.
暴利来自于新环境而不是自身行为
In ETS, opportunity occurs: sell or use!
ETS中,机会来自于:售卖还是自用
Opportunity costs: costs of the option not implemented if
there is more than one option
机会成本:面临多方案择一决策时,被舍弃的选项中的最高价值者
是本次决策的机会成本
Opportunity costs are added to ordinary (generation) costs
plus usual profit margin 机会成本附加到平常(一般)成本之上
再加上通常的利润率
Please follow us via WeChat
项目微信公众号
Supporting the Design and
Implementation of Emissions Trading
Systems in China - 中欧碳交易能力建设项目
This project/programme is funded by the European Union under the Service Contract No. : DCI-ASIE/2013/334-592.
Project implemented by: ICF International together with Sinocarbon, SQ Consult and Ecofys
Please follow us via LinkedIn
项目LinkedIn页面
https://www.linkedin.com/grp/h
ome?gid=6971708

Más contenido relacionado

Similar a Allocation design choices the EU ETS history on allowance allocation (如何设计配额分配: EU ETS 配额分配历史)

Where to place the saving obligation
Where to place the saving obligationWhere to place the saving obligation
Where to place the saving obligationbeta paramita
 
Module 1 - Introduction to Energy Efficiency
Module 1 - Introduction to Energy EfficiencyModule 1 - Introduction to Energy Efficiency
Module 1 - Introduction to Energy EfficiencyPaul Brown
 
session 5 Regulation&certification of energy_service_providers(article7)
session 5 Regulation&certification of energy_service_providers(article7)session 5 Regulation&certification of energy_service_providers(article7)
session 5 Regulation&certification of energy_service_providers(article7)RCREEE
 
Introduction to Energy Efficiency and Course Program
Introduction to Energy Efficiency and Course Program Introduction to Energy Efficiency and Course Program
Introduction to Energy Efficiency and Course Program RCREEE
 
Chappuis Halder - EU Benchmark Regulation threepager - May 2016
Chappuis Halder - EU Benchmark Regulation threepager - May 2016Chappuis Halder - EU Benchmark Regulation threepager - May 2016
Chappuis Halder - EU Benchmark Regulation threepager - May 2016Nicolas Heguy
 
PPTTR2024 for public release presentation.pdf
PPTTR2024 for public release presentation.pdfPPTTR2024 for public release presentation.pdf
PPTTR2024 for public release presentation.pdfMukeshKr19
 
David lazenby report
David lazenby reportDavid lazenby report
David lazenby reportW.P.C.
 
ESCOs, IPEEC
ESCOs, IPEECESCOs, IPEEC
ESCOs, IPEECnooone
 
Codice di Condotta del Psc
Codice di Condotta del PscCodice di Condotta del Psc
Codice di Condotta del PscLavoce.info
 
Webinar - Support Schemes for Renewable Energy Development and Grid Development
Webinar - Support Schemes for Renewable Energy Development and Grid DevelopmentWebinar - Support Schemes for Renewable Energy Development and Grid Development
Webinar - Support Schemes for Renewable Energy Development and Grid DevelopmentLeonardo ENERGY
 
Detailed comparison of Brazilian and French obligation schemes to promote ene...
Detailed comparison of Brazilian and French obligation schemes to promote ene...Detailed comparison of Brazilian and French obligation schemes to promote ene...
Detailed comparison of Brazilian and French obligation schemes to promote ene...Gilberto De Martino Jannuzzi
 
Ch 2 energy conservation act and its features
Ch 2 energy conservation act and its featuresCh 2 energy conservation act and its features
Ch 2 energy conservation act and its featuresKartik Mahajan
 
Italy country report on energy efficiency
Italy country report on energy efficiencyItaly country report on energy efficiency
Italy country report on energy efficiencyWorld Office Forum
 
CCS in the UNFCCC - Barry Jones - 2 Dec 2011
CCS in the UNFCCC - Barry Jones - 2 Dec 2011CCS in the UNFCCC - Barry Jones - 2 Dec 2011
CCS in the UNFCCC - Barry Jones - 2 Dec 2011Global CCS Institute
 
The Logic Behind Carbon Emission Cap Setting, by Prof. Zhang Xiliang, 25th Ap...
The Logic Behind Carbon Emission Cap Setting, by Prof. Zhang Xiliang, 25th Ap...The Logic Behind Carbon Emission Cap Setting, by Prof. Zhang Xiliang, 25th Ap...
The Logic Behind Carbon Emission Cap Setting, by Prof. Zhang Xiliang, 25th Ap...Renato Roldao
 

Similar a Allocation design choices the EU ETS history on allowance allocation (如何设计配额分配: EU ETS 配额分配历史) (20)

Where to place the saving obligation
Where to place the saving obligationWhere to place the saving obligation
Where to place the saving obligation
 
Module 1 - Introduction to Energy Efficiency
Module 1 - Introduction to Energy EfficiencyModule 1 - Introduction to Energy Efficiency
Module 1 - Introduction to Energy Efficiency
 
session 5 Regulation&certification of energy_service_providers(article7)
session 5 Regulation&certification of energy_service_providers(article7)session 5 Regulation&certification of energy_service_providers(article7)
session 5 Regulation&certification of energy_service_providers(article7)
 
Deliver CCS demonstration - ZEP
Deliver CCS demonstration - ZEPDeliver CCS demonstration - ZEP
Deliver CCS demonstration - ZEP
 
Introduction to Energy Efficiency and Course Program
Introduction to Energy Efficiency and Course Program Introduction to Energy Efficiency and Course Program
Introduction to Energy Efficiency and Course Program
 
Chappuis Halder - EU Benchmark Regulation threepager - May 2016
Chappuis Halder - EU Benchmark Regulation threepager - May 2016Chappuis Halder - EU Benchmark Regulation threepager - May 2016
Chappuis Halder - EU Benchmark Regulation threepager - May 2016
 
PPTTR2024 for public release presentation.pdf
PPTTR2024 for public release presentation.pdfPPTTR2024 for public release presentation.pdf
PPTTR2024 for public release presentation.pdf
 
The EU F-Gas Regulation
The EU F-Gas RegulationThe EU F-Gas Regulation
The EU F-Gas Regulation
 
David lazenby report
David lazenby reportDavid lazenby report
David lazenby report
 
ESCOs, IPEEC
ESCOs, IPEECESCOs, IPEEC
ESCOs, IPEEC
 
Codice di Condotta del Psc
Codice di Condotta del PscCodice di Condotta del Psc
Codice di Condotta del Psc
 
Webinar - Support Schemes for Renewable Energy Development and Grid Development
Webinar - Support Schemes for Renewable Energy Development and Grid DevelopmentWebinar - Support Schemes for Renewable Energy Development and Grid Development
Webinar - Support Schemes for Renewable Energy Development and Grid Development
 
Detailed comparison of Brazilian and French obligation schemes to promote ene...
Detailed comparison of Brazilian and French obligation schemes to promote ene...Detailed comparison of Brazilian and French obligation schemes to promote ene...
Detailed comparison of Brazilian and French obligation schemes to promote ene...
 
Ch 2 energy conservation act and its features
Ch 2 energy conservation act and its featuresCh 2 energy conservation act and its features
Ch 2 energy conservation act and its features
 
Energy Efficiency at the IEA
Energy Efficiency at the IEAEnergy Efficiency at the IEA
Energy Efficiency at the IEA
 
Italy country report on energy efficiency
Italy country report on energy efficiencyItaly country report on energy efficiency
Italy country report on energy efficiency
 
CCS in the UNFCCC - Barry Jones - 2 Dec 2011
CCS in the UNFCCC - Barry Jones - 2 Dec 2011CCS in the UNFCCC - Barry Jones - 2 Dec 2011
CCS in the UNFCCC - Barry Jones - 2 Dec 2011
 
PV LEGAL: Key recommendations
PV LEGAL: Key recommendationsPV LEGAL: Key recommendations
PV LEGAL: Key recommendations
 
The Logic Behind Carbon Emission Cap Setting, by Prof. Zhang Xiliang, 25th Ap...
The Logic Behind Carbon Emission Cap Setting, by Prof. Zhang Xiliang, 25th Ap...The Logic Behind Carbon Emission Cap Setting, by Prof. Zhang Xiliang, 25th Ap...
The Logic Behind Carbon Emission Cap Setting, by Prof. Zhang Xiliang, 25th Ap...
 
Tgi & cálidda earnings call 1 q 2015
Tgi & cálidda earnings call 1 q 2015Tgi & cálidda earnings call 1 q 2015
Tgi & cálidda earnings call 1 q 2015
 

Más de Renato Roldao

数据报送流程、目标及数据报送模板介绍
数据报送流程、目标及数据报送模板介绍数据报送流程、目标及数据报送模板介绍
数据报送流程、目标及数据报送模板介绍Renato Roldao
 
Introduction of Data Reporting Process, Objective and Reporting Template
Introduction of Data Reporting Process, Objective and Reporting TemplateIntroduction of Data Reporting Process, Objective and Reporting Template
Introduction of Data Reporting Process, Objective and Reporting TemplateRenato Roldao
 
总量设定及配额分配的数据要求
总量设定及配额分配的数据要求总量设定及配额分配的数据要求
总量设定及配额分配的数据要求Renato Roldao
 
Data Requirement for Total Carbon Emission Cap Setting and Allowance Allocation
Data Requirement for Total Carbon Emission Cap Setting and Allowance AllocationData Requirement for Total Carbon Emission Cap Setting and Allowance Allocation
Data Requirement for Total Carbon Emission Cap Setting and Allowance AllocationRenato Roldao
 
排放配额分配方法
排放配额分配方法排放配额分配方法
排放配额分配方法Renato Roldao
 
Allocation Methods of Emission allowance
Allocation Methods of Emission allowanceAllocation Methods of Emission allowance
Allocation Methods of Emission allowanceRenato Roldao
 

Más de Renato Roldao (6)

数据报送流程、目标及数据报送模板介绍
数据报送流程、目标及数据报送模板介绍数据报送流程、目标及数据报送模板介绍
数据报送流程、目标及数据报送模板介绍
 
Introduction of Data Reporting Process, Objective and Reporting Template
Introduction of Data Reporting Process, Objective and Reporting TemplateIntroduction of Data Reporting Process, Objective and Reporting Template
Introduction of Data Reporting Process, Objective and Reporting Template
 
总量设定及配额分配的数据要求
总量设定及配额分配的数据要求总量设定及配额分配的数据要求
总量设定及配额分配的数据要求
 
Data Requirement for Total Carbon Emission Cap Setting and Allowance Allocation
Data Requirement for Total Carbon Emission Cap Setting and Allowance AllocationData Requirement for Total Carbon Emission Cap Setting and Allowance Allocation
Data Requirement for Total Carbon Emission Cap Setting and Allowance Allocation
 
排放配额分配方法
排放配额分配方法排放配额分配方法
排放配额分配方法
 
Allocation Methods of Emission allowance
Allocation Methods of Emission allowanceAllocation Methods of Emission allowance
Allocation Methods of Emission allowance
 

Último

VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...SUHANI PANDEY
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.cojitesh
 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Pooja Nehwal
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...SUHANI PANDEY
 
celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...Call Girls in Nagpur High Profile
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...tanu pandey
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptxJIT KUMAR GUPTA
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995garthraymundo123
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...ZAPPAC1
 
Plastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability ProgramsPlastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability Programsitadmin50
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...SUHANI PANDEY
 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxEdgar Hertwich
 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...SUHANI PANDEY
 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...MOHANI PANDEY
 

Último (20)

VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
 
Deforestation
DeforestationDeforestation
Deforestation
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
 
celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
 
Climate Change
Climate ChangeClimate Change
Climate Change
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
Plastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability ProgramsPlastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability Programs
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
 

Allocation design choices the EU ETS history on allowance allocation (如何设计配额分配: EU ETS 配额分配历史)

  • 1. Training for local DRC representatives Learning by doing towards the establishment of robust cap setting and allocation for National ETS 全国碳交易能力建设培训会 Supporting the Design and Implementation of Emissions Trading Systems in China - 中欧碳交易能力建设项目 Beijing, 25th – 26th April 2015 北京,2015年4月25-26日 This project/programme is funded by the European Union under the Service Contract No. : DCI-ASIE/2013/334-592. Project implemented by: ICF International together with Sinocarbon, SQ Consult and Ecofys
  • 2. Allocation design choices: the EU ETS history on allowance allocation 如何设计配额分配: EU ETS 配额分配历史 25 April 2015 2015年4月25日
  • 3. Overview and structure 概览和提纲 Overall context 总体背景情况 NAP 1 and 2: allocation and cap setting in a decentralised system 国家层面配额分配计划一期和二期:非集中体系下的配额分配和总量设定 Allocation approaches: lessons learnt 配额分配方法:我们的教训 Call for harmonisation 对统一的需求
  • 4. Overall context 总体背景情况 Kyoto-Protocol 京都议定书 EU commitment 欧盟的承诺 Burden sharing to achieve 8% reduction to 1990 各成员国分担减排量,在1990年基础上减8% State of play highlights need to act 国家要案强调必须行动起来 Idea of emissions trading gains ground 排放交易的想法获得支持 EU ETS Directive adopted in October 2003 EU ETS指令于2003年10月颁布 Phase 1: 2005 – 2007 (trial phase) 第一阶段:2005至2007(测试阶段) Phase 2: 2008 – 2012 (Kyoto phase) 第二阶段:2008至2012(京都议定书阶段)
  • 5. NAP 1 and 2: Process (1) 国家配额分配一期和二期:流程(1) EU ETS Directive EU ETS指令 legally binding on the objectives 目标具有法律约束性 but Member States were free to decide how to achieve these objectives 但成员国可自行决定如何达到目标 Relevant provisions of Directive 指令中的相关条款 National Allocation Plan (Art 9) 国家配额分配计划 (第九章) Allocation provision 配额分配条款 Annex 3 criteria to ensure 附录三 保障条件 Compliance with Kyoto track 遵循京都议定书方针 Technical abatement potential to be exploited 利用技术减排潜力 Compliance with Community legislation 符合共同体立法
  • 6. NAP 1 and 2: Process (2) 国家配额分配一期和二期:流程(1) COM guidance COM指南 to assist Member States in drawing up the NAP 协助成员国设立国家配额分配计划 To support COM assessment of NAP 支持COM评估国家配额分配计划 Setting out criteria including whether mandatory or optional 设定强制或可选条件 Guidance represents the understanding and interpretation of the Commission, but is not binding on Member States 指南中陈述了对欧盟委员会政策的理解和解读,但对成员国没有强制性 NAP to be submitted to COM for approval 国家配额分配计划需提交COM予以批准 Great level of discretion for Member States with respect to cap setting and allocation 成员 国在总量设定和配额分配方面有相当大的自行决定权
  • 7. EU ETS cap under NAPs 国家配额分配计划下的EU ETS总量 Composition of cap made up of Member States amount of allowances determined by the NAP 各成员国的国家配额分配计划中配额 的总量组成了欧盟层面的总量 Special feature of NAP 1 国家配额分配计划一期的特性 Scope definition 设定范围 BAU projections 照常运营情景的预测 No reliable emissions data 没有可靠的排放数据 On average more allowances than emissions 平均来说配额多于排放量 Special feature of NAP 2国家配额分配计划二期的特性 Some clarification on scope, but non binding and not harmonised 澄清范围,但不是强制性的,并且没有统一 More stringent cap 更紧缩的总量 Still heavy process with many uncertainties 鉴于很多不确定性流程依旧繁重
  • 8. Comparison of Second Period caps with first period caps 二期总量和一期总量的对比 0 1000 2000 3000 EU15 EU10 EU25 EU12 EU27 1st period cap 2005 emissions 2nd period cap 一期总量 2005年排放量 二期总量
  • 9. Allocation to incumbents in NAP 1&2 国家配额分配计划一期和二期中对的配额分配 Allocation mainly based on historical emissions (grandfathering) 配额分配主要基于历史排放数据(祖父法) Different base periods 不同的基准阶段 Different approaches 不同的方法 Benchmarking only in few countries, even if increased in NAP2 二期中标杆法有上升,但也只在部分国家被采用 Very different benchmarks 差异较大的标杆 Matter of distortion/fairness 有真实性或公平性的顾虑 Auctioning very limited, but also increased in NAP2 二期中拍卖有所增长,但还是非常有限
  • 10. Further examples for not harmonised treatment 更多的关于不统一对待的案例 Early action 早期行动 Some Member States rewarded early action, some did not 一些成员国对早期行动给予了回馈,一些没有 CHP 热电联用 Wide range of measures to counterbalance disadvantages relative to conventional energy installations 改进传统能源设施有非常多样的措施 Some MS dropped compliance factor 一些成员国弃用了合规系数 Double benchmarks 双重标杆 Earmarking reserve 特定用途的配额预留 Process-related emissions 流程相关的排放 Some MS give special treatment 一些成员国提供了特殊的政策 Special consideration in cap calculation 在计算总量时采用了特殊的考虑
  • 11. Example: base periods for grandfathering 案例: 祖父法的基准情景
  • 12. Use of benchmarks in Phase 1 and 2 in Member States 一期和二期成员国对标杆的使用 0 10 20 30 PG new PG incumbent Industry new Industry incumbent Phase 1 Phase 2 Source: Ecofys/IFSI 2009 一期 二期
  • 13. NAP 1 and 2: allocation: new entrants 国家配额分配计划一期和二期对新进产能的配额分配 All Member States established new entrants reserve 所有的成员国都为新进产能预留了配额 Different sizes 不同的规模 Free allocation to new entrants in accordance with national rules 根据国家规定新进产能获得免费配额 Fuel specific benchmarks provide wrong signals 燃料相关的标杆发出了错误的信号 Similar problems with closure rules 关停相关的政策有类似的问题 Less efficient plants may run longer than lifetime 效率较低的工厂运营的时间可能长于额定寿命 Negative effects from non-harmonised rules for new entrants 未统一的政策对新进产能产生了消极的影响
  • 14. 0 10 20 30 Power new Power inc Industry new Industry inc Phase 1 Phase 2 Number of Member States using benchmarks in Phase 1&2 一期和二期成员国使用标杆的数量 一期 二期
  • 15. Issues with allocation methods NAP 1 and 2 国家配额分配计划一期和二期方法的问题 Grandfathering 祖父法 Base period 基准期 Reference: installation – sector – economy 参考:设施-行业-经济体 Special rules: e.g. early action 特殊政策:例如早期行动 Free allocation benchmarks 免费配额标杆 Which benchmarks? 哪一个标杆? BAT, average or other reference? 最佳可行技术,平均还是其他的参考值? If activity data, which period? 若采用活动数据,采用哪一个时间段的? Auctioning 拍卖 Competitiveness? 竞争力 Higher costs? 更高的成本?
  • 16. Environmental effectiveness and cost efficiency 环境有效性和成本有效性 Environmental effectiveness not jeopardised, as long as overall amount of allowances does not change 只要配额总量没有发生变化,环境有效性就没有被损害 No updating 没有更新 No ex-post allocation 没有事后分配 Cost efficiency 成本有效性 Price signal is crucial 价格信号非常关键 Least cost approach also requires right signals from allocation, if non-perfect markets prevail 如果没有成熟市场,最小成本法同样需要来自配额分配的正确信号,
  • 17. Call for harmonisation from Member States 成员国要求统一性 During 2005 to 2007, call for „harmonisation“ of EU ETS was rapidly increasing 2005至2007,来自成员国的要求EU ETS统一性的呼声剧增 It concerned all essential elements of EU ETS, in particular cap setting, allocation, scope and new entrants EU ETS所有的关键要素都有涉及,特别是总量设定、配额分配、覆盖范围和新进产能 Strong role of EU regulator necessary and acknowledged by Member States and European Parliament 成员国和欧盟议会都同意增强欧盟层面立法的必要性 Result: fully harmonised EU ETS as from 2013 with key decisions taken at EU level 成果:欧盟层面作出关键决策,自2013年起EU ETS将完全统一
  • 18. Thank you for your attention! 谢谢! Further information available from: 更多信息请访问: http://ec.europa.eu/clima/policies/ets/index_en.htm
  • 19. Functioning of the EU ETS: underlying economics EU ETS的功能:经济学原理 0 5 10 15 20 25 Sell Buy Investment/abatement costs CO2 price Profit from abatement Purchase is cheaper than abatement
  • 20. Principles of emission trading 排放交易的原则
  • 21. Electricity sector: how do windfall profits occur? 电力行业:暴利的获得 Windfall profits are profits which are not due to own action, but occur due to new circumstances. 暴利来自于新环境而不是自身行为 In ETS, opportunity occurs: sell or use! ETS中,机会来自于:售卖还是自用 Opportunity costs: costs of the option not implemented if there is more than one option 机会成本:面临多方案择一决策时,被舍弃的选项中的最高价值者 是本次决策的机会成本 Opportunity costs are added to ordinary (generation) costs plus usual profit margin 机会成本附加到平常(一般)成本之上 再加上通常的利润率
  • 22. Please follow us via WeChat 项目微信公众号 Supporting the Design and Implementation of Emissions Trading Systems in China - 中欧碳交易能力建设项目 This project/programme is funded by the European Union under the Service Contract No. : DCI-ASIE/2013/334-592. Project implemented by: ICF International together with Sinocarbon, SQ Consult and Ecofys Please follow us via LinkedIn 项目LinkedIn页面 https://www.linkedin.com/grp/h ome?gid=6971708