Heap Leach Facility
For the Rosemont Copper Project




By Joel Carrasco
Outline

 § General Facility Arrangement
 § Design Criteria
 § Laboratory Tests
 § Items in Progress
 § Conclusions




                        Heap Leach Facility
Heap Leach Facility Arrangement




                  Heap Leach Facility
Design Criteria




Pertinent design criteria, along with the approach for the final design of
 the Rosemont Copper heap leach facility




                          Heap Leach Facility
Heap Leach Pad

 § Start-up pad at 65 million dry tons with an additional 10 million dry
    tons.
 § Phase 1 Pad capacity of 40 million dry tons.
 § Phase 2 Pad capacity of 35 million dry tons.
 § 300-foot maximum design height (truck stacked individual ore lifts at
    natural angle-of-repose between benches).
 § 2H:1V overall slopes with benches.




                          Heap Leach Facility
Heap Leach Liner System

 § Geosynthethic clay liner (GCL) – equivalent to
    12 inches of compacted soil with a saturated hydraulic
    conductivity of < 10-6 cm/sec.
 § 60 mil smooth/double textured sheet Low Liner Density
    Polyethylene (LLDPE) geomembrane liner.
 § 3-foot minimum thickness of drain cover fill (minus 1.5-inch
    crushed ore).




                       Heap Leach Facility
Heap Leach Liner System




                 Heap Leach Facility
Heap Leach Drain Pipe System

 § Drain pipes spaced as necessary to handle the solution
    application flows plus estimated 100-yr, 24-hr design
    storm event
 § 4-inch diameter corrugated and perforated dual-wall
    N-12 PE lateral pipes placed in a herringbone fashion
 § 8-inch diameter corrugated and perforated dual-wall
    N-12 PE collector pipes
 § 18-inch diameter corrugated and perforated dual-wall
    N-12 PE header pipes located at the downhill collection
    ditch to route flows to pregnant leach solution pond.



                     Heap Leach Facility
Heap Leach Drain Pipe System




                  Heap Leach Facility
Heap Leach Drain Pipe System




                  Heap Leach Facility
Solution Collection Channel

 § The solution collection channel will contain the leach
    pad drain pipes and convey solutions to the pregnant
    solution pond.
 § Channel will be lined for double containment of the
    pipelines.
 § 80 mil High Density Polyethylene Liner (HDPE)
 § Geosynthethic clay liner




                     Heap Leach Facility
Solution Collection Channel




                   Heap Leach Facility
Solution Process Ponds

 § The solution collection ponds will collect and store 100
    percent of the operational solutions.
 § Ponds will contain any temporary drain down and 100-yr
    24-hr design storm flows within the lined leach pad area.
 § Ponds include a double-lined Pregnant Leach Solution
    pond, double-lined Raffinate pond and a single-lined
    Stormwater pond.




                     Heap Leach Facility
Double-Lined
Pond Parameters
§  25-foot maximum depth
§  3-foot minimum freeboard
§  2.5H:1V maximum lined
    interior slope
§  80 mil High Density
    Polyethylene top Liner
§  Geonet between liners
§  60 mil Low Liner Density
    Polyethylene top Liner
§  Geosynthethic clay liner
§  Leak Collection and
    Removal System




                               Heap Leach Facility
Single-Lined
  Pond Parameters
§ 25-foot maximum depth
§ 3-foot minimum freeboard
§ 2.5H:1V maximum lined
   interior slope
§ 80 mil High Density
   Polyethylene Liner
§ Geosynthethic clay liner




                              Heap Leach Facility
Heap Leach Stability




The heap will be evaluated and designed to provide stability of the heap
 under static and potential seismic loading conditions.




                         Heap Leach Facility
Stability

 § Minimum static factor of safety of 1.5
 § Minimum pseudo-static factor of safety of 1.1




                      Heap Leach Facility
Laboratory Testing
                                 § Screened Arkose material through
§ Large Scale Interface            1 ½ inch sieve
   direct Shear                  § Smooth 60 mil LLDPE Liner
§ Liner Puncture Test           § GCL
§ Alternative materials will    § Loaded to load equivalent to heap
   collected and tested for         height of 450 feet (390 psi)
   liner puncture pending        § Load maintained to a minimum of
   final drain cover selection      48 hours
                                 § Results reveled indentation on liner
                                    but no pinholes, vacuum tested for
                                    verification




                            Heap Leach Facility
Liner Puncture Apparatus




                  Heap Leach Facility
Final Design Items in Progress

 § Finalize detail leach pad grading.
 § Optimize size and location of process ponds.
 § Possible liner puncture test for alternative drain cover
    material.
 § Optimized ore
   stacking plan




                      Heap Leach Facility
Questions

Joel Carrasco
joel.carrasco@tetratech.com
520.297.7723




                      Heap Leach Facility

More Related Content

What's hot (20)

L 17 coagulation and flocculation
L 17 coagulation and flocculationL 17 coagulation and flocculation
L 17 coagulation and flocculation
 
Membranes
MembranesMembranes
Membranes
 
Chemical EOR.pdf
Chemical EOR.pdfChemical EOR.pdf
Chemical EOR.pdf
 
Cement additives
Cement additivesCement additives
Cement additives
 
Physical Unit Operations (screens )
Physical Unit Operations (screens )Physical Unit Operations (screens )
Physical Unit Operations (screens )
 
05 Treatment of water - Aeration and Sedimentation (C+F)
05 Treatment of water - Aeration and Sedimentation (C+F)05 Treatment of water - Aeration and Sedimentation (C+F)
05 Treatment of water - Aeration and Sedimentation (C+F)
 
Liquid membrane
Liquid membraneLiquid membrane
Liquid membrane
 
Membrane process for water treatment
Membrane process for water treatmentMembrane process for water treatment
Membrane process for water treatment
 
L 1 introduction
L 1 introductionL 1 introduction
L 1 introduction
 
Water treatment-lecture-2-eenv
Water treatment-lecture-2-eenvWater treatment-lecture-2-eenv
Water treatment-lecture-2-eenv
 
Polymer flooding
Polymer floodingPolymer flooding
Polymer flooding
 
Coagulation and flocculation in water treatment
Coagulation and flocculation in water treatmentCoagulation and flocculation in water treatment
Coagulation and flocculation in water treatment
 
Survey of unit operations
Survey of unit operationsSurvey of unit operations
Survey of unit operations
 
ETP Phase-II
ETP Phase-IIETP Phase-II
ETP Phase-II
 
Electrodialysis
ElectrodialysisElectrodialysis
Electrodialysis
 
08 filtration
08 filtration08 filtration
08 filtration
 
Packers & bridge plugs
Packers & bridge plugsPackers & bridge plugs
Packers & bridge plugs
 
common effluent treatment plant
common effluent treatment plantcommon effluent treatment plant
common effluent treatment plant
 
Sedimentation And Purification of Water
Sedimentation And Purification of WaterSedimentation And Purification of Water
Sedimentation And Purification of Water
 
ADVANCED WATER TREATMENT PROCESS
ADVANCED WATER TREATMENT PROCESSADVANCED WATER TREATMENT PROCESS
ADVANCED WATER TREATMENT PROCESS
 

Similar to Heap Leach Facilities

Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDDDemzy George
 
Diseño de tanques circulares para cultivo de pecesv
Diseño de tanques circulares para cultivo de pecesvDiseño de tanques circulares para cultivo de pecesv
Diseño de tanques circulares para cultivo de pecesvUAEhighstreet.com
 
NRCS Pond Construction
NRCS Pond ConstructionNRCS Pond Construction
NRCS Pond ConstructionGrant Schultz
 
BECM 4103: Lecture 2 On site human waste management
BECM 4103: Lecture 2 On site human waste managementBECM 4103: Lecture 2 On site human waste management
BECM 4103: Lecture 2 On site human waste managementBECM, RUET, Bangladesh
 
Presentation for safegard septic tank
Presentation for safegard septic tankPresentation for safegard septic tank
Presentation for safegard septic tankkalyanmaji
 
Dewatering containers v7 small rev1
Dewatering containers v7 small rev1Dewatering containers v7 small rev1
Dewatering containers v7 small rev1Chris Eberly, PE
 
Treatment of wastewater
Treatment of wastewaterTreatment of wastewater
Treatment of wastewaterArpit Budania
 
NEW BakerCorp Tank Line Card
NEW BakerCorp Tank Line CardNEW BakerCorp Tank Line Card
NEW BakerCorp Tank Line CardColin Linn
 
03 Conventional Biological Treatments
03 Conventional Biological Treatments03 Conventional Biological Treatments
03 Conventional Biological Treatmentsakashpadole
 
Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05htrdano
 
Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05htrdano
 
Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111Mazen Alqadi
 
Bulk Solids Brochure Small file
Bulk Solids Brochure Small fileBulk Solids Brochure Small file
Bulk Solids Brochure Small fileMark Neal
 
Bulk Solids Brochure Small file
Bulk Solids Brochure Small fileBulk Solids Brochure Small file
Bulk Solids Brochure Small fileMatt Drew
 
koyesha hydropower.pptx
koyesha hydropower.pptxkoyesha hydropower.pptx
koyesha hydropower.pptxYonatanFikadu
 

Similar to Heap Leach Facilities (20)

Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDD
 
Boat Washpad Designs To Meet NPDES
Boat Washpad Designs To Meet NPDESBoat Washpad Designs To Meet NPDES
Boat Washpad Designs To Meet NPDES
 
Diseño de tanques circulares para cultivo de pecesv
Diseño de tanques circulares para cultivo de pecesvDiseño de tanques circulares para cultivo de pecesv
Diseño de tanques circulares para cultivo de pecesv
 
NRCS Pond Construction
NRCS Pond ConstructionNRCS Pond Construction
NRCS Pond Construction
 
BECM 4103: Lecture 2 On site human waste management
BECM 4103: Lecture 2 On site human waste managementBECM 4103: Lecture 2 On site human waste management
BECM 4103: Lecture 2 On site human waste management
 
Presentation for safegard septic tank
Presentation for safegard septic tankPresentation for safegard septic tank
Presentation for safegard septic tank
 
Dewatering containers v7 small rev1
Dewatering containers v7 small rev1Dewatering containers v7 small rev1
Dewatering containers v7 small rev1
 
Well Hydraulics
Well HydraulicsWell Hydraulics
Well Hydraulics
 
MBBR PRESENTATION
MBBR PRESENTATIONMBBR PRESENTATION
MBBR PRESENTATION
 
Treatment of wastewater
Treatment of wastewaterTreatment of wastewater
Treatment of wastewater
 
NEW BakerCorp Tank Line Card
NEW BakerCorp Tank Line CardNEW BakerCorp Tank Line Card
NEW BakerCorp Tank Line Card
 
Rain gardens and bio retention
Rain gardens and bio retentionRain gardens and bio retention
Rain gardens and bio retention
 
03 Conventional Biological Treatments
03 Conventional Biological Treatments03 Conventional Biological Treatments
03 Conventional Biological Treatments
 
Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05
 
Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05
 
Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111
 
Low Cost Sanitation Systems
Low Cost Sanitation SystemsLow Cost Sanitation Systems
Low Cost Sanitation Systems
 
Bulk Solids Brochure Small file
Bulk Solids Brochure Small fileBulk Solids Brochure Small file
Bulk Solids Brochure Small file
 
Bulk Solids Brochure Small file
Bulk Solids Brochure Small fileBulk Solids Brochure Small file
Bulk Solids Brochure Small file
 
koyesha hydropower.pptx
koyesha hydropower.pptxkoyesha hydropower.pptx
koyesha hydropower.pptx
 

More from Hudbay Minerals Inc.

Well Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationWell Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationHudbay Minerals Inc.
 
Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Hudbay Minerals Inc.
 
Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Hudbay Minerals Inc.
 
Rosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockRosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockHudbay Minerals Inc.
 
Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Hudbay Minerals Inc.
 
Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Hudbay Minerals Inc.
 
Reclamation Examples - Before and After
Reclamation Examples - Before and AfterReclamation Examples - Before and After
Reclamation Examples - Before and AfterHudbay Minerals Inc.
 
Mine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelMine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelHudbay Minerals Inc.
 
Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Hudbay Minerals Inc.
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyHudbay Minerals Inc.
 
Facilities Engineering Presentation
Facilities Engineering PresentationFacilities Engineering Presentation
Facilities Engineering PresentationHudbay Minerals Inc.
 
Aquifer Protection Permitting: Rosemont Mine
Aquifer Protection Permitting:  Rosemont MineAquifer Protection Permitting:  Rosemont Mine
Aquifer Protection Permitting: Rosemont MineHudbay Minerals Inc.
 

More from Hudbay Minerals Inc. (20)

Well Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationWell Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling Presentation
 
Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009
 
Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872
 
Rosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockRosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine Rock
 
Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009
 
Dry Stack Tailings Overview
Dry Stack Tailings OverviewDry Stack Tailings Overview
Dry Stack Tailings Overview
 
Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007
 
Reclamation Requirements
Reclamation RequirementsReclamation Requirements
Reclamation Requirements
 
Reclamation Examples - Before and After
Reclamation Examples - Before and AfterReclamation Examples - Before and After
Reclamation Examples - Before and After
 
Partial Pit Backfill Alternative
Partial Pit Backfill AlternativePartial Pit Backfill Alternative
Partial Pit Backfill Alternative
 
Regional Groundwater Flow Models
Regional Groundwater Flow ModelsRegional Groundwater Flow Models
Regional Groundwater Flow Models
 
Baseline Traffic Study
Baseline Traffic StudyBaseline Traffic Study
Baseline Traffic Study
 
Baseline Noise Study
Baseline Noise StudyBaseline Noise Study
Baseline Noise Study
 
Geotechnical Study
Geotechnical StudyGeotechnical Study
Geotechnical Study
 
Mine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelMine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake Model
 
Rosemont Project Orientation
Rosemont Project OrientationRosemont Project Orientation
Rosemont Project Orientation
 
Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water Supply
 
Facilities Engineering Presentation
Facilities Engineering PresentationFacilities Engineering Presentation
Facilities Engineering Presentation
 
Aquifer Protection Permitting: Rosemont Mine
Aquifer Protection Permitting:  Rosemont MineAquifer Protection Permitting:  Rosemont Mine
Aquifer Protection Permitting: Rosemont Mine
 

Recently uploaded

Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)cama23
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsManeerUddin
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 

Recently uploaded (20)

Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture hons
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 

Heap Leach Facilities

  • 1. Heap Leach Facility For the Rosemont Copper Project By Joel Carrasco
  • 2. Outline § General Facility Arrangement § Design Criteria § Laboratory Tests § Items in Progress § Conclusions Heap Leach Facility
  • 3. Heap Leach Facility Arrangement Heap Leach Facility
  • 4. Design Criteria Pertinent design criteria, along with the approach for the final design of the Rosemont Copper heap leach facility Heap Leach Facility
  • 5. Heap Leach Pad § Start-up pad at 65 million dry tons with an additional 10 million dry tons. § Phase 1 Pad capacity of 40 million dry tons. § Phase 2 Pad capacity of 35 million dry tons. § 300-foot maximum design height (truck stacked individual ore lifts at natural angle-of-repose between benches). § 2H:1V overall slopes with benches. Heap Leach Facility
  • 6. Heap Leach Liner System § Geosynthethic clay liner (GCL) – equivalent to 12 inches of compacted soil with a saturated hydraulic conductivity of < 10-6 cm/sec. § 60 mil smooth/double textured sheet Low Liner Density Polyethylene (LLDPE) geomembrane liner. § 3-foot minimum thickness of drain cover fill (minus 1.5-inch crushed ore). Heap Leach Facility
  • 7. Heap Leach Liner System Heap Leach Facility
  • 8. Heap Leach Drain Pipe System § Drain pipes spaced as necessary to handle the solution application flows plus estimated 100-yr, 24-hr design storm event § 4-inch diameter corrugated and perforated dual-wall N-12 PE lateral pipes placed in a herringbone fashion § 8-inch diameter corrugated and perforated dual-wall N-12 PE collector pipes § 18-inch diameter corrugated and perforated dual-wall N-12 PE header pipes located at the downhill collection ditch to route flows to pregnant leach solution pond. Heap Leach Facility
  • 9. Heap Leach Drain Pipe System Heap Leach Facility
  • 10. Heap Leach Drain Pipe System Heap Leach Facility
  • 11. Solution Collection Channel § The solution collection channel will contain the leach pad drain pipes and convey solutions to the pregnant solution pond. § Channel will be lined for double containment of the pipelines. § 80 mil High Density Polyethylene Liner (HDPE) § Geosynthethic clay liner Heap Leach Facility
  • 12. Solution Collection Channel Heap Leach Facility
  • 13. Solution Process Ponds § The solution collection ponds will collect and store 100 percent of the operational solutions. § Ponds will contain any temporary drain down and 100-yr 24-hr design storm flows within the lined leach pad area. § Ponds include a double-lined Pregnant Leach Solution pond, double-lined Raffinate pond and a single-lined Stormwater pond. Heap Leach Facility
  • 14. Double-Lined Pond Parameters §  25-foot maximum depth §  3-foot minimum freeboard §  2.5H:1V maximum lined interior slope §  80 mil High Density Polyethylene top Liner §  Geonet between liners §  60 mil Low Liner Density Polyethylene top Liner §  Geosynthethic clay liner §  Leak Collection and Removal System Heap Leach Facility
  • 15. Single-Lined Pond Parameters § 25-foot maximum depth § 3-foot minimum freeboard § 2.5H:1V maximum lined interior slope § 80 mil High Density Polyethylene Liner § Geosynthethic clay liner Heap Leach Facility
  • 16. Heap Leach Stability The heap will be evaluated and designed to provide stability of the heap under static and potential seismic loading conditions. Heap Leach Facility
  • 17. Stability § Minimum static factor of safety of 1.5 § Minimum pseudo-static factor of safety of 1.1 Heap Leach Facility
  • 18. Laboratory Testing § Screened Arkose material through § Large Scale Interface 1 ½ inch sieve direct Shear § Smooth 60 mil LLDPE Liner § Liner Puncture Test § GCL § Alternative materials will § Loaded to load equivalent to heap collected and tested for height of 450 feet (390 psi) liner puncture pending § Load maintained to a minimum of final drain cover selection 48 hours § Results reveled indentation on liner but no pinholes, vacuum tested for verification Heap Leach Facility
  • 19. Liner Puncture Apparatus Heap Leach Facility
  • 20. Final Design Items in Progress § Finalize detail leach pad grading. § Optimize size and location of process ponds. § Possible liner puncture test for alternative drain cover material. § Optimized ore stacking plan Heap Leach Facility