SlideShare a Scribd company logo
1 of 55
Switch OFF the
 BTS cabinet and
 disconnect Abis
 connectors from
DDF before offline
       start
Disconnect
   the Abis
  connector
from The DDF
Switch ON the
 BTS cabinet
 breakers and
 connect the
 Laptop with
     BTS
User Name
            “COMMTE”


 Password
“COMMTE”
Communication
  Port setting
OR
After
  connecting
 this window
will be appear
Go to
Configuration->
    BTS-SW
  Download->
  to download
 BTS software
After BTS-
     SW
 download
this window
 will appear
Go to offline
Files and select
  First File of
  Master File.
Go to offline
Files and select
  First File of
   DDL file.
Click ok to
    start
downloading
     SW
BTS software
  starts to
 download.
All these
  Files are
downloaded
Go to
Configuration
      BTS
commissioning
Click start
commissioning
Edit Qmux
 Address
Edit sector
 Mapping
Check All
Twin TRE’s.
Click End
Commissioning



  Click << arrow
 to move selected
    modules to
     available
     modules
All modules
 Shifted to
   update
 modules.
Click No to
    end
Reconnect the
Abis connector at
 DDF by verifying
the TX/RX cables
     properly
Give Hard Reset to
 BTS cabinet as the
OML has established
 to put the site on
   Downloading.
OFF Line Commissioning
      Completed
      Successfully.
BTS ON-Line commissioning
         Procedure using B10
      Go to
configuration>>
    Hardware
 setting>>Begin
HW modification
Go to
     configuration>
          BTS
     commissioning



    Go to start
 commissioning>
     Edit Q1
Address, Edit Sector
Mapping and Twin
 TRA setting as in
     offline.
Go to
configuration>
   Hardware
 setting>“End
Modification” to
  end online
commissioning
Online commissioning steps
 Connect the Abis connector at DDF by verifying Tx/Rx
    cable properly.
   OML will be established after primary Abis has
    connected to DDF.
   Give hard reset to BTS after OML has established.
   Put site on Downloading from OMC.
   O&M will be established as downloading completes.
   Connect Laptop to BTS MMI port.
   Go to configuration>Hardware setting>Begin Hardware
    modification.
Online commissioning steps
 Go to configuration>BTS commissioning>start
    commissioning.
   Edit Qmux Address
   Edit sector mapping
   Check all Twin TRA setting.
   Click end commissioning and shift all modules from selected
    modules to available modules.
   Go to configuration>Hardware setting>End Hardware
    modification.
   Click “yes” when an automatically hardware modification
    window appears.
   Hw Audit will be run and all Hardware will be shown after
    sometime.
ON Line Commissioning
    Completed
    Successfully.
Software components
           combiner           Fan Unit




Hardware
Shown in
software
 window

             Tre’s

            clock
                      Alarm
                       card
Alarms
window
Transceivers
 Shown in
  window
Transceivers Types
 Four type of Transceivers in Alcatel Equipment
 TRAGE>Gsm Single TRE
 TRADE>Dcs single TRE
 TGT09>Gsm Twin TRE
 TGT18>DCS Twin TRE
 TAGHE>High power TRE
VSWR
Shown in
 window
Sectors
  Shown
In window
Station units
BSC SBLs
(security block levels)
BTS OM & Sectors.Sec
  RSLs can be unlock
 from local Terminal.
Troubleshooting
 If a TRE or combiner is in “Not Operational” or “FOS” state then
    disable it then initialize it by using “init” command.
   If TRE or combiner can not operational by doing above command
    then remove it by using the following method.
   Go to configuration>>Hardware setting>>Begin HW modification.
   Go to Configuration>>Hardware setting>>Remove.
   Remove the Hardware from BTS.
   Window will be appear of Hardware removal, select the module to
    remove.
   Go to Configuration>>Hardware setting>>End Modification.
   Click ”yes” when configuration changes window appears.
Hardware
Removal
 Method
  Step:1
Hardware
Removal
 Step:2
Hardware
Removal
 Step:3
Troubleshooting cont..
 When a module goes in “FOS” state then it must be disable by
  using ”disable” command before initializing it by using “init”
  command otherwise it will not goes to operational state.
 When a module is in “Not Operational” state with color white
  then it means it has not got it’s RSL number still. Reload BTS
  data by going to “configuration>Reload Bts data” or using a
  method of “Begin Hardware then End Hardware” as discussed
  earlier. It will take some time to become operational.
 When a module is in “MSD” or “MSA” state then it will not get
  any command because its maintenance has seized for a while.
 When TRE RSL has locked then then its RSL will not be
  stable, so unlock the TRE from OMC.
Troubleshooting cont..
 Sometime there is some faulty hardware in Bts that’s why other
  sectors or TRE’s can effect and can not work properly. Due to
  these faulty hardware other sectors or TRE’s can be down so
  simply remove this hardware. By this method other hardware
  become in operational state.
 Some time “SUMA” can not work properly that’s why whole Bts
  effects so change the slot of “SUMA” and give hard reset to Bts.
 If modules in a shelf can not powers up then check it’s power
  cable at the back ports of Bts or check it “RI” cable. Also check
  the power switch for the concern shelf.
 If a “EACB” card is Not operational or “FIT” state then initialize it
  from software. If it again goes in “FIT” state then Alarm card is
  faulty.
Troubleshooting cont..
 Some time Primary Abis is stable by showing LED on Suma card
  but OML can not become stable, It means that Abis LED is fake.
  So check the Tx/Rx cable from both Bts end and microwave end
  and make sure that it is correctly connected. Also check Tx/Rx
  patching on DDF by using LED. Make sure that LED blinks on
  every pair on DDF. Also check the BNC and Abis connectors.
  Abis cable which is connected from Suma card to Bts board can
  be faulty so also verify it.
 If a TRE or combiner can not operational than change its slot
  then verify it.
 Vswr issues can be resolved by checking connectors from Bts end
  and feeder end.
 The last option for Alcatel equipment to become operational is
  the “Hard reset of Bts”.
External Alarms of MBO2
ALCATEL GLOSSARY
       A
AN     Antenna Network

       B
BCB             BTS Control Bus
BSII            Base Station Controller
BSS             Base Station Subsystem
BTS             Base Station Transceiver
BTSW   BTS-Terminal for Windows

       C
CCF               Cabinet Cooling Fan
CDM    Configuration Data Message
CLEI   Common Language Equipment
CLLK   Clock Link
CPF               Configuration Parameter File
CRC    Cyclic Redundancy Check
CU     Carrier Unit
ALCATEL GLOSSARY
      D
DC               Direct Current
DMA   Deferred Maintenance Alarm
      E
EQU   Equipped
      F
FIA              Format Identifier for Application part of RI
FIM              Format Identifier Manufacturing
FIT              Faulty In Traffic
FLT              Faulty
FOS              Faulty Out of Service
ICS              Item Change Status
IT    In Traffic
      L
LDA   Local Defence Action
LRA              Local Recovery Action
      M
MI    Maintenance Information
MSA   MSD Auto
MSD   Maintenance Seized
ALCATEL GLOSSARY
       N
NEQ             Not Equipped
NOP             Not Operational
       O
O&M    Operation and Maintenance
OMU    Operation and Maintenance Unit
OMUA   OMU A RIT
OMUB   OMU B RIT
OP     Operational
OPR               Operator
       P
PADD   Physical Address
PMA    Prompt Maintenance
ALCATEL GLOSSARY
               R
RA             Radio Access
RF             Radio Frequency
RFH                      Radio Frequency Hopping ( also known as : Synthesizer
   Hopping )
RI             Remote Inventory
RIT                      Replaceable Item
RX             Receiver or receive .....
RTC                      Remote Tunable Combiner
               S
SBL                      Security Block Level
SCFE           Station Unit Control Function Entity RIT
SOS                      System Out of Service
SUM            Station Unit Module
SUMP           SUM PCM RIT
SW                       Software
ALCATEL GLOSSARY
       S
SBL    Security Block Level
SCFE   Station Unit Control Function Entity RIT
SOS    System Out of Service
SUM    Station Unit Module
SUMP   SUM PCM RIT
SW              Software
       T
TLV    Tag, Length, Value
TRE    Transceiver Module (combined Transmitter / Receiver
       functionality for base band and RF signals)
TS     Timeslot
TX              Transmitter or transmit .
       V
VPMA   Very Prompt Maintenance Alarm
VSWR   Voltage Standing Wave Ratio
ALCATEL GLOSSARY
         W
WBC      Wide Band Combiner
WTC      Wait Traffic Clear
         X
XBCB     External BCB
XCLK     External Clock
XIOB     External Input Output Board
Bts commissioning (alcatel lucent)

More Related Content

What's hot

Introduction to Nokia RNC
Introduction to Nokia RNCIntroduction to Nokia RNC
Introduction to Nokia RNCAhmed Nabeeh
 
Introducing to LAC-CI
Introducing to LAC-CIIntroducing to LAC-CI
Introducing to LAC-CIRiswan
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...Jean de la Sagesse
 
76125491 2 g-ericsson-recommended-parameters-g10
76125491 2 g-ericsson-recommended-parameters-g1076125491 2 g-ericsson-recommended-parameters-g10
76125491 2 g-ericsson-recommended-parameters-g10Rakesh Singh
 
Bts installation & commisioning.ppt
Bts installation & commisioning.pptBts installation & commisioning.ppt
Bts installation & commisioning.pptAIRTEL
 
Chap 4. call processing and handover.eng
Chap 4. call processing and handover.engChap 4. call processing and handover.eng
Chap 4. call processing and handover.engsivakumar D
 
240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-trainingShelton Siziba
 
01 Bts3900 System Structure
01 Bts3900 System Structure01 Bts3900 System Structure
01 Bts3900 System StructureAtif Mahmood
 
52 gsm bss network performance ps kpi (downlink tbf establishment success rat...
52 gsm bss network performance ps kpi (downlink tbf establishment success rat...52 gsm bss network performance ps kpi (downlink tbf establishment success rat...
52 gsm bss network performance ps kpi (downlink tbf establishment success rat...tharinduwije
 
LTE Location Management and Mobility Management
LTE Location Management and Mobility ManagementLTE Location Management and Mobility Management
LTE Location Management and Mobility Managementaliirfan04
 
Lte ho parameters trial_01262011
Lte ho parameters trial_01262011Lte ho parameters trial_01262011
Lte ho parameters trial_01262011Hatim100
 
Lte system signaling procedures
Lte system signaling proceduresLte system signaling procedures
Lte system signaling procedurestharinduwije
 
Volte troubleshooting
Volte troubleshootingVolte troubleshooting
Volte troubleshootingJamil Awan
 

What's hot (20)

Introduction to Nokia RNC
Introduction to Nokia RNCIntroduction to Nokia RNC
Introduction to Nokia RNC
 
Introducing to LAC-CI
Introducing to LAC-CIIntroducing to LAC-CI
Introducing to LAC-CI
 
3 g notes
3 g notes3 g notes
3 g notes
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
 
76125491 2 g-ericsson-recommended-parameters-g10
76125491 2 g-ericsson-recommended-parameters-g1076125491 2 g-ericsson-recommended-parameters-g10
76125491 2 g-ericsson-recommended-parameters-g10
 
Bts installation & commisioning.ppt
Bts installation & commisioning.pptBts installation & commisioning.ppt
Bts installation & commisioning.ppt
 
GSM , RF & DT
GSM , RF & DTGSM , RF & DT
GSM , RF & DT
 
Chap 4. call processing and handover.eng
Chap 4. call processing and handover.engChap 4. call processing and handover.eng
Chap 4. call processing and handover.eng
 
GSM Idle Mode Behavior
GSM Idle Mode BehaviorGSM Idle Mode Behavior
GSM Idle Mode Behavior
 
240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training
 
GSM ARCHITECTURE
GSM ARCHITECTUREGSM ARCHITECTURE
GSM ARCHITECTURE
 
01 Bts3900 System Structure
01 Bts3900 System Structure01 Bts3900 System Structure
01 Bts3900 System Structure
 
Gsm interview question
Gsm interview questionGsm interview question
Gsm interview question
 
2G Handover Details (Huawei)
2G Handover Details (Huawei)2G Handover Details (Huawei)
2G Handover Details (Huawei)
 
Umts Kpi
Umts KpiUmts Kpi
Umts Kpi
 
52 gsm bss network performance ps kpi (downlink tbf establishment success rat...
52 gsm bss network performance ps kpi (downlink tbf establishment success rat...52 gsm bss network performance ps kpi (downlink tbf establishment success rat...
52 gsm bss network performance ps kpi (downlink tbf establishment success rat...
 
LTE Location Management and Mobility Management
LTE Location Management and Mobility ManagementLTE Location Management and Mobility Management
LTE Location Management and Mobility Management
 
Lte ho parameters trial_01262011
Lte ho parameters trial_01262011Lte ho parameters trial_01262011
Lte ho parameters trial_01262011
 
Lte system signaling procedures
Lte system signaling proceduresLte system signaling procedures
Lte system signaling procedures
 
Volte troubleshooting
Volte troubleshootingVolte troubleshooting
Volte troubleshooting
 

Viewers also liked

Viewers also liked (20)

Cell tower, BTS & antennas
Cell tower, BTS & antennasCell tower, BTS & antennas
Cell tower, BTS & antennas
 
Mpr mss 1 c_user_manual (Alcatel Lucent)
Mpr mss 1 c_user_manual (Alcatel Lucent)Mpr mss 1 c_user_manual (Alcatel Lucent)
Mpr mss 1 c_user_manual (Alcatel Lucent)
 
Zte cabinets
Zte cabinetsZte cabinets
Zte cabinets
 
Bts3900 gsm commissioning guide (v300 r008-03)
Bts3900 gsm commissioning guide (v300 r008-03)Bts3900 gsm commissioning guide (v300 r008-03)
Bts3900 gsm commissioning guide (v300 r008-03)
 
Bts-site-installation
 Bts-site-installation Bts-site-installation
Bts-site-installation
 
Waqas_Abbasi
Waqas_AbbasiWaqas_Abbasi
Waqas_Abbasi
 
Wimax
WimaxWimax
Wimax
 
Squire Technologies: Media Gateway Controller
Squire Technologies: Media Gateway ControllerSquire Technologies: Media Gateway Controller
Squire Technologies: Media Gateway Controller
 
India Africa Aligning for the changing global business dynamics
India Africa Aligning for the changing global business dynamicsIndia Africa Aligning for the changing global business dynamics
India Africa Aligning for the changing global business dynamics
 
Cours 3 — les techniques de transfert
Cours 3 — les techniques de transfertCours 3 — les techniques de transfert
Cours 3 — les techniques de transfert
 
Joining letter
Joining letterJoining letter
Joining letter
 
Start (ceb) new
Start (ceb) newStart (ceb) new
Start (ceb) new
 
Cours ipv6pdf
Cours ipv6pdfCours ipv6pdf
Cours ipv6pdf
 
Doc6 mpls vpn-ppt
Doc6 mpls vpn-pptDoc6 mpls vpn-ppt
Doc6 mpls vpn-ppt
 
Shameera - Work Report - Maga Engineering
Shameera - Work Report - Maga EngineeringShameera - Work Report - Maga Engineering
Shameera - Work Report - Maga Engineering
 
Microwave radio link design
Microwave radio link designMicrowave radio link design
Microwave radio link design
 
2g,3g,4g, technology Dialog axiata
2g,3g,4g, technology Dialog axiata2g,3g,4g, technology Dialog axiata
2g,3g,4g, technology Dialog axiata
 
Zxmw nr8250 v1.00 commissioning guide ¸±±¾
Zxmw nr8250 v1.00 commissioning guide   ¸±±¾Zxmw nr8250 v1.00 commissioning guide   ¸±±¾
Zxmw nr8250 v1.00 commissioning guide ¸±±¾
 
120463N
120463N120463N
120463N
 
Rtn
RtnRtn
Rtn
 

Similar to Bts commissioning (alcatel lucent)

ALC_PDH_RADIO_Technical_Training_Siae_Mi.ppt
ALC_PDH_RADIO_Technical_Training_Siae_Mi.pptALC_PDH_RADIO_Technical_Training_Siae_Mi.ppt
ALC_PDH_RADIO_Technical_Training_Siae_Mi.pptMauricioWeisser
 
Iai robonet controller_specsheet
Iai robonet controller_specsheetIai robonet controller_specsheet
Iai robonet controller_specsheetElectromate
 
Iai robonet network_controller_specsheet
Iai robonet network_controller_specsheetIai robonet network_controller_specsheet
Iai robonet network_controller_specsheetElectromate
 
PLC, DCS and PLC vs DCS Presentation by Jitender Singh Shekhawat
PLC, DCS and PLC vs DCS Presentation by Jitender Singh ShekhawatPLC, DCS and PLC vs DCS Presentation by Jitender Singh Shekhawat
PLC, DCS and PLC vs DCS Presentation by Jitender Singh ShekhawatJitender Singh Shekhawat
 
Alcatel Lucnet bts offline commissioning
Alcatel Lucnet bts offline commissioningAlcatel Lucnet bts offline commissioning
Alcatel Lucnet bts offline commissioningengramjadislam78
 
DCS PRESENTATION
DCS PRESENTATIONDCS PRESENTATION
DCS PRESENTATIONbvent2005
 
ACCELEROMETER BASED GESTURE ROBO CAR
ACCELEROMETER BASED GESTURE ROBO CARACCELEROMETER BASED GESTURE ROBO CAR
ACCELEROMETER BASED GESTURE ROBO CARHarshit Jain
 
Gesture based vehicle movements control and alerting system docu
Gesture based vehicle movements control and alerting system docuGesture based vehicle movements control and alerting system docu
Gesture based vehicle movements control and alerting system docuVignan Munna
 
MR - MGD
MR - MGDMR - MGD
MR - MGDleet01
 
Siemens Automation Station Compact Model PXC52
Siemens Automation Station Compact Model PXC52Siemens Automation Station Compact Model PXC52
Siemens Automation Station Compact Model PXC52CONTROLS & SYSTEMS
 

Similar to Bts commissioning (alcatel lucent) (20)

ALC_PDH_RADIO_Technical_Training_Siae_Mi.ppt
ALC_PDH_RADIO_Technical_Training_Siae_Mi.pptALC_PDH_RADIO_Technical_Training_Siae_Mi.ppt
ALC_PDH_RADIO_Technical_Training_Siae_Mi.ppt
 
Commisioning.pptx
Commisioning.pptxCommisioning.pptx
Commisioning.pptx
 
Iai robonet controller_specsheet
Iai robonet controller_specsheetIai robonet controller_specsheet
Iai robonet controller_specsheet
 
Iai robonet network_controller_specsheet
Iai robonet network_controller_specsheetIai robonet network_controller_specsheet
Iai robonet network_controller_specsheet
 
Ome201101 gsm bts312 hardware structure issue4.0
Ome201101 gsm bts312 hardware structure issue4.0Ome201101 gsm bts312 hardware structure issue4.0
Ome201101 gsm bts312 hardware structure issue4.0
 
Ome201101 gsm bts312 hardware structure issue4.0
Ome201101 gsm bts312 hardware structure issue4.0Ome201101 gsm bts312 hardware structure issue4.0
Ome201101 gsm bts312 hardware structure issue4.0
 
Huawei bts3012 hardware structure issue1.0
Huawei bts3012 hardware structure issue1.0Huawei bts3012 hardware structure issue1.0
Huawei bts3012 hardware structure issue1.0
 
CATV Optical Transmitter
CATV Optical TransmitterCATV Optical Transmitter
CATV Optical Transmitter
 
L6283 1.3.pdf
L6283 1.3.pdfL6283 1.3.pdf
L6283 1.3.pdf
 
PLC, DCS and PLC vs DCS Presentation by Jitender Singh Shekhawat
PLC, DCS and PLC vs DCS Presentation by Jitender Singh ShekhawatPLC, DCS and PLC vs DCS Presentation by Jitender Singh Shekhawat
PLC, DCS and PLC vs DCS Presentation by Jitender Singh Shekhawat
 
Alcatel Lucnet bts offline commissioning
Alcatel Lucnet bts offline commissioningAlcatel Lucnet bts offline commissioning
Alcatel Lucnet bts offline commissioning
 
04 2 new smart csu r00
04 2 new smart csu r0004 2 new smart csu r00
04 2 new smart csu r00
 
SURVEILLANCE ROBOT
SURVEILLANCE ROBOTSURVEILLANCE ROBOT
SURVEILLANCE ROBOT
 
DCS PRESENTATION
DCS PRESENTATIONDCS PRESENTATION
DCS PRESENTATION
 
ACCELEROMETER BASED GESTURE ROBO CAR
ACCELEROMETER BASED GESTURE ROBO CARACCELEROMETER BASED GESTURE ROBO CAR
ACCELEROMETER BASED GESTURE ROBO CAR
 
Wiring cp1 e_s_analogicas
Wiring cp1 e_s_analogicasWiring cp1 e_s_analogicas
Wiring cp1 e_s_analogicas
 
4 ql uart_psb_ds_revc
4 ql uart_psb_ds_revc4 ql uart_psb_ds_revc
4 ql uart_psb_ds_revc
 
Gesture based vehicle movements control and alerting system docu
Gesture based vehicle movements control and alerting system docuGesture based vehicle movements control and alerting system docu
Gesture based vehicle movements control and alerting system docu
 
MR - MGD
MR - MGDMR - MGD
MR - MGD
 
Siemens Automation Station Compact Model PXC52
Siemens Automation Station Compact Model PXC52Siemens Automation Station Compact Model PXC52
Siemens Automation Station Compact Model PXC52
 

More from Sayed Qaisar Shah

Huawei OLT Ma5600 & 5608t GPON feature glance
Huawei OLT Ma5600 & 5608t GPON feature glanceHuawei OLT Ma5600 & 5608t GPON feature glance
Huawei OLT Ma5600 & 5608t GPON feature glanceSayed Qaisar Shah
 
Fiber loss & link loss calculating
Fiber loss & link loss calculatingFiber loss & link loss calculating
Fiber loss & link loss calculatingSayed Qaisar Shah
 
Introduction to dwdm technology
Introduction to dwdm technologyIntroduction to dwdm technology
Introduction to dwdm technologySayed Qaisar Shah
 
Fiber optic solution (bright wires)
Fiber optic solution (bright wires)Fiber optic solution (bright wires)
Fiber optic solution (bright wires)Sayed Qaisar Shah
 
Bts offline commissioning alcatel lucent
Bts offline commissioning alcatel lucentBts offline commissioning alcatel lucent
Bts offline commissioning alcatel lucentSayed Qaisar Shah
 

More from Sayed Qaisar Shah (8)

Huawei OLT Ma5600 & 5608t GPON feature glance
Huawei OLT Ma5600 & 5608t GPON feature glanceHuawei OLT Ma5600 & 5608t GPON feature glance
Huawei OLT Ma5600 & 5608t GPON feature glance
 
Fiber loss & link loss calculating
Fiber loss & link loss calculatingFiber loss & link loss calculating
Fiber loss & link loss calculating
 
Introduction to dwdm technology
Introduction to dwdm technologyIntroduction to dwdm technology
Introduction to dwdm technology
 
Ip addressing & subnetting
Ip addressing & subnettingIp addressing & subnetting
Ip addressing & subnetting
 
Jncia junos
Jncia junosJncia junos
Jncia junos
 
Fiber optic solution (bright wires)
Fiber optic solution (bright wires)Fiber optic solution (bright wires)
Fiber optic solution (bright wires)
 
Dcs vs scada
Dcs vs scadaDcs vs scada
Dcs vs scada
 
Bts offline commissioning alcatel lucent
Bts offline commissioning alcatel lucentBts offline commissioning alcatel lucent
Bts offline commissioning alcatel lucent
 

Recently uploaded

Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 

Recently uploaded (20)

Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 

Bts commissioning (alcatel lucent)

  • 1.
  • 2. Switch OFF the BTS cabinet and disconnect Abis connectors from DDF before offline start
  • 3. Disconnect the Abis connector from The DDF
  • 4. Switch ON the BTS cabinet breakers and connect the Laptop with BTS
  • 5. User Name “COMMTE” Password “COMMTE”
  • 7. OR
  • 8. After connecting this window will be appear
  • 9. Go to Configuration-> BTS-SW Download-> to download BTS software
  • 10. After BTS- SW download this window will appear
  • 11. Go to offline Files and select First File of Master File.
  • 12. Go to offline Files and select First File of DDL file.
  • 13. Click ok to start downloading SW
  • 14. BTS software starts to download.
  • 15. All these Files are downloaded
  • 16. Go to Configuration BTS commissioning
  • 21. Click End Commissioning Click << arrow to move selected modules to available modules
  • 22. All modules Shifted to update modules.
  • 23. Click No to end
  • 24. Reconnect the Abis connector at DDF by verifying the TX/RX cables properly
  • 25. Give Hard Reset to BTS cabinet as the OML has established to put the site on Downloading.
  • 26. OFF Line Commissioning Completed Successfully.
  • 27. BTS ON-Line commissioning Procedure using B10 Go to configuration>> Hardware setting>>Begin HW modification
  • 28. Go to configuration> BTS commissioning Go to start commissioning> Edit Q1 Address, Edit Sector Mapping and Twin TRA setting as in offline.
  • 29. Go to configuration> Hardware setting>“End Modification” to end online commissioning
  • 30. Online commissioning steps  Connect the Abis connector at DDF by verifying Tx/Rx cable properly.  OML will be established after primary Abis has connected to DDF.  Give hard reset to BTS after OML has established.  Put site on Downloading from OMC.  O&M will be established as downloading completes.  Connect Laptop to BTS MMI port.  Go to configuration>Hardware setting>Begin Hardware modification.
  • 31. Online commissioning steps  Go to configuration>BTS commissioning>start commissioning.  Edit Qmux Address  Edit sector mapping  Check all Twin TRA setting.  Click end commissioning and shift all modules from selected modules to available modules.  Go to configuration>Hardware setting>End Hardware modification.  Click “yes” when an automatically hardware modification window appears.  Hw Audit will be run and all Hardware will be shown after sometime.
  • 32. ON Line Commissioning Completed Successfully.
  • 33. Software components combiner Fan Unit Hardware Shown in software window Tre’s clock Alarm card
  • 36. Transceivers Types  Four type of Transceivers in Alcatel Equipment  TRAGE>Gsm Single TRE  TRADE>Dcs single TRE  TGT09>Gsm Twin TRE  TGT18>DCS Twin TRE  TAGHE>High power TRE
  • 40. BSC SBLs (security block levels) BTS OM & Sectors.Sec RSLs can be unlock from local Terminal.
  • 41. Troubleshooting  If a TRE or combiner is in “Not Operational” or “FOS” state then disable it then initialize it by using “init” command.  If TRE or combiner can not operational by doing above command then remove it by using the following method.  Go to configuration>>Hardware setting>>Begin HW modification.  Go to Configuration>>Hardware setting>>Remove.  Remove the Hardware from BTS.  Window will be appear of Hardware removal, select the module to remove.  Go to Configuration>>Hardware setting>>End Modification.  Click ”yes” when configuration changes window appears.
  • 45. Troubleshooting cont..  When a module goes in “FOS” state then it must be disable by using ”disable” command before initializing it by using “init” command otherwise it will not goes to operational state.  When a module is in “Not Operational” state with color white then it means it has not got it’s RSL number still. Reload BTS data by going to “configuration>Reload Bts data” or using a method of “Begin Hardware then End Hardware” as discussed earlier. It will take some time to become operational.  When a module is in “MSD” or “MSA” state then it will not get any command because its maintenance has seized for a while.  When TRE RSL has locked then then its RSL will not be stable, so unlock the TRE from OMC.
  • 46. Troubleshooting cont..  Sometime there is some faulty hardware in Bts that’s why other sectors or TRE’s can effect and can not work properly. Due to these faulty hardware other sectors or TRE’s can be down so simply remove this hardware. By this method other hardware become in operational state.  Some time “SUMA” can not work properly that’s why whole Bts effects so change the slot of “SUMA” and give hard reset to Bts.  If modules in a shelf can not powers up then check it’s power cable at the back ports of Bts or check it “RI” cable. Also check the power switch for the concern shelf.  If a “EACB” card is Not operational or “FIT” state then initialize it from software. If it again goes in “FIT” state then Alarm card is faulty.
  • 47. Troubleshooting cont..  Some time Primary Abis is stable by showing LED on Suma card but OML can not become stable, It means that Abis LED is fake. So check the Tx/Rx cable from both Bts end and microwave end and make sure that it is correctly connected. Also check Tx/Rx patching on DDF by using LED. Make sure that LED blinks on every pair on DDF. Also check the BNC and Abis connectors. Abis cable which is connected from Suma card to Bts board can be faulty so also verify it.  If a TRE or combiner can not operational than change its slot then verify it.  Vswr issues can be resolved by checking connectors from Bts end and feeder end.  The last option for Alcatel equipment to become operational is the “Hard reset of Bts”.
  • 49. ALCATEL GLOSSARY A AN Antenna Network B BCB BTS Control Bus BSII Base Station Controller BSS Base Station Subsystem BTS Base Station Transceiver BTSW BTS-Terminal for Windows C CCF Cabinet Cooling Fan CDM Configuration Data Message CLEI Common Language Equipment CLLK Clock Link CPF Configuration Parameter File CRC Cyclic Redundancy Check CU Carrier Unit
  • 50. ALCATEL GLOSSARY D DC Direct Current DMA Deferred Maintenance Alarm E EQU Equipped F FIA Format Identifier for Application part of RI FIM Format Identifier Manufacturing FIT Faulty In Traffic FLT Faulty FOS Faulty Out of Service ICS Item Change Status IT In Traffic L LDA Local Defence Action LRA Local Recovery Action M MI Maintenance Information MSA MSD Auto MSD Maintenance Seized
  • 51. ALCATEL GLOSSARY N NEQ Not Equipped NOP Not Operational O O&M Operation and Maintenance OMU Operation and Maintenance Unit OMUA OMU A RIT OMUB OMU B RIT OP Operational OPR Operator P PADD Physical Address PMA Prompt Maintenance
  • 52. ALCATEL GLOSSARY R RA Radio Access RF Radio Frequency RFH Radio Frequency Hopping ( also known as : Synthesizer Hopping ) RI Remote Inventory RIT Replaceable Item RX Receiver or receive ..... RTC Remote Tunable Combiner S SBL Security Block Level SCFE Station Unit Control Function Entity RIT SOS System Out of Service SUM Station Unit Module SUMP SUM PCM RIT SW Software
  • 53. ALCATEL GLOSSARY S SBL Security Block Level SCFE Station Unit Control Function Entity RIT SOS System Out of Service SUM Station Unit Module SUMP SUM PCM RIT SW Software T TLV Tag, Length, Value TRE Transceiver Module (combined Transmitter / Receiver functionality for base band and RF signals) TS Timeslot TX Transmitter or transmit . V VPMA Very Prompt Maintenance Alarm VSWR Voltage Standing Wave Ratio
  • 54. ALCATEL GLOSSARY W WBC Wide Band Combiner WTC Wait Traffic Clear X XBCB External BCB XCLK External Clock XIOB External Input Output Board