Sudhir Kumar Rai has over 5 years of experience in project management, operations, maintenance, and testing. He currently works as a Senior Engineer for Adani Power Ltd.'s 2500 MW 500 kV HVDC project. He is skilled in maintenance management, erection and commissioning, operations and maintenance, team management, and has experience working with HVAC, fire safety, and electrical systems. He holds an EMBA in Marketing and a B.E. in Electrical Engineering.
1. SUDHIR KUMAR RAISUDHIR KUMAR RAI
Mobile:Mobile: +91 9431535325&9466181447+91 9431535325&9466181447
EmaiEmaill:: anu.rai783@gmail.com/rsudhir76@yahoo.comanu.rai783@gmail.com/rsudhir76@yahoo.com
A competent professional with over 5+ years of experience in Project, Operation, Maintenance, and
Testing.
Currently associated with Adani power Ltd. as a Sr. Engineer in 2500 MW 500 kV HVDC PROJECT.
Proficiency in managing maintenance of various equipments for reducing downtime and enhancing
operational effectiveness of equipment.
Adept in managing erection & commissioning activities involving resource planning, in-process
inspection, team building and co-ordination with Internal / External Departments.
Honed skills in working on initiatives for reduction in costs by minimising equipment breakdown and
improving productivity by technology management.
An effective communicator with excellent skills in building relationships. Possess strong analytical,
problem solving and organisational abilities.
Erection & Commissioning
Installation and commissioning of the heavy equipments as well as conducting tests & inspections to
ensure operational effectiveness of plant & utilities.
Reviewing engineering drawings, layouts, diagrams, technical specifications, cost estimates for erection &
commission of the plant; reviewing & analyzing contractor's change order proposals & submittals.
Operations & Maintenance
Planning and effecting preventive maintenance schedules of various machinery and instruments to
increase machine up time / equipment reliability; thereby accomplishing planned production targets
within budget.
Proactively identifying areas of obstruction / breakdowns and taking steps to rectify the equipments
through application of trouble shooting tools.
Team Management
Leading, mentoring & monitoring the performance of the team members to ensure efficiency in process
operations and meeting of individual & group targets.
Creating and sustaining a dynamic environment that fosters development opportunities and motivates
high performance amongst Team members.
INDUSTRIAL TRAINING
Under gone Industrial Training as a part of Curriculum, for a period of One month at
DOMODERVELLYCORPRATIONTHERMAPOWERSTATION (WEST BANGAL).
Since Nov-10 Adani power limited, Mundra
Career Path
Jan2008- Nov-10 VINACHAL PRUB CONCERET
Dec’06-Dec’07 BHARAT REFACTORES ,
REFACTORESPLANTRANCHI.ROAD
Seeking assignments in Project / Operations & Maintenance / Testing with a reputedSeeking assignments in Project / Operations & Maintenance / Testing with a reputed
organisation.organisation.
Seeking assignments in Operations & Maintenance / Testing/Production with a reputedSeeking assignments in Operations & Maintenance / Testing/Production with a reputed
SYNOPSISSYNOPSIS
AREAS OF EXPERTISEAREAS OF EXPERTISE
EXPERIENCE SCANEXPERIENCE SCAN
2. Feb’18, – Dec’,01 DAMODER VALLY CAROPATION M.T.P.S DULAPUR (W.B
Nov 8-10 to continue Adani power limited
Key Deliverables
400 KV Switch yard Erection and Testing work.
Key Responsibility of Dc 500 Kv Switchyard Erection work
Auxiliary system Erection and Testing work.
Good Knowledge of HVAC, Fire Fighting, False ceiling, false Flooring work etc.
Execution of 220 KV switchyard projects of Welspun Phase-1 & Phase-2.
Key skill of men power management and completed work within time limit.
Leading a team responsible for the 43 mw power plant, 220 KV Substation, 11 KV Distribution
Substations, LV Distribution Systems, and Distribution Transformers from 1.5 MVA to 15
MVA, Installation Application checking before charging, Troubleshooting, Operation and
Maintenance.
Erection, Testing and commissioning of CT, PT, Isolators, Sf6 Ckt. Breaker, Indoor
Switchgears, Power Transformer, HT Cables, Battery banks, charger and UPS system.
Good knowledge of Civil work
Co-ordination of 43-mw power plant regarding power supply, import-export, etc.
Working with PLCC and SCADA system.
Leading a team responsible for power factor analyis and improvement in the Welspun
premises.
Working for short term open access permission for export of power.
Notable Attainments
500 MVA Transformers Testing in Domoder velly mtps
AC Filter, DC Filter, Valve hall, Dc equipment Training Given
220KV (Line in Line out) Substation consisting of two 220 / 11 KV 50 MVA transformer of
AREVAmake
220KV Synchronizing substation consisting of one 220 / 11KV 50 MVA transformer of AREVA
make.
Testing of 66/11 kV Switchyard of Adani port.
Ht section of the plate mill division consisting distribution transformers, HT and LT
switchgears.
Played a vital role in Erection, Testing and Commissioning of EHV / HV Switchyard, HV /
LV Indoor Switchgear panels, Power Cables.
Awarded as the star performer for electrical department in March 2008.
EMBA (MARKETING) FROM CHENNAI UNIVERSITY IN 2007.
B.E. (ELECTRICAL) FROM S.P.UNIVERSITY IN 2005.
AUTOCAD, C-LANGUAGE, SAP, SCADA etc.
Date of Birth : 12/08/78
Present Address : # 500Kv hvdc kheri agiyaar mahender garh
Permanent Address : Arya ager opp sio mander hazaribag jharkand 825301
Linguistic Abilities : English, Hindi, .
Yours
sincerely
EDIFICATIONEDIFICATION
PERSONAL VITAEPERSONAL VITAE
ITS SKILLSITS SKILLS