RIVER ENGINEERING
• CLASSIFICATION OF RIVER TRAINING WORKS
• TYPES OF RIVER TRAINING WORKS
•

GUIDE BANK SYSTEM

•

GROYNES OR SPURS

•

LEVEES OR EMBANKMENT

•

BANK PROTECTION AND PITCHED BANKS

•

PITCHED ISLANDS

•

MISCELLANEOUS METHODS
•

RIVER TRAINING WITHOUT EMBANKMENT

•

BANDALLING
CLASSIFICATION OF RIVER TRAINING WORKS
1.

High water training:

• Also called as “TRAINING FOR DISCHARGE”.
• It is trained for providing sufficient and efficient C/S area
for the expeditious passage of maximum flood.
• It concerns mainly with the alignment and height of
embankments for a given flood discharge.
2. Low water training:
•Also called as “TRAINING FOR DEPTH”.
•It is trained for providing sufficient depth for navigation during low stage of river.
•This is achieved by contraction of the width of the channel.
3.

Mean water training:

•

Also called as “TRAINING FOR SEDIMENT”.

•

The river is trained to correct the configuration of river bed for efficient transport and also keeps
the channel in good shape.

•

Mean water training is the most important one and based on this the high and low mean training
are designed.
TYPES OF RIVER TRAINING WORKS
GUIDE BANK SYSTEM:
•They are made for guiding the stream near a structure.
•This confines it in a reasonable width of the river.
•As it was designed by Bell, it is so called as Bell’s Bund and further developed by spring and is
known as guide bank.
•It consist of a heavily built embankment.
•This is in shape of a bell mouth on both sides of the channel.
•Usually only one embankmenty is required if the other end of the bank is high and stable.
GROYNES OR SPURS
•

It is constructed transverse to the river flow.

•

It extends from the bank into the river upto a limit.

•

They are also known as spurs, dikes and transverse dikes.
TYPES OF GROYNES
1. ACCORDING TO THE MATERIALS USED:
• Permeable groyne
• Solid impermeable groyne
2. ACCORDING TO ITS HEIGHT BELOW HIGH WATER:
• Submerged groyne
• Non- submerged groyne
3. ACCORDING TO THE FUNCTION IT SERVES:
• Attracting groyne
• Deflecting groyne
• Repelling groyne
• Sedimenting groyne
4. SPECIAL TYPES OF GROYNES:
• Denehy’s T-headed groyne
• Hockey type groyne
• Burma type groyne
FACTORS INFLUENCING THE CHOICE AND OF DESIGNING
GROYNES
•

Fall velocity of the river

•

Width of the river @ high, low and mean water

•

Depth of water way, height and nature of flood rise

•

Character of bed materials like sand or silt, shingles.

•

Materials available and funds

•

Amt of materials carried in stream
REPELLING GROYNE
•

The groyne is pointing towards the upstream at an
angle of 10` to 30` to the line normal to the bank.

•

This deflects the current in a perpendicular direction
to itself.

•

This current that comes in contact with the still water
area adjacent causes eddies and deep scour.

•

The head of the groyne should be strong to resist the
swirling action of this current.

•

A still water pocket is formed on the upstream and
the suspended load that is brought by the river gets
deposited in this pocket.
DEFLECTING GROYNES
•

The deflecting groyne has a shorter length than a repelling groyne

•

The river is laid perpendicular to the bank.

•

It deflects the flow alone.
ATTRACTING GROYNES
•

This type of groyne points downwards the direction of normal flow.

•

Thus, this causes scour holes; therefore, they tend to maintain the deep currents close to the
bank.

•

Thus the upstream face bears the frontal attack of the river.

•

Hence a heavy protection is not required on the downstream slope.
LENGTH OF THE GROYNES
•

The length of the groyne depends upon the magnitude of river training required.

•

A longer length of the groyne is required if the current has to be thrown on the other end of the
bank.

•

So initially a shorter length is designed and as the silting is done the length is extended.
IMPERMEABLE GROYNES
•

Impermeable or solid groynes do not permit any flow through them.

•

The core of it is made up of materials like sand, clay and gravel.

•

The sides are heavily protected by stone pitching or concrete blocks.

•

The side slope is varying from 2:1 to 3:1 and front slope varying from 3:1 to 5:1.

•

An apron is provided at the bottom of the slope to prevent the slipping of the stones.
PERMEABLE GROYNES
•

They permit the flow of water through them.

•

The erosive action is reduced in the stream.

•

In case river water carries sedimented load, it gets deposited near the groyne as the velocity
is reduced.

ADVANTAGES OF PERMEABLE GROYNE:
•

Cost of construction is cheap.

•

Small quantity of stone is required hence this is used in places where the stones are scarce.

•

It has better performance.

•

This doesn’t change the flow, hence no eddies and scours are formed.

•

Suitable for deep narrow rivers.

DISADVANTAGES OF PERMEABLE GROYNE:
•

They do not resist shock and pressures caused by floating ice logs.
TYPES OF PERMEABLE GROYNES

TREE GROYNE

PILE GROYNE
TREE GROYNE
•

A tree is being held in position with the weir along the bank and ties to a heavy buoy.

•

The tree should be very leafy and with many braches.

•

This reduces the velocity of the flowing waters and helps in sedimentation.

•

This deflects the currents

•

It is used for closing a river channel and opening the other.

•

It checks the flow.
PILE GROYNE
•

They are constructed with timber piles.

•

This is driven up to a depth of 9m.

•

Two or three rows of main verticals are braced together by transverse and diagonals.

•

Spacing between the main verticals is 2 to 3m.

•

Two intermediates can be embedded at least 1.5m below.

•

This s filled with alternate layers of brush woods and stones.

•

Sometimes they filter the sand and act as a solid groyne.

•

To safeguard it against the scour, an apron is built @ 1m of stone.
HOCKEY GROYNE
•

This groyne has a curved head.

•

Thus it is termed as hockey groyne.

•

It increases the attracting tendency of the groyne.

•

It does not protects the bank.

FLOW

BANK

SCOURHOLE
DENEHY’S GROYNE
•

They are earthen embankments from a marginal bund.

•

It has a T-shape head.

•

The front perpendicular arm is 100m in length, parallel to the current.

•

As the head has a longer portion, it looks like an inverted “L”.

•

The head has a slope and is protected by stone.

FLOW

CURRENT

BANK

Más contenido relacionado

La actualidad más candente (20)

Dams and spillways
Dams and spillwaysDams and spillways
Dams and spillways
 
Canal outlets
Canal outletsCanal outlets
Canal outlets
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
Diversion head work
Diversion head workDiversion head work
Diversion head work
 
Stilling basin
Stilling basinStilling basin
Stilling basin
 
Dams arvind gupta-12march13 (2)
Dams   arvind gupta-12march13 (2)Dams   arvind gupta-12march13 (2)
Dams arvind gupta-12march13 (2)
 
Canal headworks
Canal headworksCanal headworks
Canal headworks
 
Storage head works
Storage head worksStorage head works
Storage head works
 
Energy dissipators
Energy dissipatorsEnergy dissipators
Energy dissipators
 
Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)
 
River training works lecture
River training works lectureRiver training works lecture
River training works lecture
 
Unit 12 River training work.pdf
Unit 12 River training work.pdfUnit 12 River training work.pdf
Unit 12 River training work.pdf
 
TYPES OF RESERVOIR
TYPES OF RESERVOIRTYPES OF RESERVOIR
TYPES OF RESERVOIR
 
Spillway
Spillway Spillway
Spillway
 
Canal outlets and modules
Canal outlets and modulesCanal outlets and modules
Canal outlets and modules
 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
 
Spillways and Flood Control Works
Spillways and Flood Control WorksSpillways and Flood Control Works
Spillways and Flood Control Works
 
design of weirs
design of weirsdesign of weirs
design of weirs
 
Arch and Buttress Dams
Arch and Buttress DamsArch and Buttress Dams
Arch and Buttress Dams
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 

Similar a River engineering

Similar a River engineering (20)

Mohit mayoor kashyap
Mohit mayoor kashyapMohit mayoor kashyap
Mohit mayoor kashyap
 
Geology of Dams & Reservoirs
Geology of Dams & ReservoirsGeology of Dams & Reservoirs
Geology of Dams & Reservoirs
 
Geological Considerations - Dam
Geological Considerations - DamGeological Considerations - Dam
Geological Considerations - Dam
 
weir & barrage
weir & barrageweir & barrage
weir & barrage
 
Earthen dam
Earthen damEarthen dam
Earthen dam
 
Irrigation canals
Irrigation canalsIrrigation canals
Irrigation canals
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
 
Dams
DamsDams
Dams
 
DIVERSION HEAD WORK
DIVERSION HEAD WORKDIVERSION HEAD WORK
DIVERSION HEAD WORK
 
minor and micro irrigation
 minor and micro irrigation minor and micro irrigation
minor and micro irrigation
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Rivers presentation
Rivers presentationRivers presentation
Rivers presentation
 
Diversionheadworks 150327075328-conversion-gate01
Diversionheadworks 150327075328-conversion-gate01Diversionheadworks 150327075328-conversion-gate01
Diversionheadworks 150327075328-conversion-gate01
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages
• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages
• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages
 
diversionheadworks-150327075328-conversion-gate01.pdf
diversionheadworks-150327075328-conversion-gate01.pdfdiversionheadworks-150327075328-conversion-gate01.pdf
diversionheadworks-150327075328-conversion-gate01.pdf
 
DAM ENGINEERING
DAM ENGINEERINGDAM ENGINEERING
DAM ENGINEERING
 
Water supply slides (1).pptx
Water supply slides (1).pptxWater supply slides (1).pptx
Water supply slides (1).pptx
 
Hard engineering
Hard engineeringHard engineering
Hard engineering
 

Último

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 

Último (20)

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 

River engineering

  • 1. RIVER ENGINEERING • CLASSIFICATION OF RIVER TRAINING WORKS • TYPES OF RIVER TRAINING WORKS • GUIDE BANK SYSTEM • GROYNES OR SPURS • LEVEES OR EMBANKMENT • BANK PROTECTION AND PITCHED BANKS • PITCHED ISLANDS • MISCELLANEOUS METHODS • RIVER TRAINING WITHOUT EMBANKMENT • BANDALLING
  • 2. CLASSIFICATION OF RIVER TRAINING WORKS 1. High water training: • Also called as “TRAINING FOR DISCHARGE”. • It is trained for providing sufficient and efficient C/S area for the expeditious passage of maximum flood. • It concerns mainly with the alignment and height of embankments for a given flood discharge.
  • 3. 2. Low water training: •Also called as “TRAINING FOR DEPTH”. •It is trained for providing sufficient depth for navigation during low stage of river. •This is achieved by contraction of the width of the channel.
  • 4. 3. Mean water training: • Also called as “TRAINING FOR SEDIMENT”. • The river is trained to correct the configuration of river bed for efficient transport and also keeps the channel in good shape. • Mean water training is the most important one and based on this the high and low mean training are designed.
  • 5. TYPES OF RIVER TRAINING WORKS GUIDE BANK SYSTEM: •They are made for guiding the stream near a structure. •This confines it in a reasonable width of the river. •As it was designed by Bell, it is so called as Bell’s Bund and further developed by spring and is known as guide bank. •It consist of a heavily built embankment. •This is in shape of a bell mouth on both sides of the channel. •Usually only one embankmenty is required if the other end of the bank is high and stable.
  • 6. GROYNES OR SPURS • It is constructed transverse to the river flow. • It extends from the bank into the river upto a limit. • They are also known as spurs, dikes and transverse dikes.
  • 7. TYPES OF GROYNES 1. ACCORDING TO THE MATERIALS USED: • Permeable groyne • Solid impermeable groyne 2. ACCORDING TO ITS HEIGHT BELOW HIGH WATER: • Submerged groyne • Non- submerged groyne 3. ACCORDING TO THE FUNCTION IT SERVES: • Attracting groyne • Deflecting groyne • Repelling groyne • Sedimenting groyne 4. SPECIAL TYPES OF GROYNES: • Denehy’s T-headed groyne • Hockey type groyne • Burma type groyne
  • 8. FACTORS INFLUENCING THE CHOICE AND OF DESIGNING GROYNES • Fall velocity of the river • Width of the river @ high, low and mean water • Depth of water way, height and nature of flood rise • Character of bed materials like sand or silt, shingles. • Materials available and funds • Amt of materials carried in stream
  • 9. REPELLING GROYNE • The groyne is pointing towards the upstream at an angle of 10` to 30` to the line normal to the bank. • This deflects the current in a perpendicular direction to itself. • This current that comes in contact with the still water area adjacent causes eddies and deep scour. • The head of the groyne should be strong to resist the swirling action of this current. • A still water pocket is formed on the upstream and the suspended load that is brought by the river gets deposited in this pocket.
  • 10. DEFLECTING GROYNES • The deflecting groyne has a shorter length than a repelling groyne • The river is laid perpendicular to the bank. • It deflects the flow alone.
  • 11. ATTRACTING GROYNES • This type of groyne points downwards the direction of normal flow. • Thus, this causes scour holes; therefore, they tend to maintain the deep currents close to the bank. • Thus the upstream face bears the frontal attack of the river. • Hence a heavy protection is not required on the downstream slope.
  • 12. LENGTH OF THE GROYNES • The length of the groyne depends upon the magnitude of river training required. • A longer length of the groyne is required if the current has to be thrown on the other end of the bank. • So initially a shorter length is designed and as the silting is done the length is extended.
  • 13. IMPERMEABLE GROYNES • Impermeable or solid groynes do not permit any flow through them. • The core of it is made up of materials like sand, clay and gravel. • The sides are heavily protected by stone pitching or concrete blocks. • The side slope is varying from 2:1 to 3:1 and front slope varying from 3:1 to 5:1. • An apron is provided at the bottom of the slope to prevent the slipping of the stones.
  • 14. PERMEABLE GROYNES • They permit the flow of water through them. • The erosive action is reduced in the stream. • In case river water carries sedimented load, it gets deposited near the groyne as the velocity is reduced. ADVANTAGES OF PERMEABLE GROYNE: • Cost of construction is cheap. • Small quantity of stone is required hence this is used in places where the stones are scarce. • It has better performance. • This doesn’t change the flow, hence no eddies and scours are formed. • Suitable for deep narrow rivers. DISADVANTAGES OF PERMEABLE GROYNE: • They do not resist shock and pressures caused by floating ice logs.
  • 15. TYPES OF PERMEABLE GROYNES TREE GROYNE PILE GROYNE
  • 16. TREE GROYNE • A tree is being held in position with the weir along the bank and ties to a heavy buoy. • The tree should be very leafy and with many braches. • This reduces the velocity of the flowing waters and helps in sedimentation. • This deflects the currents • It is used for closing a river channel and opening the other. • It checks the flow.
  • 17. PILE GROYNE • They are constructed with timber piles. • This is driven up to a depth of 9m. • Two or three rows of main verticals are braced together by transverse and diagonals. • Spacing between the main verticals is 2 to 3m. • Two intermediates can be embedded at least 1.5m below. • This s filled with alternate layers of brush woods and stones. • Sometimes they filter the sand and act as a solid groyne. • To safeguard it against the scour, an apron is built @ 1m of stone.
  • 18. HOCKEY GROYNE • This groyne has a curved head. • Thus it is termed as hockey groyne. • It increases the attracting tendency of the groyne. • It does not protects the bank. FLOW BANK SCOURHOLE
  • 19. DENEHY’S GROYNE • They are earthen embankments from a marginal bund. • It has a T-shape head. • The front perpendicular arm is 100m in length, parallel to the current. • As the head has a longer portion, it looks like an inverted “L”. • The head has a slope and is protected by stone. FLOW CURRENT BANK