SlideShare una empresa de Scribd logo
1 de 13
Descargar para leer sin conexión
The Use o f Ceiling-D ucted 
Air Containment in Data Centers 
White Paper 182 
Revision 0 
by Jim VanGilder 
Simon Zhang 
Paul Lin 
Executive summary 
Ducting hot IT-equipment exhaust to a drop ceiling can 
be an effective air management strategy, improving 
the reliability and energy efficiency of a data center. 
Typical approaches include ducting either individual 
racks or entire hot aisles and may be passive (ducting 
only) or active (include fans). This paper examines 
available ducting options and explains how such 
systems should be deployed and operated. Practical 
cooling limits are established and best-practice rec-ommendations 
are provided. 
by Schneider Electric White Papers are now part of the Schneider Electric 
white paper library produced by Schneider Electric’s Data Center Science Center 
DCSC@Schneider-Electric.com
The Use of Ceiling-Ducted Air Containment in Data Centers 
Hot exhaust airflow recirculation and cold supply airflow bypass are more likely to occur with 
high and non-uniform rack densities due to mismatches between IT and local cooling supply 
airflow (e.g., from perforated floor tiles). Air containment can virtually eliminate such 
recirculations thereby improving the reliability and energy efficiency of data centers. Both 
“hot” and “cold” air containment strategies are common and are discussed in greater detail in 
White Paper 153, Implementing Hot and Cold Air Containment in Existing Data Centers and 
White Paper 135, Impact of Hot and Cold Aisle Containment on Data Center Temperature 
and Efficiency. Ceiling-ducted containment systems, the topic of this white paper, are “hot 
air” containment strategies in which the hot IT exhaust is ducted directly into a drop ceiling 
plenum and subsequently drawn out of the plenum by CRAH (Computer Room Air Handler) 
or other cooling units. Like all hot air containment strategies, ducted systems provide the 
following primary advantages over cold air containment strategies: 
• Comfortable working conditions and better cooling of equipment located around the 
periphery of the data center; and 
• Greater energy efficiency due to increased temperature difference between the hot 
return air and the ambient. 
Ceiling-ducted containment systems deserve examination in greater detail here because of 
their unique reliance upon a drop ceiling system. As will be discussed, it is the performance 
of the ceiling plenum, specifically, the ability to provide a slightly negative pressure (relative 
to the room) which dominates the cooling performance of ducted equipment. When properly 
utilized, ducted containment is a reasonable option for new facilities and a particularly 
attractive option for improving the efficiency and extending the life of existing facilities. 
The defining characteristic of ducted containment systems is that they physically duct hot IT 
exhaust into a drop ceiling. Figures 1 and 2 show typical examples in which passive rack 
ducting is used with traditional CRAH units and passive hot-aisle ducting is used with high-efficiency 
cooling units located outside of the building, respectively. In both cases, the design 
intent is that all hot IT exhaust is captured and directed into the ceiling plenum thereby 
eliminating recirculation back to equipment inlets. Of course, such systems are not perfectly 
sealed and generally cannot provide perfect separation of cold and hot airflow streams. 
Ultimately, there must be an airflow mass balance and, any mismatch between IT and CRAH 
airflow rates must be made up by leakage either into or out of the plenum. We will discuss 
the ceiling plenum airflow and pressure in more detail later in this paper. First, this section 
provides a brief overview of the types of ducting systems considered here. See White Paper 
153, Implementing Hot and Cold Air Containment in Existing Data Centers, for additional 
details. 
Schneider Electric – Data Center Science Center Rev 0 2 
Introduction 
Classification 
of ducted air 
containment 
Figure 1 
Example of drop ceiling 
plenum and passive ducted 
racks in a typical perimeter 
CRAH application (Schneider 
Electric Vertical Exhaust Duct 
Used)
The Use of Ceiling-Ducted Air Containment in Data Centers 
Passive individually-ducted rack 
Figure 1 shows an example of passive individually-ducted racks. This air containment 
strategy involves rack-by-rack ducting to the ceiling plenum. In addition to the ducting itself, 
solid panels are installed in the rear door and sometimes the un-ducted portion of the roof to 
minimize leakage airflow. Deeper racks may be preferred for use with passive individually-ducted- 
rack containment, particularly with higher densities, to provide a larger unrestricted 
airflow path for IT exhaust. 
Active individually-ducted rack 
Figure 3 shows an example of an active individually-ducted rack. The fans in this active 
ducting system allow for rack densities up to about 12 kW and can overcome some adverse 
plenum pressure or pressure drops resulting from very dense cabling at the server exhausts. 
However, active systems can easily create unintended consequences elsewhere in the data 
center and should be employed with particular care. The solution shown in Figure 3 adds 
approximately 10 in (250 mm) to the overall depth of the rack which likely will add to the pitch 
between adjacent rows of racks. Active systems also consume power and require monitoring 
and maintenance. 
Schneider Electric – Data Center Science Center Rev 0 3 
Figure 2 
Ducted HACS used in 
combination with Schneider 
Electric EcoBreeze 
Figure 3 
Example of active ducted 
rack air containment 
(Schneider Electric Air Removal 
Unit shown)
The Use of Ceiling-Ducted Air Containment in Data Centers 
Ducted hot aisle containment system (Ducted HACS) 
Figure 4 shows an example of a ducted hot aisle containment system (HACS). This passive 
system encloses the entire hot aisle with solid panels and, sometimes, plastic curtains at the 
end of rack rows. Customized containment solutions may be required due to building column 
constraints, vendor-compatibility issues, or mismatched row lengths. While a specific rack 
orientation and configuration is required, rack rear doors and internal side panels are 
unnecessary with a ducted HACS. The shared hot aisle provides a large unobstructed 
volume for IT exhaust airflow which allows this solution to be effective at very high rack 
densities. 
The cooling performance of ducted systems strongly depends on the configuration of the 
entire data center. Parameters like the amount of excess cooling (relative to IT) airflow, 
“leakiness” of the dropped ceiling system, ceiling plenum depth, rack density, and the 
physical layout of equipment typically affect cooling performance more than the specific 
construction details of the ducting systems themselves. If the data center design naturally 
creates a sufficient vacuum (favorable) pressure above the ducted equipment, then very high 
density racks can be supported with practically any ducting architecture. On the other hand, 
if the aggregate design results in only a neutral or even positive (adverse) pressure above the 
ducted equipment, cooling performance will be poor as recirculation back to the IT inlets may 
be the “path of least resistance” for hot IT exhaust. 
First, we discuss the primary factors that affect ceiling plenum pressure then discuss airflow 
within the (attached) passive ducted systems. After establishing cooling performance limits 
of passive ducted systems (at a given ceiling plenum pressure), we discuss how specific 
(favorable) ceiling plenum pressures may be achieved in practice. Finally, we conclude this 
section with a brief discussion of active ducted systems. 
Ceiling plenum airflow and pressure 
Figure 5 shows an example of a complex, but typical, ceiling plenum airflow pattern. Air 
enters the plenum from ducted equipment and, possibly, perforated ceiling tiles which serve 
to capture the hot exhaust from un-ducted equipment and exits where it is drawn out by 
ducted CRAH units. Often, due primarily to imbalances between IT and CRAH airflow, overly 
leaky drop ceilings, and shallow ceiling plenums, the pressure distribution inside the ceiling 
plenum will be either “unfavorable” (higher than room pressure) and/or highly non-uniform. 
As a result, the cooling performance of ducted equipment may vary from location-to-location 
Schneider Electric – Data Center Science Center Rev 0 4 
Figure 4 
Example of ducted hot aisle 
containment system 
(Schneider Electric EcoAisle 
shown) 
Cooling 
performance of 
ducted 
containment
The Use of Ceiling-Ducted Air Containment in Data Centers 
even for otherwise-identical groups of equipment in the same data center. Furthermore, hot 
exhaust airflow may enter the room as a result of “backflow” through perforated ceiling tiles 
and leakage paths. The airflow physics associated with a ceiling plenum is similar to that of a 
floor plenum1. Fortunately, ceiling plenums tend to be naturally deeper than floor plenums 
(as a consequence of clearance for building structural members and other infrastructure) 
which helps pressure uniformity. Additionally, relatively “tight” drop ceiling systems and 
regular/symmetric data center layouts help minimize plenum pressure variations. 
Cooling performance of passive ducted systems 
The airflow physics of passive ducted systems is most easily understood with reference to a 
flow network diagram in which airflow sources and resistances to airflow are drawn in analogy 
to a simple electric circuit. Figure 6 shows an example data center architecture with its 
corresponding flow network diagram; more complex architectures simply add more ducted 
HACS, ducted racks, and CRAHs. Unlike a simple electric circuit, however, the pressure 
drop across a flow resistance typically does not vary linearly with airflow rate; relationships 
somewhere between linear and quadratic are typical. As an example, the pressure drop 
across a perforated ceiling tile varies nearly with the square of the airflow rate which passes 
through it. In the flow network diagram, Figure 6b, airflow rates (e.g., in cfm or m3/s) are 
designated with Q, pressure (e.g., in inH2O or Pa) with P, and flow resistance (e.g., in 
inH2O/cfm2 or Pa/(m3/s)2 for quadratic elements) with α. 
1 VanGilder, J. and Schmidt, R., 2005, “Airflow Uniformity Through Perforated Tiles in a Raised Floor 
Data Center”, Proceedings of InterPACK, July 17-22, San Francisco, California. 
Schneider Electric – Data Center Science Center Rev 0 5 
Figure 5 
Example airflow pattern in 
ceiling plenum (Schneider 
Electric EcoStream CFD 
software)
The Use of Ceiling-Ducted Air Containment in Data Centers 
Duct 
Ceiling Plenum 
Duct 
Tile 
Rack CRAH 
Duct 
HAC 
Ceiling Plenum 
1 P 2 P 3 P 4 P 
D 
DR P 
D 
DR α L α 
D 
HAC α 
L 
HAC α L 
DR α 
Ducted 
Rack 
D 
HAC P 
HAC Q DR Q 
Ducted 
HACS 
Leakage 
= 0 room P 
CRAH Q 
Flow Resistance IT equipment Airflow CRAH Airflow 
a) Physical Layout b) Flow Network Diagram 
In the flow network model, ducted HACS clusters are idealized as an aggregate of all racks 
within the HACS combined with the physical structure which contains the hot aisle and ducts 
it to the ceiling plenum. For each ducted HACS cluster, the total rack airflow is represented 
by a single flow source (QHAC) in parallel with a flow resistance (αL 
HAC) which characterizes all 
possible paths taken by leakage airflow passing from the hot aisle into the room (or vice 
versa) through openings in the racks and the containment system structure. Additionally, a 
“duct resistance” (αD 
HAC) represents the flow resistance between the IT equipment exhaust 
and the ceiling plenum. 
Ducted racks are represented by similar flow source (QDR) and leakage path (αL 
DR) elements; 
however, the “duct resistance” (αD 
DR) is generally much greater. The “duct resistance” is 
primarily associated with server exhaust airflow rapidly decelerating as it approaches the 
solid rear door of the rack, being redirected vertically, and, finally, being forced through a 
small space between the rear of the servers and the rear of the rack. Note that, although we 
refer to this resistance as “duct resistance” for brevity, the actual resistance inside the 
containment duct itself is fairly negligible. 
CRAHS are idealized as fixed airflow sources (QCRAH) while leakage airflow through the 
ceiling and, if present, perforated ceiling tiles, are idealized as additional flow paths (with 
resistance αL). Because the plenum pressure distribution is highly case dependent, the 
preferred design approach is to analyze the airflow in the ducted equipment and attached 
ceiling plenum using computational fluid dynamics (CFD) software. Schneider Electrics’ 
EcoStream CFD software, for example, embeds the flow network model shown above into the 
model of the room airflow and relies on experimentally-measured flow resistance data to 
characterize the various leakage paths. This software is used internally within Schneider 
Electric to assist in data center design and is available commercially as part of 
StruxureWareTM Data Center Infrastructure Management (DCIM) software2. Other references 
provide more details on the coupling of the flow network and CFD models and the analyses 
presented here3,4. 
2 http://www.schneider-electric.com/sites/corporate/en/solutions/struxureware/struxureware-applications. 
page (accessed 2/17/2014) 
3 Zhang, X., VanGilder, J., Healey, C., and Sheffer, Z., 2013, “Compact Modeling of Data Center Air 
Containment Systems”, Proceedings of InterPACK, July 16-18, Burlingame, California. 
4 VanGilder, J., and Zhang, X., 2014, “Cooling Performance of Ceiling-Plenum-Ducted Containment 
Systems in Data Centers”, Submitted for Publication. Proceedings of IEEE ITHERM Conference, May 
27-30, Orlando, Florida. 
Schneider Electric – Data Center Science Center Rev 0 6 
Figure 6 
Example data center with 
passive ducting: 1 ducted 
rack and 1 ducted HACS
The Use of Ceiling-Ducted Air Containment in Data Centers 
While we have stressed that the ceiling plenum system should generally be considered when 
designing passively-ducted systems, it is instructive to see how the different ducting systems 
perform relative to one another at a given ceiling pressure. In the analysis which follows, we 
assume IT equipment airflow is 125 cfm/kW [212 m3/hr/kW], racks are uniformly populated up 
to the 30-U position, and blanking panels are installed elsewhere. HACS clusters are 
assumed to be comprised of 20 total racks and ducted racks provide for 8 in (200 mm) of 
clearance between the rear of the server and the rear door for the rack. 
Figure 7 shows the cooling performance of ducted racks and ducted HACS as a function of 
ceiling plenum pressure and rack power density under the assumptions outlined above. 
“Good”, “Marginal”, and “Bad” cooling performance is based on the amount of IT exhaust 
recirculation. “Good” means that all of the IT-exhaust airflow is captured by the ceiling 
plenum and the Good/Marginal interface corresponds to a neutral pressure environment for 
the servers – with neither backpressure nor additional suction. “Bad” signifies at least 10% 
recirculation with 90% or less of the IT exhaust captured by the ceiling plenum. With refer-ence 
to Figure 7, we draw the following two main conclusions: 
Cooling performance is strongly linked to the ceiling plenum pressure. Both ducted 
HACS and individually-ducted racks can potentially accommodate reasonably high rack 
densities but only when appropriate plenum vacuum pressures can be achieved. 
Ducted HACS can adequately cool much higher densities than individually-ducted 
racks at a given ceiling vacuum pressure. For example, at a vacuum pressure of 0.03 
inH20 (7.5 Pa), individually-ducted racks are limited to about 8 kW while ducted HACS 
systems can support up to about 16 kW. Furthermore, ducted HACS systems provide at 
least “marginal” cooling performance far into the “bad” range for individually-ducted racks. 
30 Individually Ducted Racks 
20 
10 
0 
30 
20 
10 
0 
Rack Density (kW/rack) 
Rack Density (kW/rack) 
0.04 
[10] 
Good 
0.06 
[15] 
Ceiling Plenum Vacuum Pressure (inH2O, [Pa]) 
Ducted HACS 
0 
[0] 
0 
[0] 
Bad 
0.02 
[5] 
Bad Marginal 
0.02 
[5] 
0.04 
[10] 
Good 
0.06 
[15] 
Marginal 
0.08 
[20] 
0.08 
[20] 
0.1 
[25] 
0.1 
[25] 
Ceiling Plenum Vacuum Pressure (inH2O, [Pa]) 
Figure 8 summarizes the maximum rack density limits of Figure 7 and facilitates a more 
direct comparison of performance between ducted racks and ducted HACS. Ideally, ceiling 
plenum pressure should be maintained at just the values indicated by the curves of Figure 8 
as these are the neutral-pressure operating points for the IT equipment. Lower values of 
ceiling vacuum result in some hot-exhaust recirculation while higher values imply wasted 
Schneider Electric – Data Center Science Center Rev 0 7 
Figure 7 
Cooling performance of 
passive ducted systems as a 
function of ceiling plenum 
pressure and rack density
The Use of Ceiling-Ducted Air Containment in Data Centers 
cooling power as room (bypass) air is drawn into the ceiling plenum. Also indicated in Figure 
8, is the practicality of achieving specific plenum pressures. Ceiling vacuum of greater than 
0.03 inH2O (7.5 Pa) can be achieved by minimizing cutouts, employing more restrictive (or 
eliminating) perforated tiles, and selecting lighting fixtures that do not introduce substantial 
leakage paths. As ceiling vacuum increases beyond about 0.06 inH2O (15 Pa) or so, typical-density 
ceiling tiles begin to lift with the resulting leakage airflow limiting further increase in 
vacuum pressure. 
Plenum Vacuum Pressure (inH2O, [Pa]) 
[25] 
[20] 
[15] 
[10] 
[5] 
[0] 
Extreme 
With Effort 
Ducted HACS 
Ducted Racks 
0 5 10 15 20 25 30 
Rack Density (kW/rack) 
Typical Capability 
0.1 
0.08 
0.06 
0.04 
0.02 
0 
Cooling analysis including entire ceiling plenum 
If CRAHs are controlled based on ceiling plenum pressure, then Figures 7 and 8 give the 
information the data center designer or operator needs to assure good cooling performance. 
But, without active ceiling pressure control, how can we be sure that a given design is 
capable of achieving the required plenum vacuum? Although, this question is best answered 
by performing a design-specific analysis, we give general design guidance here based on 
CFD analyses of a typical data center layout5. The layout includes four rows of 10 racks; 20 
racks on one side of the room are individually ducted while the other 20 racks form one 
ducted HACS cluster. Four CRAHs are placed at the ends of the hot aisles. CFD simulations 
cover the following design values: 
• Cooling-to-IT airflow ratio: 0.8, 1.0, 1.2 
• Ceiling leakiness: “leaky”, “typical”, “well sealed” 
• Ceiling plenum depth: 12, 18, 24, 36, 48, 60 in (0.30, 0.46, 0.61, 0.91, 1.22, 1.52 m) 
• Rack density: 2, 6, 12 kW 
Summarizing the CFD results, average cooling performance is a fairly weak function of 
plenum depth and rack density; with deeper plenums and lower density yielding somewhat 
better performance. Cooling performance is moderately affected by drop-ceiling leakiness 
with “tighter” being generally better though “typical” plenums perform much closer to “well 
sealed” than “leaky”. Finally, cooling performance is a strong function of cooling-to-IT airflow 
5 VanGilder, J., and Zhang, X., 2014, “Cooling Performance of Ceiling-Plenum-Ducted Containment 
Systems in Data Centers”, Submitted for Publication. Proceedings of IEEE ITHERM Conference, May 
27-30, Orlando, Florida. 
Schneider Electric – Data Center Science Center Rev 0 8 
Figure 8 
Target ceiling plenum set 
point pressure as a function 
of rack density
The Use of Ceiling-Ducted Air Containment in Data Centers 
ratio with higher values better. For the latter, values of one are generally acceptable for 
ducted HACS but ducted racks may require cooling-to-IT airflow ratios of 1.2 or higher. 
While average cooling performance is only a weak function of plenum depth, the uniformity of 
cooling performance (i.e., rack-to-rack variations) does depend on plenum depth. Figure 9 
shows the rack-to-rack uniformity in cooling performance for typical design conditions 
(cooling-to-IT airflow ratio of 1 and “Typical” ceiling leakiness) of ducted HACS. Note that 
uniformity is good with plenums deeper than 18-24 in (0.46-0.61 m). Furthermore, cooling 
uniformity is not strongly affected by rack density with even 12 kW racks (and higher) yielding 
“good” uniformity provided this minimum plenum depth is provided. Cooling uniformity for 
ducted racks (not shown) is even slightly better than that for ducted HACS due to the more-isolated 
nature of individual rack ducting. 
100% 
95% 
90% 
85% 
80% 
75% 
70% 
Cooling Performance Uniformity 
2 kW 
Good 
Marginal 
Bad 
6 kW 
12 kW 
12 18 24 30 36 42 48 
[300] [460] [610] [760] [910] [1070] [1220] 
Plenum Depth (in, [mm]) 
Cooling performance of active ducted systems 
With an understanding of the airflow physics of passive systems we now provide a brief 
discussion of active systems. Although active-ducted systems, i.e., those with fans to force 
the airflow into the ceiling plenum may be able to overcome adverse plenum pressures, they 
may do so at the expense of other areas of the data center. In simple terms, whatever airflow 
gets pushed into the ceiling plenum has to find a way out and, if CRAH airflow is insufficient 
or the plenum is too restrictive, hot air will simply be forced back out elsewhere – through 
perforated ceiling tiles, leakage paths, and even other ducted equipment. For this reason, it 
is recommended that active systems be deployed following the same design guidelines as for 
passive systems, e.g., Figures 7 and 8 and in the “Guidance for implementation” section 
below. Additionally, the reader should refer to the product literature related to the maximum 
airflow of the active system under consideration. 
Table 1 summarizes the primary considerations when selecting a specific ceiling-ducted 
architecture. Capital cost is similar for the passive systems but substantially higher for the 
active ducted rack. Because the active systems draw fan power, they will also cost more in 
operating costs which will negatively offset some of the energy saving benefit of containment. 
Schneider Electric – Data Center Science Center Rev 0 9 
Figure 9 
Cooling performance 
uniformity as a function of 
ceiling plenum depth for 
Ducted HACS 
Comparison 
of ducting 
options
The Use of Ceiling-Ducted Air Containment in Data Centers 
The primary limitation of passive ducted HACS is that a specific floor layout is required for its 
implementation. However, since the standard hot/cold aisle architecture has been a best-practices 
standard for many years, this may not be a real limitation. Where ducted HACS can 
be implemented, it offers the best performance with the highest density IT equipment while 
not adding to rack depth or requiring specific racks or adapter hardware. However, if only a 
sparse distribution of racks requires ducting or the layout required for ducted HACS is 
impractical, individual-rack options might be employed. In any case, passive ducted racks 
are a good overall choice especially with “shorter” servers up to moderate densities, e.g., up 
to about 8 kW/rack or even higher if the required ceiling plenum vacuum pressure can be 
achieved. 
Active ducted systems may offer an advantage in the case where ducted HACS are impracti-cal 
due to layout and passive ducted racks are too limited in density at the maximum 
achievable ceiling plenum vacuum. However, the general use of active ducted systems to 
compensate for undesirable plenum pressure is not recommended due to the likelihood of 
creating cooling problems elsewhere in the data center. The preferred approach is to first 
address ceiling plenum pressure problems (e.g., by increasing ducted cooling airflow, 
improving ceiling “tightness”, and/or increasing plenum depth) before deploying ducted 
equipment of any kind. 
Additional considerations may also guide the selection of particular ducted-containment 
architecture. These include the possible interference with fire suppression and lighting, 
cooling performance under emergency conditions, and noise. The reader is also reminded 
that there are other cold and hot-aisle containment options available beyond the plenum-ducted 
options discussed here. See the references noted in the Introduction for more 
information. 
Table 1 
Comparison of ducted air containment architectures 
Consideration 
Ducted air containment 
Passive ducted rack Active ducted rack Ducted HACS 
Capital cost $500 - 700 / rack $1,800 - 2,000 / rack $500 - 1,000 / rack 
Works with any floor layout Yes Possibly1 No 
Works with all racks without 
special hardware 
No No Yes 
Maintenance and monitoring free 
(power feed not required) 
Yes No Yes 
Allows for normal (minimum) row 
pitch 
Possibly2 No Yes 
Best choice for high density 
(6kW) or low plenum vacuum 
pressure 
No No Yes 
1May require wider row pitch 
2Deeper racks are recommended for use with deeper servers and higher densities 
Schneider Electric – Data Center Science Center Rev 0 10
The Use of Ceiling-Ducted Air Containment in Data Centers 
Ensure adequate ceiling plenum vacuum pressure 
Ideally, the proposed new design or retrofit should be simulated using CFD software to 
ensure that adequate vacuum and reasonably uniform pressures can be achieved throughout 
the ceiling plenum. At a minimum, the following best-practices should be observed: 
• Ceiling plenums should be at least 18 in (450 mm) deep in all cases while deeper is 
better when practical. 
• Ducted cooling airflow should exceed ducted IT airflow by a minimum 10% for most 
cases or 20% when passive ducted racks are employed with relatively leaky drop ceil-ing 
systems. 
• Ceiling plenum vacuum should be maximized: 
o Minimize and seal leakage paths in the drop ceiling 
o Minimize the number of perforated ceiling tiles and use more restrictive tiles 
• Ducted equipment should be configured in reasonably uniform (with respect to geomet-ric 
configuration and IT density) layouts to maximize plenum pressure uniformity. Note 
that, un-ducted equipment does not necessarily need to conform to this guideline as it 
does not affect ceiling plenum airflow dynamics. 
Minimize leakage paths in containment systems 
Sealing leakage paths in containment systems as much as practical helps ensure that the 
ceiling plenum remains the “path of least resistance” for rack exhaust airflow. Follow these 
best practices: 
• Fill empty rack spaces with blanking panels or brush strips to minimize recirculation 
from the back to the front of the rack. 
• Cover as many openings in the rack enclosure as possible and, in the case of passive 
ducted racks, also seal the rear door of the rack. 
• Keep the space behind IT equipment as free and clear of cabling and other obstruc-tions 
as possible. With passive ducted racks, ensure at least about 8 in (200 mm) of 
space between the rear of the server and rack rear door. Use deeper racks if neces-sary 
to achieve this. 
• For passive ducted racks, install deeper IT equipment lower in the rack to avoid choke 
points for the exhaust airflow. 
Employ active ducted containment with caution 
For configurations which include active containment systems, verifying the performance of 
the intended application in advance with CFD is even more attractive. With active systems 
there is the risk that, while the active ducted equipment will perform well – apparently “fixing” 
a hot spot, problems will be created elsewhere in the data center. Such problems may not be 
readily apparent or easy to troubleshoot. In any event, increase the likelihood of a successful 
implementation by following the best practices recommended above even with active 
systems. 
Schneider Electric – Data Center Science Center Rev 0 11 
Guidance for 
implementation
The Use of Ceiling-Ducted Air Containment in Data Centers 
Ducted air containment can simultaneously improve the energy efficiency and reliability of 
data centers. Since all ducted equipment, ducted cooling units, and the ceiling plenum 
function as a single entity, the use of CFD modeling is recommended for new deployments 
particularly when design constraints are close to the best-practice limits established here. In 
any case, deployment advice centers on ensuring an adequate and fairly uniform vacuum 
pressure in the ceiling plenum. This, in turn, can be achieved by providing sufficient ducted 
cooling airflow, creating a relatively “tight” ceiling system, employing deeper ceiling plenums, 
and sealing unnecessary leakage paths in racks and containment structures. 
About the authors 
Schneider Electric – Data Center Science Center Rev 0 12 
Conclusion 
Jim VanGilder is responsible for Schneider Electric’s data-center Computational Fluid 
Dynamics (CFD) software development and related research. He has authored or co-authored 
more than 40 peer-reviewed technical papers and holds more than 15 patents in the field of 
data center cooling. He is an active American Society of Heating, Refrigerating, and Air- 
Conditioning Engineers (ASHRAE) member where he is a recent Chair of Technical Committee 
4.10, Indoor Environmental Modeling. Jim is a registered professional engineer in the state of 
Massachusetts. He has master’s degree in mechanical engineering from Duke University and 
over 20 years experience using and developing CFD tools. 
Simon Zhang is a Sr. Research Engineer with APC by Schneider Electric working on data 
center design, operation, and management software platforms. He has extensive experience 
with real-time cooling predictions  indoor airflow simulations, and has author/co-authored 12 
patents (granted or pending) and over a dozen peer-reviewed technical papers on data center 
cooling and energy assessment techniques. He is actively involved in data center communities 
and has chaired and organized many technical sessions of ASME and IEEE conferences. He 
received his M.S. in Mechanical Engineering at Syracuse University in 2006 and an MBA 
degree from Boston University in 2013. 
Paul Lin is a Senior Research Analyst at Schneider Electric's Data Center Science Center. He 
holds a Bachelor’s degree in Mechanical Engineering from Jilin University where he majored in 
Heating, Refrigeration, and Air Conditioning. He also holds a Master’s degree in Thermody-namic 
Engineering from Jilin University. Before joining Schneider Electric, Paul worked as the 
RD Project Leader in LG Electronics for several years. He is now designated as a “Data 
Center Certified Associate”, an internationally recognized validation of the knowledge and skills 
required of a data center professional.
The Use of Ceiling-Ducted Air Containment in Data Centers 
Cooling Options for Rack Equipment with Side-to-Side Airflow 
White Paper 50 
The Different Types of Air Distribution for IT Environments 
White Paper 55 
Impact of Hot and Cold Aisle Containemnt on 
Data Center Temperature and Efficiency 
White Paper 135 
Data Center Projects: Establishing a Floor Plan 
White Paper 144 
Implementing Hot and Cold Aisle Containment in Existing Data Centers 
White Paper 153 
Data Center Temperature Rise during a Cooling System Outage 
White Paper 179 
Browse all 
white papers 
whitepapers.apc.com 
Browse all 
TradeOff Tools™ 
tools.apc.com 
Contact us 
Schneider Electric – Data Center Science Center Rev 0 13 
Resources 
© 2014 Schneider Electric. All rights reserved. 
For feedback and comments about the content of this white paper: 
Data Center Science Center 
dcsc@schneider-electric.com 
If you are a customer and have questions specific to your data center project: 
Contact your Schneider Electric representative at 
www.apc.com/support/contact/index.cfm

Más contenido relacionado

La actualidad más candente

Hot Aisle & Cold Aisle Containment Solutions & Case Studies
Hot Aisle & Cold Aisle Containment Solutions & Case StudiesHot Aisle & Cold Aisle Containment Solutions & Case Studies
Hot Aisle & Cold Aisle Containment Solutions & Case Studies42U Data Center Solutions
 
Tia 942 Data Center Standards
Tia 942 Data Center StandardsTia 942 Data Center Standards
Tia 942 Data Center StandardsSri Chalasani
 
Data center design standards for cabinet and floor loading
Data center design standards for cabinet and floor loadingData center design standards for cabinet and floor loading
Data center design standards for cabinet and floor loadingkotatsu
 
Datwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle eastDatwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle eastAli Shoaee
 
Data Center Cooling, Critical Facility and Infrastructure Optimization
Data Center Cooling, Critical Facility and Infrastructure OptimizationData Center Cooling, Critical Facility and Infrastructure Optimization
Data Center Cooling, Critical Facility and Infrastructure OptimizationGreg Stover
 
Data center Building & General Specification
Data center Building & General Specification Data center Building & General Specification
Data center Building & General Specification Ali Mirfallah
 
Slides: The Top 3 North America Data Center Trends for Cooling
Slides: The Top 3 North America Data Center Trends for CoolingSlides: The Top 3 North America Data Center Trends for Cooling
Slides: The Top 3 North America Data Center Trends for CoolingGraybar
 
Lowering operating costs through cooling system design
Lowering operating costs through cooling system designLowering operating costs through cooling system design
Lowering operating costs through cooling system designAFCOM
 
Datacenter101
Datacenter101Datacenter101
Datacenter101tarundua
 
Data center cooling infrastructure slide
Data center cooling infrastructure slideData center cooling infrastructure slide
Data center cooling infrastructure slideLivin Jose
 
Net Ops Data Center Architecture Diagram 06
Net Ops Data Center Architecture Diagram 06Net Ops Data Center Architecture Diagram 06
Net Ops Data Center Architecture Diagram 06jeffqw
 
Actual Time Online Thermal Mapping Of significant Components In Data Hub
Actual Time Online Thermal Mapping Of significant Components In Data Hub Actual Time Online Thermal Mapping Of significant Components In Data Hub
Actual Time Online Thermal Mapping Of significant Components In Data Hub IRJET Journal
 
DataCenter:: Infrastructure Presentation
DataCenter:: Infrastructure PresentationDataCenter:: Infrastructure Presentation
DataCenter:: Infrastructure PresentationMuhammad Asad Rashid
 
Data center cooling ahmed abdel-salam (2019)
Data center cooling   ahmed abdel-salam (2019)Data center cooling   ahmed abdel-salam (2019)
Data center cooling ahmed abdel-salam (2019)Ahmed Abdel-Salam
 
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...Schneider Electric
 
Data center power availability provisioning
Data center power availability provisioningData center power availability provisioning
Data center power availability provisioningLivin Jose
 

La actualidad más candente (20)

Hot Aisle & Cold Aisle Containment Solutions & Case Studies
Hot Aisle & Cold Aisle Containment Solutions & Case StudiesHot Aisle & Cold Aisle Containment Solutions & Case Studies
Hot Aisle & Cold Aisle Containment Solutions & Case Studies
 
Tia 942 Data Center Standards
Tia 942 Data Center StandardsTia 942 Data Center Standards
Tia 942 Data Center Standards
 
Data center design standards for cabinet and floor loading
Data center design standards for cabinet and floor loadingData center design standards for cabinet and floor loading
Data center design standards for cabinet and floor loading
 
Modular Data Center Design
Modular Data Center DesignModular Data Center Design
Modular Data Center Design
 
Datwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle eastDatwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle east
 
Data Center Cooling, Critical Facility and Infrastructure Optimization
Data Center Cooling, Critical Facility and Infrastructure OptimizationData Center Cooling, Critical Facility and Infrastructure Optimization
Data Center Cooling, Critical Facility and Infrastructure Optimization
 
Data center Building & General Specification
Data center Building & General Specification Data center Building & General Specification
Data center Building & General Specification
 
Slides: The Top 3 North America Data Center Trends for Cooling
Slides: The Top 3 North America Data Center Trends for CoolingSlides: The Top 3 North America Data Center Trends for Cooling
Slides: The Top 3 North America Data Center Trends for Cooling
 
Eliminating Data Center Hot Spots
Eliminating Data Center Hot SpotsEliminating Data Center Hot Spots
Eliminating Data Center Hot Spots
 
project report on DATACENTER
project report on DATACENTERproject report on DATACENTER
project report on DATACENTER
 
Lowering operating costs through cooling system design
Lowering operating costs through cooling system designLowering operating costs through cooling system design
Lowering operating costs through cooling system design
 
Datacenter101
Datacenter101Datacenter101
Datacenter101
 
Data center cooling infrastructure slide
Data center cooling infrastructure slideData center cooling infrastructure slide
Data center cooling infrastructure slide
 
Net Ops Data Center Architecture Diagram 06
Net Ops Data Center Architecture Diagram 06Net Ops Data Center Architecture Diagram 06
Net Ops Data Center Architecture Diagram 06
 
Actual Time Online Thermal Mapping Of significant Components In Data Hub
Actual Time Online Thermal Mapping Of significant Components In Data Hub Actual Time Online Thermal Mapping Of significant Components In Data Hub
Actual Time Online Thermal Mapping Of significant Components In Data Hub
 
DataCenter:: Infrastructure Presentation
DataCenter:: Infrastructure PresentationDataCenter:: Infrastructure Presentation
DataCenter:: Infrastructure Presentation
 
Data center cooling ahmed abdel-salam (2019)
Data center cooling   ahmed abdel-salam (2019)Data center cooling   ahmed abdel-salam (2019)
Data center cooling ahmed abdel-salam (2019)
 
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
 
Data center power availability provisioning
Data center power availability provisioningData center power availability provisioning
Data center power availability provisioning
 
Ashrae thermal guidelines svlg 2015 (1)
Ashrae thermal guidelines  svlg 2015 (1)Ashrae thermal guidelines  svlg 2015 (1)
Ashrae thermal guidelines svlg 2015 (1)
 

Similar a The Use of Ceiling Ducted Air Containment in Data Centers

HVAC Mini project review.pptx
HVAC Mini project review.pptxHVAC Mini project review.pptx
HVAC Mini project review.pptxCollege
 
DADANCO ACTIVE CHILLED BEAMS
DADANCO ACTIVE CHILLED BEAMSDADANCO ACTIVE CHILLED BEAMS
DADANCO ACTIVE CHILLED BEAMSbostjanpeterman
 
Server room cooling report
Server room cooling reportServer room cooling report
Server room cooling reportommuruga ps
 
Retrofitting EC plug fans - An energy efficiency drive that can cost more tha...
Retrofitting EC plug fans - An energy efficiency drive that can cost more tha...Retrofitting EC plug fans - An energy efficiency drive that can cost more tha...
Retrofitting EC plug fans - An energy efficiency drive that can cost more tha...Robert Schmidt
 
S3 Duct System Design Consideration
S3 Duct System Design ConsiderationS3 Duct System Design Consideration
S3 Duct System Design Considerationno suhaila
 
WP-59 The Different Types of Air Conditioning Equipment for IT Environments
WP-59 The Different Types of Air Conditioning Equipment for IT EnvironmentsWP-59 The Different Types of Air Conditioning Equipment for IT Environments
WP-59 The Different Types of Air Conditioning Equipment for IT Environmentszain kirmani
 
Low energy consumption hvac systems for green buildings using chilled beam te...
Low energy consumption hvac systems for green buildings using chilled beam te...Low energy consumption hvac systems for green buildings using chilled beam te...
Low energy consumption hvac systems for green buildings using chilled beam te...IAEME Publication
 
IT cooling for Data Center
IT cooling for Data Center IT cooling for Data Center
IT cooling for Data Center Henry Soong
 
Five Topmost Over-Engineered Building Components
Five Topmost Over-Engineered Building ComponentsFive Topmost Over-Engineered Building Components
Five Topmost Over-Engineered Building ComponentsRahulJaykar21
 
Energy Efficient Air Conditioning System
Energy Efficient Air Conditioning SystemEnergy Efficient Air Conditioning System
Energy Efficient Air Conditioning SystemTantish QS, UTM
 
Thermal Management of Edge Data Centers
Thermal Management of Edge Data Centers Thermal Management of Edge Data Centers
Thermal Management of Edge Data Centers Raptor Power Systems
 

Similar a The Use of Ceiling Ducted Air Containment in Data Centers (20)

Row based cooling whitepaper
Row based cooling whitepaperRow based cooling whitepaper
Row based cooling whitepaper
 
Datacenters
DatacentersDatacenters
Datacenters
 
HVAC Mini project review.pptx
HVAC Mini project review.pptxHVAC Mini project review.pptx
HVAC Mini project review.pptx
 
DADANCO ACTIVE CHILLED BEAMS
DADANCO ACTIVE CHILLED BEAMSDADANCO ACTIVE CHILLED BEAMS
DADANCO ACTIVE CHILLED BEAMS
 
Radiant Ceiling Cooling
Radiant Ceiling CoolingRadiant Ceiling Cooling
Radiant Ceiling Cooling
 
Radiant cooling
Radiant coolingRadiant cooling
Radiant cooling
 
Server room cooling report
Server room cooling reportServer room cooling report
Server room cooling report
 
Retrofitting EC plug fans - An energy efficiency drive that can cost more tha...
Retrofitting EC plug fans - An energy efficiency drive that can cost more tha...Retrofitting EC plug fans - An energy efficiency drive that can cost more tha...
Retrofitting EC plug fans - An energy efficiency drive that can cost more tha...
 
S3 Duct System Design Consideration
S3 Duct System Design ConsiderationS3 Duct System Design Consideration
S3 Duct System Design Consideration
 
WP-59 The Different Types of Air Conditioning Equipment for IT Environments
WP-59 The Different Types of Air Conditioning Equipment for IT EnvironmentsWP-59 The Different Types of Air Conditioning Equipment for IT Environments
WP-59 The Different Types of Air Conditioning Equipment for IT Environments
 
Low energy consumption hvac systems for green buildings using chilled beam te...
Low energy consumption hvac systems for green buildings using chilled beam te...Low energy consumption hvac systems for green buildings using chilled beam te...
Low energy consumption hvac systems for green buildings using chilled beam te...
 
Ceiling Radiant Cooling Panels as a Viable Distributed Parallel Sensible Co...
Ceiling Radiant Cooling Panels as a  Viable Distributed Parallel Sensible  Co...Ceiling Radiant Cooling Panels as a  Viable Distributed Parallel Sensible  Co...
Ceiling Radiant Cooling Panels as a Viable Distributed Parallel Sensible Co...
 
IT cooling for Data Center
IT cooling for Data Center IT cooling for Data Center
IT cooling for Data Center
 
Five Topmost Over-Engineered Building Components
Five Topmost Over-Engineered Building ComponentsFive Topmost Over-Engineered Building Components
Five Topmost Over-Engineered Building Components
 
Energy Efficient Air Conditioning System
Energy Efficient Air Conditioning SystemEnergy Efficient Air Conditioning System
Energy Efficient Air Conditioning System
 
Thermal Management of Edge Data Centers
Thermal Management of Edge Data Centers Thermal Management of Edge Data Centers
Thermal Management of Edge Data Centers
 
Cooling towers tech article v1r04
Cooling towers tech article v1r04Cooling towers tech article v1r04
Cooling towers tech article v1r04
 
FYPP
FYPPFYPP
FYPP
 
25985 (1).pdf
25985 (1).pdf25985 (1).pdf
25985 (1).pdf
 
Bs2 assignment
Bs2 assignmentBs2 assignment
Bs2 assignment
 

Más de Schneider Electric

Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design ConsiderationsSchneider Electric
 
Digital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsDigital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsSchneider Electric
 
32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing 32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing Schneider Electric
 
Key Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsKey Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsSchneider Electric
 
EcoStruxure™ for Cloud & Service Providers
 EcoStruxure™ for Cloud & Service Providers EcoStruxure™ for Cloud & Service Providers
EcoStruxure™ for Cloud & Service ProvidersSchneider Electric
 
Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingSchneider Electric
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSchneider Electric
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingSchneider Electric
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingSchneider Electric
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Schneider Electric
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesSchneider Electric
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Schneider Electric
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.Schneider Electric
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580Schneider Electric
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...Schneider Electric
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTSchneider Electric
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingSchneider Electric
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingSchneider Electric
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingSchneider Electric
 

Más de Schneider Electric (20)

Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design Considerations
 
Digital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsDigital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting Investors
 
32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing 32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing
 
Key Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsKey Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation Trends
 
EcoStruxure™ for Cloud & Service Providers
 EcoStruxure™ for Cloud & Service Providers EcoStruxure™ for Cloud & Service Providers
EcoStruxure™ for Cloud & Service Providers
 
Magelis Basic HMI Briefing
Magelis Basic HMI Briefing Magelis Basic HMI Briefing
Magelis Basic HMI Briefing
 
Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay Briefing
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR Briefing
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software Briefing
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive Industries
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoT
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories Briefing
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors Briefing
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches Briefing
 

Último

Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024SynarionITSolutions
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Principled Technologies
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024The Digital Insurer
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesBoston Institute of Analytics
 

Último (20)

Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 

The Use of Ceiling Ducted Air Containment in Data Centers

  • 1. The Use o f Ceiling-D ucted Air Containment in Data Centers White Paper 182 Revision 0 by Jim VanGilder Simon Zhang Paul Lin Executive summary Ducting hot IT-equipment exhaust to a drop ceiling can be an effective air management strategy, improving the reliability and energy efficiency of a data center. Typical approaches include ducting either individual racks or entire hot aisles and may be passive (ducting only) or active (include fans). This paper examines available ducting options and explains how such systems should be deployed and operated. Practical cooling limits are established and best-practice rec-ommendations are provided. by Schneider Electric White Papers are now part of the Schneider Electric white paper library produced by Schneider Electric’s Data Center Science Center DCSC@Schneider-Electric.com
  • 2. The Use of Ceiling-Ducted Air Containment in Data Centers Hot exhaust airflow recirculation and cold supply airflow bypass are more likely to occur with high and non-uniform rack densities due to mismatches between IT and local cooling supply airflow (e.g., from perforated floor tiles). Air containment can virtually eliminate such recirculations thereby improving the reliability and energy efficiency of data centers. Both “hot” and “cold” air containment strategies are common and are discussed in greater detail in White Paper 153, Implementing Hot and Cold Air Containment in Existing Data Centers and White Paper 135, Impact of Hot and Cold Aisle Containment on Data Center Temperature and Efficiency. Ceiling-ducted containment systems, the topic of this white paper, are “hot air” containment strategies in which the hot IT exhaust is ducted directly into a drop ceiling plenum and subsequently drawn out of the plenum by CRAH (Computer Room Air Handler) or other cooling units. Like all hot air containment strategies, ducted systems provide the following primary advantages over cold air containment strategies: • Comfortable working conditions and better cooling of equipment located around the periphery of the data center; and • Greater energy efficiency due to increased temperature difference between the hot return air and the ambient. Ceiling-ducted containment systems deserve examination in greater detail here because of their unique reliance upon a drop ceiling system. As will be discussed, it is the performance of the ceiling plenum, specifically, the ability to provide a slightly negative pressure (relative to the room) which dominates the cooling performance of ducted equipment. When properly utilized, ducted containment is a reasonable option for new facilities and a particularly attractive option for improving the efficiency and extending the life of existing facilities. The defining characteristic of ducted containment systems is that they physically duct hot IT exhaust into a drop ceiling. Figures 1 and 2 show typical examples in which passive rack ducting is used with traditional CRAH units and passive hot-aisle ducting is used with high-efficiency cooling units located outside of the building, respectively. In both cases, the design intent is that all hot IT exhaust is captured and directed into the ceiling plenum thereby eliminating recirculation back to equipment inlets. Of course, such systems are not perfectly sealed and generally cannot provide perfect separation of cold and hot airflow streams. Ultimately, there must be an airflow mass balance and, any mismatch between IT and CRAH airflow rates must be made up by leakage either into or out of the plenum. We will discuss the ceiling plenum airflow and pressure in more detail later in this paper. First, this section provides a brief overview of the types of ducting systems considered here. See White Paper 153, Implementing Hot and Cold Air Containment in Existing Data Centers, for additional details. Schneider Electric – Data Center Science Center Rev 0 2 Introduction Classification of ducted air containment Figure 1 Example of drop ceiling plenum and passive ducted racks in a typical perimeter CRAH application (Schneider Electric Vertical Exhaust Duct Used)
  • 3. The Use of Ceiling-Ducted Air Containment in Data Centers Passive individually-ducted rack Figure 1 shows an example of passive individually-ducted racks. This air containment strategy involves rack-by-rack ducting to the ceiling plenum. In addition to the ducting itself, solid panels are installed in the rear door and sometimes the un-ducted portion of the roof to minimize leakage airflow. Deeper racks may be preferred for use with passive individually-ducted- rack containment, particularly with higher densities, to provide a larger unrestricted airflow path for IT exhaust. Active individually-ducted rack Figure 3 shows an example of an active individually-ducted rack. The fans in this active ducting system allow for rack densities up to about 12 kW and can overcome some adverse plenum pressure or pressure drops resulting from very dense cabling at the server exhausts. However, active systems can easily create unintended consequences elsewhere in the data center and should be employed with particular care. The solution shown in Figure 3 adds approximately 10 in (250 mm) to the overall depth of the rack which likely will add to the pitch between adjacent rows of racks. Active systems also consume power and require monitoring and maintenance. Schneider Electric – Data Center Science Center Rev 0 3 Figure 2 Ducted HACS used in combination with Schneider Electric EcoBreeze Figure 3 Example of active ducted rack air containment (Schneider Electric Air Removal Unit shown)
  • 4. The Use of Ceiling-Ducted Air Containment in Data Centers Ducted hot aisle containment system (Ducted HACS) Figure 4 shows an example of a ducted hot aisle containment system (HACS). This passive system encloses the entire hot aisle with solid panels and, sometimes, plastic curtains at the end of rack rows. Customized containment solutions may be required due to building column constraints, vendor-compatibility issues, or mismatched row lengths. While a specific rack orientation and configuration is required, rack rear doors and internal side panels are unnecessary with a ducted HACS. The shared hot aisle provides a large unobstructed volume for IT exhaust airflow which allows this solution to be effective at very high rack densities. The cooling performance of ducted systems strongly depends on the configuration of the entire data center. Parameters like the amount of excess cooling (relative to IT) airflow, “leakiness” of the dropped ceiling system, ceiling plenum depth, rack density, and the physical layout of equipment typically affect cooling performance more than the specific construction details of the ducting systems themselves. If the data center design naturally creates a sufficient vacuum (favorable) pressure above the ducted equipment, then very high density racks can be supported with practically any ducting architecture. On the other hand, if the aggregate design results in only a neutral or even positive (adverse) pressure above the ducted equipment, cooling performance will be poor as recirculation back to the IT inlets may be the “path of least resistance” for hot IT exhaust. First, we discuss the primary factors that affect ceiling plenum pressure then discuss airflow within the (attached) passive ducted systems. After establishing cooling performance limits of passive ducted systems (at a given ceiling plenum pressure), we discuss how specific (favorable) ceiling plenum pressures may be achieved in practice. Finally, we conclude this section with a brief discussion of active ducted systems. Ceiling plenum airflow and pressure Figure 5 shows an example of a complex, but typical, ceiling plenum airflow pattern. Air enters the plenum from ducted equipment and, possibly, perforated ceiling tiles which serve to capture the hot exhaust from un-ducted equipment and exits where it is drawn out by ducted CRAH units. Often, due primarily to imbalances between IT and CRAH airflow, overly leaky drop ceilings, and shallow ceiling plenums, the pressure distribution inside the ceiling plenum will be either “unfavorable” (higher than room pressure) and/or highly non-uniform. As a result, the cooling performance of ducted equipment may vary from location-to-location Schneider Electric – Data Center Science Center Rev 0 4 Figure 4 Example of ducted hot aisle containment system (Schneider Electric EcoAisle shown) Cooling performance of ducted containment
  • 5. The Use of Ceiling-Ducted Air Containment in Data Centers even for otherwise-identical groups of equipment in the same data center. Furthermore, hot exhaust airflow may enter the room as a result of “backflow” through perforated ceiling tiles and leakage paths. The airflow physics associated with a ceiling plenum is similar to that of a floor plenum1. Fortunately, ceiling plenums tend to be naturally deeper than floor plenums (as a consequence of clearance for building structural members and other infrastructure) which helps pressure uniformity. Additionally, relatively “tight” drop ceiling systems and regular/symmetric data center layouts help minimize plenum pressure variations. Cooling performance of passive ducted systems The airflow physics of passive ducted systems is most easily understood with reference to a flow network diagram in which airflow sources and resistances to airflow are drawn in analogy to a simple electric circuit. Figure 6 shows an example data center architecture with its corresponding flow network diagram; more complex architectures simply add more ducted HACS, ducted racks, and CRAHs. Unlike a simple electric circuit, however, the pressure drop across a flow resistance typically does not vary linearly with airflow rate; relationships somewhere between linear and quadratic are typical. As an example, the pressure drop across a perforated ceiling tile varies nearly with the square of the airflow rate which passes through it. In the flow network diagram, Figure 6b, airflow rates (e.g., in cfm or m3/s) are designated with Q, pressure (e.g., in inH2O or Pa) with P, and flow resistance (e.g., in inH2O/cfm2 or Pa/(m3/s)2 for quadratic elements) with α. 1 VanGilder, J. and Schmidt, R., 2005, “Airflow Uniformity Through Perforated Tiles in a Raised Floor Data Center”, Proceedings of InterPACK, July 17-22, San Francisco, California. Schneider Electric – Data Center Science Center Rev 0 5 Figure 5 Example airflow pattern in ceiling plenum (Schneider Electric EcoStream CFD software)
  • 6. The Use of Ceiling-Ducted Air Containment in Data Centers Duct Ceiling Plenum Duct Tile Rack CRAH Duct HAC Ceiling Plenum 1 P 2 P 3 P 4 P D DR P D DR α L α D HAC α L HAC α L DR α Ducted Rack D HAC P HAC Q DR Q Ducted HACS Leakage = 0 room P CRAH Q Flow Resistance IT equipment Airflow CRAH Airflow a) Physical Layout b) Flow Network Diagram In the flow network model, ducted HACS clusters are idealized as an aggregate of all racks within the HACS combined with the physical structure which contains the hot aisle and ducts it to the ceiling plenum. For each ducted HACS cluster, the total rack airflow is represented by a single flow source (QHAC) in parallel with a flow resistance (αL HAC) which characterizes all possible paths taken by leakage airflow passing from the hot aisle into the room (or vice versa) through openings in the racks and the containment system structure. Additionally, a “duct resistance” (αD HAC) represents the flow resistance between the IT equipment exhaust and the ceiling plenum. Ducted racks are represented by similar flow source (QDR) and leakage path (αL DR) elements; however, the “duct resistance” (αD DR) is generally much greater. The “duct resistance” is primarily associated with server exhaust airflow rapidly decelerating as it approaches the solid rear door of the rack, being redirected vertically, and, finally, being forced through a small space between the rear of the servers and the rear of the rack. Note that, although we refer to this resistance as “duct resistance” for brevity, the actual resistance inside the containment duct itself is fairly negligible. CRAHS are idealized as fixed airflow sources (QCRAH) while leakage airflow through the ceiling and, if present, perforated ceiling tiles, are idealized as additional flow paths (with resistance αL). Because the plenum pressure distribution is highly case dependent, the preferred design approach is to analyze the airflow in the ducted equipment and attached ceiling plenum using computational fluid dynamics (CFD) software. Schneider Electrics’ EcoStream CFD software, for example, embeds the flow network model shown above into the model of the room airflow and relies on experimentally-measured flow resistance data to characterize the various leakage paths. This software is used internally within Schneider Electric to assist in data center design and is available commercially as part of StruxureWareTM Data Center Infrastructure Management (DCIM) software2. Other references provide more details on the coupling of the flow network and CFD models and the analyses presented here3,4. 2 http://www.schneider-electric.com/sites/corporate/en/solutions/struxureware/struxureware-applications. page (accessed 2/17/2014) 3 Zhang, X., VanGilder, J., Healey, C., and Sheffer, Z., 2013, “Compact Modeling of Data Center Air Containment Systems”, Proceedings of InterPACK, July 16-18, Burlingame, California. 4 VanGilder, J., and Zhang, X., 2014, “Cooling Performance of Ceiling-Plenum-Ducted Containment Systems in Data Centers”, Submitted for Publication. Proceedings of IEEE ITHERM Conference, May 27-30, Orlando, Florida. Schneider Electric – Data Center Science Center Rev 0 6 Figure 6 Example data center with passive ducting: 1 ducted rack and 1 ducted HACS
  • 7. The Use of Ceiling-Ducted Air Containment in Data Centers While we have stressed that the ceiling plenum system should generally be considered when designing passively-ducted systems, it is instructive to see how the different ducting systems perform relative to one another at a given ceiling pressure. In the analysis which follows, we assume IT equipment airflow is 125 cfm/kW [212 m3/hr/kW], racks are uniformly populated up to the 30-U position, and blanking panels are installed elsewhere. HACS clusters are assumed to be comprised of 20 total racks and ducted racks provide for 8 in (200 mm) of clearance between the rear of the server and the rear door for the rack. Figure 7 shows the cooling performance of ducted racks and ducted HACS as a function of ceiling plenum pressure and rack power density under the assumptions outlined above. “Good”, “Marginal”, and “Bad” cooling performance is based on the amount of IT exhaust recirculation. “Good” means that all of the IT-exhaust airflow is captured by the ceiling plenum and the Good/Marginal interface corresponds to a neutral pressure environment for the servers – with neither backpressure nor additional suction. “Bad” signifies at least 10% recirculation with 90% or less of the IT exhaust captured by the ceiling plenum. With refer-ence to Figure 7, we draw the following two main conclusions: Cooling performance is strongly linked to the ceiling plenum pressure. Both ducted HACS and individually-ducted racks can potentially accommodate reasonably high rack densities but only when appropriate plenum vacuum pressures can be achieved. Ducted HACS can adequately cool much higher densities than individually-ducted racks at a given ceiling vacuum pressure. For example, at a vacuum pressure of 0.03 inH20 (7.5 Pa), individually-ducted racks are limited to about 8 kW while ducted HACS systems can support up to about 16 kW. Furthermore, ducted HACS systems provide at least “marginal” cooling performance far into the “bad” range for individually-ducted racks. 30 Individually Ducted Racks 20 10 0 30 20 10 0 Rack Density (kW/rack) Rack Density (kW/rack) 0.04 [10] Good 0.06 [15] Ceiling Plenum Vacuum Pressure (inH2O, [Pa]) Ducted HACS 0 [0] 0 [0] Bad 0.02 [5] Bad Marginal 0.02 [5] 0.04 [10] Good 0.06 [15] Marginal 0.08 [20] 0.08 [20] 0.1 [25] 0.1 [25] Ceiling Plenum Vacuum Pressure (inH2O, [Pa]) Figure 8 summarizes the maximum rack density limits of Figure 7 and facilitates a more direct comparison of performance between ducted racks and ducted HACS. Ideally, ceiling plenum pressure should be maintained at just the values indicated by the curves of Figure 8 as these are the neutral-pressure operating points for the IT equipment. Lower values of ceiling vacuum result in some hot-exhaust recirculation while higher values imply wasted Schneider Electric – Data Center Science Center Rev 0 7 Figure 7 Cooling performance of passive ducted systems as a function of ceiling plenum pressure and rack density
  • 8. The Use of Ceiling-Ducted Air Containment in Data Centers cooling power as room (bypass) air is drawn into the ceiling plenum. Also indicated in Figure 8, is the practicality of achieving specific plenum pressures. Ceiling vacuum of greater than 0.03 inH2O (7.5 Pa) can be achieved by minimizing cutouts, employing more restrictive (or eliminating) perforated tiles, and selecting lighting fixtures that do not introduce substantial leakage paths. As ceiling vacuum increases beyond about 0.06 inH2O (15 Pa) or so, typical-density ceiling tiles begin to lift with the resulting leakage airflow limiting further increase in vacuum pressure. Plenum Vacuum Pressure (inH2O, [Pa]) [25] [20] [15] [10] [5] [0] Extreme With Effort Ducted HACS Ducted Racks 0 5 10 15 20 25 30 Rack Density (kW/rack) Typical Capability 0.1 0.08 0.06 0.04 0.02 0 Cooling analysis including entire ceiling plenum If CRAHs are controlled based on ceiling plenum pressure, then Figures 7 and 8 give the information the data center designer or operator needs to assure good cooling performance. But, without active ceiling pressure control, how can we be sure that a given design is capable of achieving the required plenum vacuum? Although, this question is best answered by performing a design-specific analysis, we give general design guidance here based on CFD analyses of a typical data center layout5. The layout includes four rows of 10 racks; 20 racks on one side of the room are individually ducted while the other 20 racks form one ducted HACS cluster. Four CRAHs are placed at the ends of the hot aisles. CFD simulations cover the following design values: • Cooling-to-IT airflow ratio: 0.8, 1.0, 1.2 • Ceiling leakiness: “leaky”, “typical”, “well sealed” • Ceiling plenum depth: 12, 18, 24, 36, 48, 60 in (0.30, 0.46, 0.61, 0.91, 1.22, 1.52 m) • Rack density: 2, 6, 12 kW Summarizing the CFD results, average cooling performance is a fairly weak function of plenum depth and rack density; with deeper plenums and lower density yielding somewhat better performance. Cooling performance is moderately affected by drop-ceiling leakiness with “tighter” being generally better though “typical” plenums perform much closer to “well sealed” than “leaky”. Finally, cooling performance is a strong function of cooling-to-IT airflow 5 VanGilder, J., and Zhang, X., 2014, “Cooling Performance of Ceiling-Plenum-Ducted Containment Systems in Data Centers”, Submitted for Publication. Proceedings of IEEE ITHERM Conference, May 27-30, Orlando, Florida. Schneider Electric – Data Center Science Center Rev 0 8 Figure 8 Target ceiling plenum set point pressure as a function of rack density
  • 9. The Use of Ceiling-Ducted Air Containment in Data Centers ratio with higher values better. For the latter, values of one are generally acceptable for ducted HACS but ducted racks may require cooling-to-IT airflow ratios of 1.2 or higher. While average cooling performance is only a weak function of plenum depth, the uniformity of cooling performance (i.e., rack-to-rack variations) does depend on plenum depth. Figure 9 shows the rack-to-rack uniformity in cooling performance for typical design conditions (cooling-to-IT airflow ratio of 1 and “Typical” ceiling leakiness) of ducted HACS. Note that uniformity is good with plenums deeper than 18-24 in (0.46-0.61 m). Furthermore, cooling uniformity is not strongly affected by rack density with even 12 kW racks (and higher) yielding “good” uniformity provided this minimum plenum depth is provided. Cooling uniformity for ducted racks (not shown) is even slightly better than that for ducted HACS due to the more-isolated nature of individual rack ducting. 100% 95% 90% 85% 80% 75% 70% Cooling Performance Uniformity 2 kW Good Marginal Bad 6 kW 12 kW 12 18 24 30 36 42 48 [300] [460] [610] [760] [910] [1070] [1220] Plenum Depth (in, [mm]) Cooling performance of active ducted systems With an understanding of the airflow physics of passive systems we now provide a brief discussion of active systems. Although active-ducted systems, i.e., those with fans to force the airflow into the ceiling plenum may be able to overcome adverse plenum pressures, they may do so at the expense of other areas of the data center. In simple terms, whatever airflow gets pushed into the ceiling plenum has to find a way out and, if CRAH airflow is insufficient or the plenum is too restrictive, hot air will simply be forced back out elsewhere – through perforated ceiling tiles, leakage paths, and even other ducted equipment. For this reason, it is recommended that active systems be deployed following the same design guidelines as for passive systems, e.g., Figures 7 and 8 and in the “Guidance for implementation” section below. Additionally, the reader should refer to the product literature related to the maximum airflow of the active system under consideration. Table 1 summarizes the primary considerations when selecting a specific ceiling-ducted architecture. Capital cost is similar for the passive systems but substantially higher for the active ducted rack. Because the active systems draw fan power, they will also cost more in operating costs which will negatively offset some of the energy saving benefit of containment. Schneider Electric – Data Center Science Center Rev 0 9 Figure 9 Cooling performance uniformity as a function of ceiling plenum depth for Ducted HACS Comparison of ducting options
  • 10. The Use of Ceiling-Ducted Air Containment in Data Centers The primary limitation of passive ducted HACS is that a specific floor layout is required for its implementation. However, since the standard hot/cold aisle architecture has been a best-practices standard for many years, this may not be a real limitation. Where ducted HACS can be implemented, it offers the best performance with the highest density IT equipment while not adding to rack depth or requiring specific racks or adapter hardware. However, if only a sparse distribution of racks requires ducting or the layout required for ducted HACS is impractical, individual-rack options might be employed. In any case, passive ducted racks are a good overall choice especially with “shorter” servers up to moderate densities, e.g., up to about 8 kW/rack or even higher if the required ceiling plenum vacuum pressure can be achieved. Active ducted systems may offer an advantage in the case where ducted HACS are impracti-cal due to layout and passive ducted racks are too limited in density at the maximum achievable ceiling plenum vacuum. However, the general use of active ducted systems to compensate for undesirable plenum pressure is not recommended due to the likelihood of creating cooling problems elsewhere in the data center. The preferred approach is to first address ceiling plenum pressure problems (e.g., by increasing ducted cooling airflow, improving ceiling “tightness”, and/or increasing plenum depth) before deploying ducted equipment of any kind. Additional considerations may also guide the selection of particular ducted-containment architecture. These include the possible interference with fire suppression and lighting, cooling performance under emergency conditions, and noise. The reader is also reminded that there are other cold and hot-aisle containment options available beyond the plenum-ducted options discussed here. See the references noted in the Introduction for more information. Table 1 Comparison of ducted air containment architectures Consideration Ducted air containment Passive ducted rack Active ducted rack Ducted HACS Capital cost $500 - 700 / rack $1,800 - 2,000 / rack $500 - 1,000 / rack Works with any floor layout Yes Possibly1 No Works with all racks without special hardware No No Yes Maintenance and monitoring free (power feed not required) Yes No Yes Allows for normal (minimum) row pitch Possibly2 No Yes Best choice for high density (6kW) or low plenum vacuum pressure No No Yes 1May require wider row pitch 2Deeper racks are recommended for use with deeper servers and higher densities Schneider Electric – Data Center Science Center Rev 0 10
  • 11. The Use of Ceiling-Ducted Air Containment in Data Centers Ensure adequate ceiling plenum vacuum pressure Ideally, the proposed new design or retrofit should be simulated using CFD software to ensure that adequate vacuum and reasonably uniform pressures can be achieved throughout the ceiling plenum. At a minimum, the following best-practices should be observed: • Ceiling plenums should be at least 18 in (450 mm) deep in all cases while deeper is better when practical. • Ducted cooling airflow should exceed ducted IT airflow by a minimum 10% for most cases or 20% when passive ducted racks are employed with relatively leaky drop ceil-ing systems. • Ceiling plenum vacuum should be maximized: o Minimize and seal leakage paths in the drop ceiling o Minimize the number of perforated ceiling tiles and use more restrictive tiles • Ducted equipment should be configured in reasonably uniform (with respect to geomet-ric configuration and IT density) layouts to maximize plenum pressure uniformity. Note that, un-ducted equipment does not necessarily need to conform to this guideline as it does not affect ceiling plenum airflow dynamics. Minimize leakage paths in containment systems Sealing leakage paths in containment systems as much as practical helps ensure that the ceiling plenum remains the “path of least resistance” for rack exhaust airflow. Follow these best practices: • Fill empty rack spaces with blanking panels or brush strips to minimize recirculation from the back to the front of the rack. • Cover as many openings in the rack enclosure as possible and, in the case of passive ducted racks, also seal the rear door of the rack. • Keep the space behind IT equipment as free and clear of cabling and other obstruc-tions as possible. With passive ducted racks, ensure at least about 8 in (200 mm) of space between the rear of the server and rack rear door. Use deeper racks if neces-sary to achieve this. • For passive ducted racks, install deeper IT equipment lower in the rack to avoid choke points for the exhaust airflow. Employ active ducted containment with caution For configurations which include active containment systems, verifying the performance of the intended application in advance with CFD is even more attractive. With active systems there is the risk that, while the active ducted equipment will perform well – apparently “fixing” a hot spot, problems will be created elsewhere in the data center. Such problems may not be readily apparent or easy to troubleshoot. In any event, increase the likelihood of a successful implementation by following the best practices recommended above even with active systems. Schneider Electric – Data Center Science Center Rev 0 11 Guidance for implementation
  • 12. The Use of Ceiling-Ducted Air Containment in Data Centers Ducted air containment can simultaneously improve the energy efficiency and reliability of data centers. Since all ducted equipment, ducted cooling units, and the ceiling plenum function as a single entity, the use of CFD modeling is recommended for new deployments particularly when design constraints are close to the best-practice limits established here. In any case, deployment advice centers on ensuring an adequate and fairly uniform vacuum pressure in the ceiling plenum. This, in turn, can be achieved by providing sufficient ducted cooling airflow, creating a relatively “tight” ceiling system, employing deeper ceiling plenums, and sealing unnecessary leakage paths in racks and containment structures. About the authors Schneider Electric – Data Center Science Center Rev 0 12 Conclusion Jim VanGilder is responsible for Schneider Electric’s data-center Computational Fluid Dynamics (CFD) software development and related research. He has authored or co-authored more than 40 peer-reviewed technical papers and holds more than 15 patents in the field of data center cooling. He is an active American Society of Heating, Refrigerating, and Air- Conditioning Engineers (ASHRAE) member where he is a recent Chair of Technical Committee 4.10, Indoor Environmental Modeling. Jim is a registered professional engineer in the state of Massachusetts. He has master’s degree in mechanical engineering from Duke University and over 20 years experience using and developing CFD tools. Simon Zhang is a Sr. Research Engineer with APC by Schneider Electric working on data center design, operation, and management software platforms. He has extensive experience with real-time cooling predictions indoor airflow simulations, and has author/co-authored 12 patents (granted or pending) and over a dozen peer-reviewed technical papers on data center cooling and energy assessment techniques. He is actively involved in data center communities and has chaired and organized many technical sessions of ASME and IEEE conferences. He received his M.S. in Mechanical Engineering at Syracuse University in 2006 and an MBA degree from Boston University in 2013. Paul Lin is a Senior Research Analyst at Schneider Electric's Data Center Science Center. He holds a Bachelor’s degree in Mechanical Engineering from Jilin University where he majored in Heating, Refrigeration, and Air Conditioning. He also holds a Master’s degree in Thermody-namic Engineering from Jilin University. Before joining Schneider Electric, Paul worked as the RD Project Leader in LG Electronics for several years. He is now designated as a “Data Center Certified Associate”, an internationally recognized validation of the knowledge and skills required of a data center professional.
  • 13. The Use of Ceiling-Ducted Air Containment in Data Centers Cooling Options for Rack Equipment with Side-to-Side Airflow White Paper 50 The Different Types of Air Distribution for IT Environments White Paper 55 Impact of Hot and Cold Aisle Containemnt on Data Center Temperature and Efficiency White Paper 135 Data Center Projects: Establishing a Floor Plan White Paper 144 Implementing Hot and Cold Aisle Containment in Existing Data Centers White Paper 153 Data Center Temperature Rise during a Cooling System Outage White Paper 179 Browse all white papers whitepapers.apc.com Browse all TradeOff Tools™ tools.apc.com Contact us Schneider Electric – Data Center Science Center Rev 0 13 Resources © 2014 Schneider Electric. All rights reserved. For feedback and comments about the content of this white paper: Data Center Science Center dcsc@schneider-electric.com If you are a customer and have questions specific to your data center project: Contact your Schneider Electric representative at www.apc.com/support/contact/index.cfm