SlideShare una empresa de Scribd logo
1 de 2
1
Sean L. Blocker, MBA Manager
4712 Indiana Ave, Ft. Wayne, IN 46807
(260) 220–9336 seanlblocker@gmail.com
Education:
Master’s in Business Administration (3.46 GPA) Indiana University
BA in History, Economics minor (3.56 GP) Augsburg College
Accomplishments:
 $1,000,000+ annual cost savings through team leadership and mentoring utilizing Lean, OEE, and I.E. tools and concepts.
 $1,000,000 production roll-out resulting in Supplier of the Year award for Lincoln Foodservice.
 Achieved 20% EBITA for Group Dekko through effective management of 22% inventory reduction, labor allocation, and budgeted
resources, aiding in preparation for operations consolidation.
 $243,000 annual labor cost savings for Harris-Kayot as Project Leader restructuring production line process and throughput.
 Reinforcement of safety protocols resulting in reduced injuries and zero LTA for multiple firms, motivated through daily team
meetings and training
 Successfulcompletion of new start-up facilities, product work centers/cells, product launches, and production process changes.
Certifications:
Lean Manufacturing Six Sigma Project Management RFID Microsoft Project
Summary of Tools and Processes Used
- Lean Principles/ Value Stream / 5S / Capacity planning and evaluation / Kaizan / Industrial Engineering / OEE
- Six Sigma / Root Cause Analysis / CAR / QS9000 / ISO 9001
- Project Management / New Product Launches / APQP / PPAP / PCC / PSO
- Production Scheduling / Kanban / ERP / WMS / RFID / MRP
- OSHA / IOSHA / Safety Incentive Programs / Production Incentive Programs
- MS Office (Word, Excel, PowerPoint) / Microsoft Project & Minitab
Career Experience: 1985 – 2014
Craftline Graphics, Inc. – Fort Wayne, IN
This manufacturing facility printed, packaged, and distributed goods for the retail market. Resigned position – wife terminally ill.
Reference available
Department Manager – Packaging and Fulfillment
 Successful management of department team in lean processing and +10% productivity gains during 70% growth period, allowing
for increased capacity without corresponding increase of labor cost
 Manager of 2 supervisors and 80+ hourly personnel in packaging and assembly of display materials in 24-48 hour ship window
 Successfuldevelopment and growth of key personnel
 Implementation of Quality team and KPI reporting and visualization, leading to 8% decrease in quality failures to <2%.
Group Dekko – Garret, IN
This manufacturing facility fabricated and assembled goods for the architectural lighting industry. Position ended due to
plant/organizational consolidation. Reference available
Production Manager
 Managed fabrication, stamping, and powder coat department teams to 20%+ EBITA during record sales year
 22% WIP inventory reduction, 1% total year end variance
 Manager of 5 supervisors and 90+ personnel in 3 shift operation
 Cross training and team empowerment leading to improved throughput, inventory reduction, and safety occurrences
Lincoln Foodservice Products – Ft. Wayne, IN
This manufacturing division of a fortune 500 company assembled goods for food service industry. Position is ending due to product line
being sold and product/plant rationalization. Plant closed. References available
Production Supervisor
 OTD improvement from 71% to 94% during $500,000 savings through reduced labor
 Successfulcompletion of $1,000,000 production roll out resulting in Supplier of the Year award
 Implementation of metrics, performance objectives, and operating procedures
 Conduct training and ensure conformation of SMS safety program; zero LTA during tenure
2
Nature’s Fuel - Atwood, IN
Contracted through TechEdge Corp to launch this green-field bio-fuel manufacturing facility to process patented fuel mixtures into solid
bio-fuels. Assignment successfully concluded and plant turned over at end of Jan 08. Reference available
Project Manager
 Lead engineering, electrical, and mechanical contractors through multi-million dollar production facility implementation
 Completed process evaluation studies and vendor negotiations resulting in $80,000 in reclaimed costs
 Develop and implement all required quality testing and documentation procedures, safety, and equipment training
National Tube Form - Fort Wayne, IN
This privately held company was a tier-one and tier-two provider to automotive and trucking in a non-union environment. Position
ended due to operations consolidations. References available
Production Manager
 Lead supervisors, engineering, maintenance, and 100+ associates in production for $30+ million business unit
 Successfulleadership and coordination of 60+ product launches during 9-month period, through engineering development, FMEA,
APQP, and PPAP process
 Realized a 20% improvement in productivity, efficiency, and yield after implementation of new production cells and OEE metrics
 Coordinated on-boarding of $4,000,000 in new business—multi-year, multi-million-dollar programs with engineering, production,
vendors, customers, HR, and shipping to ensure client satisfaction is maintained
Parker Hannifin HVD, Hicksville, OH
This Fortune 500 company manufactured valve assemblies for multiple industries in a union environment. Position ended due to
multiple plant consolidation. Reference available
Production Supervisor/Coordinator
 Lead 3 shifts in $15-$20 million annual production, planning, scheduling, material flow, staffing requirements
 Obtained $240,000 annual savings for group by participation in a Kaizan implementation
 30+% gains in production, OTD, and sales backlog reduction through OEE metrics, Lean Manufacturing, and Kanban programs
Pentacon Industrial Group - Fort Wayne, IN
This was a non-union, material distribution company to large manufacturers. Position ended when the company filed for bankruptcy.
Senior Account Executive
 Oversee all facets of $4.6 million in customer accounts, covering IN, OH, California, Texas, Mexico
 Successfully organize and lead process recapturing $300,000 in past due invoicing
 Achieved cost savings for company and client through improved inventory management and inventory reduction of 30%
 Direct customer service & purchasing support personnel; achieve on time JIT shipment & maximum inventory turns
Harris Kayot - Fort Wayne, IN
This privately held company was one of the largest US makers of pontoon and deck boats. In mid-2001, the market contracted
dramatically forcing a major downsizing throughout the company.
Project Coordinator / Process Improvement Leader
 Achieved $243,000 annual labor cost savings as the Project Leader restructuring job shop to assembly line production process
 Reorganized warehouse distribution-to-production process; $25,000 annualcost savings
 Develop SOP, Man Assignments, and “takt” times using I.E. studies/process evaluations
 Participated in creation of Access database, with consultant, enabling accurate management of work force levels and “takt” time
changes, as dictated by sales
Cooper Engineered Products - Auburn, IN
Production Supervisor
 Supervise 40 associates in Tier I automotive Lean Manufacturing environment; assisting in training and implementation of lean
production and Kanban concepts in department, resulting in an 80% reduction of WIP, with annual cost savings of $200,000
 Developed fixture inventory & maintenance program lowering lost production & set-up downtime ($100,000 annual savings)
Twin City Wire-MFI, Eagan, MN and division Ohio Wire Cloth, Englewood, OH
Project Manager / Plant Superintendent / Sales Engineer
 Successfulstart-up project leadership overseeing all details and requirements resulting in implementation of new production facility
 Oversee all facets of production and facilities management, including inside sales, and purchasing.
 Accomplished 250% sales increase and improved profit margins though direct customer sales calling and market development.

Más contenido relacionado

La actualidad más candente

CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23Avinash Wadaskar
 
Bruce Shaver Operations 2011
Bruce Shaver   Operations 2011Bruce Shaver   Operations 2011
Bruce Shaver Operations 2011tbshaver
 
Dennis Potts - Plant Manager with Turnaround Experience
Dennis Potts - Plant Manager with Turnaround ExperienceDennis Potts - Plant Manager with Turnaround Experience
Dennis Potts - Plant Manager with Turnaround ExperienceDennis Potts
 
About Andrew Avgousti
About Andrew AvgoustiAbout Andrew Avgousti
About Andrew Avgoustiaavgousti
 
bufford, peter resume 160608
bufford, peter resume 160608bufford, peter resume 160608
bufford, peter resume 160608Peter Bufford
 
resume_Sid Persaud_Dec 9 2015
resume_Sid Persaud_Dec 9 2015resume_Sid Persaud_Dec 9 2015
resume_Sid Persaud_Dec 9 2015Sid Persaud
 
Russell C Davies
Russell C DaviesRussell C Davies
Russell C DaviesRuss Davies
 
CV_NKAM_18113_Global Quality Manager
CV_NKAM_18113_Global Quality ManagerCV_NKAM_18113_Global Quality Manager
CV_NKAM_18113_Global Quality ManagerMadhuubalan N K A
 
Arthur Rehn no contact information 4-9-16
Arthur Rehn no contact information 4-9-16Arthur Rehn no contact information 4-9-16
Arthur Rehn no contact information 4-9-16Art Rehn
 
Quality Manager-Damon Goodwin
Quality Manager-Damon GoodwinQuality Manager-Damon Goodwin
Quality Manager-Damon GoodwinDamon Goodwin
 
2016 Fermenick Resume doc
2016 Fermenick Resume doc2016 Fermenick Resume doc
2016 Fermenick Resume docMark Fermenick
 
Jxhakim industrial 08'2016 ( updated )
Jxhakim industrial  08'2016 ( updated )Jxhakim industrial  08'2016 ( updated )
Jxhakim industrial 08'2016 ( updated )Jehanzeb Hakim
 

La actualidad más candente (19)

CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23
 
Abhimanyu Katoch Cv.
Abhimanyu Katoch Cv.Abhimanyu Katoch Cv.
Abhimanyu Katoch Cv.
 
Bruce Shaver Operations 2011
Bruce Shaver   Operations 2011Bruce Shaver   Operations 2011
Bruce Shaver Operations 2011
 
Dennis Potts - Plant Manager with Turnaround Experience
Dennis Potts - Plant Manager with Turnaround ExperienceDennis Potts - Plant Manager with Turnaround Experience
Dennis Potts - Plant Manager with Turnaround Experience
 
About Andrew Avgousti
About Andrew AvgoustiAbout Andrew Avgousti
About Andrew Avgousti
 
bufford, peter resume 160608
bufford, peter resume 160608bufford, peter resume 160608
bufford, peter resume 160608
 
DWADAMS RESUME2
DWADAMS RESUME2DWADAMS RESUME2
DWADAMS RESUME2
 
Resume 2014 2
Resume 2014 2Resume 2014 2
Resume 2014 2
 
Resume
ResumeResume
Resume
 
Michael Salvatore Valentino CPIM resume 2012
Michael Salvatore Valentino CPIM resume 2012Michael Salvatore Valentino CPIM resume 2012
Michael Salvatore Valentino CPIM resume 2012
 
resume_Sid Persaud_Dec 9 2015
resume_Sid Persaud_Dec 9 2015resume_Sid Persaud_Dec 9 2015
resume_Sid Persaud_Dec 9 2015
 
Russell C Davies
Russell C DaviesRussell C Davies
Russell C Davies
 
CV_NKAM_18113_Global Quality Manager
CV_NKAM_18113_Global Quality ManagerCV_NKAM_18113_Global Quality Manager
CV_NKAM_18113_Global Quality Manager
 
Arthur Rehn no contact information 4-9-16
Arthur Rehn no contact information 4-9-16Arthur Rehn no contact information 4-9-16
Arthur Rehn no contact information 4-9-16
 
Resume Giridhar
Resume GiridharResume Giridhar
Resume Giridhar
 
Quality Manager-Damon Goodwin
Quality Manager-Damon GoodwinQuality Manager-Damon Goodwin
Quality Manager-Damon Goodwin
 
2016 Fermenick Resume doc
2016 Fermenick Resume doc2016 Fermenick Resume doc
2016 Fermenick Resume doc
 
PRADIPTA BHATTACHARYA_resume(L)
PRADIPTA BHATTACHARYA_resume(L)PRADIPTA BHATTACHARYA_resume(L)
PRADIPTA BHATTACHARYA_resume(L)
 
Jxhakim industrial 08'2016 ( updated )
Jxhakim industrial  08'2016 ( updated )Jxhakim industrial  08'2016 ( updated )
Jxhakim industrial 08'2016 ( updated )
 

Destacado

マレーシアの歴史.Blog
マレーシアの歴史.Blogマレーシアの歴史.Blog
マレーシアの歴史.BlogRobert Croker
 
Aragon Juan - como medir la estrategia de la empresa
Aragon Juan - como medir la estrategia de la empresaAragon Juan - como medir la estrategia de la empresa
Aragon Juan - como medir la estrategia de la empresaJoel Ernesto Vilchez Aquino
 
Административная ответственность
Административная ответственностьАдминистративная ответственность
Административная ответственностьДенис Клянченко
 
Elecciones 2012
Elecciones 2012Elecciones 2012
Elecciones 2012meowingrrr
 
온라인 야마토 SDS119,COM 생방송바둑이카지노무료머니dd9
온라인 야마토 SDS119,COM 생방송바둑이카지노무료머니dd9 온라인 야마토 SDS119,COM 생방송바둑이카지노무료머니dd9
온라인 야마토 SDS119,COM 생방송바둑이카지노무료머니dd9 장 민호
 
Short list of ideas of digipak .
Short list of ideas of digipak .Short list of ideas of digipak .
Short list of ideas of digipak .meganmanigan
 
Prevalensi penyakit kardiovaskuler
Prevalensi penyakit kardiovaskulerPrevalensi penyakit kardiovaskuler
Prevalensi penyakit kardiovaskulernoormansurya234
 
การสร้าง Query เบื้องต้น
การสร้าง Query เบื้องต้นการสร้าง Query เบื้องต้น
การสร้าง Query เบื้องต้นNatthapon Inhom
 
知識創造企業
知識創造企業知識創造企業
知識創造企業尚 鈴木
 
Example presentation 1
Example presentation 1Example presentation 1
Example presentation 1Robert Croker
 
Practical tips for monitoring of an iui cycle
Practical tips for monitoring of an iui cyclePractical tips for monitoring of an iui cycle
Practical tips for monitoring of an iui cycleLifecare Centre
 
Clinical management of men with nonobstructive azoospermia - Steps Before Spe...
Clinical management of men with nonobstructive azoospermia - Steps Before Spe...Clinical management of men with nonobstructive azoospermia - Steps Before Spe...
Clinical management of men with nonobstructive azoospermia - Steps Before Spe...Sandro Esteves
 
Role of LH in Controlled Ovarian Stimulation
Role of LH in Controlled Ovarian StimulationRole of LH in Controlled Ovarian Stimulation
Role of LH in Controlled Ovarian StimulationSandro Esteves
 

Destacado (19)

SPIRITOSO_DEF
SPIRITOSO_DEFSPIRITOSO_DEF
SPIRITOSO_DEF
 
マレーシアの歴史.Blog
マレーシアの歴史.Blogマレーシアの歴史.Blog
マレーシアの歴史.Blog
 
Pumas
PumasPumas
Pumas
 
Class 4
Class 4Class 4
Class 4
 
Aragon Juan - como medir la estrategia de la empresa
Aragon Juan - como medir la estrategia de la empresaAragon Juan - como medir la estrategia de la empresa
Aragon Juan - como medir la estrategia de la empresa
 
System1
System1System1
System1
 
Административная ответственность
Административная ответственностьАдминистративная ответственность
Административная ответственность
 
Test
TestTest
Test
 
Elecciones 2012
Elecciones 2012Elecciones 2012
Elecciones 2012
 
온라인 야마토 SDS119,COM 생방송바둑이카지노무료머니dd9
온라인 야마토 SDS119,COM 생방송바둑이카지노무료머니dd9 온라인 야마토 SDS119,COM 생방송바둑이카지노무료머니dd9
온라인 야마토 SDS119,COM 생방송바둑이카지노무료머니dd9
 
Short list of ideas of digipak .
Short list of ideas of digipak .Short list of ideas of digipak .
Short list of ideas of digipak .
 
Prevalensi penyakit kardiovaskuler
Prevalensi penyakit kardiovaskulerPrevalensi penyakit kardiovaskuler
Prevalensi penyakit kardiovaskuler
 
การสร้าง Query เบื้องต้น
การสร้าง Query เบื้องต้นการสร้าง Query เบื้องต้น
การสร้าง Query เบื้องต้น
 
知識創造企業
知識創造企業知識創造企業
知識創造企業
 
Example presentation 1
Example presentation 1Example presentation 1
Example presentation 1
 
Practical tips for monitoring of an iui cycle
Practical tips for monitoring of an iui cyclePractical tips for monitoring of an iui cycle
Practical tips for monitoring of an iui cycle
 
Sentiment Analysis
Sentiment AnalysisSentiment Analysis
Sentiment Analysis
 
Clinical management of men with nonobstructive azoospermia - Steps Before Spe...
Clinical management of men with nonobstructive azoospermia - Steps Before Spe...Clinical management of men with nonobstructive azoospermia - Steps Before Spe...
Clinical management of men with nonobstructive azoospermia - Steps Before Spe...
 
Role of LH in Controlled Ovarian Stimulation
Role of LH in Controlled Ovarian StimulationRole of LH in Controlled Ovarian Stimulation
Role of LH in Controlled Ovarian Stimulation
 

Similar a Results Driven Mgr, MBA - Sean Blocker

VP Operations / General Manager
VP Operations / General ManagerVP Operations / General Manager
VP Operations / General Managerjiwri79
 
Resume_Joe_Belanger Oct 15
Resume_Joe_Belanger Oct 15 Resume_Joe_Belanger Oct 15
Resume_Joe_Belanger Oct 15 Joe Belanger
 
Functional resume 2016-OH
Functional resume 2016-OHFunctional resume 2016-OH
Functional resume 2016-OHBill Ferguson
 
Resume M Pitcher 2010 08 27
Resume   M Pitcher 2010 08 27Resume   M Pitcher 2010 08 27
Resume M Pitcher 2010 08 27Michael Pitcher
 
Scott a. bean resume july 2016
Scott a. bean resume july 2016Scott a. bean resume july 2016
Scott a. bean resume july 2016Scott Bean
 
Michael McMeans Resume 02.06.16
Michael McMeans Resume 02.06.16Michael McMeans Resume 02.06.16
Michael McMeans Resume 02.06.16Michael McMeans
 
Roger Banks: My Professional Resume
Roger Banks: My Professional ResumeRoger Banks: My Professional Resume
Roger Banks: My Professional Resumerogerkbanks
 
GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015Tim Gilliatt
 
Resume Edgardo Rivera-Sueiro 2015-v1
Resume Edgardo Rivera-Sueiro 2015-v1Resume Edgardo Rivera-Sueiro 2015-v1
Resume Edgardo Rivera-Sueiro 2015-v1Edgardo Rivera-Sueiro
 
Maintenance Excellence
Maintenance ExcellenceMaintenance Excellence
Maintenance ExcellenceDavid McDonald
 
CRIDDLE Resume 2015
CRIDDLE Resume 2015CRIDDLE Resume 2015
CRIDDLE Resume 2015Corey Riddle
 
Schneckenaichner,JoJo_ExpandedResume_HC
Schneckenaichner,JoJo_ExpandedResume_HCSchneckenaichner,JoJo_ExpandedResume_HC
Schneckenaichner,JoJo_ExpandedResume_HCJoJo Schneckenaichner
 
KachurResume 11-13-14
KachurResume 11-13-14KachurResume 11-13-14
KachurResume 11-13-14Bob Kachur
 

Similar a Results Driven Mgr, MBA - Sean Blocker (20)

VP Operations / General Manager
VP Operations / General ManagerVP Operations / General Manager
VP Operations / General Manager
 
Resume_Joe_Belanger Oct 15
Resume_Joe_Belanger Oct 15 Resume_Joe_Belanger Oct 15
Resume_Joe_Belanger Oct 15
 
Functional resume 2016-OH
Functional resume 2016-OHFunctional resume 2016-OH
Functional resume 2016-OH
 
M Pitcher Resume
M Pitcher ResumeM Pitcher Resume
M Pitcher Resume
 
Resume M Pitcher 2010 08 27
Resume   M Pitcher 2010 08 27Resume   M Pitcher 2010 08 27
Resume M Pitcher 2010 08 27
 
Scott a. bean resume july 2016
Scott a. bean resume july 2016Scott a. bean resume july 2016
Scott a. bean resume july 2016
 
Smiley Stephen Resume
Smiley Stephen ResumeSmiley Stephen Resume
Smiley Stephen Resume
 
Michael McMeans Resume 02.06.16
Michael McMeans Resume 02.06.16Michael McMeans Resume 02.06.16
Michael McMeans Resume 02.06.16
 
Michael Oczowinski Resume
Michael Oczowinski ResumeMichael Oczowinski Resume
Michael Oczowinski Resume
 
Roger Banks: My Professional Resume
Roger Banks: My Professional ResumeRoger Banks: My Professional Resume
Roger Banks: My Professional Resume
 
GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015
 
RES_Bob_Polcyn_2015
RES_Bob_Polcyn_2015RES_Bob_Polcyn_2015
RES_Bob_Polcyn_2015
 
Resume Edgardo Rivera-Sueiro 2015-v1
Resume Edgardo Rivera-Sueiro 2015-v1Resume Edgardo Rivera-Sueiro 2015-v1
Resume Edgardo Rivera-Sueiro 2015-v1
 
Maintenance Excellence
Maintenance ExcellenceMaintenance Excellence
Maintenance Excellence
 
KaranianRE Resume - 2016FF
KaranianRE Resume - 2016FFKaranianRE Resume - 2016FF
KaranianRE Resume - 2016FF
 
CRIDDLE Resume 2015
CRIDDLE Resume 2015CRIDDLE Resume 2015
CRIDDLE Resume 2015
 
Schneckenaichner,JoJo_ExpandedResume_HC
Schneckenaichner,JoJo_ExpandedResume_HCSchneckenaichner,JoJo_ExpandedResume_HC
Schneckenaichner,JoJo_ExpandedResume_HC
 
sunil_jan_16
sunil_jan_16sunil_jan_16
sunil_jan_16
 
Anthony_Scianna_Resume
Anthony_Scianna_ResumeAnthony_Scianna_Resume
Anthony_Scianna_Resume
 
KachurResume 11-13-14
KachurResume 11-13-14KachurResume 11-13-14
KachurResume 11-13-14
 

Results Driven Mgr, MBA - Sean Blocker

  • 1. 1 Sean L. Blocker, MBA Manager 4712 Indiana Ave, Ft. Wayne, IN 46807 (260) 220–9336 seanlblocker@gmail.com Education: Master’s in Business Administration (3.46 GPA) Indiana University BA in History, Economics minor (3.56 GP) Augsburg College Accomplishments:  $1,000,000+ annual cost savings through team leadership and mentoring utilizing Lean, OEE, and I.E. tools and concepts.  $1,000,000 production roll-out resulting in Supplier of the Year award for Lincoln Foodservice.  Achieved 20% EBITA for Group Dekko through effective management of 22% inventory reduction, labor allocation, and budgeted resources, aiding in preparation for operations consolidation.  $243,000 annual labor cost savings for Harris-Kayot as Project Leader restructuring production line process and throughput.  Reinforcement of safety protocols resulting in reduced injuries and zero LTA for multiple firms, motivated through daily team meetings and training  Successfulcompletion of new start-up facilities, product work centers/cells, product launches, and production process changes. Certifications: Lean Manufacturing Six Sigma Project Management RFID Microsoft Project Summary of Tools and Processes Used - Lean Principles/ Value Stream / 5S / Capacity planning and evaluation / Kaizan / Industrial Engineering / OEE - Six Sigma / Root Cause Analysis / CAR / QS9000 / ISO 9001 - Project Management / New Product Launches / APQP / PPAP / PCC / PSO - Production Scheduling / Kanban / ERP / WMS / RFID / MRP - OSHA / IOSHA / Safety Incentive Programs / Production Incentive Programs - MS Office (Word, Excel, PowerPoint) / Microsoft Project & Minitab Career Experience: 1985 – 2014 Craftline Graphics, Inc. – Fort Wayne, IN This manufacturing facility printed, packaged, and distributed goods for the retail market. Resigned position – wife terminally ill. Reference available Department Manager – Packaging and Fulfillment  Successful management of department team in lean processing and +10% productivity gains during 70% growth period, allowing for increased capacity without corresponding increase of labor cost  Manager of 2 supervisors and 80+ hourly personnel in packaging and assembly of display materials in 24-48 hour ship window  Successfuldevelopment and growth of key personnel  Implementation of Quality team and KPI reporting and visualization, leading to 8% decrease in quality failures to <2%. Group Dekko – Garret, IN This manufacturing facility fabricated and assembled goods for the architectural lighting industry. Position ended due to plant/organizational consolidation. Reference available Production Manager  Managed fabrication, stamping, and powder coat department teams to 20%+ EBITA during record sales year  22% WIP inventory reduction, 1% total year end variance  Manager of 5 supervisors and 90+ personnel in 3 shift operation  Cross training and team empowerment leading to improved throughput, inventory reduction, and safety occurrences Lincoln Foodservice Products – Ft. Wayne, IN This manufacturing division of a fortune 500 company assembled goods for food service industry. Position is ending due to product line being sold and product/plant rationalization. Plant closed. References available Production Supervisor  OTD improvement from 71% to 94% during $500,000 savings through reduced labor  Successfulcompletion of $1,000,000 production roll out resulting in Supplier of the Year award  Implementation of metrics, performance objectives, and operating procedures  Conduct training and ensure conformation of SMS safety program; zero LTA during tenure
  • 2. 2 Nature’s Fuel - Atwood, IN Contracted through TechEdge Corp to launch this green-field bio-fuel manufacturing facility to process patented fuel mixtures into solid bio-fuels. Assignment successfully concluded and plant turned over at end of Jan 08. Reference available Project Manager  Lead engineering, electrical, and mechanical contractors through multi-million dollar production facility implementation  Completed process evaluation studies and vendor negotiations resulting in $80,000 in reclaimed costs  Develop and implement all required quality testing and documentation procedures, safety, and equipment training National Tube Form - Fort Wayne, IN This privately held company was a tier-one and tier-two provider to automotive and trucking in a non-union environment. Position ended due to operations consolidations. References available Production Manager  Lead supervisors, engineering, maintenance, and 100+ associates in production for $30+ million business unit  Successfulleadership and coordination of 60+ product launches during 9-month period, through engineering development, FMEA, APQP, and PPAP process  Realized a 20% improvement in productivity, efficiency, and yield after implementation of new production cells and OEE metrics  Coordinated on-boarding of $4,000,000 in new business—multi-year, multi-million-dollar programs with engineering, production, vendors, customers, HR, and shipping to ensure client satisfaction is maintained Parker Hannifin HVD, Hicksville, OH This Fortune 500 company manufactured valve assemblies for multiple industries in a union environment. Position ended due to multiple plant consolidation. Reference available Production Supervisor/Coordinator  Lead 3 shifts in $15-$20 million annual production, planning, scheduling, material flow, staffing requirements  Obtained $240,000 annual savings for group by participation in a Kaizan implementation  30+% gains in production, OTD, and sales backlog reduction through OEE metrics, Lean Manufacturing, and Kanban programs Pentacon Industrial Group - Fort Wayne, IN This was a non-union, material distribution company to large manufacturers. Position ended when the company filed for bankruptcy. Senior Account Executive  Oversee all facets of $4.6 million in customer accounts, covering IN, OH, California, Texas, Mexico  Successfully organize and lead process recapturing $300,000 in past due invoicing  Achieved cost savings for company and client through improved inventory management and inventory reduction of 30%  Direct customer service & purchasing support personnel; achieve on time JIT shipment & maximum inventory turns Harris Kayot - Fort Wayne, IN This privately held company was one of the largest US makers of pontoon and deck boats. In mid-2001, the market contracted dramatically forcing a major downsizing throughout the company. Project Coordinator / Process Improvement Leader  Achieved $243,000 annual labor cost savings as the Project Leader restructuring job shop to assembly line production process  Reorganized warehouse distribution-to-production process; $25,000 annualcost savings  Develop SOP, Man Assignments, and “takt” times using I.E. studies/process evaluations  Participated in creation of Access database, with consultant, enabling accurate management of work force levels and “takt” time changes, as dictated by sales Cooper Engineered Products - Auburn, IN Production Supervisor  Supervise 40 associates in Tier I automotive Lean Manufacturing environment; assisting in training and implementation of lean production and Kanban concepts in department, resulting in an 80% reduction of WIP, with annual cost savings of $200,000  Developed fixture inventory & maintenance program lowering lost production & set-up downtime ($100,000 annual savings) Twin City Wire-MFI, Eagan, MN and division Ohio Wire Cloth, Englewood, OH Project Manager / Plant Superintendent / Sales Engineer  Successfulstart-up project leadership overseeing all details and requirements resulting in implementation of new production facility  Oversee all facets of production and facilities management, including inside sales, and purchasing.  Accomplished 250% sales increase and improved profit margins though direct customer sales calling and market development.