SlideShare una empresa de Scribd logo
1 de 37
Descargar para leer sin conexión
Architects & Architectural
Drawings
Integrated Project of
Introduction To Drawing,
Introduction To Construction
Industry and English 1
Members
• Teoh Jun Xiang
• Yee Jyh Lin
• Tang Ying Jien
• Quah Keng Yew
• Ow Xun Cong
• Bryan Teh Qing Da
Tutors
1. Introduction To Drawing
• Miss Noorul Iffa
2. Introduction To
Construction Industry
• Ms. Ann See Peng
3. English 1
• Ms. Thivilojana
Scope of work handled by
architects
Scope of work handled by architects
1) Taking client's instructions and preparation of
design brief
2) Site evaluation and analysis of development on
environment
• Lay foundation to an eco-friendly design
Scope of work handled by architects
3) Design and site
development
a) First draft: 1/500 – 1/200
scale.
• The architects generate 2-
3 preliminary designs from
the information acquired
from site evaluation.
• Meetings are conducted
with clients to determine
overall design strategy
Scope of work handled by architects
b) Structural design
 Deliver a design which
incorporates :
 Elevators, escalators etc
 Sanitary, plumbing etc
 Heating, ventilation and other
systems
Scope of work handled by architects
4) Client validation
o Scale: 1/100 – 1/50
• The architecture firm will work
with the client to refine the
original design
• The architecture firm will also
work closely with the general
contractor
• Other professions also brought
into process
Scope of work handled by architects
5) Process permit documents
• The permit documents are used to submit, coordinate, and
obtain the building permit from the city or council.
• The drawings are refined in regards to details and methods.
Scope of work handled by architects
6) Execution
• Plans are sent back and forth to the contractors and
engineers for review
• Most of the materials are specified
o Detailed 1/50, 1/20 and 1/10 scale plans
Scope of work handled by architects
7) Construction
• Conduct periodic inspections and evaluations on the
construction
Responsibilities and tasks at
different stage of
construction
Before construction
Consult with
the owner
Communicate
with project
team
Attend
meetings
Research
design criteriaReport
progress to
owner
Submit a
schedule (date
for start and
completion of
construction)
Submits
drawings and
specification to
owner
During construction
Administration
• Owner’s
representative
Site visit
• Observing
progress of work
Investigation
• Site conditions that are different
Communication
• Inform progress
• Report deviations and defects
Inspection
• Determine dates of completion
• Whether work conforms with contract document
After Construction
 The architect’s work continues until after the building
work.
 Part of the payment due to the builder – the retention –
is held back for up to twelve months and is only paid
out on the architect’s instruction, after any defects
have been rectified by the contractor.
 Remember that the architect’s opinion on compliance
with planning and building regulations is subject to
work not being changed during construction.
Authority and limitations of architects
 The architect’s authority might be actual, implied or apparent
during construction.
 Rejecting contractor’s work if work does not conform to the
contract documents is a common authority granted to
architects by contract.
 An architect often makes several site visits in order to
become familiar with the progress of the work
Stages and examples of
drawings & Types and
functions of drawings
1) Initial discussion and information gathering
• Show a portfolio of past projects
• Discuss goals, needs and requirements
• Visit the site and review the existing conditions
• Take as-built measurements and create plans
Types of drawings
As-built drawings
Types of drawings
Sketch drawings or freehand drawings
 Drawn using a free hand by holding a pen or pencil
 To initiate and freely work through ideas
2) Schematic design
• First phase in the design of a project
• Prepares schematic diagrams after detailed
discussions with client
3) Design development
• The project development phase
• The project’s composition,
dimensions, attributes and/or
specifications are determined
Types of drawings
Site Plans
 Describes the location and
orientation of a building
complex on a plot of land
 Provides information of the
site’s topography,
landscaping utilities and site
work.
Types of drawings
Orthographic projections
• Consists of plans, sections and elevations
• To illustrate three-dimensional objects in a
two-dimensional drawing
Materials shown on elevations
Plan symbols
Reflected ceiling plan
 Shows the items that are
located on the ceiling of a
room or space
Roof plan
 Show the basic shape of the
roof of a building
Types of drawings
Presentation drawings and renderings
• Drawings that are usually rendered
• Proposal for clients approval
• Means for others to study structure’s appearance
4) Construction drawings
• Drawings, plans, specifications and others
associated with a construction project
Types of drawings
Working drawings
• Final drawn instructions which the builder will use
on site to convert the design ideas into a real
building
• Detailed, specific and accurate
Assembly Drawings Component Drawings
5) Bidding documents
• The offering of particular prices to suit both the client
and the contractor
6) Construction administration
• The architect will oversee the fulfillment
of responsibilities of all parties to the
contract for construction
• Site visits
• The architect will keep the client updated
about the progress
References
Websites
 Career Option: Architect. (2015, February 5). Retrieved March 3,
2015, from Digi Careers website:
https://digicareers.wordpress.com/2015/02/05/career-option-
architect/
 De Biasse & Seminara Architects. (Date unknown). Retrieved March
3, 2015, from De Biasse & Seminara Architects’ website:
http://dbsem.com/the-five-phases-of-the-architectural-design-
process/
 George. A. M. (2007). Architectural Process. Retrieved March 3
2015 from Michael A. George Architect’s website:
http://www.seattlearchitects.com/realestate.html
 Charles Levin Architects. Schematic Design Phase. Retrieved
March 3 2015 from Charles Levin Architects’ website:
http://www.charleslevinarchitects.com/whatwedo/schematicdesign/s
chematicdesign.html
 Pilot Builders. (Date Unknown). Design - Build Process. Retrieved
March 3 2015 from http://www.pilotbuilders.com/design.php
References
 Isometric Projection. (Date Unknown). Retrieved March 3 2015 from
http://www3.ul.ie/~rynnet/keanea/isometri.htm
 Types of drawings for building design. (2015). Retrieved March 3
2015 from
http://www.designingbuildings.co.uk/wiki/Types_of_drawings_for_bui
lding_design
 Perspective Drawing - Linear and Aerial Perspective. (Date
Unknown). Retrieved March 3 2015 from
http://www.artyfactory.com/perspective_drawing/perspective_index.
html
 Chicago Architecture Foundation. (unknown date). DISCOVER
DESIGN- A Student Design Experience. Retrieved March 3 2015
from Chicago Architecture Foundation’s website:
http://discoverdesign.org/design/process
 Cellier, I. (2009) How to sell to architects- Part 2 – Architect’s
workflow
References
Blogs
 Build LLC. (2008, September 23). The Process of Architecture [Blog
post]. Retrieved from http://blog.buildllc.com/2008/09/the-process-
of-architecture/
 Cellier, I. (Date Unknown). How to sell architects – Part 2 –
Architect’s workflow [Blog post]. Retrieved from
http://www.polantis.com/blog/2009/10/06/how-to-sell-to-architects-
part-2-architects-workflow/
 Author Unknown. (Date Unknown)
Books
 Makstutis, G. (2010). Architecture – An Introduction. London:
Laurence King Publishing Ltd
 Ching, F. D. K. (2009). Architectural Graphics. New Jersey: John
Willey & Sons, Inc.
 Grau III, P. A., Muller, E. J., Fausett, J. G. (2010). Architectural
Drawing & Light Construction. New Jersey: Pearson Education, Inc.

Más contenido relacionado

Destacado

SarahScudder_Article
SarahScudder_ArticleSarahScudder_Article
SarahScudder_Article
Sarah Scudder
 

Destacado (20)

Binder1
Binder1Binder1
Binder1
 
How to get iso 9001 certification in dubai
How to get iso 9001 certification in dubaiHow to get iso 9001 certification in dubai
How to get iso 9001 certification in dubai
 
Academic form a4 (1)
Academic form a4 (1)Academic form a4 (1)
Academic form a4 (1)
 
How to select iso certification bodies in uae
How to select iso certification bodies in uaeHow to select iso certification bodies in uae
How to select iso certification bodies in uae
 
SarahScudder_Article
SarahScudder_ArticleSarahScudder_Article
SarahScudder_Article
 
Video política
Video políticaVideo política
Video política
 
5 steps to get iso 9001 certification in dubai
5 steps to get  iso 9001 certification in dubai5 steps to get  iso 9001 certification in dubai
5 steps to get iso 9001 certification in dubai
 
How to register a company in dubai
How to register a company in dubaiHow to register a company in dubai
How to register a company in dubai
 
English Oral Presentation Brief
English Oral Presentation BriefEnglish Oral Presentation Brief
English Oral Presentation Brief
 
Painting the world Ori
Painting the world OriPainting the world Ori
Painting the world Ori
 
Images
ImagesImages
Images
 
ITD Design design process journal brief
ITD Design design process journal briefITD Design design process journal brief
ITD Design design process journal brief
 
Brief CNC message from the past
Brief CNC message from the pastBrief CNC message from the past
Brief CNC message from the past
 
EPC Final presentation project Bak Kut Teh
EPC Final presentation project Bak Kut TehEPC Final presentation project Bak Kut Teh
EPC Final presentation project Bak Kut Teh
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015
 
Module outline enbe
Module outline enbeModule outline enbe
Module outline enbe
 
Essay Writing Brief
Essay Writing BriefEssay Writing Brief
Essay Writing Brief
 
ITD Design project two brief rev b
ITD Design project two   brief rev bITD Design project two   brief rev b
ITD Design project two brief rev b
 
Module outline cl
Module outline clModule outline cl
Module outline cl
 
Cts module outline january 2015
Cts module outline january 2015Cts module outline january 2015
Cts module outline january 2015
 

Similar a Integrated Project

Structure engineer slide share
Structure engineer slide shareStructure engineer slide share
Structure engineer slide share
Chia Ting
 
ICI and ITD presentation
ICI and ITD presentationICI and ITD presentation
ICI and ITD presentation
Marco Leong
 
Ici&itd presentation project 1
Ici&itd presentation project 1Ici&itd presentation project 1
Ici&itd presentation project 1
IRFAANYADUN
 
Ici&itd presentation project 1
Ici&itd presentation project 1Ici&itd presentation project 1
Ici&itd presentation project 1
Json96
 
Ici&itd presentation project 1(1) copy
Ici&itd presentation project 1(1)   copyIci&itd presentation project 1(1)   copy
Ici&itd presentation project 1(1) copy
IRFAANYADUN
 
Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation new
WadeLim
 
Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation new
WadeLim
 
ICI ITD (1).pdf
ICI ITD (1).pdfICI ITD (1).pdf
ICI ITD (1).pdf
gabchin29
 

Similar a Integrated Project (20)

Architects in chennai who is an architect
Architects in chennai who is an architectArchitects in chennai who is an architect
Architects in chennai who is an architect
 
Structure engineer slide share
Structure engineer slide shareStructure engineer slide share
Structure engineer slide share
 
ICI and ITD presentation
ICI and ITD presentationICI and ITD presentation
ICI and ITD presentation
 
Ici&itd presentation project 1
Ici&itd presentation project 1Ici&itd presentation project 1
Ici&itd presentation project 1
 
FNBE AUGUST'14 ICI&ITD Presentation Project 1
FNBE AUGUST'14 ICI&ITD Presentation Project 1FNBE AUGUST'14 ICI&ITD Presentation Project 1
FNBE AUGUST'14 ICI&ITD Presentation Project 1
 
Ici&itd presentation project 1
Ici&itd presentation project 1Ici&itd presentation project 1
Ici&itd presentation project 1
 
Ici&itd presentation project 1(1) copy
Ici&itd presentation project 1(1)   copyIci&itd presentation project 1(1)   copy
Ici&itd presentation project 1(1) copy
 
Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation new
 
Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation new
 
Iciitd2 150816125948-lva1-app6892
Iciitd2 150816125948-lva1-app6892Iciitd2 150816125948-lva1-app6892
Iciitd2 150816125948-lva1-app6892
 
Ici itd-2
Ici itd-2Ici itd-2
Ici itd-2
 
ICI + ITD PROJECT 1 SLIDES
ICI + ITD PROJECT 1 SLIDESICI + ITD PROJECT 1 SLIDES
ICI + ITD PROJECT 1 SLIDES
 
Ici & itd
Ici & itd Ici & itd
Ici & itd
 
Guc arct 702 legislations lecture 4 - project delivery process and business...
Guc arct 702 legislations   lecture 4 - project delivery process and business...Guc arct 702 legislations   lecture 4 - project delivery process and business...
Guc arct 702 legislations lecture 4 - project delivery process and business...
 
Architectural Project Planning
Architectural Project PlanningArchitectural Project Planning
Architectural Project Planning
 
ICI & ITD Slideshow
ICI & ITD SlideshowICI & ITD Slideshow
ICI & ITD Slideshow
 
Building Drawing(CE3G)- Introduction.ppt
Building Drawing(CE3G)-  Introduction.pptBuilding Drawing(CE3G)-  Introduction.ppt
Building Drawing(CE3G)- Introduction.ppt
 
ICI ITD.pdf
ICI ITD.pdfICI ITD.pdf
ICI ITD.pdf
 
ICI ITD.pdf
ICI ITD.pdfICI ITD.pdf
ICI ITD.pdf
 
ICI ITD (1).pdf
ICI ITD (1).pdfICI ITD (1).pdf
ICI ITD (1).pdf
 

Más de SolomonTangerine

Más de SolomonTangerine (20)

Food and Culture (Booklet)
Food and Culture (Booklet)Food and Culture (Booklet)
Food and Culture (Booklet)
 
Research proposal
Research proposalResearch proposal
Research proposal
 
Nawamin House
Nawamin HouseNawamin House
Nawamin House
 
Team bunga raya final report
Team bunga raya final reportTeam bunga raya final report
Team bunga raya final report
 
National mosque
National mosqueNational mosque
National mosque
 
ITD Design project one full brief
ITD Design project one full   briefITD Design project one full   brief
ITD Design project one full brief
 
Intro to Design Module outline jan2015
Intro to Design Module outline jan2015Intro to Design Module outline jan2015
Intro to Design Module outline jan2015
 
EPC Mural art oral presentation
EPC Mural art oral presentationEPC Mural art oral presentation
EPC Mural art oral presentation
 
EPC Course outline July
EPC Course outline JulyEPC Course outline July
EPC Course outline July
 
EPC blog photo pictures
EPC blog photo picturesEPC blog photo pictures
EPC blog photo pictures
 
Social Psychology Finale Journal
Social Psychology Finale JournalSocial Psychology Finale Journal
Social Psychology Finale Journal
 
Social Psychology Video Fnbe research project
Social Psychology Video Fnbe research projectSocial Psychology Video Fnbe research project
Social Psychology Video Fnbe research project
 
Social Psychology project Assessment
Social Psychology project AssessmentSocial Psychology project Assessment
Social Psychology project Assessment
 
Social Psychology Fnbe journal assignment
Social Psychology Fnbe journal assignmentSocial Psychology Fnbe journal assignment
Social Psychology Fnbe journal assignment
 
Social Psychology Fnbe course outline
Social Psychology Fnbe  course outline Social Psychology Fnbe  course outline
Social Psychology Fnbe course outline
 
Business Tutorial Questions Compilation
Business Tutorial Questions CompilationBusiness Tutorial Questions Compilation
Business Tutorial Questions Compilation
 
Business report complete
Business report completeBusiness report complete
Business report complete
 
Business Charity Drive Event 2015
Business Charity Drive Event 2015Business Charity Drive Event 2015
Business Charity Drive Event 2015
 
Business business plan aug 2015
Business  business plan aug 2015Business  business plan aug 2015
Business business plan aug 2015
 
Business new course outline
Business  new course outline  Business  new course outline
Business new course outline
 

Último

Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
gajnagarg
 
Jual Cytotec Asli Obat Aborsi No. 1 Paling Manjur
Jual Cytotec Asli Obat Aborsi No. 1 Paling ManjurJual Cytotec Asli Obat Aborsi No. 1 Paling Manjur
Jual Cytotec Asli Obat Aborsi No. 1 Paling Manjur
ptikerjasaptiker
 
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
nirzagarg
 
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
nirzagarg
 
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi ArabiaIn Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
ahmedjiabur940
 
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
Bertram Ludäscher
 
Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1
ranjankumarbehera14
 
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
怎样办理旧金山城市学院毕业证(CCSF毕业证书)成绩单学校原版复制
怎样办理旧金山城市学院毕业证(CCSF毕业证书)成绩单学校原版复制怎样办理旧金山城市学院毕业证(CCSF毕业证书)成绩单学校原版复制
怎样办理旧金山城市学院毕业证(CCSF毕业证书)成绩单学校原版复制
vexqp
 
怎样办理伦敦大学毕业证(UoL毕业证书)成绩单学校原版复制
怎样办理伦敦大学毕业证(UoL毕业证书)成绩单学校原版复制怎样办理伦敦大学毕业证(UoL毕业证书)成绩单学校原版复制
怎样办理伦敦大学毕业证(UoL毕业证书)成绩单学校原版复制
vexqp
 

Último (20)

Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
 
SR-101-01012024-EN.docx Federal Constitution of the Swiss Confederation
SR-101-01012024-EN.docx  Federal Constitution  of the Swiss ConfederationSR-101-01012024-EN.docx  Federal Constitution  of the Swiss Confederation
SR-101-01012024-EN.docx Federal Constitution of the Swiss Confederation
 
Digital Transformation Playbook by Graham Ware
Digital Transformation Playbook by Graham WareDigital Transformation Playbook by Graham Ware
Digital Transformation Playbook by Graham Ware
 
The-boAt-Story-Navigating-the-Waves-of-Innovation.pptx
The-boAt-Story-Navigating-the-Waves-of-Innovation.pptxThe-boAt-Story-Navigating-the-Waves-of-Innovation.pptx
The-boAt-Story-Navigating-the-Waves-of-Innovation.pptx
 
Jual Cytotec Asli Obat Aborsi No. 1 Paling Manjur
Jual Cytotec Asli Obat Aborsi No. 1 Paling ManjurJual Cytotec Asli Obat Aborsi No. 1 Paling Manjur
Jual Cytotec Asli Obat Aborsi No. 1 Paling Manjur
 
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
 
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
 
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
 
Data Analyst Tasks to do the internship.pdf
Data Analyst Tasks to do the internship.pdfData Analyst Tasks to do the internship.pdf
Data Analyst Tasks to do the internship.pdf
 
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi ArabiaIn Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
 
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
 
Sequential and reinforcement learning for demand side management by Margaux B...
Sequential and reinforcement learning for demand side management by Margaux B...Sequential and reinforcement learning for demand side management by Margaux B...
Sequential and reinforcement learning for demand side management by Margaux B...
 
Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1
 
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Dubai Call Girls Peeing O525547819 Call Girls Dubai
Dubai Call Girls Peeing O525547819 Call Girls DubaiDubai Call Girls Peeing O525547819 Call Girls Dubai
Dubai Call Girls Peeing O525547819 Call Girls Dubai
 
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24  Building Real-Time Pipelines With FLaNKDATA SUMMIT 24  Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
 
Aspirational Block Program Block Syaldey District - Almora
Aspirational Block Program Block Syaldey District - AlmoraAspirational Block Program Block Syaldey District - Almora
Aspirational Block Program Block Syaldey District - Almora
 
怎样办理旧金山城市学院毕业证(CCSF毕业证书)成绩单学校原版复制
怎样办理旧金山城市学院毕业证(CCSF毕业证书)成绩单学校原版复制怎样办理旧金山城市学院毕业证(CCSF毕业证书)成绩单学校原版复制
怎样办理旧金山城市学院毕业证(CCSF毕业证书)成绩单学校原版复制
 
Ranking and Scoring Exercises for Research
Ranking and Scoring Exercises for ResearchRanking and Scoring Exercises for Research
Ranking and Scoring Exercises for Research
 
怎样办理伦敦大学毕业证(UoL毕业证书)成绩单学校原版复制
怎样办理伦敦大学毕业证(UoL毕业证书)成绩单学校原版复制怎样办理伦敦大学毕业证(UoL毕业证书)成绩单学校原版复制
怎样办理伦敦大学毕业证(UoL毕业证书)成绩单学校原版复制
 

Integrated Project

  • 2. Integrated Project of Introduction To Drawing, Introduction To Construction Industry and English 1
  • 3. Members • Teoh Jun Xiang • Yee Jyh Lin • Tang Ying Jien • Quah Keng Yew • Ow Xun Cong • Bryan Teh Qing Da Tutors 1. Introduction To Drawing • Miss Noorul Iffa 2. Introduction To Construction Industry • Ms. Ann See Peng 3. English 1 • Ms. Thivilojana
  • 4. Scope of work handled by architects
  • 5. Scope of work handled by architects 1) Taking client's instructions and preparation of design brief 2) Site evaluation and analysis of development on environment • Lay foundation to an eco-friendly design
  • 6. Scope of work handled by architects 3) Design and site development a) First draft: 1/500 – 1/200 scale. • The architects generate 2- 3 preliminary designs from the information acquired from site evaluation. • Meetings are conducted with clients to determine overall design strategy
  • 7. Scope of work handled by architects b) Structural design  Deliver a design which incorporates :  Elevators, escalators etc  Sanitary, plumbing etc  Heating, ventilation and other systems
  • 8. Scope of work handled by architects 4) Client validation o Scale: 1/100 – 1/50 • The architecture firm will work with the client to refine the original design • The architecture firm will also work closely with the general contractor • Other professions also brought into process
  • 9. Scope of work handled by architects 5) Process permit documents • The permit documents are used to submit, coordinate, and obtain the building permit from the city or council. • The drawings are refined in regards to details and methods.
  • 10. Scope of work handled by architects 6) Execution • Plans are sent back and forth to the contractors and engineers for review • Most of the materials are specified o Detailed 1/50, 1/20 and 1/10 scale plans
  • 11. Scope of work handled by architects 7) Construction • Conduct periodic inspections and evaluations on the construction
  • 12. Responsibilities and tasks at different stage of construction
  • 13. Before construction Consult with the owner Communicate with project team Attend meetings Research design criteriaReport progress to owner Submit a schedule (date for start and completion of construction) Submits drawings and specification to owner
  • 14. During construction Administration • Owner’s representative Site visit • Observing progress of work Investigation • Site conditions that are different Communication • Inform progress • Report deviations and defects Inspection • Determine dates of completion • Whether work conforms with contract document
  • 15. After Construction  The architect’s work continues until after the building work.  Part of the payment due to the builder – the retention – is held back for up to twelve months and is only paid out on the architect’s instruction, after any defects have been rectified by the contractor.  Remember that the architect’s opinion on compliance with planning and building regulations is subject to work not being changed during construction.
  • 16. Authority and limitations of architects  The architect’s authority might be actual, implied or apparent during construction.  Rejecting contractor’s work if work does not conform to the contract documents is a common authority granted to architects by contract.  An architect often makes several site visits in order to become familiar with the progress of the work
  • 17. Stages and examples of drawings & Types and functions of drawings
  • 18. 1) Initial discussion and information gathering • Show a portfolio of past projects • Discuss goals, needs and requirements • Visit the site and review the existing conditions • Take as-built measurements and create plans
  • 20.
  • 21. Types of drawings Sketch drawings or freehand drawings  Drawn using a free hand by holding a pen or pencil  To initiate and freely work through ideas
  • 22. 2) Schematic design • First phase in the design of a project • Prepares schematic diagrams after detailed discussions with client
  • 23. 3) Design development • The project development phase • The project’s composition, dimensions, attributes and/or specifications are determined
  • 24. Types of drawings Site Plans  Describes the location and orientation of a building complex on a plot of land  Provides information of the site’s topography, landscaping utilities and site work.
  • 25. Types of drawings Orthographic projections • Consists of plans, sections and elevations • To illustrate three-dimensional objects in a two-dimensional drawing
  • 26. Materials shown on elevations
  • 28. Reflected ceiling plan  Shows the items that are located on the ceiling of a room or space Roof plan  Show the basic shape of the roof of a building
  • 29. Types of drawings Presentation drawings and renderings • Drawings that are usually rendered • Proposal for clients approval • Means for others to study structure’s appearance
  • 30. 4) Construction drawings • Drawings, plans, specifications and others associated with a construction project
  • 31.
  • 32. Types of drawings Working drawings • Final drawn instructions which the builder will use on site to convert the design ideas into a real building • Detailed, specific and accurate Assembly Drawings Component Drawings
  • 33. 5) Bidding documents • The offering of particular prices to suit both the client and the contractor
  • 34. 6) Construction administration • The architect will oversee the fulfillment of responsibilities of all parties to the contract for construction • Site visits • The architect will keep the client updated about the progress
  • 35. References Websites  Career Option: Architect. (2015, February 5). Retrieved March 3, 2015, from Digi Careers website: https://digicareers.wordpress.com/2015/02/05/career-option- architect/  De Biasse & Seminara Architects. (Date unknown). Retrieved March 3, 2015, from De Biasse & Seminara Architects’ website: http://dbsem.com/the-five-phases-of-the-architectural-design- process/  George. A. M. (2007). Architectural Process. Retrieved March 3 2015 from Michael A. George Architect’s website: http://www.seattlearchitects.com/realestate.html  Charles Levin Architects. Schematic Design Phase. Retrieved March 3 2015 from Charles Levin Architects’ website: http://www.charleslevinarchitects.com/whatwedo/schematicdesign/s chematicdesign.html  Pilot Builders. (Date Unknown). Design - Build Process. Retrieved March 3 2015 from http://www.pilotbuilders.com/design.php
  • 36. References  Isometric Projection. (Date Unknown). Retrieved March 3 2015 from http://www3.ul.ie/~rynnet/keanea/isometri.htm  Types of drawings for building design. (2015). Retrieved March 3 2015 from http://www.designingbuildings.co.uk/wiki/Types_of_drawings_for_bui lding_design  Perspective Drawing - Linear and Aerial Perspective. (Date Unknown). Retrieved March 3 2015 from http://www.artyfactory.com/perspective_drawing/perspective_index. html  Chicago Architecture Foundation. (unknown date). DISCOVER DESIGN- A Student Design Experience. Retrieved March 3 2015 from Chicago Architecture Foundation’s website: http://discoverdesign.org/design/process  Cellier, I. (2009) How to sell to architects- Part 2 – Architect’s workflow
  • 37. References Blogs  Build LLC. (2008, September 23). The Process of Architecture [Blog post]. Retrieved from http://blog.buildllc.com/2008/09/the-process- of-architecture/  Cellier, I. (Date Unknown). How to sell architects – Part 2 – Architect’s workflow [Blog post]. Retrieved from http://www.polantis.com/blog/2009/10/06/how-to-sell-to-architects- part-2-architects-workflow/  Author Unknown. (Date Unknown) Books  Makstutis, G. (2010). Architecture – An Introduction. London: Laurence King Publishing Ltd  Ching, F. D. K. (2009). Architectural Graphics. New Jersey: John Willey & Sons, Inc.  Grau III, P. A., Muller, E. J., Fausett, J. G. (2010). Architectural Drawing & Light Construction. New Jersey: Pearson Education, Inc.