CAPITAL
IMPROVEMENT PLAN
  2013 PROJECT HIGHLIGHTS
2013 DOWNTOWN
         PUBLIC WORKS PROJECTS
Sidewalks & Streets Projects             Parking Facilities
 • ADA Compliant Ramps                    • Fraser Street Garage Lighting
 • Street & Alley Resurfacing               Conversion
 • Atherton Streetscape Project           • Conversion of Meter Lots to
 • Garner Street Reconstruction             Kiosks
 • Tree Replacements and Additions        • Pugh Street Garage Sealant
 • Bike Racks & Covered Bike Racks        • Parking Study

Transportation Improvements              Other Projects
  • Downtown Signal Retiming              • Organic Food Waste Collection
  • Atherton/Hillcrest Overhead Signs     • Video Surveillance Project
  • Bicycle Ambassador Project            • Downtown Master Plan
                                          • Columbia Gasline Project*
Stormwater and Sanitary Sewer Projects
                                          • HFL Building on Hetzel*
 • No projects scheduled in the
   Downtown at this year
 • Inflow and Infiltration Project
Parks
 • Orchard Park Playground Project
SIDEWALKS & STREETS
2012 CORL STREET RECONSTRUCTION
ADA COMPLIANCE PROJECT


         • Installation of ADA
           compliant ramps at the
           following intersections:
Before    • Calder Way/Humes Alley
          • Calder Way/McAllister Alley
          • Calder Way/McAllister Street
         • Work anticipated to begin
           in May
 After
STREET & ALLEY RESURFACING

                        Streets Selected
                        • Patterson Street
                          From Foster to Fairmount
                        • Sparks Street
                          From Prospect to Westerly Parkway
                        • East Foster Avenue
                          From Locust Lane to Garner
                        • Fairmount Avenue
                          From Sparks to Patterson
 Resurfacing to begin   • Nittany Avenue
      in late July        From Sparks to Patterson
                        • Gill Street
                          From Prospect to Hamilton
                        • McCormick Street
                          From Old Boalsburg to Pugh
ATHERTON CORRIDOR
          IMPROVEMENT PROJECT

• Summer construction
  schedule
• Sidewalks may be closed at
  times with alternate
  pathways for pedestrians
• Some temporary lane
  closures
• Install handicapped ramps,
  fence, wider sidewalks,
  landscaping, new overhead
  lane designations, new traffic
  signals and new streetlight
  poles, fixtures and
  foundations
GARNER STREET RECONSTRUCTION

• South Garner Street
  from Hamilton to
  Easterly Parkway
• Will improve drainage
  and pedestrian ramps
• Allows for adequate
  pavement structure for
  present and future
  vehicle loads
• Work to begin in early
  May; expect 2-3
  months of construction
TREE REPLACEMENT & TREE GRATES

• 10 trees planned for
  downtown
• Trees planted by end
  of May
• 12 new tree grates
  along College &
  Beaver Avenue
• Tree grates
  completed by mid-
  August                 Tree grates are resized as trees
                              grow and replaced
                                 when needed
BIKE RACKS

• Staff continues to look
  for possible new bike
  rack locations
• Demonstration
  covered rack ready for
  deployment
  • Will be set up in different
    areas of the Borough to
    demonstrate
  • Will be permanently
    installed in front of Schlow
    Memorial Library
  • Additional covered racks
    under consideration
TRANSPORTATION IMPROVEMENTS
2012 UNIVERSITY DRIVE/EASTERLY PARKWAY SIGNAL UPGRADE
TRAFFIC SIGNAL RETIMING

• 22 signals in the study
• Implementation is scheduled for 2013
• No interruption of
  service expected
• For more information,
  watch the most
  recent report to
  Transportation
  Commission
  (12-10-12) online at
  cnet1.org
HILLCREST & ATHERTON OVERHEAD
    LANE USE CONTROL SIGNS

                                             • Installation of 2 Overhead Mast
                                               Arms with Lane Use Control
                                               Signs
                                             • Implementation of Intersection
                                               Safety Study Recommendations
 In an early study conducted by Hoffman
    (1969), overhead lane use signage          • Hillcrest/Atherton was
                                                 identified as one of the top 5
   contributed to a reduction in the total
  number of accidents by 44 percent in a
                1-year period
                                                 high-crash intersections
BICYCLE AMBASSADOR PROGRAM

• Ambassador activities
  for the Spring
  Semester include:
 • Events to encourage
   safe cycling downtown
 • Light giveaways
 • Bicycle parking
   “positive” enforcement
 • Trained ambassadors           2013 Bicycle
   available to give          Ambassador Training
   presentations and
   interact with the public
PARK PROJECTS
 LEDERER PARK
ORCHARD PARK PLAYGROUND
    PML CONFERENCE VOLUNTEER PROJECT


• Build Day: June 25
• KaBOOM, a
  national non-profit,
  will help coordinate
  activities
• DCNR grant funding
  for 50% of project
• Will need ~175
  Volunteers
STORMWATER AND SANITARY SEWERS
2012 WEST COLLEGE SEWER MAIN AND WATER MAIN PROJECT
STORMWATER & SANITARY SEWERS

• No independent projects scheduled in the
  downtown this year
• During street reconstruction and major roadway
  projects the Public Works Department performs
  preventative sanitary and stormwater sewer
  maintenance
  • Improves efficiency/reduces labor costs
  • Minimizes future disturbances on new roadway
• Inflow and Infiltration (INI) Project
  • Upon execution of the contract, the first phase of the INI
    project will be to monitor for high flow areas
PARKING FACILITIES
PUGH STREET GARAGE
FRASER GARAGE LIGHTING PROJECT


                                 • Project led by a PSU
                                   student group
                                   • Review of utility bills
                                   • Designing a new lighting
                                     system with occupancy
                                     sensors, daylight
                                     harvesting, possibly solar
                                     and all new fixtures
  Fraser Street Parking Garage
                                 • Primarily for energy
                                   efficiency
                                 • Will go out for bid when
                                   plan is complete
CONVERSION OF METER LOTS TO KIOSK

• Implement Pay by credit
  card option
• Pay-by-plate
• Pay by mobile device
• Kiosks will replace the old
  fashioned parking meters in
  the following locations:
  • 2 kiosks on the 1st Floor of
    McAlister Parking Deck
  • 1 kiosk on the roof of McAlister
  • 1 kiosk in the Allen Lot           New Kiosks to be installed
                                           in metered lots
  • 2 kiosks in the Beaver Ave Lot
PUGH STREET GARAGE SEALANT

• Placing a sealant on
  the Pugh Street
  Garage drive aisles
• Expect a full closure
  for a week
• Planned for
  May/June after          Pugh Street Garage
  student move out
  and before Arts Fest
PARKING STUDY

• A comprehensive study of both public and private
  on- and off-street parking in the Central Business
  District will be developed in 2013
  • Analysis to include
    • Parking structure
      placement alternatives
    • Review of all policies and
      ordinances related to
      parking demand
    • Analysis of privately
      owned parking in the
      Central Business District
  • Last report completed in
    1985
                                   Pugh Street Garage will be at
  • Kickoff planned for June        the end of its useful in 2018
OTHER PROJECTS
PLANNING PROJECTS & PROJECTS FROM OTHER ORGANIZATIONS
ORGANIC WASTE COLLECTION


                      • Phased roll-out to
                        downtown commercial
                        customers beginning in
                        late summer/early fall

 Commercial Organic
  Waste Collection
VIDEO SURVEILLANCE PROJECT

• Consolidate video          Phase 1 Garages         Early May
  surveillance systems
                             Phase 2 Municipal       Early June
• Replace and install                Building
  additional cameras in              (Parking,
  municipal garages,                 Police, etc.)
  buildings and in public    Phase 3 Downtown        Early July
  areas with a focus on
  the Central Business       Phase 4 Neighborhoods Pilot (Not
  District                           /Highlands    Funded)

• If funding allows, pilot
  video surveillance in
  neighborhood settings
DOWNTOWN MASTER PLAN

• Planning document
• Phase 1: Physical and
  Design Improvements
 • Final draft complete
• Phase 2:
  Implementation
  Strategies
 • Ready for review by    Phase 1 meeting with municipal
                            staff and regional partners
   March 2013
• Expect completion by
  June
COLUMBIA GASLINE PROJECT
           BELLAIRE, BURROWES & PROSPECT


• Areas affected:
  • Bellaire Avenue
  • East Prospect Avenue from University Drive to Burrowes Street
  • Burrowes Street from Prospect Avenue to College Avenue
• Plan to complete crossing of Beaver and College
  between student move out and Arts Fest
• Project permitting through PennDOT, not SCB
• Streets will be resurfaced in 2014
HFL BUILDING
 477 EAST BEAVER


         • Expected completion
           in early August
         • Hetzel Street closed to
           traffic
         • Hetzel Street expected
           to reopen to at least
           one lane prior to
           completion date
CAPITAL
IMPROVEMENT PLAN
 2014-2018 PROJECT HIGHLIGHTS
2014 – 2018
              PROPOSED PROJECTS


• Streetlight Replacement (Annual)
• Pugh Street Garage Replacement (By 2018)
• Fraser Street Open Space Project (2014)
• Downtown Master Plan Infrastructure
  Improvements (2015-2016)
• Pugh Streetscape Project (2014)
• College Avenue Waterline Replacement (2014)
STREET LIGHT REPLACEMENT

• 2013 – Integrated into
  Atherton Street
  Improvement Project
• 2014 – Integrated into Pugh
  Street Streetscape Project
• 2015 – College Avenue
• 2016 – Beaver Avenue from
  “H” Alley to Burrowes Street
• 2017 – Beaver Avenue from
  Allen to McAllister
PUGH STREET GARAGE
    REPLACEMENT



              • End of useful life -
                2018
              • Begin to plan for
                replacement
                through parking
                study
PUGH STREET
   STREETSCAPE DESIGN & IMPLEMENTATION


• Needs assessment
 • Replacement for Elms
 • Traffic control at Beaver
 • Pedestrian amenities
• Design completed last
  year
• Incorporated into
  Downtown Master Plan
• Implementation will be
  dependent upon new
  garage structure decisions
FRASER STREET
                  OPEN SPACE PROJECT


• Completed concept
  design includes
  accommodations for:
  • Pedestrian scale amenities
  • A public gathering space
  • Art or sculptures

• Planned for 2014
• Grant funding will be
  used, if possible, for art
  installations
COLLEGE AVENUE WATERLINE
                   REPLACEMENT


• State College Borough Water Authority
  Project
 • College Avenue from Atherton Street to Hiester
   Street
 • Project planned for 2014
 • One-lane closure expected that will involve the
   parking lane
 • New service line to be installed
DOWNTOWN MASTER PLAN
       INFRASTRUCTURE IMPROVEMENTS

• Recommendations from the Downtown Master Plan
  will be incorporated into future CIP projects
• Expected to
  fund projects
  identified in
  the approved
  Downtown
  Master Plan
  beginning in
  2015
CAPITAL IMPROVEMENT PLAN
                      SCHEDULE

• Proposals submitted – Early March 2012
• Published – Early April
• Presented to Council – Mid-April
• Public hearing – Early May
• Council review – May
• Council adoption – Early June




                                           Questions??

Más contenido relacionado

La actualidad más candente

Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Fairfax County
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Crosstown TO
 
Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020Fairfax County
 
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectCommunity Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectFairfax County
 
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Crosstown TO
 
Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Crosstown TO
 
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Fairfax County
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open HouseCrosstown TO
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018Crosstown TO
 
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020Fairfax County
 
Laird Station Open House
Laird Station Open HouseLaird Station Open House
Laird Station Open HouseCrosstown TO
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestFairfax County
 
Lakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community MeetingLakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community MeetingFairfax County
 
Caledonia station open house
Caledonia station open houseCaledonia station open house
Caledonia station open houseCrosstown TO
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementFairfax County
 
Chaplin station open house
Chaplin station open houseChaplin station open house
Chaplin station open houseCrosstown TO
 
Mount pleasant station open house
Mount pleasant station open house  Mount pleasant station open house
Mount pleasant station open house Crosstown TO
 
Chaplin slide deck final
Chaplin slide deck finalChaplin slide deck final
Chaplin slide deck finalCrosstown TO
 

La actualidad más candente (20)

Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017
 
Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020
 
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectCommunity Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
 
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
 
Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Leaside Station Open House - March 2017
Leaside Station Open House - March 2017
 
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open House
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
 
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
 
Laird Station Open House
Laird Station Open HouseLaird Station Open House
Laird Station Open House
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury Forest
 
Lakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community MeetingLakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community Meeting
 
Caledonia station open house
Caledonia station open houseCaledonia station open house
Caledonia station open house
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
 
Chaplin station open house
Chaplin station open houseChaplin station open house
Chaplin station open house
 
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
 
Mount pleasant station open house
Mount pleasant station open house  Mount pleasant station open house
Mount pleasant station open house
 
Chaplin slide deck final
Chaplin slide deck finalChaplin slide deck final
Chaplin slide deck final
 

Destacado

Steering committee presentation 032113 annotated
Steering committee presentation 032113 annotatedSteering committee presentation 032113 annotated
Steering committee presentation 032113 annotatedStateCollegePA
 
Downtown Master Plan Draft Summary
Downtown Master Plan Draft SummaryDowntown Master Plan Draft Summary
Downtown Master Plan Draft SummaryStateCollegePA
 
Hype vs. Reality: The AI Explainer
Hype vs. Reality: The AI ExplainerHype vs. Reality: The AI Explainer
Hype vs. Reality: The AI ExplainerLuminary Labs
 

Destacado (6)

Camp cadet 2013
Camp cadet 2013Camp cadet 2013
Camp cadet 2013
 
Camp cadet 2013
Camp cadet 2013Camp cadet 2013
Camp cadet 2013
 
Steering committee presentation 032113 annotated
Steering committee presentation 032113 annotatedSteering committee presentation 032113 annotated
Steering committee presentation 032113 annotated
 
5 meses
5 meses5 meses
5 meses
 
Downtown Master Plan Draft Summary
Downtown Master Plan Draft SummaryDowntown Master Plan Draft Summary
Downtown Master Plan Draft Summary
 
Hype vs. Reality: The AI Explainer
Hype vs. Reality: The AI ExplainerHype vs. Reality: The AI Explainer
Hype vs. Reality: The AI Explainer
 

Similar a Capital Improvement Project Highlights for Downtown Merchants

2015 State College Borough Construction Projects
2015 State College Borough Construction Projects2015 State College Borough Construction Projects
2015 State College Borough Construction ProjectsCourtney Hayden
 
Annual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOAnnual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOCity of College Station
 
Bray Main Street Works 2013
Bray Main Street Works 2013Bray Main Street Works 2013
Bray Main Street Works 2013Cllr. Mick Glynn
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Crosstown TO
 
Multi-use Pathway Wetlands Trail Boardwalk & Pavement Rehabilitation
Multi-use Pathway Wetlands Trail Boardwalk & Pavement RehabilitationMulti-use Pathway Wetlands Trail Boardwalk & Pavement Rehabilitation
Multi-use Pathway Wetlands Trail Boardwalk & Pavement Rehabilitationcitygb
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarAssociation for Project Management
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarAssociation for Project Management
 
Community Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCommunity Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCrosstown TO
 
Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12Samantha Coren
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2Crosstown TO
 
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCrosstown TO
 
Project Leaders presentation
Project Leaders  presentationProject Leaders  presentation
Project Leaders presentationZiad el-Balbisi
 
Virtual Open House: Eastern Works
Virtual Open House: Eastern WorksVirtual Open House: Eastern Works
Virtual Open House: Eastern WorksCrosstown TO
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Crosstown TO
 
Pardon Our Thunderdust 2011-2012
Pardon Our Thunderdust 2011-2012Pardon Our Thunderdust 2011-2012
Pardon Our Thunderdust 2011-2012richlandcollegetx
 
Laird Station Open House - April 2017
Laird Station Open House - April 2017Laird Station Open House - April 2017
Laird Station Open House - April 2017Crosstown TO
 
Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Crosstown TO
 
Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Crosstown TO
 

Similar a Capital Improvement Project Highlights for Downtown Merchants (20)

2015 State College Borough Construction Projects
2015 State College Borough Construction Projects2015 State College Borough Construction Projects
2015 State College Borough Construction Projects
 
Annual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOAnnual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDO
 
Bray Main Street Works 2013
Bray Main Street Works 2013Bray Main Street Works 2013
Bray Main Street Works 2013
 
State of the City of Norman
State of the City of NormanState of the City of Norman
State of the City of Norman
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
 
Multi-use Pathway Wetlands Trail Boardwalk & Pavement Rehabilitation
Multi-use Pathway Wetlands Trail Boardwalk & Pavement RehabilitationMulti-use Pathway Wetlands Trail Boardwalk & Pavement Rehabilitation
Multi-use Pathway Wetlands Trail Boardwalk & Pavement Rehabilitation
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 
Community Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCommunity Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank Station
 
Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 final
 
Project Leaders presentation
Project Leaders  presentationProject Leaders  presentation
Project Leaders presentation
 
Virtual Open House: Eastern Works
Virtual Open House: Eastern WorksVirtual Open House: Eastern Works
Virtual Open House: Eastern Works
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017
 
Pardon Our Thunderdust 2011-2012
Pardon Our Thunderdust 2011-2012Pardon Our Thunderdust 2011-2012
Pardon Our Thunderdust 2011-2012
 
Laird Station Open House - April 2017
Laird Station Open House - April 2017Laird Station Open House - April 2017
Laird Station Open House - April 2017
 
Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017
 
Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017
 

Último

Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeAbdulGhani778830
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.NaveedKhaskheli1
 
Experience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendExperience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendFabwelt
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdfGerald Furnkranz
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkbhavenpr
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest2
 

Último (8)

Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for Justice
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.
 
Experience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendExperience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming Trend
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global News
 

Capital Improvement Project Highlights for Downtown Merchants

  • 1. CAPITAL IMPROVEMENT PLAN 2013 PROJECT HIGHLIGHTS
  • 2. 2013 DOWNTOWN PUBLIC WORKS PROJECTS Sidewalks & Streets Projects Parking Facilities • ADA Compliant Ramps • Fraser Street Garage Lighting • Street & Alley Resurfacing Conversion • Atherton Streetscape Project • Conversion of Meter Lots to • Garner Street Reconstruction Kiosks • Tree Replacements and Additions • Pugh Street Garage Sealant • Bike Racks & Covered Bike Racks • Parking Study Transportation Improvements Other Projects • Downtown Signal Retiming • Organic Food Waste Collection • Atherton/Hillcrest Overhead Signs • Video Surveillance Project • Bicycle Ambassador Project • Downtown Master Plan • Columbia Gasline Project* Stormwater and Sanitary Sewer Projects • HFL Building on Hetzel* • No projects scheduled in the Downtown at this year • Inflow and Infiltration Project Parks • Orchard Park Playground Project
  • 3. SIDEWALKS & STREETS 2012 CORL STREET RECONSTRUCTION
  • 4. ADA COMPLIANCE PROJECT • Installation of ADA compliant ramps at the following intersections: Before • Calder Way/Humes Alley • Calder Way/McAllister Alley • Calder Way/McAllister Street • Work anticipated to begin in May After
  • 5. STREET & ALLEY RESURFACING Streets Selected • Patterson Street From Foster to Fairmount • Sparks Street From Prospect to Westerly Parkway • East Foster Avenue From Locust Lane to Garner • Fairmount Avenue From Sparks to Patterson Resurfacing to begin • Nittany Avenue in late July From Sparks to Patterson • Gill Street From Prospect to Hamilton • McCormick Street From Old Boalsburg to Pugh
  • 6. ATHERTON CORRIDOR IMPROVEMENT PROJECT • Summer construction schedule • Sidewalks may be closed at times with alternate pathways for pedestrians • Some temporary lane closures • Install handicapped ramps, fence, wider sidewalks, landscaping, new overhead lane designations, new traffic signals and new streetlight poles, fixtures and foundations
  • 7. GARNER STREET RECONSTRUCTION • South Garner Street from Hamilton to Easterly Parkway • Will improve drainage and pedestrian ramps • Allows for adequate pavement structure for present and future vehicle loads • Work to begin in early May; expect 2-3 months of construction
  • 8. TREE REPLACEMENT & TREE GRATES • 10 trees planned for downtown • Trees planted by end of May • 12 new tree grates along College & Beaver Avenue • Tree grates completed by mid- August Tree grates are resized as trees grow and replaced when needed
  • 9. BIKE RACKS • Staff continues to look for possible new bike rack locations • Demonstration covered rack ready for deployment • Will be set up in different areas of the Borough to demonstrate • Will be permanently installed in front of Schlow Memorial Library • Additional covered racks under consideration
  • 10. TRANSPORTATION IMPROVEMENTS 2012 UNIVERSITY DRIVE/EASTERLY PARKWAY SIGNAL UPGRADE
  • 11. TRAFFIC SIGNAL RETIMING • 22 signals in the study • Implementation is scheduled for 2013 • No interruption of service expected • For more information, watch the most recent report to Transportation Commission (12-10-12) online at cnet1.org
  • 12. HILLCREST & ATHERTON OVERHEAD LANE USE CONTROL SIGNS • Installation of 2 Overhead Mast Arms with Lane Use Control Signs • Implementation of Intersection Safety Study Recommendations In an early study conducted by Hoffman (1969), overhead lane use signage • Hillcrest/Atherton was identified as one of the top 5 contributed to a reduction in the total number of accidents by 44 percent in a 1-year period high-crash intersections
  • 13. BICYCLE AMBASSADOR PROGRAM • Ambassador activities for the Spring Semester include: • Events to encourage safe cycling downtown • Light giveaways • Bicycle parking “positive” enforcement • Trained ambassadors 2013 Bicycle available to give Ambassador Training presentations and interact with the public
  • 15. ORCHARD PARK PLAYGROUND PML CONFERENCE VOLUNTEER PROJECT • Build Day: June 25 • KaBOOM, a national non-profit, will help coordinate activities • DCNR grant funding for 50% of project • Will need ~175 Volunteers
  • 16. STORMWATER AND SANITARY SEWERS 2012 WEST COLLEGE SEWER MAIN AND WATER MAIN PROJECT
  • 17. STORMWATER & SANITARY SEWERS • No independent projects scheduled in the downtown this year • During street reconstruction and major roadway projects the Public Works Department performs preventative sanitary and stormwater sewer maintenance • Improves efficiency/reduces labor costs • Minimizes future disturbances on new roadway • Inflow and Infiltration (INI) Project • Upon execution of the contract, the first phase of the INI project will be to monitor for high flow areas
  • 19. FRASER GARAGE LIGHTING PROJECT • Project led by a PSU student group • Review of utility bills • Designing a new lighting system with occupancy sensors, daylight harvesting, possibly solar and all new fixtures Fraser Street Parking Garage • Primarily for energy efficiency • Will go out for bid when plan is complete
  • 20. CONVERSION OF METER LOTS TO KIOSK • Implement Pay by credit card option • Pay-by-plate • Pay by mobile device • Kiosks will replace the old fashioned parking meters in the following locations: • 2 kiosks on the 1st Floor of McAlister Parking Deck • 1 kiosk on the roof of McAlister • 1 kiosk in the Allen Lot New Kiosks to be installed in metered lots • 2 kiosks in the Beaver Ave Lot
  • 21. PUGH STREET GARAGE SEALANT • Placing a sealant on the Pugh Street Garage drive aisles • Expect a full closure for a week • Planned for May/June after Pugh Street Garage student move out and before Arts Fest
  • 22. PARKING STUDY • A comprehensive study of both public and private on- and off-street parking in the Central Business District will be developed in 2013 • Analysis to include • Parking structure placement alternatives • Review of all policies and ordinances related to parking demand • Analysis of privately owned parking in the Central Business District • Last report completed in 1985 Pugh Street Garage will be at • Kickoff planned for June the end of its useful in 2018
  • 23. OTHER PROJECTS PLANNING PROJECTS & PROJECTS FROM OTHER ORGANIZATIONS
  • 24. ORGANIC WASTE COLLECTION • Phased roll-out to downtown commercial customers beginning in late summer/early fall Commercial Organic Waste Collection
  • 25. VIDEO SURVEILLANCE PROJECT • Consolidate video Phase 1 Garages Early May surveillance systems Phase 2 Municipal Early June • Replace and install Building additional cameras in (Parking, municipal garages, Police, etc.) buildings and in public Phase 3 Downtown Early July areas with a focus on the Central Business Phase 4 Neighborhoods Pilot (Not District /Highlands Funded) • If funding allows, pilot video surveillance in neighborhood settings
  • 26. DOWNTOWN MASTER PLAN • Planning document • Phase 1: Physical and Design Improvements • Final draft complete • Phase 2: Implementation Strategies • Ready for review by Phase 1 meeting with municipal staff and regional partners March 2013 • Expect completion by June
  • 27. COLUMBIA GASLINE PROJECT BELLAIRE, BURROWES & PROSPECT • Areas affected: • Bellaire Avenue • East Prospect Avenue from University Drive to Burrowes Street • Burrowes Street from Prospect Avenue to College Avenue • Plan to complete crossing of Beaver and College between student move out and Arts Fest • Project permitting through PennDOT, not SCB • Streets will be resurfaced in 2014
  • 28. HFL BUILDING 477 EAST BEAVER • Expected completion in early August • Hetzel Street closed to traffic • Hetzel Street expected to reopen to at least one lane prior to completion date
  • 30. 2014 – 2018 PROPOSED PROJECTS • Streetlight Replacement (Annual) • Pugh Street Garage Replacement (By 2018) • Fraser Street Open Space Project (2014) • Downtown Master Plan Infrastructure Improvements (2015-2016) • Pugh Streetscape Project (2014) • College Avenue Waterline Replacement (2014)
  • 31. STREET LIGHT REPLACEMENT • 2013 – Integrated into Atherton Street Improvement Project • 2014 – Integrated into Pugh Street Streetscape Project • 2015 – College Avenue • 2016 – Beaver Avenue from “H” Alley to Burrowes Street • 2017 – Beaver Avenue from Allen to McAllister
  • 32. PUGH STREET GARAGE REPLACEMENT • End of useful life - 2018 • Begin to plan for replacement through parking study
  • 33. PUGH STREET STREETSCAPE DESIGN & IMPLEMENTATION • Needs assessment • Replacement for Elms • Traffic control at Beaver • Pedestrian amenities • Design completed last year • Incorporated into Downtown Master Plan • Implementation will be dependent upon new garage structure decisions
  • 34. FRASER STREET OPEN SPACE PROJECT • Completed concept design includes accommodations for: • Pedestrian scale amenities • A public gathering space • Art or sculptures • Planned for 2014 • Grant funding will be used, if possible, for art installations
  • 35. COLLEGE AVENUE WATERLINE REPLACEMENT • State College Borough Water Authority Project • College Avenue from Atherton Street to Hiester Street • Project planned for 2014 • One-lane closure expected that will involve the parking lane • New service line to be installed
  • 36. DOWNTOWN MASTER PLAN INFRASTRUCTURE IMPROVEMENTS • Recommendations from the Downtown Master Plan will be incorporated into future CIP projects • Expected to fund projects identified in the approved Downtown Master Plan beginning in 2015
  • 37. CAPITAL IMPROVEMENT PLAN SCHEDULE • Proposals submitted – Early March 2012 • Published – Early April • Presented to Council – Mid-April • Public hearing – Early May • Council review – May • Council adoption – Early June Questions??