3. Paul Bunyan, commemorating Bangor’s 125 th birthday in 1959 1853 lithograph 1887 ad: all specimens cured with arsenic, the only preventative against moths.
4. Tall ships taking on lumber, 1880’s Steamer “City of Rockland” launched 1990 Early 20 th Century postcard
5. Flood of 1902 “ Bangor Tiger” river drivers Ice harvesting, shipped to Buenos Aires
8. The 36 acre Project area acquired by the City was occupied by leaking fuel oil tank farms, unused or underutilized industrial warehouses and distribution facilities, rail yards, vacant manufacturing buildings and coal yards. Circa 1985
9.
10. Railroad Street Improvements, 2004 Water’s Edge Improvements, 2005 Front Street Improvements, 2003 Open Space Improvements, 2003 Park Improvements, 2009 - 2010
24. Phase I Park Under Construction, 2009 - 2011 Railroad Street Parking Lot with drainage chambers, lights Waterfront Parking Lot with drainage chambers, lights and access drive Multiuse trails and grading for amphitheater Compass Rose Trail connection to Dutton Street with lights Fencing and planting along RR Right of Way
25. Water front Park Existing Conditions Looking north from hotel December 2008 Park Construction 2009-2011
32. Bangor Waterfront Development Project Total Federal Funding $4,670,940 40% Total State Funds $3,375,000 29% Total City Funds $3,522,655 30% Total Funding $ 11,568,595 100%
33.
34. Construction Estimate (11/09): $674,860 Construction Estimate (11/09): $1,348,960 Construction Estimate (11/09): $1,770,710 Total Constr. Estimate (11/09): $3,794,530
40. Construction Estimate (11/09): $674,860 Construction Estimate (11/09): $1,348,960 Construction Estimate (11/09): $1,770,710 Total Constr. Estimate (11/09): $3,794,530
41. Part 1: $1,448,636 Construction Estimates December 2010 Part 2: $278,933 Part 3: $366,113 Part 4: $520,478 Part 5: $239,892 Part 6: $243,630 Part 7: $841,585 Construction Estimate (12/22): $3,939,267
42. Part 1: $1,448,636 Part 2: $278,933 Part 3: $366,113 Part 4: $520,478 Part 5: $239,892 Part 6: $243,630 Part 7: $841,585 Recommendation for Spring 2011 Bid: Part 5, Restroom Building: $239,892 Part 6 Waterfront Walkway at Coal Tar Area: $243,630 Total Estimated Base Bid:$483,522 Add Alternate Part 3: $366,133 Construction Estimates December 2010