Permanent Magnet Direct Drive
     (PM/DD) Technology
September 2011
  p




                 ©2009. Northern Power Systems. All Rights Reserved. Not to be used or shared without permission. Proprietary and Confidential.
Northern Power Systems Profile Today…

  NPS is an advanced technology U.S. based wind turbine company specializing in
  next generation Permanent Magnet Direct Drive (PM/DD) wind turbines
      Private company with Lead Investors in USA and EU
      Two separate businesses based on the same PM/DD technology: Distributed Wind and Utility Wind


  Largest Distributed Wind company in the world
      Over 300 NPS 100 kW (NPS 100) turbines ordered to-date with 130 turbines installed globally...
      Highest availability in the distributed wind market – 800,000 run hours with 98% median availability to-date
                                                                                                           to date
      Largest installed base of integrated wind-diesel generation platforms in the world
      New technology under development including 450 kW turbine and wind-diesel-battery integrated solutions


  Utility Wind has world class expertise in large PM/DD wind turbine platforms
                   world-class
      Introduced new NPS 2.3 MW (NPS 2.3) onshore wind turbine in 2011 with 93m and 100m rotors
      − First two prototype turbines are installed in Michigan USA and are running with very high availability
      − DNV type-certification process well underway ... expect DNV certification award in first quarter 2012
      Developing larger, more cost effective PM/DD platforms for onshore and offshore applications


  Locations in the United States and Europe
      Offices: Barre, Vermont (HQ), Boston, Massachusetts (Corp) , and Zurich, Switzerland (Sales & Service)
      Production facilities: Barre Vermont and Saginaw Michigan
                             Barre,            Saginaw,

                                                                                                                                                              2



                             ©2009. Northern Power Systems. All Rights Reserved. Not to be used or shared without permission. Proprietary and Confidential.
NPS Today – Distributed Wind and Utility Wind …
              Distributed Wind                                                                                                                          Utility Wind

NPS 100                                                                                                         NPS 2.3
   Launched in 2000, with PMDD in 2008                                                                                  First prototype installed in December 2010
                                                                                                                              p     yp
   280 units, >$80M ordered since 2008                                                                                  Extensively Tested at NREL
   130 units in operation globally                                                                                      Launched in 2011
   800,000 accumulated fleet hours                                                                                      Two prototypes flying in MI
   98-99%
   98 99% availability                                                                                                  Strong Performance
   Average $300,000 selling price                                                                                       Medium/Low Wind Variants



 NPS 450                                                                                                   NPS 3.4                                                    NPS 8.0
   Platform extension under development with DOE grant                                                            Platform Extension                                    Large Offshore
   2012-13 prototype launch                                                                                       Existing 2.3 Technology                               New Technologies
   Fast commercial ramp                                                                                           Fast Commercial Ramp                                  Low Maintenance
   Larger di t ib t d l d
   L      distributed loads                                                                                       EU and A i markets
                                                                                                                       d Asian  k t                                     Global Markets
                                                                                                                                                                        Gl b l M k t




                         Next-generation PM/DD Technology
                              g                        gy


                                     ©2009. Northern Power Systems. All Rights Reserved. Not to be used or shared without permission. Proprietary and Confidential.
Permanent magnet/direct-drive (PM/DD) technology is
disruptive ….
                                                                                                                                                                                  NPS
                                                                                                                                                                                 PM/DD
                                                                                                                                                                         PM/DD
                                                                                                                                               Permanent Magnet Direct Drive
                                                                                                                              First-Gen
                                                                                                                               PM/DD                        • SAME weight as traditional
                                                                                                                                                              geared turbines
                                                                                                                                                            • Extremely reliable … low
 ophistication




                                                           Original Direct-Drive                                                                              downtime,
                                                                                                                                                              downtime low maintenance
 Technology




                                               Traditional Wound-Rotor Direct Drive                                                                         • Cost similar to traditional
                                                                                                                                                              geared turbines
                                                                • 30% heavier than traditional
                                                                  geared turbines
                                                                • Extremely reliable … low
 T
So




                                                                  downtime, low maintenance
                                                                • Command a 15-20%
                                                                  price premium
        Traditional Geared Turbines
                 “High-Speed”
                 “High Speed” Geared Drive

                       • 80-90% market-share

                                                                                         Value to
                                                                                        Customers



                                        ©2009. Northern Power Systems. All Rights Reserved. Not to be used or shared without permission. Proprietary and Confidential.
Northern Power Systems Technology Differentiation …
  Traditional Geared Turbine
                                                                    Complex, high-speed (1800 rpm) drivetrain
                                                                    problematic:
                                                                                 5% Downtime
                                                                                 Gearbox replacements every 5 years

                                                                    Efficiency losses due to gear friction & electrically-
                                                                    powered magnetic field

                                                                    Failures of large components require expensive
                                                                    crane & significant downtime



   NPS 2.3 PM/DD Turbine                                           Simple, slow-speed (15-20 rpm) drivetrain extremely
                                                                   reliable:
                                                                                2% Downtime
                                                                                No high-speed wear & tear, gearbox replacement

                                                                   Very high-efficiency … no friction losses and p
                                                                      y g             y                          permanent
                                                                   magnets supply magnetic field

                                                                   Highly modular design allows up-tower swap-outs: no
                                                                   crane & minimal downtime

                                                                   Facilitates larger rotors



                    ©2009. Northern Power Systems. All Rights Reserved. Not to be used or shared without permission. Proprietary and Confidential.
NPS PM/DD enables the Lowest Cost of Energy …
             Better Energy Capture via Very Large Rotors
                                          Simple load path
                                          Simple powertrain dynamics and harmonics
                                          Simple blade characterization and construction
                                          High efficiency power train and nacelle layout gives
                                          more power, especially at low wind speeds
                                                               y



  High Reliability Translates to Lower Operating Costs and Risks
     Low part count means fewer opportunities for failure
     Highly modular design
         Enables tight quality control in production
         Up-tower swap-outs: No external crane & minimal downtime

     No oil or fluids to leak or change
     Liquid coo g a o s e pa ded environmental ope at g e
       qu d cooling allows expanded e o e ta operating environment
                                                            o e t



                     ©2009. Northern Power Systems. All Rights Reserved. Not to be used or shared without permission. Proprietary and Confidential.
Wind Farm Cash Flow Drivers – NPS value proposition ...

                     Power curve … energy
Turbine-specific                                                                                                                Uptime%                   Costs required
                       production from a
  key drivers                                                                                                              (or ”availability”)             to maintain
                       given wind speed




                                Power Curve
                                                                                                                                                        Maintenance
Wind Farm
           =       Power
                   (MW)                                                                 X $/MW-Hr                                      X Uptime        - & Repair
Cash Flows
                                                                                                                                                           Costs
                                        Wind Speed

                                                                                                                                               Captures more energy
                                                                                                                                                 … more of the time
                                                                                                                                                  … at LOWER cost!

                                                                                           Price of
  Site-specific           Wind Speed                                                      electricity
  key drivers
     y                                                                                    generated




                    ©2009. Northern Power Systems. All Rights Reserved. Not to be used or shared without permission. Proprietary and Confidential.
Utility Wind economics greatly improved with NPS 2.3 …


 Same potential site …                                               … but NPS delivers better economics
 EXAMPLE                                                   Annual Cash Flow
 • 80MW site                                              ($/Year)                                                                                    $600k    $11.0M
                                                                                                                              $100k
 • Class II/III                                                                                 $300k
                                                                $10.1M
 • PPA rate = $100/MW hr
              $100/MW-hr
                                                                                                                    $1M/yr. higher
 • Project const. costs = $40M                                                                                        cash flow!
 • ITC/PTC incentives                                     Traditional          Better                                                                           NPS
 • Tax equity benefits                                     Turbine Increased production Lower                                                                  PMDD
                                                                      uptime             Maint.                                                               Turbine
 •20-year investment life
                                                                     Return on I
                                                                     R t       Investment (ROI) 22% b tt
                                                                                    t   t (ROI):    better
                                                                        Net Present Value (NPV): $10M better




                     ©2009. Northern Power Systems. All Rights Reserved. Not to be used or shared without permission. Proprietary and Confidential.
NPS 2.3 Prototypes at Stoney Corners I wind farm …




               ©2009. Northern Power Systems. All Rights Reserved. Not to be used or shared without permission. Proprietary and Confidential.

Más contenido relacionado

Similar a Permanent Magnet Direct Drive (PM/DD) Technology

Presentation by Gene Delaney, President, Government & Public Safety business...
	Presentation by Gene Delaney, President, Government & Public Safety business...	Presentation by Gene Delaney, President, Government & Public Safety business...
Presentation by Gene Delaney, President, Government & Public Safety business...finance7
 
Webinar Renewable Energy Session 2
Webinar Renewable Energy Session 2Webinar Renewable Energy Session 2
Webinar Renewable Energy Session 2webinarrenewables
 
SDP Telecom Corporate Presentation - August 23 2010
SDP Telecom Corporate Presentation - August 23 2010SDP Telecom Corporate Presentation - August 23 2010
SDP Telecom Corporate Presentation - August 23 2010sdptelecom
 
Green Telecom & IT Workshop: Rod Tucker Keynote
Green Telecom & IT Workshop: Rod Tucker KeynoteGreen Telecom & IT Workshop: Rod Tucker Keynote
Green Telecom & IT Workshop: Rod Tucker KeynoteBellLabs
 
Juniper Networks IR Investor and Analyst Update - Mobile World Congress 2012
Juniper Networks IR Investor and Analyst Update - Mobile World Congress 2012Juniper Networks IR Investor and Analyst Update - Mobile World Congress 2012
Juniper Networks IR Investor and Analyst Update - Mobile World Congress 2012Juniper Networks
 
Debashish Bhattacharya
Debashish  BhattacharyaDebashish  Bhattacharya
Debashish BhattacharyaVarun Chandra
 
HANJUNG TECH Co., Ltd_About info.
HANJUNG TECH Co., Ltd_About info.HANJUNG TECH Co., Ltd_About info.
HANJUNG TECH Co., Ltd_About info.Matt KING
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide sharejbtolstoy
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide sharejbtolstoy
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide sharejbtolstoy
 
Pacific Energy Network
Pacific Energy NetworkPacific Energy Network
Pacific Energy Networkmichaeltn
 
BUILDING THE LARGEST SOLAR SMART ARRAY IN NORTH AMERICA: Behind the Scenes of...
BUILDING THE LARGEST SOLAR SMART ARRAY IN NORTH AMERICA: Behind the Scenes of...BUILDING THE LARGEST SOLAR SMART ARRAY IN NORTH AMERICA: Behind the Scenes of...
BUILDING THE LARGEST SOLAR SMART ARRAY IN NORTH AMERICA: Behind the Scenes of...Rick Borry
 
2007 Datang prepares TD-SCDMA for Olympics 2008
2007 Datang prepares TD-SCDMA for Olympics 20082007 Datang prepares TD-SCDMA for Olympics 2008
2007 Datang prepares TD-SCDMA for Olympics 2008tdd.pek
 
Energy Efficient Solutions for FPSO Applications
Energy Efficient Solutions for FPSO ApplicationsEnergy Efficient Solutions for FPSO Applications
Energy Efficient Solutions for FPSO ApplicationsIQPC
 
Sun sparc enterprise t5140 and t5240 servers customer presentation
Sun sparc enterprise t5140 and t5240 servers customer presentationSun sparc enterprise t5140 and t5240 servers customer presentation
Sun sparc enterprise t5140 and t5240 servers customer presentationxKinAnx
 

Similar a Permanent Magnet Direct Drive (PM/DD) Technology (20)

Converteam presentation
Converteam presentationConverteam presentation
Converteam presentation
 
Presentation by Gene Delaney, President, Government & Public Safety business...
	Presentation by Gene Delaney, President, Government & Public Safety business...	Presentation by Gene Delaney, President, Government & Public Safety business...
Presentation by Gene Delaney, President, Government & Public Safety business...
 
Webinar Renewable Energy Session 2
Webinar Renewable Energy Session 2Webinar Renewable Energy Session 2
Webinar Renewable Energy Session 2
 
SDP Telecom Corporate Presentation - August 23 2010
SDP Telecom Corporate Presentation - August 23 2010SDP Telecom Corporate Presentation - August 23 2010
SDP Telecom Corporate Presentation - August 23 2010
 
Green Telecom & IT Workshop: Rod Tucker Keynote
Green Telecom & IT Workshop: Rod Tucker KeynoteGreen Telecom & IT Workshop: Rod Tucker Keynote
Green Telecom & IT Workshop: Rod Tucker Keynote
 
10 fn s34
10 fn s3410 fn s34
10 fn s34
 
10 fn s34
10 fn s3410 fn s34
10 fn s34
 
Juniper Networks IR Investor and Analyst Update - Mobile World Congress 2012
Juniper Networks IR Investor and Analyst Update - Mobile World Congress 2012Juniper Networks IR Investor and Analyst Update - Mobile World Congress 2012
Juniper Networks IR Investor and Analyst Update - Mobile World Congress 2012
 
Debashish Bhattacharya
Debashish  BhattacharyaDebashish  Bhattacharya
Debashish Bhattacharya
 
Pbn -hospitality_level_two_02-2010
Pbn  -hospitality_level_two_02-2010Pbn  -hospitality_level_two_02-2010
Pbn -hospitality_level_two_02-2010
 
HANJUNG TECH Co., Ltd_About info.
HANJUNG TECH Co., Ltd_About info.HANJUNG TECH Co., Ltd_About info.
HANJUNG TECH Co., Ltd_About info.
 
Etsi whitepaper eng
Etsi whitepaper engEtsi whitepaper eng
Etsi whitepaper eng
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide share
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide share
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide share
 
Pacific Energy Network
Pacific Energy NetworkPacific Energy Network
Pacific Energy Network
 
BUILDING THE LARGEST SOLAR SMART ARRAY IN NORTH AMERICA: Behind the Scenes of...
BUILDING THE LARGEST SOLAR SMART ARRAY IN NORTH AMERICA: Behind the Scenes of...BUILDING THE LARGEST SOLAR SMART ARRAY IN NORTH AMERICA: Behind the Scenes of...
BUILDING THE LARGEST SOLAR SMART ARRAY IN NORTH AMERICA: Behind the Scenes of...
 
2007 Datang prepares TD-SCDMA for Olympics 2008
2007 Datang prepares TD-SCDMA for Olympics 20082007 Datang prepares TD-SCDMA for Olympics 2008
2007 Datang prepares TD-SCDMA for Olympics 2008
 
Energy Efficient Solutions for FPSO Applications
Energy Efficient Solutions for FPSO ApplicationsEnergy Efficient Solutions for FPSO Applications
Energy Efficient Solutions for FPSO Applications
 
Sun sparc enterprise t5140 and t5240 servers customer presentation
Sun sparc enterprise t5140 and t5240 servers customer presentationSun sparc enterprise t5140 and t5240 servers customer presentation
Sun sparc enterprise t5140 and t5240 servers customer presentation
 

Más de Suat Furkan ISIK

Elektrik Üreticileri Toplantısı.pptx
Elektrik Üreticileri Toplantısı.pptxElektrik Üreticileri Toplantısı.pptx
Elektrik Üreticileri Toplantısı.pptxSuat Furkan ISIK
 
Roberto Unger Hakkında Rapor by SFI.pdf
Roberto Unger Hakkında Rapor by SFI.pdfRoberto Unger Hakkında Rapor by SFI.pdf
Roberto Unger Hakkında Rapor by SFI.pdfSuat Furkan ISIK
 
Çok Kriterli Karar Verme Yöntemi İle Rüzgar Santrali Alanı Seçimi
Çok Kriterli Karar Verme Yöntemi İle Rüzgar Santrali Alanı SeçimiÇok Kriterli Karar Verme Yöntemi İle Rüzgar Santrali Alanı Seçimi
Çok Kriterli Karar Verme Yöntemi İle Rüzgar Santrali Alanı SeçimiSuat Furkan ISIK
 
Esmaül Hüsna (Allah'ın 99 İsmi ve Türkçe Anlamları)
Esmaül Hüsna (Allah'ın 99 İsmi ve Türkçe Anlamları)Esmaül Hüsna (Allah'ın 99 İsmi ve Türkçe Anlamları)
Esmaül Hüsna (Allah'ın 99 İsmi ve Türkçe Anlamları)Suat Furkan ISIK
 
Sudaki Zehirli Maddelerin Tayini İçin Analitik Prosedürlerin PROMETHEE ile An...
Sudaki Zehirli Maddelerin Tayini İçin Analitik Prosedürlerin PROMETHEE ile An...Sudaki Zehirli Maddelerin Tayini İçin Analitik Prosedürlerin PROMETHEE ile An...
Sudaki Zehirli Maddelerin Tayini İçin Analitik Prosedürlerin PROMETHEE ile An...Suat Furkan ISIK
 
DEMATEL Yönteminin Yeşil Tedarik Zinicirinde Kullanılması
DEMATEL Yönteminin Yeşil Tedarik Zinicirinde KullanılmasıDEMATEL Yönteminin Yeşil Tedarik Zinicirinde Kullanılması
DEMATEL Yönteminin Yeşil Tedarik Zinicirinde KullanılmasıSuat Furkan ISIK
 
Çok Kriterli Karar Verme Yöntemleri İle Katı Atık Bertaraf Teknolojisi Seçimi
Çok Kriterli Karar Verme Yöntemleri İle Katı Atık Bertaraf Teknolojisi SeçimiÇok Kriterli Karar Verme Yöntemleri İle Katı Atık Bertaraf Teknolojisi Seçimi
Çok Kriterli Karar Verme Yöntemleri İle Katı Atık Bertaraf Teknolojisi SeçimiSuat Furkan ISIK
 
ARAŞTIRMA TEKNİKLERİ VE YAYIN ETİĞİ DERSİ ÖDEV–1
ARAŞTIRMA TEKNİKLERİ VE YAYIN ETİĞİ DERSİ ÖDEV–1ARAŞTIRMA TEKNİKLERİ VE YAYIN ETİĞİ DERSİ ÖDEV–1
ARAŞTIRMA TEKNİKLERİ VE YAYIN ETİĞİ DERSİ ÖDEV–1Suat Furkan ISIK
 
PFAFF HOBBY 1142 Türkçe Kullanım Kitabı
PFAFF HOBBY 1142 Türkçe Kullanım KitabıPFAFF HOBBY 1142 Türkçe Kullanım Kitabı
PFAFF HOBBY 1142 Türkçe Kullanım KitabıSuat Furkan ISIK
 
Mobil platformlar ve uygulamalar rapor
Mobil platformlar ve uygulamalar raporMobil platformlar ve uygulamalar rapor
Mobil platformlar ve uygulamalar raporSuat Furkan ISIK
 
Mobil platformlar ve uygulamalar
Mobil platformlar ve uygulamalarMobil platformlar ve uygulamalar
Mobil platformlar ve uygulamalarSuat Furkan ISIK
 
TURKISH POWER SYSTEM AND RENEWABLE ENERGY IN TURKEY
TURKISH POWER SYSTEM AND RENEWABLE ENERGY IN TURKEYTURKISH POWER SYSTEM AND RENEWABLE ENERGY IN TURKEY
TURKISH POWER SYSTEM AND RENEWABLE ENERGY IN TURKEYSuat Furkan ISIK
 
RENEWABLE ENERGY in WORLD & TURKEY
RENEWABLE ENERGY  in WORLD & TURKEYRENEWABLE ENERGY  in WORLD & TURKEY
RENEWABLE ENERGY in WORLD & TURKEYSuat Furkan ISIK
 
UNDERSTANDING THE LICENSING PROCESS FOR LARGE SCALE SOLAR PROJECTS
UNDERSTANDING THE LICENSING PROCESS FOR  LARGE SCALE SOLAR PROJECTSUNDERSTANDING THE LICENSING PROCESS FOR  LARGE SCALE SOLAR PROJECTS
UNDERSTANDING THE LICENSING PROCESS FOR LARGE SCALE SOLAR PROJECTSSuat Furkan ISIK
 
Türkiye’de  Solar  PV  Üretimi
Türkiye’de  Solar  PV  ÜretimiTürkiye’de  Solar  PV  Üretimi
Türkiye’de  Solar  PV  ÜretimiSuat Furkan ISIK
 
CSP GLOBAL MARKET OVERVIEW
CSP GLOBAL MARKET  OVERVIEWCSP GLOBAL MARKET  OVERVIEW
CSP GLOBAL MARKET OVERVIEWSuat Furkan ISIK
 
MANUFACTURE OF ORGANIC PHOTOVOLTAICS
MANUFACTURE OF ORGANIC PHOTOVOLTAICSMANUFACTURE OF ORGANIC PHOTOVOLTAICS
MANUFACTURE OF ORGANIC PHOTOVOLTAICSSuat Furkan ISIK
 

Más de Suat Furkan ISIK (20)

Elektrik Üreticileri Toplantısı.pptx
Elektrik Üreticileri Toplantısı.pptxElektrik Üreticileri Toplantısı.pptx
Elektrik Üreticileri Toplantısı.pptx
 
Roberto Unger Hakkında Rapor by SFI.pdf
Roberto Unger Hakkında Rapor by SFI.pdfRoberto Unger Hakkında Rapor by SFI.pdf
Roberto Unger Hakkında Rapor by SFI.pdf
 
Rüzgar enerjisi
Rüzgar enerjisiRüzgar enerjisi
Rüzgar enerjisi
 
Çok Kriterli Karar Verme Yöntemi İle Rüzgar Santrali Alanı Seçimi
Çok Kriterli Karar Verme Yöntemi İle Rüzgar Santrali Alanı SeçimiÇok Kriterli Karar Verme Yöntemi İle Rüzgar Santrali Alanı Seçimi
Çok Kriterli Karar Verme Yöntemi İle Rüzgar Santrali Alanı Seçimi
 
Esmaül Hüsna (Allah'ın 99 İsmi ve Türkçe Anlamları)
Esmaül Hüsna (Allah'ın 99 İsmi ve Türkçe Anlamları)Esmaül Hüsna (Allah'ın 99 İsmi ve Türkçe Anlamları)
Esmaül Hüsna (Allah'ın 99 İsmi ve Türkçe Anlamları)
 
Sudaki Zehirli Maddelerin Tayini İçin Analitik Prosedürlerin PROMETHEE ile An...
Sudaki Zehirli Maddelerin Tayini İçin Analitik Prosedürlerin PROMETHEE ile An...Sudaki Zehirli Maddelerin Tayini İçin Analitik Prosedürlerin PROMETHEE ile An...
Sudaki Zehirli Maddelerin Tayini İçin Analitik Prosedürlerin PROMETHEE ile An...
 
DEMATEL Yönteminin Yeşil Tedarik Zinicirinde Kullanılması
DEMATEL Yönteminin Yeşil Tedarik Zinicirinde KullanılmasıDEMATEL Yönteminin Yeşil Tedarik Zinicirinde Kullanılması
DEMATEL Yönteminin Yeşil Tedarik Zinicirinde Kullanılması
 
Çok Kriterli Karar Verme Yöntemleri İle Katı Atık Bertaraf Teknolojisi Seçimi
Çok Kriterli Karar Verme Yöntemleri İle Katı Atık Bertaraf Teknolojisi SeçimiÇok Kriterli Karar Verme Yöntemleri İle Katı Atık Bertaraf Teknolojisi Seçimi
Çok Kriterli Karar Verme Yöntemleri İle Katı Atık Bertaraf Teknolojisi Seçimi
 
ARAŞTIRMA TEKNİKLERİ VE YAYIN ETİĞİ DERSİ ÖDEV–1
ARAŞTIRMA TEKNİKLERİ VE YAYIN ETİĞİ DERSİ ÖDEV–1ARAŞTIRMA TEKNİKLERİ VE YAYIN ETİĞİ DERSİ ÖDEV–1
ARAŞTIRMA TEKNİKLERİ VE YAYIN ETİĞİ DERSİ ÖDEV–1
 
PFAFF HOBBY 1142 Türkçe Kullanım Kitabı
PFAFF HOBBY 1142 Türkçe Kullanım KitabıPFAFF HOBBY 1142 Türkçe Kullanım Kitabı
PFAFF HOBBY 1142 Türkçe Kullanım Kitabı
 
Mobil platformlar ve uygulamalar rapor
Mobil platformlar ve uygulamalar raporMobil platformlar ve uygulamalar rapor
Mobil platformlar ve uygulamalar rapor
 
Mobil platformlar ve uygulamalar
Mobil platformlar ve uygulamalarMobil platformlar ve uygulamalar
Mobil platformlar ve uygulamalar
 
TURKISH POWER SYSTEM AND RENEWABLE ENERGY IN TURKEY
TURKISH POWER SYSTEM AND RENEWABLE ENERGY IN TURKEYTURKISH POWER SYSTEM AND RENEWABLE ENERGY IN TURKEY
TURKISH POWER SYSTEM AND RENEWABLE ENERGY IN TURKEY
 
BORUSAN EnBW Enerji
BORUSAN EnBW Enerji BORUSAN EnBW Enerji
BORUSAN EnBW Enerji
 
RENEWABLE ENERGY in WORLD & TURKEY
RENEWABLE ENERGY  in WORLD & TURKEYRENEWABLE ENERGY  in WORLD & TURKEY
RENEWABLE ENERGY in WORLD & TURKEY
 
Oerlikon Solar
Oerlikon SolarOerlikon Solar
Oerlikon Solar
 
UNDERSTANDING THE LICENSING PROCESS FOR LARGE SCALE SOLAR PROJECTS
UNDERSTANDING THE LICENSING PROCESS FOR  LARGE SCALE SOLAR PROJECTSUNDERSTANDING THE LICENSING PROCESS FOR  LARGE SCALE SOLAR PROJECTS
UNDERSTANDING THE LICENSING PROCESS FOR LARGE SCALE SOLAR PROJECTS
 
Türkiye’de  Solar  PV  Üretimi
Türkiye’de  Solar  PV  ÜretimiTürkiye’de  Solar  PV  Üretimi
Türkiye’de  Solar  PV  Üretimi
 
CSP GLOBAL MARKET OVERVIEW
CSP GLOBAL MARKET  OVERVIEWCSP GLOBAL MARKET  OVERVIEW
CSP GLOBAL MARKET OVERVIEW
 
MANUFACTURE OF ORGANIC PHOTOVOLTAICS
MANUFACTURE OF ORGANIC PHOTOVOLTAICSMANUFACTURE OF ORGANIC PHOTOVOLTAICS
MANUFACTURE OF ORGANIC PHOTOVOLTAICS
 

Permanent Magnet Direct Drive (PM/DD) Technology

  • 1. Permanent Magnet Direct Drive (PM/DD) Technology September 2011 p ©2009. Northern Power Systems. All Rights Reserved. Not to be used or shared without permission. Proprietary and Confidential.
  • 2. Northern Power Systems Profile Today… NPS is an advanced technology U.S. based wind turbine company specializing in next generation Permanent Magnet Direct Drive (PM/DD) wind turbines Private company with Lead Investors in USA and EU Two separate businesses based on the same PM/DD technology: Distributed Wind and Utility Wind Largest Distributed Wind company in the world Over 300 NPS 100 kW (NPS 100) turbines ordered to-date with 130 turbines installed globally... Highest availability in the distributed wind market – 800,000 run hours with 98% median availability to-date to date Largest installed base of integrated wind-diesel generation platforms in the world New technology under development including 450 kW turbine and wind-diesel-battery integrated solutions Utility Wind has world class expertise in large PM/DD wind turbine platforms world-class Introduced new NPS 2.3 MW (NPS 2.3) onshore wind turbine in 2011 with 93m and 100m rotors − First two prototype turbines are installed in Michigan USA and are running with very high availability − DNV type-certification process well underway ... expect DNV certification award in first quarter 2012 Developing larger, more cost effective PM/DD platforms for onshore and offshore applications Locations in the United States and Europe Offices: Barre, Vermont (HQ), Boston, Massachusetts (Corp) , and Zurich, Switzerland (Sales & Service) Production facilities: Barre Vermont and Saginaw Michigan Barre, Saginaw, 2 ©2009. Northern Power Systems. All Rights Reserved. Not to be used or shared without permission. Proprietary and Confidential.
  • 3. NPS Today – Distributed Wind and Utility Wind … Distributed Wind Utility Wind NPS 100 NPS 2.3 Launched in 2000, with PMDD in 2008 First prototype installed in December 2010 p yp 280 units, >$80M ordered since 2008 Extensively Tested at NREL 130 units in operation globally Launched in 2011 800,000 accumulated fleet hours Two prototypes flying in MI 98-99% 98 99% availability Strong Performance Average $300,000 selling price Medium/Low Wind Variants NPS 450 NPS 3.4 NPS 8.0 Platform extension under development with DOE grant Platform Extension Large Offshore 2012-13 prototype launch Existing 2.3 Technology New Technologies Fast commercial ramp Fast Commercial Ramp Low Maintenance Larger di t ib t d l d L distributed loads EU and A i markets d Asian k t Global Markets Gl b l M k t Next-generation PM/DD Technology g gy ©2009. Northern Power Systems. All Rights Reserved. Not to be used or shared without permission. Proprietary and Confidential.
  • 4. Permanent magnet/direct-drive (PM/DD) technology is disruptive …. NPS PM/DD PM/DD Permanent Magnet Direct Drive First-Gen PM/DD • SAME weight as traditional geared turbines • Extremely reliable … low ophistication Original Direct-Drive downtime, downtime low maintenance Technology Traditional Wound-Rotor Direct Drive • Cost similar to traditional geared turbines • 30% heavier than traditional geared turbines • Extremely reliable … low T So downtime, low maintenance • Command a 15-20% price premium Traditional Geared Turbines “High-Speed” “High Speed” Geared Drive • 80-90% market-share Value to Customers ©2009. Northern Power Systems. All Rights Reserved. Not to be used or shared without permission. Proprietary and Confidential.
  • 5. Northern Power Systems Technology Differentiation … Traditional Geared Turbine Complex, high-speed (1800 rpm) drivetrain problematic: 5% Downtime Gearbox replacements every 5 years Efficiency losses due to gear friction & electrically- powered magnetic field Failures of large components require expensive crane & significant downtime NPS 2.3 PM/DD Turbine Simple, slow-speed (15-20 rpm) drivetrain extremely reliable: 2% Downtime No high-speed wear & tear, gearbox replacement Very high-efficiency … no friction losses and p y g y permanent magnets supply magnetic field Highly modular design allows up-tower swap-outs: no crane & minimal downtime Facilitates larger rotors ©2009. Northern Power Systems. All Rights Reserved. Not to be used or shared without permission. Proprietary and Confidential.
  • 6. NPS PM/DD enables the Lowest Cost of Energy … Better Energy Capture via Very Large Rotors Simple load path Simple powertrain dynamics and harmonics Simple blade characterization and construction High efficiency power train and nacelle layout gives more power, especially at low wind speeds y High Reliability Translates to Lower Operating Costs and Risks Low part count means fewer opportunities for failure Highly modular design Enables tight quality control in production Up-tower swap-outs: No external crane & minimal downtime No oil or fluids to leak or change Liquid coo g a o s e pa ded environmental ope at g e qu d cooling allows expanded e o e ta operating environment o e t ©2009. Northern Power Systems. All Rights Reserved. Not to be used or shared without permission. Proprietary and Confidential.
  • 7. Wind Farm Cash Flow Drivers – NPS value proposition ... Power curve … energy Turbine-specific Uptime% Costs required production from a key drivers (or ”availability”) to maintain given wind speed Power Curve Maintenance Wind Farm = Power (MW) X $/MW-Hr X Uptime - & Repair Cash Flows Costs Wind Speed Captures more energy … more of the time … at LOWER cost! Price of Site-specific Wind Speed electricity key drivers y generated ©2009. Northern Power Systems. All Rights Reserved. Not to be used or shared without permission. Proprietary and Confidential.
  • 8. Utility Wind economics greatly improved with NPS 2.3 … Same potential site … … but NPS delivers better economics EXAMPLE Annual Cash Flow • 80MW site ($/Year) $600k $11.0M $100k • Class II/III $300k $10.1M • PPA rate = $100/MW hr $100/MW-hr $1M/yr. higher • Project const. costs = $40M cash flow! • ITC/PTC incentives Traditional Better NPS • Tax equity benefits Turbine Increased production Lower PMDD uptime Maint. Turbine •20-year investment life Return on I R t Investment (ROI) 22% b tt t t (ROI): better Net Present Value (NPV): $10M better ©2009. Northern Power Systems. All Rights Reserved. Not to be used or shared without permission. Proprietary and Confidential.
  • 9. NPS 2.3 Prototypes at Stoney Corners I wind farm … ©2009. Northern Power Systems. All Rights Reserved. Not to be used or shared without permission. Proprietary and Confidential.