www.kredlinfo.in
Karnataka Renewable Energy Development Limited
• KREDL was established in 1996 by the Government of
Karnataka.
• Forerunner for Ministry of New and Renewable Energy (MNRE)
and BEE.
• Nodal Agency for the Non-Conventional Energy Sources and the
implementation of various energy conservation activities.
Objective
To promote renewable energy and to initiate all necessary actions
for the Energy Conservation in the State.
www.kredlinfo.in
Renewable Energy Status in Karnataka
www.kredlinfo.in
Sl No.
Renewable
Energy Sources
Capacity
Potential
in MWs
Allotted
capacity in
MWs
Installed
Capacity in
MWs
Tariff fixed by the KERC
1 Cogeneration 2500 1551.91 1139.11
Rs. 2.85 for existing
projects (before 2010),
Rs. 3.59 to 4.14
2 Small Hydro 3000 2871.3 711.66 Rs. 3.40
3 Wind 13236 10187.88 2218.73 Rs. 3.70
4 Biomass 1000 258.50 90.50
Rs. 2.85 for existing
projects (before 2010)
Rs. 3.66 to 4.13
5 Solar 10000 222
KREDL- 10
KPCL – 14
Total - 24
Rs. 14.50 – SPV
Rs. 11.35 – ST
Rs. 14.50 – Roof top
6 Waste to Energy 135 8.00 -
Rs. 4.15/unit ( for M/s
Srinivasa Gayathri
Resource Recovery Ltd.,)
29871 17202.33 4184.00
Status up to 30th August 2013
Wind 53%
Hydro
17%
Bio Mass
2 %
Co-gen
27 %
Solar 0.57 %
RE Source MW (Installed
Capacity)
Wind 2218.73
Small Hydro 711.66
Biomass 90.50
Solar 24.00
Cogen 1139.11
Total 4184.00
www.kredlinfo.in
RE Sources
YEAR 2010- 11 2011- 12 2012-13 2010- 11 2011- 12 2012-13
MU 1564.521 1836.411 1201.122
MW 615.55 650.4 701.41
MU 1586.696 1907.106 2527.312
MW 930.66 914.66 1082.54
MU 302.458 222.696 240.496
MW 86.5 87.5 90.5
MU 2650.071 3661.216 4329.021
MW 1765.64 1980.69 2182.34
MU 6.356 8.176 16.481
MW 6 9 14
MU 6110.102 7635.605 8314.432
MW 3404.35 3642.25 4070.79
State Generation MU 44997.379 56981.033 57476.336
RE Share 0.1358 0.134 0.1446
0.1037 0.1344
0.22520.23960.2179
0.2939 0.3033
0.22640.2110.1713
Biomass
Wind
Solar
RE Generation
0.2918
0.2479
0.3992
0.1209
Yearwise Details of Generation from Renewable Energy sources
Annual Generation CUF
Mini/Small Hydro
Cogen
0.324 0.1954
0.238 0.2665
www.kredlinfo.in
Solar Off grid Projects
Solar Photovoltaic Installed
Capacity
Total 236.155 kWp installed in various places.
Atal Ji Jana Snehi Kendra
1.202 MW (2Kwp x 601 Centers)
State Govt.(Revenue Dept.) - 50 %,
MNRE. - 30% and Total project cost is – Rs 27.48 Cr
K.R.E.D.L - 20 %
Solar Thermal Water Heaters
500 LPD and above capacity, Total 2,34,250 LPD installed in various
districts in Karnataka.
Energy Savings of about 3.514 million units annually
Solar Cooking and Laundry Total 17 projects were installed in different districts of Karnataka.
(Cooking food for about 86000 persons per day)
Alternate Fuel Surface Transport
(Battery operated vehicles)
4 Wheeler - 542
2 Wheeler- 322. Subsidy Released - Rs. 4.59 Crores.
Total - 864.
www.kredlinfo.in
Govt financial assistance
helpful to Apartments
• Solar water heaters
• Grid connected spv
• Offgrid SPV , Street lights, Pumps
• Considering Rs 5.7/ unit as electricity charge
and also considering DG consumption ,SPV
viable
DDG Scheme (Distributed Decentralized Generation)
Under the MNRE scheme (RGGVY) the electrification of the remote villages
without distribution systems is being taken up. Decentralized Distributed Generation
projects can be from conventional or renewable sources such as Biomass, Biofuels,
Biogas, Mini hydro, solar etc for villages where grid connectivity is either not feasible
or not cost effective.
The RGGVY in XI Plan has a financial outlay of Rs. 540 Crore for implementation
of DDG projects.
Under DDG scheme of RGGVY, 90% of the project cost is provided as capital
subsidy by the Government. All un-electrified revenue villages and hamlets (above
100 population) are eligible under DDG scheme of RGGVY. Identification of eligible
villages shall be done by SREDAs in consultation with state utilities SC/ST
development corporation and MNRE.
The detailed project reports (DPR) of 15 villages of HESCOM, 46 villages of
MESCOM, 1 Hamlet of CESC and 1 village of GESCOM, Total of 63 DPRs submitted
to REC for approval.
www.kredlinfo.in
SN Devices Central Financial Assistance Benchmark Cost
1
Solar Water Heaters (ETC) 1) Rs. 2550/- per sq.mt. or 30% of cost whichever is less
2) Rs.2400/-per sq.mt. or 30% of cost whichever is less
1)Rs.8,500/- per sq.mt.for
Domestic
2)Rs.8,000/- per sq.mt for
Commercial
2
Solar Water Heaters (FPC) 1) Rs. 3300/- per sq.mt. or 30% of cost whichever is less
2)Rs. 3000/- per sq.mt. or 30% of cost whichever is less
1)Rs.11000/- per sq.mt.for
Domestic
2)Rs.10,000/- per sq.mt.for
Commercial
3
Solar Concentrator (Manual
tracking
Rs. 2100/- per sq.mt. or 30% of cost whichever is less Rs.7000/- per sq.mt.
4
Solar Concentrator (Single
axis tracking)
Rs.5400/- per sq.mt. or 30% of cost whichever is less Rs.18000/- per sq.mt.
5
Solar P.V. Systems (With
Battery bank)Applicable to
Solar Street light
30% of cost
1)300 Wp to 1 kWp
2)> 1 kWp to 10 kWp
3)> 10 kWp to 100 kWp
1) Rs.210/- per watt
2) Rs.190/- per watt
3) Rs170/- per watt
6
Solar P.V. Systems (Without
Battery bank)Applicable to
Solar Street light
30% of cost
1) Upto 100 kWp
2) > 100 kWp to 500 kWp
1)Rs.100/-perwatt
2)Rs.90/- per watt
7
Solar water Pumps Upto 5 kWp Rs.190/- per watt
8
Aerogenerators/Wind-Solar
Hybrid Systems
a) Rs.1.5/- Lakhs per kW for Govt/Public/Charitable,
R&D,academic and other non-profit making institution.
b) Rs.1/- Lakhs per kW for other beneficiaries not covered
under (a) i.e. Individuals and private/corporate sector will come
under this category.
Rs.2.5 lakhs per KW
9
Box type Solar Cooker Capable of cooking 1kgs of food no Government subsidy for this
type of Solar Cookers. But interest free loan is available for the
users and individuals through IREDA and some of the banks.
Rs.2500/- to Rs.3500/-
10
Dish Solar Cookers can cook food for 10 to 15 person. MNRE subsidy a maximum
of Rs.1500/- per sq.m
Rs.6000/-to Rs.9000
Solar City Project
Solar City project aims to promote energy security and Green Energy, the
“Development of Solar Cities” program is designed to support/encourage Urban
Local Bodies to prepare a Road Map to guide their cities in becoming ‘renewable
energy cities’ or ‘solar cities’.
•Mysore and Hubli - Dharwad are selected as solar cities.
•Master Plan for Mysore as solar city has been approved in 2012.
• An amount of Rs. 1.5 Lakhs has been released towards preparation of master plan
for Hubli – Dharwad under Solar City Program.
•Total amount of Rs. 5.65 Lakhs has been released for Mysore city Corporation
under Solar City Program.
•196 kWp stand alone SPV power plants at 5 locations are sanctioned to Mysore
Solar City. MNRE sanctioned 30% of the project cost i.e.Rs.158.70lakhs and
released an amount of Rs.79.35lakhs.
•The CFA up to Rs. 9.5Cr for each model solar city will be provided with the
condition that the similar matching funds up to Rs. 9.5Cr is provided by the
Municipal Corporation/ Municipality/State/District Authority by there own or any
other sources includes Public Private Partnership
Roof Top Solar PV System
State Budget Share INR 7.00 Cr 20% subsidy by State Government
MNRE Budget Share INR 10.50 Cr Upto 30% subsidy by MNRE as per their scheme
Total subsidy INR 17.50 Cr Total subsidy -50% of the cost of the system
User share INR 17.50 Cr 50% of the cost of the system
Total project cost INR 35.00 Cr Total subsidy of 50%
Beneficiary share 50%
Solar Roof Top Project
The objective of the scheme is to pilot the roof-top solar PV
system in selected 5 cities (Bangalore, Mysore, Mangalore, Hubli
and Gulbarga). 50% of subsidy funds to be utilized in Bangalore,
while rest to be equally divided in other four cities. Each
beneficiary will be entitled to a maximum subsidy of 50% of the
cost of the system, with breakup of 30% by MNRE under MNRE
guidelines and 20% by state government subsidy. The tenders for
the implementation of the project will be floated shortly.
Budget
•For the year 2012-2013 out of Rs. 7 crore , Rs. 2 crore has been released on
26th March 2013.
•KREDL requested to MNRE for the sanction of CFA of Rs 3 Crores.
Energy Conservation Building Code
A ECBC code has been prepared and submitted to the Govt. of Karnataka for
issuing notification in the gazette.
As per the ECBC code, it is applicable for the commercial buildings (both
private and Govt. buildings) where,
o The connected load is 100 kW or more, OR
o The contract demand of 120 KVA or more, OR
o The conditioned area of 500 Sq.m or more.
A notification in the gazette will be issued shortly.
 The Public works department and Principal Chief Architect are the enforcing
agency for the Govt. buildings.
 The Urban local bodies are the enforcing agency for the Private buildings.
 The chief electrical inspector, Govt. of Karnataka is authorized to inspect ECBC
compliant buildings.
 KREDL monitors the implementation of the ECBC at the state level
and also to create awareness of the ECBC
Energy Conservation in Karnataka
Completed Projects/Activites
•LED Street lights at Udupi, Kalagatagi and Alnavar Towns.
•LED Lights at JP Park and Hanumanthnagar Public Parks in Bangalore.
•LED Street Lights at Richmond Road Flyover , Bangalore.
•LED Village Campaign at Mathur Village in Shimoga District.
•Energy Auditing of 20 Govt. buildings across the state.
•Fixing of hoardings at Public Places, Govt. offices etc. across the state under
Publicity & Awareness programme.
•Workshop on Notified PAT scheme for the Designated Consumers.
•Celebration of Akshay Urja Diwas.
•Workshop on Energy Conservation Building Code for all the stake holders.
•Competition for School Children’s/College Students on Essay, painting, debate,
project making, RE models, drama etc., and distribution of prizes.
•Training programme for the Architects, PWD on Energy conservation building
code.
1. LED Street lights- Rs. 200 Lakh..
a. Magadi and Puttur Town. Work has been awarded, it is under process.
b. Government Hospitals in Bangalore City. - Work has been awarded, it is under process.
c. Basavana Bagevadi town.
Pavagada town. DPR preparation is under process
Annigeri town.
 It is proposed to conserve energy of 12.81 lakh kWh per annum.
 The proposed energy cost savings is Rs 76.86 lakhs per annum
2. Energy Efficient Pumps- Rs. 100 Lakh.
A. 5 Govt. hospitals in Bangalore city – DPR is ready, to be tendered shortly.
B. Other District Govt. Hospitals – DPR preparations is under process.
 It is proposed to conserve more than 15% of energy.
Details of the Energy Conservation and Energy
Efficiency ongoing Projects
Details of the Energy Conservation and Energy
Efficiency ongoing Projects
3. LED video moving display board- Rs. 100 lakh.
The work has been entrusted to M/s MC&A- work is under process.
 It is proposed to install these boards at all KREDL offices, Public places, DCs offices etc.,
 To create awareness among public regarding conservation of energy, use of energy
efficient household appliances, benefits, rebates, etc., this program has been taken up.
4. Implementation of Energy Audit measures at three Government buildings- 100 lakhs.
 DC’s office building Chamarajanagar, Tumkur and State Prisons Head Office,
Bengaluru have been selected for the implementation of energy audit measures.
 It is proposed to conserve energy of 10.2 Lakh kWh per annum.
 The proposed energy cost savings is Rs 61.2 Lakhs per annum.
 Proposals sent to PWD for implementation - work is under process.
Details of the Energy Conservation and Energy
Efficiency ongoing Projects
5. Replacement of the existing T10/T12 Fluorescent tube fittings with copper chokes by
T5 lamp with electronic Ballast at 500 selected Police Stations in Bangalore city -
Rs. 100 lakh.
 It is proposed to conserve energy of 7.3 Lakh kWh per annum.
 The proposed energy cost saving is Rs 43.8 Lakh per annum.
 Proposals sent to Karnataka State Police Housing Corp. Ltd. for implementation -
work is under process.
6. Providing energy saver units at streetlight circuits in Bangalore and Mysore City –
150 Lakhs.
 It is proposed to conserve more than 20% of the energy
 Proposals sent to EESL, Delhi for implementation - work is under process.
www.kredlinfo.in

Más contenido relacionado

La actualidad más candente

Rehabilitation & Resettlement policy
Rehabilitation & Resettlement policyRehabilitation & Resettlement policy
Rehabilitation & Resettlement policyPrastut Maurya
 
Green energy
Green energyGreen energy
Green energy5613007
 
WE1.L09.5 - ESTIMATION OF FOREST BIOMASS CHANGE FROM FUSION OF RADAR AND LIDA...
WE1.L09.5 - ESTIMATION OF FOREST BIOMASS CHANGE FROM FUSION OF RADAR AND LIDA...WE1.L09.5 - ESTIMATION OF FOREST BIOMASS CHANGE FROM FUSION OF RADAR AND LIDA...
WE1.L09.5 - ESTIMATION OF FOREST BIOMASS CHANGE FROM FUSION OF RADAR AND LIDA...grssieee
 
Managment of natural resources h asmita-xd
Managment of natural resources  h asmita-xdManagment of natural resources  h asmita-xd
Managment of natural resources h asmita-xdShephali Bose
 
Joint Forest Management - Kerala
Joint Forest Management - KeralaJoint Forest Management - Kerala
Joint Forest Management - KeralaGeo Basil Paul
 
Joint Forest Management
Joint Forest ManagementJoint Forest Management
Joint Forest ManagementGeo Basil Paul
 
Forest rights act 2006
Forest rights act 2006Forest rights act 2006
Forest rights act 2006AID FOR CHANGE
 
Slides on tiribals, dikus and vision of a golden age (viii)
Slides on tiribals, dikus and vision of a golden age (viii)Slides on tiribals, dikus and vision of a golden age (viii)
Slides on tiribals, dikus and vision of a golden age (viii)vijaybh3
 
Solar Energy presentation ppt
Solar Energy presentation  pptSolar Energy presentation  ppt
Solar Energy presentation pptParagRamani1
 
Automatic sun tracking system. ppt
Automatic sun tracking system. pptAutomatic sun tracking system. ppt
Automatic sun tracking system. pptSaumya Ranjan Behura
 

La actualidad más candente (20)

Agro forestry
Agro forestry Agro forestry
Agro forestry
 
Rehabilitation & Resettlement policy
Rehabilitation & Resettlement policyRehabilitation & Resettlement policy
Rehabilitation & Resettlement policy
 
Green energy
Green energyGreen energy
Green energy
 
WE1.L09.5 - ESTIMATION OF FOREST BIOMASS CHANGE FROM FUSION OF RADAR AND LIDA...
WE1.L09.5 - ESTIMATION OF FOREST BIOMASS CHANGE FROM FUSION OF RADAR AND LIDA...WE1.L09.5 - ESTIMATION OF FOREST BIOMASS CHANGE FROM FUSION OF RADAR AND LIDA...
WE1.L09.5 - ESTIMATION OF FOREST BIOMASS CHANGE FROM FUSION OF RADAR AND LIDA...
 
Managment of natural resources h asmita-xd
Managment of natural resources  h asmita-xdManagment of natural resources  h asmita-xd
Managment of natural resources h asmita-xd
 
Federalism
FederalismFederalism
Federalism
 
A Hybrid Wind and Solar Energy System with Battery Energy Storage for an Isol...
A Hybrid Wind and Solar Energy System with Battery Energy Storage for an Isol...A Hybrid Wind and Solar Energy System with Battery Energy Storage for an Isol...
A Hybrid Wind and Solar Energy System with Battery Energy Storage for an Isol...
 
Joint Forest Management - Kerala
Joint Forest Management - KeralaJoint Forest Management - Kerala
Joint Forest Management - Kerala
 
Joint Forest Management
Joint Forest ManagementJoint Forest Management
Joint Forest Management
 
Types of forest in India
Types of forest in IndiaTypes of forest in India
Types of forest in India
 
Forest rights act 2006
Forest rights act 2006Forest rights act 2006
Forest rights act 2006
 
Slides on tiribals, dikus and vision of a golden age (viii)
Slides on tiribals, dikus and vision of a golden age (viii)Slides on tiribals, dikus and vision of a golden age (viii)
Slides on tiribals, dikus and vision of a golden age (viii)
 
ppt on Smart Grid
ppt on Smart Gridppt on Smart Grid
ppt on Smart Grid
 
Non conventional sources of energy
Non conventional sources of energyNon conventional sources of energy
Non conventional sources of energy
 
Solar Energy presentation ppt
Solar Energy presentation  pptSolar Energy presentation  ppt
Solar Energy presentation ppt
 
Solar Equipments
Solar EquipmentsSolar Equipments
Solar Equipments
 
Automatic sun tracking system. ppt
Automatic sun tracking system. pptAutomatic sun tracking system. ppt
Automatic sun tracking system. ppt
 
Energy plantation
Energy plantationEnergy plantation
Energy plantation
 
Windmill
WindmillWindmill
Windmill
 
Bishnoi movement ppt
Bishnoi movement pptBishnoi movement ppt
Bishnoi movement ppt
 

Similar a Karnataka Renewable Energy Development Limited

Indian power sector 2017
Indian power sector 2017Indian power sector 2017
Indian power sector 2017rini ravi
 
India’s solar policies
India’s solar policiesIndia’s solar policies
India’s solar policiesNaresh Goud
 
Solar policys in india and state comparison
Solar policys in india and state comparison Solar policys in india and state comparison
Solar policys in india and state comparison Nilesh Dayalapwar
 
Green Corner l2010
Green Corner l2010Green Corner l2010
Green Corner l2010Amit Bharti
 
Renewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and PolicyRenewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and PolicyMalik Sameeullah
 
Systematic Roadmap Approach on Solar City
Systematic Roadmap Approach on Solar CitySystematic Roadmap Approach on Solar City
Systematic Roadmap Approach on Solar CityVignesh Sekar
 
Rbsa Research Report rise of solar power in India
Rbsa Research Report  rise of solar power in IndiaRbsa Research Report  rise of solar power in India
Rbsa Research Report rise of solar power in IndiaRBSA Advisors
 
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEF
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEFRenewable Energy status and road-map of Bangladesh and support of UNDP-GEF
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEFDr. Md. Taibur Rahman
 
Energy Transition and Net Zero initiative
Energy Transition and Net Zero initiativeEnergy Transition and Net Zero initiative
Energy Transition and Net Zero initiativeSUBRATAMUKHOPADHYAY9
 
Status of Distributed Solar Energy in Tamil Nadu – Challenges & Roadmap 2025
Status of Distributed Solar Energy in Tamil Nadu – Challenges & Roadmap 2025Status of Distributed Solar Energy in Tamil Nadu – Challenges & Roadmap 2025
Status of Distributed Solar Energy in Tamil Nadu – Challenges & Roadmap 2025AurovilleConsulting
 
Rewa Ultra Mega Solar Project Presentation
Rewa Ultra Mega Solar Project PresentationRewa Ultra Mega Solar Project Presentation
Rewa Ultra Mega Solar Project PresentationRoneeSingh
 
Financing clean energy projects in nepal: A practitioner’s perspective
Financing clean energy projects in nepal: A practitioner’s perspectiveFinancing clean energy projects in nepal: A practitioner’s perspective
Financing clean energy projects in nepal: A practitioner’s perspectiveKushal Gurung
 
Introduction to JNNSM- India's National Solar Mission
Introduction to JNNSM- India's National Solar MissionIntroduction to JNNSM- India's National Solar Mission
Introduction to JNNSM- India's National Solar MissionKranav Sharma
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsSanman Rajput
 

Similar a Karnataka Renewable Energy Development Limited (20)

Indian power sector 2017
Indian power sector 2017Indian power sector 2017
Indian power sector 2017
 
India’s solar policies
India’s solar policiesIndia’s solar policies
India’s solar policies
 
Solar policys in india and state comparison
Solar policys in india and state comparison Solar policys in india and state comparison
Solar policys in india and state comparison
 
Green Corner l2010
Green Corner l2010Green Corner l2010
Green Corner l2010
 
Renewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and PolicyRenewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and Policy
 
Systematic Roadmap Approach on Solar City
Systematic Roadmap Approach on Solar CitySystematic Roadmap Approach on Solar City
Systematic Roadmap Approach on Solar City
 
Rbsa Research Report rise of solar power in India
Rbsa Research Report  rise of solar power in IndiaRbsa Research Report  rise of solar power in India
Rbsa Research Report rise of solar power in India
 
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEF
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEFRenewable Energy status and road-map of Bangladesh and support of UNDP-GEF
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEF
 
Policy of central and state
Policy of central and statePolicy of central and state
Policy of central and state
 
23PESGM4066.pptx
23PESGM4066.pptx23PESGM4066.pptx
23PESGM4066.pptx
 
Energy Transition and Net Zero initiative
Energy Transition and Net Zero initiativeEnergy Transition and Net Zero initiative
Energy Transition and Net Zero initiative
 
Status of Distributed Solar Energy in Tamil Nadu – Challenges & Roadmap 2025
Status of Distributed Solar Energy in Tamil Nadu – Challenges & Roadmap 2025Status of Distributed Solar Energy in Tamil Nadu – Challenges & Roadmap 2025
Status of Distributed Solar Energy in Tamil Nadu – Challenges & Roadmap 2025
 
Renewable Energy in India
Renewable Energy in IndiaRenewable Energy in India
Renewable Energy in India
 
Rewa Ultra Mega Solar Project Presentation
Rewa Ultra Mega Solar Project PresentationRewa Ultra Mega Solar Project Presentation
Rewa Ultra Mega Solar Project Presentation
 
Sanjunit
SanjunitSanjunit
Sanjunit
 
Financing clean energy projects in nepal: A practitioner’s perspective
Financing clean energy projects in nepal: A practitioner’s perspectiveFinancing clean energy projects in nepal: A practitioner’s perspective
Financing clean energy projects in nepal: A practitioner’s perspective
 
National Solar Mission Status (July'17)
National Solar Mission Status (July'17)National Solar Mission Status (July'17)
National Solar Mission Status (July'17)
 
RE 2022
RE 2022RE 2022
RE 2022
 
Introduction to JNNSM- India's National Solar Mission
Introduction to JNNSM- India's National Solar MissionIntroduction to JNNSM- India's National Solar Mission
Introduction to JNNSM- India's National Solar Mission
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
 

Más de TiE Bangalore

Product Management in IoT
Product Management in IoTProduct Management in IoT
Product Management in IoTTiE Bangalore
 
Customer Specific Tailorability
Customer Specific TailorabilityCustomer Specific Tailorability
Customer Specific TailorabilityTiE Bangalore
 
Art of Product Management for IoT Startups
Art of Product Management for IoT Startups Art of Product Management for IoT Startups
Art of Product Management for IoT Startups TiE Bangalore
 
Revised Telemedicine Guidelines
Revised Telemedicine GuidelinesRevised Telemedicine Guidelines
Revised Telemedicine GuidelinesTiE Bangalore
 
Telemedicine Guidelines
Telemedicine GuidelinesTelemedicine Guidelines
Telemedicine GuidelinesTiE Bangalore
 
Opportunities For Entrepreneurs in Bahrain.
Opportunities For Entrepreneurs in Bahrain.Opportunities For Entrepreneurs in Bahrain.
Opportunities For Entrepreneurs in Bahrain.TiE Bangalore
 
Business Planning and Preparing a Business Plan
Business Planning and Preparing a Business PlanBusiness Planning and Preparing a Business Plan
Business Planning and Preparing a Business PlanTiE Bangalore
 
Distributed Ledgers and IoT
Distributed Ledgers and IoTDistributed Ledgers and IoT
Distributed Ledgers and IoTTiE Bangalore
 
Valuation for Startups
Valuation for StartupsValuation for Startups
Valuation for StartupsTiE Bangalore
 
TiE Sales Masterclass - a neuroscience approach to sales
TiE Sales Masterclass - a neuroscience approach to salesTiE Sales Masterclass - a neuroscience approach to sales
TiE Sales Masterclass - a neuroscience approach to salesTiE Bangalore
 
TiE Sales Masterclass - Guerrilla Warfare
TiE Sales Masterclass - Guerrilla WarfareTiE Sales Masterclass - Guerrilla Warfare
TiE Sales Masterclass - Guerrilla WarfareTiE Bangalore
 
IoT Reality & Way Ahead: Incubators for Hardware, IoT Startups
IoT Reality & Way Ahead: Incubators for Hardware, IoT StartupsIoT Reality & Way Ahead: Incubators for Hardware, IoT Startups
IoT Reality & Way Ahead: Incubators for Hardware, IoT StartupsTiE Bangalore
 
Driving Business Value with Artificial Intelligence and IoT
Driving Business Value with Artificial Intelligence and IoTDriving Business Value with Artificial Intelligence and IoT
Driving Business Value with Artificial Intelligence and IoTTiE Bangalore
 
The Road Ahead of IoT
The Road Ahead of IoTThe Road Ahead of IoT
The Road Ahead of IoTTiE Bangalore
 
IKP Knowledge Park & IKP-EDEN™ IKP-Engineering Design Entrepreneurship Network
IKP Knowledge Park & IKP-EDEN™ IKP-Engineering Design Entrepreneurship NetworkIKP Knowledge Park & IKP-EDEN™ IKP-Engineering Design Entrepreneurship Network
IKP Knowledge Park & IKP-EDEN™ IKP-Engineering Design Entrepreneurship NetworkTiE Bangalore
 
IoT and the Role of Platforms
IoT and the Role of PlatformsIoT and the Role of Platforms
IoT and the Role of PlatformsTiE Bangalore
 
3GPP/GSMA technologies for LPWAN in the Licensed Spectrum
3GPP/GSMA technologies for LPWAN in the Licensed Spectrum3GPP/GSMA technologies for LPWAN in the Licensed Spectrum
3GPP/GSMA technologies for LPWAN in the Licensed SpectrumTiE Bangalore
 
IoT Solutions for Businesses
IoT Solutions for BusinessesIoT Solutions for Businesses
IoT Solutions for BusinessesTiE Bangalore
 
Valuation for Startups - What is your Start-up worth?
Valuation for Startups - What is your Start-up worth?Valuation for Startups - What is your Start-up worth?
Valuation for Startups - What is your Start-up worth?TiE Bangalore
 

Más de TiE Bangalore (20)

Product Management in IoT
Product Management in IoTProduct Management in IoT
Product Management in IoT
 
Customer Specific Tailorability
Customer Specific TailorabilityCustomer Specific Tailorability
Customer Specific Tailorability
 
Art of Product Management for IoT Startups
Art of Product Management for IoT Startups Art of Product Management for IoT Startups
Art of Product Management for IoT Startups
 
Revised Telemedicine Guidelines
Revised Telemedicine GuidelinesRevised Telemedicine Guidelines
Revised Telemedicine Guidelines
 
Telemedicine Guidelines
Telemedicine GuidelinesTelemedicine Guidelines
Telemedicine Guidelines
 
Opportunities For Entrepreneurs in Bahrain.
Opportunities For Entrepreneurs in Bahrain.Opportunities For Entrepreneurs in Bahrain.
Opportunities For Entrepreneurs in Bahrain.
 
Business Planning and Preparing a Business Plan
Business Planning and Preparing a Business PlanBusiness Planning and Preparing a Business Plan
Business Planning and Preparing a Business Plan
 
Distributed Ledgers and IoT
Distributed Ledgers and IoTDistributed Ledgers and IoT
Distributed Ledgers and IoT
 
Go-to-Market 101
Go-to-Market 101Go-to-Market 101
Go-to-Market 101
 
Valuation for Startups
Valuation for StartupsValuation for Startups
Valuation for Startups
 
TiE Sales Masterclass - a neuroscience approach to sales
TiE Sales Masterclass - a neuroscience approach to salesTiE Sales Masterclass - a neuroscience approach to sales
TiE Sales Masterclass - a neuroscience approach to sales
 
TiE Sales Masterclass - Guerrilla Warfare
TiE Sales Masterclass - Guerrilla WarfareTiE Sales Masterclass - Guerrilla Warfare
TiE Sales Masterclass - Guerrilla Warfare
 
IoT Reality & Way Ahead: Incubators for Hardware, IoT Startups
IoT Reality & Way Ahead: Incubators for Hardware, IoT StartupsIoT Reality & Way Ahead: Incubators for Hardware, IoT Startups
IoT Reality & Way Ahead: Incubators for Hardware, IoT Startups
 
Driving Business Value with Artificial Intelligence and IoT
Driving Business Value with Artificial Intelligence and IoTDriving Business Value with Artificial Intelligence and IoT
Driving Business Value with Artificial Intelligence and IoT
 
The Road Ahead of IoT
The Road Ahead of IoTThe Road Ahead of IoT
The Road Ahead of IoT
 
IKP Knowledge Park & IKP-EDEN™ IKP-Engineering Design Entrepreneurship Network
IKP Knowledge Park & IKP-EDEN™ IKP-Engineering Design Entrepreneurship NetworkIKP Knowledge Park & IKP-EDEN™ IKP-Engineering Design Entrepreneurship Network
IKP Knowledge Park & IKP-EDEN™ IKP-Engineering Design Entrepreneurship Network
 
IoT and the Role of Platforms
IoT and the Role of PlatformsIoT and the Role of Platforms
IoT and the Role of Platforms
 
3GPP/GSMA technologies for LPWAN in the Licensed Spectrum
3GPP/GSMA technologies for LPWAN in the Licensed Spectrum3GPP/GSMA technologies for LPWAN in the Licensed Spectrum
3GPP/GSMA technologies for LPWAN in the Licensed Spectrum
 
IoT Solutions for Businesses
IoT Solutions for BusinessesIoT Solutions for Businesses
IoT Solutions for Businesses
 
Valuation for Startups - What is your Start-up worth?
Valuation for Startups - What is your Start-up worth?Valuation for Startups - What is your Start-up worth?
Valuation for Startups - What is your Start-up worth?
 

Último

Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Vector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesVector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesZilliz
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embeddingZilliz
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 

Último (20)

Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Vector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesVector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector Databases
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embedding
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 

Karnataka Renewable Energy Development Limited

  • 2. Karnataka Renewable Energy Development Limited • KREDL was established in 1996 by the Government of Karnataka. • Forerunner for Ministry of New and Renewable Energy (MNRE) and BEE. • Nodal Agency for the Non-Conventional Energy Sources and the implementation of various energy conservation activities. Objective To promote renewable energy and to initiate all necessary actions for the Energy Conservation in the State. www.kredlinfo.in
  • 3. Renewable Energy Status in Karnataka www.kredlinfo.in Sl No. Renewable Energy Sources Capacity Potential in MWs Allotted capacity in MWs Installed Capacity in MWs Tariff fixed by the KERC 1 Cogeneration 2500 1551.91 1139.11 Rs. 2.85 for existing projects (before 2010), Rs. 3.59 to 4.14 2 Small Hydro 3000 2871.3 711.66 Rs. 3.40 3 Wind 13236 10187.88 2218.73 Rs. 3.70 4 Biomass 1000 258.50 90.50 Rs. 2.85 for existing projects (before 2010) Rs. 3.66 to 4.13 5 Solar 10000 222 KREDL- 10 KPCL – 14 Total - 24 Rs. 14.50 – SPV Rs. 11.35 – ST Rs. 14.50 – Roof top 6 Waste to Energy 135 8.00 - Rs. 4.15/unit ( for M/s Srinivasa Gayathri Resource Recovery Ltd.,) 29871 17202.33 4184.00
  • 4. Status up to 30th August 2013 Wind 53% Hydro 17% Bio Mass 2 % Co-gen 27 % Solar 0.57 % RE Source MW (Installed Capacity) Wind 2218.73 Small Hydro 711.66 Biomass 90.50 Solar 24.00 Cogen 1139.11 Total 4184.00 www.kredlinfo.in
  • 5. RE Sources YEAR 2010- 11 2011- 12 2012-13 2010- 11 2011- 12 2012-13 MU 1564.521 1836.411 1201.122 MW 615.55 650.4 701.41 MU 1586.696 1907.106 2527.312 MW 930.66 914.66 1082.54 MU 302.458 222.696 240.496 MW 86.5 87.5 90.5 MU 2650.071 3661.216 4329.021 MW 1765.64 1980.69 2182.34 MU 6.356 8.176 16.481 MW 6 9 14 MU 6110.102 7635.605 8314.432 MW 3404.35 3642.25 4070.79 State Generation MU 44997.379 56981.033 57476.336 RE Share 0.1358 0.134 0.1446 0.1037 0.1344 0.22520.23960.2179 0.2939 0.3033 0.22640.2110.1713 Biomass Wind Solar RE Generation 0.2918 0.2479 0.3992 0.1209 Yearwise Details of Generation from Renewable Energy sources Annual Generation CUF Mini/Small Hydro Cogen 0.324 0.1954 0.238 0.2665 www.kredlinfo.in
  • 6. Solar Off grid Projects Solar Photovoltaic Installed Capacity Total 236.155 kWp installed in various places. Atal Ji Jana Snehi Kendra 1.202 MW (2Kwp x 601 Centers) State Govt.(Revenue Dept.) - 50 %, MNRE. - 30% and Total project cost is – Rs 27.48 Cr K.R.E.D.L - 20 % Solar Thermal Water Heaters 500 LPD and above capacity, Total 2,34,250 LPD installed in various districts in Karnataka. Energy Savings of about 3.514 million units annually Solar Cooking and Laundry Total 17 projects were installed in different districts of Karnataka. (Cooking food for about 86000 persons per day) Alternate Fuel Surface Transport (Battery operated vehicles) 4 Wheeler - 542 2 Wheeler- 322. Subsidy Released - Rs. 4.59 Crores. Total - 864. www.kredlinfo.in
  • 7. Govt financial assistance helpful to Apartments • Solar water heaters • Grid connected spv • Offgrid SPV , Street lights, Pumps • Considering Rs 5.7/ unit as electricity charge and also considering DG consumption ,SPV viable
  • 8. DDG Scheme (Distributed Decentralized Generation) Under the MNRE scheme (RGGVY) the electrification of the remote villages without distribution systems is being taken up. Decentralized Distributed Generation projects can be from conventional or renewable sources such as Biomass, Biofuels, Biogas, Mini hydro, solar etc for villages where grid connectivity is either not feasible or not cost effective. The RGGVY in XI Plan has a financial outlay of Rs. 540 Crore for implementation of DDG projects. Under DDG scheme of RGGVY, 90% of the project cost is provided as capital subsidy by the Government. All un-electrified revenue villages and hamlets (above 100 population) are eligible under DDG scheme of RGGVY. Identification of eligible villages shall be done by SREDAs in consultation with state utilities SC/ST development corporation and MNRE. The detailed project reports (DPR) of 15 villages of HESCOM, 46 villages of MESCOM, 1 Hamlet of CESC and 1 village of GESCOM, Total of 63 DPRs submitted to REC for approval. www.kredlinfo.in
  • 9. SN Devices Central Financial Assistance Benchmark Cost 1 Solar Water Heaters (ETC) 1) Rs. 2550/- per sq.mt. or 30% of cost whichever is less 2) Rs.2400/-per sq.mt. or 30% of cost whichever is less 1)Rs.8,500/- per sq.mt.for Domestic 2)Rs.8,000/- per sq.mt for Commercial 2 Solar Water Heaters (FPC) 1) Rs. 3300/- per sq.mt. or 30% of cost whichever is less 2)Rs. 3000/- per sq.mt. or 30% of cost whichever is less 1)Rs.11000/- per sq.mt.for Domestic 2)Rs.10,000/- per sq.mt.for Commercial 3 Solar Concentrator (Manual tracking Rs. 2100/- per sq.mt. or 30% of cost whichever is less Rs.7000/- per sq.mt. 4 Solar Concentrator (Single axis tracking) Rs.5400/- per sq.mt. or 30% of cost whichever is less Rs.18000/- per sq.mt. 5 Solar P.V. Systems (With Battery bank)Applicable to Solar Street light 30% of cost 1)300 Wp to 1 kWp 2)> 1 kWp to 10 kWp 3)> 10 kWp to 100 kWp 1) Rs.210/- per watt 2) Rs.190/- per watt 3) Rs170/- per watt 6 Solar P.V. Systems (Without Battery bank)Applicable to Solar Street light 30% of cost 1) Upto 100 kWp 2) > 100 kWp to 500 kWp 1)Rs.100/-perwatt 2)Rs.90/- per watt 7 Solar water Pumps Upto 5 kWp Rs.190/- per watt 8 Aerogenerators/Wind-Solar Hybrid Systems a) Rs.1.5/- Lakhs per kW for Govt/Public/Charitable, R&D,academic and other non-profit making institution. b) Rs.1/- Lakhs per kW for other beneficiaries not covered under (a) i.e. Individuals and private/corporate sector will come under this category. Rs.2.5 lakhs per KW 9 Box type Solar Cooker Capable of cooking 1kgs of food no Government subsidy for this type of Solar Cookers. But interest free loan is available for the users and individuals through IREDA and some of the banks. Rs.2500/- to Rs.3500/- 10 Dish Solar Cookers can cook food for 10 to 15 person. MNRE subsidy a maximum of Rs.1500/- per sq.m Rs.6000/-to Rs.9000
  • 10. Solar City Project Solar City project aims to promote energy security and Green Energy, the “Development of Solar Cities” program is designed to support/encourage Urban Local Bodies to prepare a Road Map to guide their cities in becoming ‘renewable energy cities’ or ‘solar cities’. •Mysore and Hubli - Dharwad are selected as solar cities. •Master Plan for Mysore as solar city has been approved in 2012. • An amount of Rs. 1.5 Lakhs has been released towards preparation of master plan for Hubli – Dharwad under Solar City Program. •Total amount of Rs. 5.65 Lakhs has been released for Mysore city Corporation under Solar City Program. •196 kWp stand alone SPV power plants at 5 locations are sanctioned to Mysore Solar City. MNRE sanctioned 30% of the project cost i.e.Rs.158.70lakhs and released an amount of Rs.79.35lakhs. •The CFA up to Rs. 9.5Cr for each model solar city will be provided with the condition that the similar matching funds up to Rs. 9.5Cr is provided by the Municipal Corporation/ Municipality/State/District Authority by there own or any other sources includes Public Private Partnership
  • 11. Roof Top Solar PV System State Budget Share INR 7.00 Cr 20% subsidy by State Government MNRE Budget Share INR 10.50 Cr Upto 30% subsidy by MNRE as per their scheme Total subsidy INR 17.50 Cr Total subsidy -50% of the cost of the system User share INR 17.50 Cr 50% of the cost of the system Total project cost INR 35.00 Cr Total subsidy of 50% Beneficiary share 50% Solar Roof Top Project The objective of the scheme is to pilot the roof-top solar PV system in selected 5 cities (Bangalore, Mysore, Mangalore, Hubli and Gulbarga). 50% of subsidy funds to be utilized in Bangalore, while rest to be equally divided in other four cities. Each beneficiary will be entitled to a maximum subsidy of 50% of the cost of the system, with breakup of 30% by MNRE under MNRE guidelines and 20% by state government subsidy. The tenders for the implementation of the project will be floated shortly. Budget •For the year 2012-2013 out of Rs. 7 crore , Rs. 2 crore has been released on 26th March 2013. •KREDL requested to MNRE for the sanction of CFA of Rs 3 Crores.
  • 12. Energy Conservation Building Code A ECBC code has been prepared and submitted to the Govt. of Karnataka for issuing notification in the gazette. As per the ECBC code, it is applicable for the commercial buildings (both private and Govt. buildings) where, o The connected load is 100 kW or more, OR o The contract demand of 120 KVA or more, OR o The conditioned area of 500 Sq.m or more. A notification in the gazette will be issued shortly.  The Public works department and Principal Chief Architect are the enforcing agency for the Govt. buildings.  The Urban local bodies are the enforcing agency for the Private buildings.  The chief electrical inspector, Govt. of Karnataka is authorized to inspect ECBC compliant buildings.  KREDL monitors the implementation of the ECBC at the state level and also to create awareness of the ECBC
  • 13. Energy Conservation in Karnataka Completed Projects/Activites •LED Street lights at Udupi, Kalagatagi and Alnavar Towns. •LED Lights at JP Park and Hanumanthnagar Public Parks in Bangalore. •LED Street Lights at Richmond Road Flyover , Bangalore. •LED Village Campaign at Mathur Village in Shimoga District. •Energy Auditing of 20 Govt. buildings across the state. •Fixing of hoardings at Public Places, Govt. offices etc. across the state under Publicity & Awareness programme. •Workshop on Notified PAT scheme for the Designated Consumers. •Celebration of Akshay Urja Diwas. •Workshop on Energy Conservation Building Code for all the stake holders. •Competition for School Children’s/College Students on Essay, painting, debate, project making, RE models, drama etc., and distribution of prizes. •Training programme for the Architects, PWD on Energy conservation building code.
  • 14. 1. LED Street lights- Rs. 200 Lakh.. a. Magadi and Puttur Town. Work has been awarded, it is under process. b. Government Hospitals in Bangalore City. - Work has been awarded, it is under process. c. Basavana Bagevadi town. Pavagada town. DPR preparation is under process Annigeri town.  It is proposed to conserve energy of 12.81 lakh kWh per annum.  The proposed energy cost savings is Rs 76.86 lakhs per annum 2. Energy Efficient Pumps- Rs. 100 Lakh. A. 5 Govt. hospitals in Bangalore city – DPR is ready, to be tendered shortly. B. Other District Govt. Hospitals – DPR preparations is under process.  It is proposed to conserve more than 15% of energy. Details of the Energy Conservation and Energy Efficiency ongoing Projects
  • 15. Details of the Energy Conservation and Energy Efficiency ongoing Projects 3. LED video moving display board- Rs. 100 lakh. The work has been entrusted to M/s MC&A- work is under process.  It is proposed to install these boards at all KREDL offices, Public places, DCs offices etc.,  To create awareness among public regarding conservation of energy, use of energy efficient household appliances, benefits, rebates, etc., this program has been taken up. 4. Implementation of Energy Audit measures at three Government buildings- 100 lakhs.  DC’s office building Chamarajanagar, Tumkur and State Prisons Head Office, Bengaluru have been selected for the implementation of energy audit measures.  It is proposed to conserve energy of 10.2 Lakh kWh per annum.  The proposed energy cost savings is Rs 61.2 Lakhs per annum.  Proposals sent to PWD for implementation - work is under process.
  • 16. Details of the Energy Conservation and Energy Efficiency ongoing Projects 5. Replacement of the existing T10/T12 Fluorescent tube fittings with copper chokes by T5 lamp with electronic Ballast at 500 selected Police Stations in Bangalore city - Rs. 100 lakh.  It is proposed to conserve energy of 7.3 Lakh kWh per annum.  The proposed energy cost saving is Rs 43.8 Lakh per annum.  Proposals sent to Karnataka State Police Housing Corp. Ltd. for implementation - work is under process. 6. Providing energy saver units at streetlight circuits in Bangalore and Mysore City – 150 Lakhs.  It is proposed to conserve more than 20% of the energy  Proposals sent to EESL, Delhi for implementation - work is under process.