1. Production Schedule
Date Location Scene Detail Equipment Props & Costumes Actors & Crew
20/12/2015 Bedroom I will aim to film all the
scenes that occur in the
bedroom throughout the
entire music video where
only actor 1 (myself is
present/inshot) (Evening –
after 5pm)
Cannon (600d)
iPhone 5s
Tripod
Lamp
White V-NeckT-shirt
Boxers (lee cooper)
Deodorant cans,
stationary, paper
work, books, hair
products, pens,
earphones
Clock/Watch
Myself (actor 1)
Ross -filming hand
held shots
21/12/2015 Walk of Art Filmingall the scenesinthe
‘Walk of Art’. This includes
the introductory scene and
the other lip syncing parts
as listed in my storyboard
and shot list. (11am and
anytime after 5pm)
Cannon 600d
iPhone 5s
Tripod
White V-NeckT-shirt
Black skinny jeans
Grey zipper hoodie
Grey Nike SB shoes
Beats Headphones
Actor 1 (myself)
Ross – filminghand
held shots
22/12/2015
(this is whether
dependant as
preferably a rainy
day will add to the
dramatic effect
that I had planned
for my shots – if
filming cannot be
achieved on this
day, it will have to
be on the next
rainyday available.
Car (inside
and out)
On thisdayI will filmallthe
scenes when actor 1 is lip
syncing in and out of the
car. This includes a slow
motion shot for the
introduction and other
scenes throughout the
video.
Cannon 600d
iPhone 5s
Tripod
White V-NeckT-shirt
Black skinny jeans
Grey zipper hoodie
Grey Nike SB shoes
Beats Headphones
Car
Actor 1 (myself)
Ross – passenger
seat filming and
any other hand
held shots.
28/12/2015 -
29/12/2015
Ferndown On eitherof these days, all
the filming in Ferndown
(Wimborne Road) such as
the traffic light scenes and
lip syncing under street
lights will be obtained.
(After 5pm)
Cannon 600d
iPhone 5s
Tripod
White V-NeckT-shirt
Black skinny jeans
Grey zipper hoodie
Grey Nike SB shoes
Watch
Actor 1 (myself)
Ross – filminghand
held close ups
8/1/2016 -
9/1/2016
Bedroom On either the
Friday/Saturdaynight I will
finish the filming for the
scenesinthe bedroomthat
feature actor 1 and 2. T
Cannon 600d
iPhone 5s
Tripod
Lamp
White v-neck t-shirt
Red Underwear
(actor 2)
Boxers (lee cooper –
for actor 1)
Lighter
Actor 1 (myself)
Actor 2 (Poppy
Ross – Any extra
filming
requirements
10/1/2016 –
15/1/2016
Bedroom
Walk of Art
For the last week assigned
for gatheringfootage,Iwill
Cannon 600d
iPhone 5s
White v-neck t-shirt
Grey zipper hoodie
Actor 1 (myself)
Actor 2 (Poppy)
2. Post-Production
Date Activity Details
18/1/2016 – 5/2/2016 Post-Production:
BetweenMonday18th
and Friday5th
I will completeall
the post-productionformy musicvideo.Thiswillinclude:
Editingmymusicvideo
Progressclips
Lip synctesting
Colourgrade testing
Stepby stepdetailingeditingtechniques
The editingwill be completed
duringlessontime (Thursdays
and Fridays) andoutside of
lessontime duringstudy
periodsatany spare time each
day/week. Thisisdue tothe
software thatit available in
school that I donot have
access to at home andcan also
use peerfeedbackwhilst
editingtomake any
improvements.
Car
Ferndown
go back to re-filmanyshots
that I am not 100%
satisfied with or decide to
change.
Tripod
Lamp
Black skinny jeans
Grey Nike SB shoes
Underwear (actors 1
and 2)
Clock/Watch
Beat headphones
On desk items?
Car
Ross – any extra
filming
requirements
20/12/2015 –
15/1/2016
My footage will be gatheredoutof lessontime,in the eveningsonweekdaysandweekends.Thisisdue
to the time of the daythat my footage needstobe filmedandthe actorsand crew I require due to their
availability.Therefore,forthe lessons thatIhave duringthe productionstage,Iwill be practicingsome
editingtechniquesinpremierproand aftereffectsandwill be testingclipssuchaslipsynctimingand
clarityand otherperformance relatedaspects.Thisallowsme tonote downwhichshots/scenesneedre-
filmingoradaptedfora particularlydesiredeffectandmeansthatI know whatneedsre-doingwhenand
where withoutitbeingtoolate andbeingstuckwithpoorfootage.
Duringthisproductionstage I will alsobe:
‘Vlogging’myfilmingprocess toupdate myfilmingprogressandnote anythingthathasbeen
successful/unsuccessful
Imagesof the filmingforthe video(equipmentsetupsandlocationusage)
Outtakes/Rehearsals
Photosforthe digipak
3. 22/2/2016 – 26/2/2016 Watchingthe final productionsof all A2 music
videosandreceivingpeerfeedback
Uploadmy finishedmusicvideotoYouTube and
thento my blog
Complete the introductiontomyevaluation
questions
BeginDesigningDigipakandPosterformymusic
videos
28/2/2016 – 7/3/2016 Designandcomplete mydigipakandposter Thisincludesdesigningafront
and back cover,a coverfor the
CD and a posterto advertise
the song.
8/3/2016 – 21/3/2016 Complete all evaluationquestions1-4andwhen
finished,uploadtomyblog.
25/3/2016
DEADLINE FORALL POST-PRODUCTION
Thisspare time afterthe
finishingof the evaluation
questions will be usedforany
changesto my designsand
evaluationquestions.