Locating a waste treatment
 facility by using stochastic
  multicriteria acceptability
analysis with ordinal criteria
           Group members:

            Mohd Farid
            Mohd Shafie
             S.Yasmin
              Grace
            Saiful Zaidi
1. Introduction
Solid waste management company to build new solid
waste management area near Lappeenranta (South
Eastern), Finland


Problem : current landfills not able to satisfy recent
requirement on the waste treatment


National waste plan requires recycling of municipal
solid waste from 50% - 70% by year 2005
New waste treatment area will be more centralized
waste treatment , less environmental (modern
technologies applied)



Waste : households, agriculture and buildings sites.
(Small amount hazardous pass through the plant)



current landfill use traditional process it leads to ugly
scenery, land value and property decrease and slowing
the development growth
Problem characterized as group MCDM problem :
- no preference information was available
- ordinal measurements for the criteria were
available.


New waste treatment area :
2-4 years : composting plant, facilities and landfills
20 years : operating time of plant
15 years : for the equipment
100 years will remain in location but re planning might
take place
2. Legislation & Participation
     • Finnish legislation, more towards “direct and
       indirect” effects inside and outside of the territory
1      of the Finnish project.

     • all citizens affected by the project , allowed to
       participate in the EIA procedure to express
2      opinions (written)

     • Supervisory group (stakeholders) are formed to
       understand citizens opinion and public meetings
3      were held.
3. Problem & Alternatives
six alternative , but only three of the alternative
discarded because:

Close to the settlement area
Too valuable to the scenery and nature
public meeting, they suggest four alternative for
waste treatment area (Herttuanvuori,
Kukkuroinmaki, Laapmaki and Ryosola)
Citizens    • Negative view towards the plant effects : to
              traffic, comfort , recreational use, effect
point of      economy, decrease value in real estate and nature.
 view         Positive view new road improve the traffic connections



   The
            • Directly to the requirements of the legislation
planner’s   • 10 points that effects that from the project
 opinion

            • 17 criteria, several criteria can not be measured
              including positive and negative effect which indirectly
Criteria      ranking produced by the experts approved by
              supervisory
The ranking for the criteria based
on the benefit to the environment.


 1–       2–        3–      4–
 Best    Better    good    worse
5. SMAA – O : Stochastic Multicriteria
    Acceptability with Ordinal Criteria
Developed for discrete multicriteria
problems


     Based on exploring weight space in order
     to describe the valuation that would make
     each alternative the preferred one



          SMAA –O method is descriptive.
Formula
6. Results of analysis
• There are alternative ways for performing the
  ordinal to cardinal scale mapping.
   – Use identical mappings from full range {1,……,4}
     [0,1], for each criterion or
   – Choose the smallest sufficient range for each criterion
• For table 2 is the 1st approach- it shows that the
  best place Kukkuroinmaki and Herttuanvuori
  because they get high acceptability indicies (%).
• For table 3 is the 2nd approach-the result shows
  that the acceptabilities of Kukkuroinmaki and
  Herttuanvuori change slightly, but they still
  remaind the only widely acceptable alternatives.
• These conclude that the result are not
  sensitive to how the mapping was done
• After adding some constraints based on the
  data collected, the analysis was repeated.
• After looking at the result, decision maker
  (DM), chose Kukkuroinmaki alternative as the
  forthcoming location of the plant.
7. Discussion
                            1

 The EIA process consider very good by the participants



                            2

     Evaluation on the social effects was successful



                             3
4 alternatives analyzed in detail and elimination of 2 poor
                  alternatives were done

Más contenido relacionado

Similar a Locating a waste treatment facility by using stochastic

Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptxthanga2
 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptxthanga2
 
Environmental clearance procedure in India: Principal of Governance
Environmental clearance procedure in India: Principal of GovernanceEnvironmental clearance procedure in India: Principal of Governance
Environmental clearance procedure in India: Principal of GovernanceAjay Bidyarthy
 
Cn 4 th14_iswc_selecting_slm_technologies_using_stakeholders_wangfei
Cn 4 th14_iswc_selecting_slm_technologies_using_stakeholders_wangfeiCn 4 th14_iswc_selecting_slm_technologies_using_stakeholders_wangfei
Cn 4 th14_iswc_selecting_slm_technologies_using_stakeholders_wangfeiErik van den Elsen
 
Item 7: Progress on implementation of GSOC17
Item 7: Progress on implementation of GSOC17Item 7: Progress on implementation of GSOC17
Item 7: Progress on implementation of GSOC17Stankovic G
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIGAURAV. H .TANDON
 
Environmental Impact Assessment methods.pdf
Environmental Impact Assessment methods.pdfEnvironmental Impact Assessment methods.pdf
Environmental Impact Assessment methods.pdfDr. Subramanyam Revanuru
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentIntan Ayuna
 
Bridging the hydropower policy implementation gap-bpig (mk11)
Bridging the hydropower policy implementation gap-bpig (mk11)Bridging the hydropower policy implementation gap-bpig (mk11)
Bridging the hydropower policy implementation gap-bpig (mk11)CPWF Mekong
 
PRESENTATION OF FINAL PROJECT1[26] [Recovered].pptx
PRESENTATION OF FINAL PROJECT1[26] [Recovered].pptxPRESENTATION OF FINAL PROJECT1[26] [Recovered].pptx
PRESENTATION OF FINAL PROJECT1[26] [Recovered].pptxbenjaminkwasiboateng
 
ChristopherKoh_Symposium_Poster
ChristopherKoh_Symposium_PosterChristopherKoh_Symposium_Poster
ChristopherKoh_Symposium_PosterChristopher Koh
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentKashmeera N.A.
 
The European Commission's Proposal on the Waste Target Review
The European Commission's Proposal on the Waste Target ReviewThe European Commission's Proposal on the Waste Target Review
The European Commission's Proposal on the Waste Target ReviewEuropeanPaper
 
Environmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental ExaminationEnvironmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental ExaminationNabin Lamichhane
 
Environmental assessment
Environmental assessmentEnvironmental assessment
Environmental assessmentWaheed Hassan
 

Similar a Locating a waste treatment facility by using stochastic (20)

Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
 
Environmental clearance procedure in India: Principal of Governance
Environmental clearance procedure in India: Principal of GovernanceEnvironmental clearance procedure in India: Principal of Governance
Environmental clearance procedure in India: Principal of Governance
 
Cn 4 th14_iswc_selecting_slm_technologies_using_stakeholders_wangfei
Cn 4 th14_iswc_selecting_slm_technologies_using_stakeholders_wangfeiCn 4 th14_iswc_selecting_slm_technologies_using_stakeholders_wangfei
Cn 4 th14_iswc_selecting_slm_technologies_using_stakeholders_wangfei
 
Item 7: Progress on implementation of GSOC17
Item 7: Progress on implementation of GSOC17Item 7: Progress on implementation of GSOC17
Item 7: Progress on implementation of GSOC17
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
 
Environmental Impact Assessment methods.pdf
Environmental Impact Assessment methods.pdfEnvironmental Impact Assessment methods.pdf
Environmental Impact Assessment methods.pdf
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Nordin hassan
Nordin hassanNordin hassan
Nordin hassan
 
Bridging the hydropower policy implementation gap-bpig (mk11)
Bridging the hydropower policy implementation gap-bpig (mk11)Bridging the hydropower policy implementation gap-bpig (mk11)
Bridging the hydropower policy implementation gap-bpig (mk11)
 
Environmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdfEnvironmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdf
 
PRESENTATION OF FINAL PROJECT1[26] [Recovered].pptx
PRESENTATION OF FINAL PROJECT1[26] [Recovered].pptxPRESENTATION OF FINAL PROJECT1[26] [Recovered].pptx
PRESENTATION OF FINAL PROJECT1[26] [Recovered].pptx
 
Fine pack
Fine packFine pack
Fine pack
 
ChristopherKoh_Symposium_Poster
ChristopherKoh_Symposium_PosterChristopherKoh_Symposium_Poster
ChristopherKoh_Symposium_Poster
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Swan CBP methods ws oct 2011
Swan CBP methods ws oct 2011Swan CBP methods ws oct 2011
Swan CBP methods ws oct 2011
 
The European Commission's Proposal on the Waste Target Review
The European Commission's Proposal on the Waste Target ReviewThe European Commission's Proposal on the Waste Target Review
The European Commission's Proposal on the Waste Target Review
 
Environmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental ExaminationEnvironmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental Examination
 
Breeam
BreeamBreeam
Breeam
 
Environmental assessment
Environmental assessmentEnvironmental assessment
Environmental assessment
 

Último

Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 

Último (20)

Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 

Locating a waste treatment facility by using stochastic

  • 1. Locating a waste treatment facility by using stochastic multicriteria acceptability analysis with ordinal criteria Group members: Mohd Farid Mohd Shafie S.Yasmin Grace Saiful Zaidi
  • 2. 1. Introduction Solid waste management company to build new solid waste management area near Lappeenranta (South Eastern), Finland Problem : current landfills not able to satisfy recent requirement on the waste treatment National waste plan requires recycling of municipal solid waste from 50% - 70% by year 2005
  • 3. New waste treatment area will be more centralized waste treatment , less environmental (modern technologies applied) Waste : households, agriculture and buildings sites. (Small amount hazardous pass through the plant) current landfill use traditional process it leads to ugly scenery, land value and property decrease and slowing the development growth
  • 4. Problem characterized as group MCDM problem : - no preference information was available - ordinal measurements for the criteria were available. New waste treatment area : 2-4 years : composting plant, facilities and landfills 20 years : operating time of plant 15 years : for the equipment 100 years will remain in location but re planning might take place
  • 5. 2. Legislation & Participation • Finnish legislation, more towards “direct and indirect” effects inside and outside of the territory 1 of the Finnish project. • all citizens affected by the project , allowed to participate in the EIA procedure to express 2 opinions (written) • Supervisory group (stakeholders) are formed to understand citizens opinion and public meetings 3 were held.
  • 6. 3. Problem & Alternatives six alternative , but only three of the alternative discarded because: Close to the settlement area Too valuable to the scenery and nature public meeting, they suggest four alternative for waste treatment area (Herttuanvuori, Kukkuroinmaki, Laapmaki and Ryosola)
  • 7. Citizens • Negative view towards the plant effects : to traffic, comfort , recreational use, effect point of economy, decrease value in real estate and nature. view Positive view new road improve the traffic connections The • Directly to the requirements of the legislation planner’s • 10 points that effects that from the project opinion • 17 criteria, several criteria can not be measured including positive and negative effect which indirectly Criteria ranking produced by the experts approved by supervisory
  • 8. The ranking for the criteria based on the benefit to the environment. 1– 2– 3– 4– Best Better good worse
  • 9.
  • 10. 5. SMAA – O : Stochastic Multicriteria Acceptability with Ordinal Criteria Developed for discrete multicriteria problems Based on exploring weight space in order to describe the valuation that would make each alternative the preferred one SMAA –O method is descriptive.
  • 12. 6. Results of analysis
  • 13. • There are alternative ways for performing the ordinal to cardinal scale mapping. – Use identical mappings from full range {1,……,4} [0,1], for each criterion or – Choose the smallest sufficient range for each criterion • For table 2 is the 1st approach- it shows that the best place Kukkuroinmaki and Herttuanvuori because they get high acceptability indicies (%). • For table 3 is the 2nd approach-the result shows that the acceptabilities of Kukkuroinmaki and Herttuanvuori change slightly, but they still remaind the only widely acceptable alternatives.
  • 14. • These conclude that the result are not sensitive to how the mapping was done • After adding some constraints based on the data collected, the analysis was repeated. • After looking at the result, decision maker (DM), chose Kukkuroinmaki alternative as the forthcoming location of the plant.
  • 15. 7. Discussion 1 The EIA process consider very good by the participants 2 Evaluation on the social effects was successful 3 4 alternatives analyzed in detail and elimination of 2 poor alternatives were done