SlideShare una empresa de Scribd logo
1 de 19
Descargar para leer sin conexión
Presentation to the
UKCCSC Winter School

Thursday 12th January
2012

By
Andrew Ritchie
Climate Change Services
Manager, LRQA Ltd


abc                       abcd
Content

Discussion on three areas:
1.   Carbon Capture & Storage in the EU Emission Trading Scheme
2.   Carbon Capture & Storage in the Clean Development Mechanism
3.   Verification




abc                                                                abcd
Carbon Capture & Storage in the
EU Emissions Trading Scheme (1)
So what is EUETS and how does it work.


•   The EU ETS is one of the policies introduced across the European Union (EU) to help it
    meet its greenhouse gas emissions reduction target under the Kyoto Protocol. The EU
    has to make an eight per cent reduction on 1990 levels by the first Kyoto Protocol
    commitment period (2008 - 2012).
•   The EU ETS commenced in 2005 and is the largest multi-country, multi-sector
    greenhouse gas emissions trading system in the world. It includes around 11,000
    installations (excluding aviation) accounting for about 45 per cent of EU carbon dioxide
    (CO2) emissions.
•   An overall limit, or 'cap', is set by Member State's Governments on the total amount of
    emissions allowed from all the installations covered by the scheme. The allowances are
    then distributed to the installations in the scheme.

abc                                                                                  abcd
Carbon Capture & Storage in the
EU Emissions Trading Scheme (2)
•   At the end of each year, operators are required to ensure they have enough allowances
    to cover their installation's emissions. They have the flexibility to buy additional
    allowances (on top of their free allocation), or to sell any surplus allowances generated
    from reducing their emissions.
•   Installations covered by the EU ETS are those which carry out activities listed in Annex I
    of the EU ETS Directive. These include energy activities, production and processing of
    ferrous metals, mineral industries and pulp and paper industries.
•   The EU ETS Directive requires all installations carrying out activities listed in Annex I to
    hold a greenhouse gas emissions permit. The conditions of the permit will require
    installations to monitor and report emissions in accordance with the Commission's
    guidelines for monitoring and reporting.
•   Each year emissions data must be verified, and the equivalent number of allowances
    surrendered. All transactions and surrendering of allowances take place on a national
    registry.


abc                                                                                     abcd
Carbon Capture & Storage in the
EU Emissions Trading Scheme (3)
Documents to consider:


•   Commission Decision 2007/589/EC of 18 July 2007 establishing guidelines for the
    monitoring and reporting of greenhouse gas emissions pursuant to Directive 2003/87/EC


•   Commission Decision of 8 June 2010 amending Decision 2007/589/EC as regards the
    inclusion of monitoring and reporting guidelines for greenhouse gas emissions from the
    capture, transport and geological storage of carbon dioxide


•   Directive 2009/31/EC of 23 April 2009 on the geological storage of carbon dioxide




abc                                                                                abcd
Carbon Capture & Storage in the
EU Emissions Trading Scheme (4)
Directive 2009/31/EC defines the following:
•   Selection of storage sites and exploration permits
•   Storage permits (application process, conditions, etc)
•   Operation, closure and post-closure obligations
     •   CO2 stream acceptance criteria and procedure
     •   Monitoring
     •   Reporting
     •   Measures in case of leakages or significant irregularities
     •   Closure & post-closure obligations
•   Annex II – Criteria for establishing and updating the monitoring plan



abc                                                                         abcd
Carbon Capture & Storage in the
EU Emissions Trading Scheme (5)
The Commission Decision of 8 June 2010:
•   Defines what is meant by ‘Transferred CO2’
•   Creates 3 new annexes to the Decision 2007/589/EC (known as the ‘MRG’) which
    define:
     •   Boundaries – these will be defined in the Permit for the installation issued by the
         competent authority
     •   How CO2 amounts transferred/emitted/leaked will be determined




abc                                                                                     abcd
Carbon Capture & Storage in the
EU Emissions Trading Scheme (6)
Key documents for a CCS Installation will be:
•   Permit issued by the Competent Authority
•   Monitoring Plan
•   Improvement Plan




abc                                             abcd
Carbon Capture & Storage in the
Clean Development Mechanism (1)
So what is CDM and how does it work.

•   The CDM allows emission-reduction projects in developing countries to earn certified
    emission reduction (CER) credits, each equivalent to one tonne of CO2. These CERs
    can be traded and sold, and used by industrialised countries to a meet a part of their
    emission reduction targets under the Kyoto Protocol.
•   The mechanism stimulates sustainable development and emission reductions, while
    giving industrialised countries some flexibility in how they meet their emission reduction
    limitation targets.
•   The CDM is the main source of income for the UNFCCC Adaptation Fund, which was
    established to finance adaptation projects and programmes in developing country
    Parties to the Kyoto Protocol that are particularly vulnerable to the adverse effects of
    climate change. The Adaptation Fund is financed by a 2% levy on CERs issued by the
    CDM.


abc                                                                                    abcd
Carbon Capture & Storage in the
Clean Development Mechanism (2)
Simplified CDM process:
•   Project Participant (PP) designs an emission reduction project and prepares a Project
    Design Document (PDD) in accordance with the scheme requirements and a specific
    methodology
•   A Designated Operational Entity (DOE) validates the PDD (including a visit to the site
    and review of data) and recommends registration of the project to the Executive Board.
•   The Executive Board registers the project as a CDM project.
•   When the project has achieved emission reductions, the PP produces a Monitoring
    Report (MR)
•   A DOE verifies the emissions reductions in the MR and recommends issuance of the
    Certified Emission Reductions (CERs) to the Executive Board.
•   The Executive Board approves issuance and the PP receives their CERs.


abc                                                                                 abcd
Carbon Capture & Storage in the
Clean Development Mechanism (3)
Documents to consider:


•   Decision 3/CMP.1 Modalities and procedures for a clean development mechanism as
    defined in Article 12 of the Kyoto Protocol


•   Draft decision -/CMP.7 Modalities and procedures for carbon dioxide capture and
    storage in geological formations as clean development mechanism project activities




abc                                                                                abcd
Carbon Capture & Storage in the
Clean Development Mechanism (4)
Draft decision -/CMP.7 defines the following:
•   Participation requirements
•   Validation and registration
•   Monitoring
•   Verification and certification
•   Issuance of certified emission reductions
•   Addressing non-permanence
•   Additional requirements covering:
     •   Selection and characterisation of the geological storage site
     •   Risk assessment, monitoring, liability, etc



abc                                                                      abcd
Carbon Capture & Storage in the
Clean Development Mechanism (5)
Key documents for a CDM Project will be:
•   Project Design Document
•   Methodology
•   Monitoring Plan




abc                                        abcd
Verification

How does Verification fit in to EUETS and CDM?


•   In EUETS, it is a requirement of section 10 of Annex I of Decision 2007/589/EC for a verification to
    be undertaken by an accredited third party to enable the verifier to come to a verification opinion
    that states with reasonable assurance whether the data in the emissions report is free from
    material misstatements and whether there are no material non-conformities.


•   In CDM, it is a requirement of Modalities and Procedures for a CDM as defined in Article 12 of the
    Kyoto Protocol for
     •   Validation of a project activity by a designated operational entity;
     •   Verification by the designated operational entity of the monitored reductions in anthropogenic
         emissions by sources of greenhouse gases that have occurred as a result of a registered
         CDM project activity during the verification period.



abc                                                                                            abcd
Verification

So what is Verification?


•   The methodology to provide reasonable assurance of the reliability,
    credibility and accuracy of monitoring systems and the reported data and
    information relating to emissions


•   It enables a verifier to state that the data is ‘free from material misstatement’




abc                                                                              abcd
Completeness                                           Transparency
                                           Boiler
Standby Generator




                          Production       Boiler
                           Process
                                           Boiler




                     Site Boundary Fence



Consistency                                         Trueness (or Accuracy)


                     vs


                    abc                                                      abcd
Verification                   Strategic
                               Analysis



The Verification Process         Risk
                               Analysis
•   Strategic Analysis (SA)
•   Risk Analysis (RA)
•   Verification Planning     Verification
                               Planning
•   Process Analysis
•   Report
                               Process
                               Analysis



                              Verification
                                Report




abc                                          abcd
Verification

Benefits of 3rd Party Verification


•   Verification
          •   provides credibility, trust and confidence
          •   ensures good quality data that is free from material misstatement
•   3rd Party Verification
          •   enables greater coverage of installations and data
          •   provides greater efficiency
          •   utilises experience




abc                                                                               abcd
Any questions?




abc              abcd

Más contenido relacionado

La actualidad más candente

Institutional set up, legal infrastructures, decision making and procedures t...
Institutional set up, legal infrastructures, decision making and procedures t...Institutional set up, legal infrastructures, decision making and procedures t...
Institutional set up, legal infrastructures, decision making and procedures t...UNEP OzonAction
 
Co‐benefits of global HFC phase‐down under the Kigali Amendment
Co‐benefits of global HFC phase‐down under the Kigali AmendmentCo‐benefits of global HFC phase‐down under the Kigali Amendment
Co‐benefits of global HFC phase‐down under the Kigali AmendmentPallav Purohit
 
Institutional set up, legal infrastructures, decision making and procedures t...
Institutional set up, legal infrastructures, decision making and procedures t...Institutional set up, legal infrastructures, decision making and procedures t...
Institutional set up, legal infrastructures, decision making and procedures t...UNEP OzonAction
 
Ignalina NPP Presentation To A o C (June 2011)
Ignalina NPP Presentation To A o C (June 2011)Ignalina NPP Presentation To A o C (June 2011)
Ignalina NPP Presentation To A o C (June 2011)Osvaldas Ciuksys
 
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...Global CCS Institute
 
13.s. smith sharing of results
13.s. smith sharing of results13.s. smith sharing of results
13.s. smith sharing of resultsBill Bly
 

La actualidad más candente (11)

Capacity Building Surface waters monitoring laboratories by Violeta Balan
Capacity Building Surface waters monitoring laboratories by Violeta BalanCapacity Building Surface waters monitoring laboratories by Violeta Balan
Capacity Building Surface waters monitoring laboratories by Violeta Balan
 
Institutional set up, legal infrastructures, decision making and procedures t...
Institutional set up, legal infrastructures, decision making and procedures t...Institutional set up, legal infrastructures, decision making and procedures t...
Institutional set up, legal infrastructures, decision making and procedures t...
 
Co‐benefits of global HFC phase‐down under the Kigali Amendment
Co‐benefits of global HFC phase‐down under the Kigali AmendmentCo‐benefits of global HFC phase‐down under the Kigali Amendment
Co‐benefits of global HFC phase‐down under the Kigali Amendment
 
Institutional set up, legal infrastructures, decision making and procedures t...
Institutional set up, legal infrastructures, decision making and procedures t...Institutional set up, legal infrastructures, decision making and procedures t...
Institutional set up, legal infrastructures, decision making and procedures t...
 
Ignalina NPP Presentation To A o C (June 2011)
Ignalina NPP Presentation To A o C (June 2011)Ignalina NPP Presentation To A o C (June 2011)
Ignalina NPP Presentation To A o C (June 2011)
 
2. TO_GHG Waste Croatia
2. TO_GHG Waste Croatia2. TO_GHG Waste Croatia
2. TO_GHG Waste Croatia
 
Regulation of Landfill in Ireland
Regulation of Landfill in IrelandRegulation of Landfill in Ireland
Regulation of Landfill in Ireland
 
Bco2 Lfg Ver Project Retuns Financing
Bco2 Lfg Ver Project Retuns FinancingBco2 Lfg Ver Project Retuns Financing
Bco2 Lfg Ver Project Retuns Financing
 
Nadine Allemand
Nadine AllemandNadine Allemand
Nadine Allemand
 
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...
 
13.s. smith sharing of results
13.s. smith sharing of results13.s. smith sharing of results
13.s. smith sharing of results
 

Destacado

Destacado (19)

Jon Gibbins speaks at UK-China (Guangdong) CCUS Centre Carbon Capture Ready (...
Jon Gibbins speaks at UK-China (Guangdong) CCUS Centre Carbon Capture Ready (...Jon Gibbins speaks at UK-China (Guangdong) CCUS Centre Carbon Capture Ready (...
Jon Gibbins speaks at UK-China (Guangdong) CCUS Centre Carbon Capture Ready (...
 
UK research programme overview - Jon Gibbins at the Canada-UK Workshop, Londo...
UK research programme overview - Jon Gibbins at the Canada-UK Workshop, Londo...UK research programme overview - Jon Gibbins at the Canada-UK Workshop, Londo...
UK research programme overview - Jon Gibbins at the Canada-UK Workshop, Londo...
 
03 ea whitfield- Early careers winter school, 9-12th January 2012, University...
03 ea whitfield- Early careers winter school, 9-12th January 2012, University...03 ea whitfield- Early careers winter school, 9-12th January 2012, University...
03 ea whitfield- Early careers winter school, 9-12th January 2012, University...
 
UK Research Programme Overview, Jon Gibbins (UKCCSRC) UK/Norway/Canada Meetin...
UK Research Programme Overview, Jon Gibbins (UKCCSRC) UK/Norway/Canada Meetin...UK Research Programme Overview, Jon Gibbins (UKCCSRC) UK/Norway/Canada Meetin...
UK Research Programme Overview, Jon Gibbins (UKCCSRC) UK/Norway/Canada Meetin...
 
Williams2012 - April 2012 Biannual Meeting, UCL
Williams2012 - April 2012 Biannual Meeting, UCLWilliams2012 - April 2012 Biannual Meeting, UCL
Williams2012 - April 2012 Biannual Meeting, UCL
 
Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Current Progres...
Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Current Progres...Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Current Progres...
Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Current Progres...
 
Blackford nott
Blackford nottBlackford nott
Blackford nott
 
Warwick report
Warwick reportWarwick report
Warwick report
 
Introduction to the GlaciStore meeting and consortium - presentations by Maxi...
Introduction to the GlaciStore meeting and consortium - presentations by Maxi...Introduction to the GlaciStore meeting and consortium - presentations by Maxi...
Introduction to the GlaciStore meeting and consortium - presentations by Maxi...
 
EERA Net Cofund CCS, Ragnhild Rønneberg (The Research Council of Norway) UK/N...
EERA Net Cofund CCS, Ragnhild Rønneberg (The Research Council of Norway) UK/N...EERA Net Cofund CCS, Ragnhild Rønneberg (The Research Council of Norway) UK/N...
EERA Net Cofund CCS, Ragnhild Rønneberg (The Research Council of Norway) UK/N...
 
Duncan McLaren (Lancaster University) presenting 'Ethics of Direct Air Captur...
Duncan McLaren (Lancaster University) presenting 'Ethics of Direct Air Captur...Duncan McLaren (Lancaster University) presenting 'Ethics of Direct Air Captur...
Duncan McLaren (Lancaster University) presenting 'Ethics of Direct Air Captur...
 
Haszeldine - Royal Academy Engineering, London 4 Nov 2009
Haszeldine - Royal Academy Engineering, London 4 Nov 2009Haszeldine - Royal Academy Engineering, London 4 Nov 2009
Haszeldine - Royal Academy Engineering, London 4 Nov 2009
 
UK CCS Policies, Industrial CCS, Jane Lumb (BIS Department for Business Innov...
UK CCS Policies, Industrial CCS, Jane Lumb (BIS Department for Business Innov...UK CCS Policies, Industrial CCS, Jane Lumb (BIS Department for Business Innov...
UK CCS Policies, Industrial CCS, Jane Lumb (BIS Department for Business Innov...
 
Ukccscco2meetingreportfinal
Ukccscco2meetingreportfinalUkccscco2meetingreportfinal
Ukccscco2meetingreportfinal
 
Wang - Royal Academy Engineering, London 4 Nov 2009
Wang  - Royal Academy Engineering, London 4 Nov 2009Wang  - Royal Academy Engineering, London 4 Nov 2009
Wang - Royal Academy Engineering, London 4 Nov 2009
 
Widdicombe nott
Widdicombe nottWiddicombe nott
Widdicombe nott
 
Peter Budd (University of Manchester) - Novel Membranes for Carbon Capture - ...
Peter Budd (University of Manchester) - Novel Membranes for Carbon Capture - ...Peter Budd (University of Manchester) - Novel Membranes for Carbon Capture - ...
Peter Budd (University of Manchester) - Novel Membranes for Carbon Capture - ...
 
Paul Fennell (Imperial College London) - Cost comparison of different technol...
Paul Fennell (Imperial College London) - Cost comparison of different technol...Paul Fennell (Imperial College London) - Cost comparison of different technol...
Paul Fennell (Imperial College London) - Cost comparison of different technol...
 
Zhixin Workshop on Modelling and Simulation of Coal-fired Power Generation an...
Zhixin Workshop on Modelling and Simulation of Coal-fired Power Generation an...Zhixin Workshop on Modelling and Simulation of Coal-fired Power Generation an...
Zhixin Workshop on Modelling and Simulation of Coal-fired Power Generation an...
 

Similar a 11 ritchie ccs_mrv_presentation_jan_2012_v1a

修勤绪 国际林业碳汇市场研究
修勤绪 国际林业碳汇市场研究修勤绪 国际林业碳汇市场研究
修勤绪 国际林业碳汇市场研究xiu1982
 
Understanding Carbon Credits Business
Understanding Carbon Credits BusinessUnderstanding Carbon Credits Business
Understanding Carbon Credits BusinessAmit Chauhan
 
Development of India's Carbon Credit Market.pptx
Development of India's Carbon Credit Market.pptxDevelopment of India's Carbon Credit Market.pptx
Development of India's Carbon Credit Market.pptxmsounak95
 
Flexibility Instruments of the Kyoto Protocol
Flexibility Instruments of the Kyoto Protocol  Flexibility Instruments of the Kyoto Protocol
Flexibility Instruments of the Kyoto Protocol Pallav Purohit
 
CCS within the UNFCCC - Luke Warren, CCSA
CCS within the UNFCCC - Luke Warren, CCSACCS within the UNFCCC - Luke Warren, CCSA
CCS within the UNFCCC - Luke Warren, CCSAGlobal CCS Institute
 
Development of carbon code – experience from forestry
Development of carbon code – experience from forestryDevelopment of carbon code – experience from forestry
Development of carbon code – experience from forestryAberdeen CES
 
Presentacion de carbon en el mundo
Presentacion de carbon en el mundoPresentacion de carbon en el mundo
Presentacion de carbon en el mundoSANDRAVENADA
 
CDR markets and policy by Eve Tamme
CDR markets and policy by Eve TammeCDR markets and policy by Eve Tamme
CDR markets and policy by Eve TammeEve Tamme
 
20151208 Hydrocarbon training Cyprus - Regulators session
20151208 Hydrocarbon training Cyprus - Regulators session20151208 Hydrocarbon training Cyprus - Regulators session
20151208 Hydrocarbon training Cyprus - Regulators sessionJarno Dakhorst
 
Bs iso 923 2000
Bs iso 923 2000Bs iso 923 2000
Bs iso 923 2000AYM1979
 
Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...
Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...
Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...UNDP Eurasia
 
British Standards for Carbon Management- including PAS 2080 – The world’s fir...
British Standards for Carbon Management- including PAS 2080 – The world’s fir...British Standards for Carbon Management- including PAS 2080 – The world’s fir...
British Standards for Carbon Management- including PAS 2080 – The world’s fir...EMEX
 
Quy định về phát thải tầng Ô-zôn, Cục Biến đổi Khi hậu (ENG).pptx
Quy định về phát thải tầng Ô-zôn, Cục Biến đổi Khi hậu (ENG).pptxQuy định về phát thải tầng Ô-zôn, Cục Biến đổi Khi hậu (ENG).pptx
Quy định về phát thải tầng Ô-zôn, Cục Biến đổi Khi hậu (ENG).pptxNgcThinNguyn10
 
David Walker - Launch of National Carbon Offset Standard - Green Brands Forum...
David Walker - Launch of National Carbon Offset Standard - Green Brands Forum...David Walker - Launch of National Carbon Offset Standard - Green Brands Forum...
David Walker - Launch of National Carbon Offset Standard - Green Brands Forum...3 Pillars Network
 
Environmental testing laboratory in delhi india
Environmental testing laboratory in delhi indiaEnvironmental testing laboratory in delhi india
Environmental testing laboratory in delhi indiaSpectro Group of Companies
 

Similar a 11 ritchie ccs_mrv_presentation_jan_2012_v1a (20)

修勤绪 国际林业碳汇市场研究
修勤绪 国际林业碳汇市场研究修勤绪 国际林业碳汇市场研究
修勤绪 国际林业碳汇市场研究
 
Understanding Carbon Credits Business
Understanding Carbon Credits BusinessUnderstanding Carbon Credits Business
Understanding Carbon Credits Business
 
Development of India's Carbon Credit Market.pptx
Development of India's Carbon Credit Market.pptxDevelopment of India's Carbon Credit Market.pptx
Development of India's Carbon Credit Market.pptx
 
Flexibility Instruments of the Kyoto Protocol
Flexibility Instruments of the Kyoto Protocol  Flexibility Instruments of the Kyoto Protocol
Flexibility Instruments of the Kyoto Protocol
 
CCS within the UNFCCC - Luke Warren, CCSA
CCS within the UNFCCC - Luke Warren, CCSACCS within the UNFCCC - Luke Warren, CCSA
CCS within the UNFCCC - Luke Warren, CCSA
 
Development of carbon code – experience from forestry
Development of carbon code – experience from forestryDevelopment of carbon code – experience from forestry
Development of carbon code – experience from forestry
 
Presentacion de carbon en el mundo
Presentacion de carbon en el mundoPresentacion de carbon en el mundo
Presentacion de carbon en el mundo
 
CDR markets and policy by Eve Tamme
CDR markets and policy by Eve TammeCDR markets and policy by Eve Tamme
CDR markets and policy by Eve Tamme
 
20151208 Hydrocarbon training Cyprus - Regulators session
20151208 Hydrocarbon training Cyprus - Regulators session20151208 Hydrocarbon training Cyprus - Regulators session
20151208 Hydrocarbon training Cyprus - Regulators session
 
Bs iso 923 2000
Bs iso 923 2000Bs iso 923 2000
Bs iso 923 2000
 
Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...
Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...
Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...
 
British Standards for Carbon Management- including PAS 2080 – The world’s fir...
British Standards for Carbon Management- including PAS 2080 – The world’s fir...British Standards for Carbon Management- including PAS 2080 – The world’s fir...
British Standards for Carbon Management- including PAS 2080 – The world’s fir...
 
Karvy
KarvyKarvy
Karvy
 
Quy định về phát thải tầng Ô-zôn, Cục Biến đổi Khi hậu (ENG).pptx
Quy định về phát thải tầng Ô-zôn, Cục Biến đổi Khi hậu (ENG).pptxQuy định về phát thải tầng Ô-zôn, Cục Biến đổi Khi hậu (ENG).pptx
Quy định về phát thải tầng Ô-zôn, Cục Biến đổi Khi hậu (ENG).pptx
 
Sgcp14beckmanncp
Sgcp14beckmanncpSgcp14beckmanncp
Sgcp14beckmanncp
 
Qatar petroleum presentation
Qatar petroleum presentationQatar petroleum presentation
Qatar petroleum presentation
 
David Walker - Launch of National Carbon Offset Standard - Green Brands Forum...
David Walker - Launch of National Carbon Offset Standard - Green Brands Forum...David Walker - Launch of National Carbon Offset Standard - Green Brands Forum...
David Walker - Launch of National Carbon Offset Standard - Green Brands Forum...
 
Carbon Markets
Carbon MarketsCarbon Markets
Carbon Markets
 
An update on the UK Government's CCS policy, Brian Allison, DECC - UKCCSRC St...
An update on the UK Government's CCS policy, Brian Allison, DECC - UKCCSRC St...An update on the UK Government's CCS policy, Brian Allison, DECC - UKCCSRC St...
An update on the UK Government's CCS policy, Brian Allison, DECC - UKCCSRC St...
 
Environmental testing laboratory in delhi india
Environmental testing laboratory in delhi indiaEnvironmental testing laboratory in delhi india
Environmental testing laboratory in delhi india
 

Más de UK Carbon Capture and Storage Research Centre

Más de UK Carbon Capture and Storage Research Centre (20)

CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...
CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...
CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...
 
Advances in Rock Physics Modelling and Improved Estimation of CO2 Saturation,...
Advances in Rock Physics Modelling and Improved Estimation of CO2 Saturation,...Advances in Rock Physics Modelling and Improved Estimation of CO2 Saturation,...
Advances in Rock Physics Modelling and Improved Estimation of CO2 Saturation,...
 
Numerical Modelling of Fracture Growth and Caprock Integrity During CO2 Injec...
Numerical Modelling of Fracture Growth and Caprock Integrity During CO2 Injec...Numerical Modelling of Fracture Growth and Caprock Integrity During CO2 Injec...
Numerical Modelling of Fracture Growth and Caprock Integrity During CO2 Injec...
 
Assessing Uncertainty of Time Lapse Seismic Response Due to Geomechanical Def...
Assessing Uncertainty of Time Lapse Seismic Response Due to Geomechanical Def...Assessing Uncertainty of Time Lapse Seismic Response Due to Geomechanical Def...
Assessing Uncertainty of Time Lapse Seismic Response Due to Geomechanical Def...
 
20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...
20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...
20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...
 
Modelling Fault Reactivation, Induced Seismicity, and Leakage During Undergro...
Modelling Fault Reactivation, Induced Seismicity, and Leakage During Undergro...Modelling Fault Reactivation, Induced Seismicity, and Leakage During Undergro...
Modelling Fault Reactivation, Induced Seismicity, and Leakage During Undergro...
 
Pore scale dynamics and the interpretation of flow processes - Martin Blunt, ...
Pore scale dynamics and the interpretation of flow processes - Martin Blunt, ...Pore scale dynamics and the interpretation of flow processes - Martin Blunt, ...
Pore scale dynamics and the interpretation of flow processes - Martin Blunt, ...
 
Passive seismic monitoring for CO2 storage sites - Anna Stork, University of ...
Passive seismic monitoring for CO2 storage sites - Anna Stork, University of ...Passive seismic monitoring for CO2 storage sites - Anna Stork, University of ...
Passive seismic monitoring for CO2 storage sites - Anna Stork, University of ...
 
Multiphase flow modelling of calcite dissolution patterns from core scale to ...
Multiphase flow modelling of calcite dissolution patterns from core scale to ...Multiphase flow modelling of calcite dissolution patterns from core scale to ...
Multiphase flow modelling of calcite dissolution patterns from core scale to ...
 
Long term safety of geological co2 storage: lessons from Bravo Dome Natural C...
Long term safety of geological co2 storage: lessons from Bravo Dome Natural C...Long term safety of geological co2 storage: lessons from Bravo Dome Natural C...
Long term safety of geological co2 storage: lessons from Bravo Dome Natural C...
 
Challenges in the chemical industry, jay brookes (boc) industry ccs worksho...
Challenges in the chemical industry, jay brookes (boc)   industry ccs worksho...Challenges in the chemical industry, jay brookes (boc)   industry ccs worksho...
Challenges in the chemical industry, jay brookes (boc) industry ccs worksho...
 
Overall Network Issues, Tim Dumenil (Pale Blue Dot) - Industry CCS Workshop, ...
Overall Network Issues, Tim Dumenil (Pale Blue Dot) - Industry CCS Workshop, ...Overall Network Issues, Tim Dumenil (Pale Blue Dot) - Industry CCS Workshop, ...
Overall Network Issues, Tim Dumenil (Pale Blue Dot) - Industry CCS Workshop, ...
 
Challenges in the Steel Industry and the Network, James Watt (Amec) - Industr...
Challenges in the Steel Industry and the Network, James Watt (Amec) - Industr...Challenges in the Steel Industry and the Network, James Watt (Amec) - Industr...
Challenges in the Steel Industry and the Network, James Watt (Amec) - Industr...
 
Horizon 2020 Update, Jon Gibbins, University of Edinburgh - UKCCSRC Strathcly...
Horizon 2020 Update, Jon Gibbins, University of Edinburgh - UKCCSRC Strathcly...Horizon 2020 Update, Jon Gibbins, University of Edinburgh - UKCCSRC Strathcly...
Horizon 2020 Update, Jon Gibbins, University of Edinburgh - UKCCSRC Strathcly...
 
Guangdong Offshore CCUS Project (GOCCUS) - Xi Liang, University of Edinburgh ...
Guangdong Offshore CCUS Project (GOCCUS) - Xi Liang, University of Edinburgh ...Guangdong Offshore CCUS Project (GOCCUS) - Xi Liang, University of Edinburgh ...
Guangdong Offshore CCUS Project (GOCCUS) - Xi Liang, University of Edinburgh ...
 
Changes in the Dutch CCS Landscape - Jan Brouwer, CATO - UKCCSRC Strathclyde ...
Changes in the Dutch CCS Landscape - Jan Brouwer, CATO - UKCCSRC Strathclyde ...Changes in the Dutch CCS Landscape - Jan Brouwer, CATO - UKCCSRC Strathclyde ...
Changes in the Dutch CCS Landscape - Jan Brouwer, CATO - UKCCSRC Strathclyde ...
 
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
 
Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...
Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...
Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...
 
Computational Modelling and Optimisation of Carbon Capture Reactors, Daniel S...
Computational Modelling and Optimisation of Carbon Capture Reactors, Daniel S...Computational Modelling and Optimisation of Carbon Capture Reactors, Daniel S...
Computational Modelling and Optimisation of Carbon Capture Reactors, Daniel S...
 
Effective Adsorbents for Establishing Solids Looping as a Next Generation NG ...
Effective Adsorbents for Establishing Solids Looping as a Next Generation NG ...Effective Adsorbents for Establishing Solids Looping as a Next Generation NG ...
Effective Adsorbents for Establishing Solids Looping as a Next Generation NG ...
 

11 ritchie ccs_mrv_presentation_jan_2012_v1a

  • 1. Presentation to the UKCCSC Winter School Thursday 12th January 2012 By Andrew Ritchie Climate Change Services Manager, LRQA Ltd abc abcd
  • 2. Content Discussion on three areas: 1. Carbon Capture & Storage in the EU Emission Trading Scheme 2. Carbon Capture & Storage in the Clean Development Mechanism 3. Verification abc abcd
  • 3. Carbon Capture & Storage in the EU Emissions Trading Scheme (1) So what is EUETS and how does it work. • The EU ETS is one of the policies introduced across the European Union (EU) to help it meet its greenhouse gas emissions reduction target under the Kyoto Protocol. The EU has to make an eight per cent reduction on 1990 levels by the first Kyoto Protocol commitment period (2008 - 2012). • The EU ETS commenced in 2005 and is the largest multi-country, multi-sector greenhouse gas emissions trading system in the world. It includes around 11,000 installations (excluding aviation) accounting for about 45 per cent of EU carbon dioxide (CO2) emissions. • An overall limit, or 'cap', is set by Member State's Governments on the total amount of emissions allowed from all the installations covered by the scheme. The allowances are then distributed to the installations in the scheme. abc abcd
  • 4. Carbon Capture & Storage in the EU Emissions Trading Scheme (2) • At the end of each year, operators are required to ensure they have enough allowances to cover their installation's emissions. They have the flexibility to buy additional allowances (on top of their free allocation), or to sell any surplus allowances generated from reducing their emissions. • Installations covered by the EU ETS are those which carry out activities listed in Annex I of the EU ETS Directive. These include energy activities, production and processing of ferrous metals, mineral industries and pulp and paper industries. • The EU ETS Directive requires all installations carrying out activities listed in Annex I to hold a greenhouse gas emissions permit. The conditions of the permit will require installations to monitor and report emissions in accordance with the Commission's guidelines for monitoring and reporting. • Each year emissions data must be verified, and the equivalent number of allowances surrendered. All transactions and surrendering of allowances take place on a national registry. abc abcd
  • 5. Carbon Capture & Storage in the EU Emissions Trading Scheme (3) Documents to consider: • Commission Decision 2007/589/EC of 18 July 2007 establishing guidelines for the monitoring and reporting of greenhouse gas emissions pursuant to Directive 2003/87/EC • Commission Decision of 8 June 2010 amending Decision 2007/589/EC as regards the inclusion of monitoring and reporting guidelines for greenhouse gas emissions from the capture, transport and geological storage of carbon dioxide • Directive 2009/31/EC of 23 April 2009 on the geological storage of carbon dioxide abc abcd
  • 6. Carbon Capture & Storage in the EU Emissions Trading Scheme (4) Directive 2009/31/EC defines the following: • Selection of storage sites and exploration permits • Storage permits (application process, conditions, etc) • Operation, closure and post-closure obligations • CO2 stream acceptance criteria and procedure • Monitoring • Reporting • Measures in case of leakages or significant irregularities • Closure & post-closure obligations • Annex II – Criteria for establishing and updating the monitoring plan abc abcd
  • 7. Carbon Capture & Storage in the EU Emissions Trading Scheme (5) The Commission Decision of 8 June 2010: • Defines what is meant by ‘Transferred CO2’ • Creates 3 new annexes to the Decision 2007/589/EC (known as the ‘MRG’) which define: • Boundaries – these will be defined in the Permit for the installation issued by the competent authority • How CO2 amounts transferred/emitted/leaked will be determined abc abcd
  • 8. Carbon Capture & Storage in the EU Emissions Trading Scheme (6) Key documents for a CCS Installation will be: • Permit issued by the Competent Authority • Monitoring Plan • Improvement Plan abc abcd
  • 9. Carbon Capture & Storage in the Clean Development Mechanism (1) So what is CDM and how does it work. • The CDM allows emission-reduction projects in developing countries to earn certified emission reduction (CER) credits, each equivalent to one tonne of CO2. These CERs can be traded and sold, and used by industrialised countries to a meet a part of their emission reduction targets under the Kyoto Protocol. • The mechanism stimulates sustainable development and emission reductions, while giving industrialised countries some flexibility in how they meet their emission reduction limitation targets. • The CDM is the main source of income for the UNFCCC Adaptation Fund, which was established to finance adaptation projects and programmes in developing country Parties to the Kyoto Protocol that are particularly vulnerable to the adverse effects of climate change. The Adaptation Fund is financed by a 2% levy on CERs issued by the CDM. abc abcd
  • 10. Carbon Capture & Storage in the Clean Development Mechanism (2) Simplified CDM process: • Project Participant (PP) designs an emission reduction project and prepares a Project Design Document (PDD) in accordance with the scheme requirements and a specific methodology • A Designated Operational Entity (DOE) validates the PDD (including a visit to the site and review of data) and recommends registration of the project to the Executive Board. • The Executive Board registers the project as a CDM project. • When the project has achieved emission reductions, the PP produces a Monitoring Report (MR) • A DOE verifies the emissions reductions in the MR and recommends issuance of the Certified Emission Reductions (CERs) to the Executive Board. • The Executive Board approves issuance and the PP receives their CERs. abc abcd
  • 11. Carbon Capture & Storage in the Clean Development Mechanism (3) Documents to consider: • Decision 3/CMP.1 Modalities and procedures for a clean development mechanism as defined in Article 12 of the Kyoto Protocol • Draft decision -/CMP.7 Modalities and procedures for carbon dioxide capture and storage in geological formations as clean development mechanism project activities abc abcd
  • 12. Carbon Capture & Storage in the Clean Development Mechanism (4) Draft decision -/CMP.7 defines the following: • Participation requirements • Validation and registration • Monitoring • Verification and certification • Issuance of certified emission reductions • Addressing non-permanence • Additional requirements covering: • Selection and characterisation of the geological storage site • Risk assessment, monitoring, liability, etc abc abcd
  • 13. Carbon Capture & Storage in the Clean Development Mechanism (5) Key documents for a CDM Project will be: • Project Design Document • Methodology • Monitoring Plan abc abcd
  • 14. Verification How does Verification fit in to EUETS and CDM? • In EUETS, it is a requirement of section 10 of Annex I of Decision 2007/589/EC for a verification to be undertaken by an accredited third party to enable the verifier to come to a verification opinion that states with reasonable assurance whether the data in the emissions report is free from material misstatements and whether there are no material non-conformities. • In CDM, it is a requirement of Modalities and Procedures for a CDM as defined in Article 12 of the Kyoto Protocol for • Validation of a project activity by a designated operational entity; • Verification by the designated operational entity of the monitored reductions in anthropogenic emissions by sources of greenhouse gases that have occurred as a result of a registered CDM project activity during the verification period. abc abcd
  • 15. Verification So what is Verification? • The methodology to provide reasonable assurance of the reliability, credibility and accuracy of monitoring systems and the reported data and information relating to emissions • It enables a verifier to state that the data is ‘free from material misstatement’ abc abcd
  • 16. Completeness Transparency Boiler Standby Generator Production Boiler Process Boiler Site Boundary Fence Consistency Trueness (or Accuracy) vs abc abcd
  • 17. Verification Strategic Analysis The Verification Process Risk Analysis • Strategic Analysis (SA) • Risk Analysis (RA) • Verification Planning Verification Planning • Process Analysis • Report Process Analysis Verification Report abc abcd
  • 18. Verification Benefits of 3rd Party Verification • Verification • provides credibility, trust and confidence • ensures good quality data that is free from material misstatement • 3rd Party Verification • enables greater coverage of installations and data • provides greater efficiency • utilises experience abc abcd